{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,5]],"date-time":"2025-11-05T14:17:10Z","timestamp":1762352230032},"reference-count":83,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2013,2,1]],"date-time":"2013-02-01T00:00:00Z","timestamp":1359676800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Empir Software Eng"],"published-print":{"date-parts":[[2014,8]]},"DOI":"10.1007\/s10664-013-9241-4","type":"journal-article","created":{"date-parts":[[2013,1,31]],"date-time":"2013-01-31T05:23:25Z","timestamp":1359609805000},"page":"857-884","source":"Crossref","is-referenced-by-count":51,"title":["A flexible method to estimate the software development effort based on the classification of projects and localization of comparisons"],"prefix":"10.1007","volume":"19","author":[{"given":"Vahid","family":"Khatibi Bardsiri","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Dayang Norhayati Abang","family":"Jawawi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Siti Zaiton Mohd","family":"Hashim","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Elham","family":"Khatibi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,2,1]]},"reference":[{"issue":"1","key":"9241_CR1","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1023\/A:1009897800559","volume":"5","author":"L Angelis","year":"2000","unstructured":"Angelis L, Stamelos I (2000) A simulation tool for efficient analogy based cost estimation. Empir Softw Eng 5(1):35\u201368","journal-title":"Empir Softw Eng"},{"key":"9241_CR2","doi-asserted-by":"crossref","first-page":"1944","DOI":"10.1016\/j.jss.2008.01.016","volume":"81","author":"J Aroba","year":"2008","unstructured":"Aroba J, Cuadrado-Gallego JJ, Sicilia M-A, Ramos I, Garc\u0131\u2019a-Barriocanal E (2008) Segmented software cost estimation models based on fuzzy clustering. J Syst Softw 81:1944\u20131950","journal-title":"J Syst Softw"},{"key":"9241_CR3","doi-asserted-by":"crossref","unstructured":"Attarzadeh I, Hock OS (2010) Proposing a new software cost estimation model based on artificial neural networks, 2nd International Conference on Computer Engineering and Technology (ICCET), Kuala Lumpur, Malaysia","DOI":"10.1109\/ICCET.2010.5485840"},{"issue":"2","key":"9241_CR4","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1109\/TSE.2006.1599418","volume":"32","author":"M Auer","year":"2006","unstructured":"Auer M, Trendowicz A, Graser B, Haunschmid E, Biffl S (2006) Optimal project feature weights in analogy-based cost estimation: improvement and limitations. IEEE Trans Softw Eng 32(2):83\u201392","journal-title":"IEEE Trans Softw Eng"},{"issue":"1","key":"9241_CR5","doi-asserted-by":"crossref","first-page":"60","DOI":"10.1007\/s10664-009-9113-0","volume":"15","author":"M Azzeh","year":"2010","unstructured":"Azzeh M, Neagu D, Cowling P (2010) Fuzzy grey relational analysis for software effort estimation. Empir Softw Eng 15(1):60\u201390","journal-title":"Empir Softw Eng"},{"issue":"2","key":"9241_CR6","doi-asserted-by":"crossref","first-page":"270","DOI":"10.1016\/j.jss.2010.09.028","volume":"84","author":"M Azzeh","year":"2011","unstructured":"Azzeh M, Neagu D, Cowling PI (2011) Analogy-based software effort estimation using Fuzzy numbers. J Syst Softw 84(2):270\u2013284","journal-title":"J Syst Softw"},{"issue":"1","key":"9241_CR7","first-page":"180","volume":"3","author":"Q Bai","year":"2010","unstructured":"Bai Q (2010) Analysis of particle swarm optimization algorithm. Comput Inform Sci 3(1):180\u2013184","journal-title":"Comput Inform Sci"},{"key":"9241_CR8","unstructured":"Bajwa SS (2009) Investigating the Nature of Relationship between Software Size and Development Effort. Department of Interaction and System Design, Blekinge Institute of Technology. Master of Science"},{"issue":"1","key":"9241_CR9","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1007\/s11219-009-9081-z","volume":"18","author":"A Bak\u0131r","year":"2010","unstructured":"Bak\u0131r A, Turhan B, Bener A (2010) A New perspective on data homogeneity in software cost estimation: a study in embedded systems domain. Softw Qual J 18(1):57\u201380","journal-title":"Softw Qual J"},{"key":"9241_CR10","unstructured":"Benala T, Dehuri S, Satapathy S, Madhurakshara S (2012) Genetic algorithm for optimizing functional link artificial neural network based software cost estimation, Proceedings of the International Conference on Information Systems Design and Intelligent Applications, Visakhapatnam, India. 132:75\u201382"},{"key":"9241_CR11","doi-asserted-by":"crossref","unstructured":"Bettenburg N, Nagappan M, Hassan AE (2012) Think locally, act globally: Improving defect and effort prediction models, Proceedings of the 9th Working Conference on Mining Software Repositories Zurich, Switzerland","DOI":"10.1109\/MSR.2012.6224300"},{"issue":"7","key":"9241_CR12","first-page":"2950","volume":"2","author":"R Bhatnagar","year":"2010","unstructured":"Bhatnagar R, Bhattacharjee V, Ghose MK (2010) Software development effort estimation neural network vs. Regression modeling approach. Int J Eng Sci Technol 2(7):2950\u20132956","journal-title":"Int J Eng Sci Technol"},{"key":"9241_CR13","volume-title":"Software engineering economics","author":"BW Boehm","year":"1981","unstructured":"Boehm BW (1981) Software engineering economics. Prentice Hall, Englewood Cliffs"},{"issue":"4","key":"9241_CR14","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1023\/A:1018991717352","volume":"10","author":"B Boehm","year":"2000","unstructured":"Boehm B, Abts C, Chulani S (2000) Software development cost estimation approaches\u2014A survey. Ann Softw Eng 10(4):177\u2013205","journal-title":"Ann Softw Eng"},{"key":"9241_CR15","volume-title":"Classification and regression trees","author":"L Breiman","year":"1984","unstructured":"Breiman L, Friedman JH, Olshen RA, Stone CJ (1984) Classification and regression trees. Wadsworth, Pacific Grove"},{"key":"9241_CR16","unstructured":"Chao-Jung H, Chin-Yu H, Nat T, Hua Univ H (2007) Improving effort estimation accuracy by weighted grey relational analysis during aoftware development. 14th Asia-Pacific Conference on Software Engineering"},{"issue":"4","key":"9241_CR17","doi-asserted-by":"crossref","first-page":"628","DOI":"10.1016\/j.jss.2006.06.006","volume":"80","author":"N-H Chiu","year":"2007","unstructured":"Chiu N-H, Huang S-J (2007) The adjusted analogy-based software effort estimation based on similarity distances. J Syst Softw 80(4):628\u2013640","journal-title":"J Syst Softw"},{"key":"9241_CR18","volume-title":"Software engineering metrics and models","author":"SD Conte","year":"1986","unstructured":"Conte SD, Dunsmore HE, Shen VY (1986) Software engineering metrics and models. Benjamin-Cummings Publishing Co., Inc, Menlo Park"},{"issue":"1","key":"9241_CR19","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1109\/TSE.2005.5","volume":"31","author":"G Costagliola","year":"2005","unstructured":"Costagliola G, Ferrucci F, Tortora G, Vitiello G (2005) Class point: an approach for the size estimation of object-oriented systems. IEEE Trans Softw Eng 31(1):52\u201374","journal-title":"IEEE Trans Softw Eng"},{"issue":"3","key":"9241_CR20","doi-asserted-by":"crossref","first-page":"458","DOI":"10.1287\/mnsc.9.3.458","volume":"9","author":"N Dalkey","year":"1963","unstructured":"Dalkey N, Helmer O (1963) An experimental application of the Delphi method to the use of experts. Manag Sci 9(3):458\u2013467","journal-title":"Manag Sci"},{"issue":"5","key":"9241_CR21","doi-asserted-by":"crossref","first-page":"288","DOI":"10.1016\/S0167-6911(82)80025-X","volume":"1","author":"JL Deng","year":"1982","unstructured":"Deng JL (1982) Control problems of grey systems. Syst Control Lett 1(5):288\u2013294","journal-title":"Syst Control Lett"},{"issue":"2","key":"9241_CR22","first-page":"121","volume":"3","author":"S Elyassami","year":"2012","unstructured":"Elyassami S, Idri A (2012) Investigating effort prediction of software projects on the ISBSG dataset. Int J Artif Intell Appl 3(2):121\u2013132","journal-title":"Int J Artif Intell Appl"},{"key":"9241_CR23","doi-asserted-by":"crossref","unstructured":"Ferrucci F, Gravino C, Oliveto R, Sarro F (2010) Genetic programming for effort estimation: An analysis of the impact of different fitness functions. Proceedings of the 2nd International Symposium on Search Based Software Engineering (SSBSE \u201910). Benevento, Italy, IEEE: 89\u201398","DOI":"10.1109\/SSBSE.2010.20"},{"issue":"4","key":"9241_CR24","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1145\/1988997.1989016","volume":"36","author":"S Gupta","year":"2011","unstructured":"Gupta S, Sikka G, Verma H (2011) Recent methods for software effort estimation by analogy. SIGSOFT Softw Eng Notes 36(4):1\u20135","journal-title":"SIGSOFT Softw Eng Notes"},{"key":"9241_CR25","doi-asserted-by":"crossref","unstructured":"Hary CHVMK, Reddy PVGDP (2011) A fine parameter tuning for COCOMO 81 software effort estimation using particle swarm optimization. J Softw Eng 5(1)","DOI":"10.3923\/jse.2011.38.48"},{"key":"9241_CR26","unstructured":"Hayes W (1994) Statistics, 5th edn. Hartcourt Brace College Publishers. New York"},{"issue":"1","key":"9241_CR27","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1007\/s11219-010-9110-y","volume":"19","author":"C-J Hsu","year":"2011","unstructured":"Hsu C-J, Huang C-Y (2011) Comparison of weighted grey relational analysis for software effort estimation. Softw Qual J 19(1):165\u2013200","journal-title":"Softw Qual J"},{"key":"9241_CR28","doi-asserted-by":"crossref","first-page":"1034","DOI":"10.1016\/j.infsof.2005.12.020","volume":"48","author":"SJ Huang","year":"2006","unstructured":"Huang SJ, Chiu NH (2006) Optimization of analogy weights by genetic algorithm for software effort estimation. Inf Softw Technol 48:1034\u20131045","journal-title":"Inf Softw Technol"},{"key":"9241_CR29","doi-asserted-by":"crossref","first-page":"1237","DOI":"10.1016\/S0031-3203(01)00124-8","volume":"35","author":"YS Huang","year":"2002","unstructured":"Huang YS, Chiang CC, Shieh JW, Grimson E (2002) Prototype optimization for nearest-neighbor classification. Pattern Recogn 35:1237\u20131245","journal-title":"Pattern Recogn"},{"issue":"3","key":"9241_CR30","doi-asserted-by":"crossref","first-page":"898","DOI":"10.1016\/j.ejor.2007.07.002","volume":"188","author":"S-J Huang","year":"2008","unstructured":"Huang S-J, Chiu N-H, Chen L-W (2008) Integration of the grey relational analysis with genetic algorithm for software effort estimation. Eur J Oper Res 188(3):898\u2013909","journal-title":"Eur J Oper Res"},{"key":"9241_CR31","unstructured":"ISBSG (2011) International Software Benchmarking standard Group. from www.isbsg.org"},{"key":"9241_CR32","unstructured":"Jensen R (1983) An improved macrolevel software development resource estimation model. In Proceeding of 5th Conference of International S Parametric Analysts: 88\u201392"},{"key":"9241_CR33","unstructured":"Jianfeng W, Shixian L, Linyan T (2009) Improve analogy-based software effort estimation using principal components analysis and correlation weighting. International conference on Software Engineering ,Guangzhou, China, IEEE:179\u2013186"},{"key":"9241_CR34","unstructured":"Jingzhou L, Guenther R (2006) A comparative study of attribute weighting heuristics for effort estimation by analogy. Proceedings of ACM\/IEEE International Symposium on Empirical software engineering. Rio de Janeiro, Brazil, ACM"},{"issue":"1","key":"9241_CR35","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1007\/s10664-007-9054-4","volume":"13","author":"L Jingzhou","year":"2008","unstructured":"Jingzhou L, Guenther R (2008) Analysis of attribute weighting heuristics for analogy-based software effort estimation method AQUA+. Empir Softw Eng 13(1):63\u201396","journal-title":"Empir Softw Eng"},{"key":"9241_CR36","unstructured":"Jones C, Bonsignour O, Subramanyam J (2011) The economics of software quality. Addison-Wesley Longman. Boston"},{"key":"9241_CR37","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/S0164-1212(02)00156-5","volume":"70","author":"M Jorgensen","year":"2004","unstructured":"Jorgensen M (2004) A review of studies on expert estimation of software development effort. Syst Softw 70:37\u201360","journal-title":"Syst Softw"},{"key":"9241_CR38","doi-asserted-by":"crossref","unstructured":"Jorgensen M, Shepperd M (2007) A systematic review of software development cost estimation studies. Software Engineering, IEEE Transactions on Software Engineering 33(1): 33\u201353","DOI":"10.1109\/TSE.2007.256943"},{"key":"9241_CR39","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1016\/S0164-1212(03)00066-9","volume":"68","author":"M Jorgensen","year":"2003","unstructured":"Jorgensen M, Indahl U, Sjoberg D (2003) Software effort estimation by analogy and regression toward the mean. J Syst Softw 68:253\u2013262","journal-title":"J Syst Softw"},{"key":"9241_CR40","unstructured":"Kadoda G, Cartwright M, Chen L, Shepperd M (2000) Experiences using case-based reasoning to predict software project effort, International Conference on Empirical Assessment and Evaluation in Software Engineering, KEELE University"},{"key":"9241_CR41","unstructured":"Kennedy J, Eberhart R (1995) Particle swarm optimization. IEEE International Conference onNeural Networks, Piscataway, NJ"},{"issue":"4","key":"9241_CR42","doi-asserted-by":"crossref","first-page":"471","DOI":"10.1109\/TSE.2008.34","volume":"34","author":"JW Keung","year":"2008","unstructured":"Keung JW, Kitchenham BA, Jeffery DR (2008) Analogy-X: providing statistical inference to analogy-based software cost estimation. IEEE Trans Softw Eng 34(4):471\u2013484","journal-title":"IEEE Trans Softw Eng"},{"key":"9241_CR43","unstructured":"Khatibi Bardsiri V, Jawawi D, Hashim S, Khatibi E (2012) A PSO-based model to increase the accuracy of software development effort estimation. Softw Qual J 1\u201326"},{"issue":"9","key":"9241_CR44","first-page":"1265","volume":"14","author":"BV Khatibi","year":"2011","unstructured":"Khatibi BV, Jawawi DNA, Hashim SZM, Khatibi E (2011) A New fuzzy clustering based method to increase the accuracy of software development effort estimation. World Applied Sciences Journal 14(9):1265\u20131275","journal-title":"World Applied Sciences Journal"},{"key":"9241_CR45","doi-asserted-by":"crossref","unstructured":"Kocaguneli E, Menzies T (2011) How to find relevant data for effort estimation? Proceedings of the 2011 International Symposium on Empirical Software Engineering and Measurement, IEEE Computer Society: 255\u2013264","DOI":"10.1109\/ESEM.2011.34"},{"issue":"2","key":"9241_CR46","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1109\/TSE.2011.27","volume":"38","author":"E Kocaguneli","year":"2012","unstructured":"Kocaguneli E, Menzies T, Bener A, Keung JW (2012) Exploiting the essential assumptions of analogy-based effort estimation. IEEE Trans Softw Eng 38(2):425\u2013438","journal-title":"IEEE Trans Softw Eng"},{"key":"9241_CR47","doi-asserted-by":"crossref","unstructured":"Kolodner JL (1993) Case-based reasoning. Morgan Kaufmann Publishers Inc. San Mateo, California","DOI":"10.1016\/B978-1-55860-237-3.50005-4"},{"key":"9241_CR48","unstructured":"Lafferty MT (2010) Software effort estimation accuracy: A comparative study of estimaion based on software sizing and development methods. Faculty of Business and Technology, Capella University. Doctor Philosophy"},{"issue":"1","key":"9241_CR49","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1007\/s10664-007-9054-4","volume":"13","author":"J Li","year":"2008","unstructured":"Li J, Ruhe G (2008a) Analysis of attribute weighting heuristics for analogy-based software effort estimation method AQUA+. Empir Softw Eng 13(1):63\u201396","journal-title":"Empir Softw Eng"},{"issue":"1","key":"9241_CR50","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1142\/S0218194008003532","volume":"18","author":"JZ Li","year":"2008","unstructured":"Li JZ, Ruhe G (2008b) Software effort estimation by analogy using attribute selection based on rough set analysis. Int J Softw Eng Knowl Eng 18(1):1\u201323","journal-title":"Int J Softw Eng Knowl Eng"},{"issue":"1","key":"9241_CR51","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1007\/s10664-006-7552-4","volume":"12","author":"J Li","year":"2007","unstructured":"Li J, Ruhe G, Al-Emran A, Richter M (2007a) A flexible method for software effort estimation by analogy. Empir Softw Eng 12(1):65\u2013106","journal-title":"Empir Softw Eng"},{"key":"9241_CR52","doi-asserted-by":"crossref","unstructured":"Li YF, Xie M, Goh TN (2007b) A study of genetic algorithm for project selection for analogy based software cost estimation. International Conference on Industrial Engineering and Engineering Management, Singapore","DOI":"10.1109\/IEEM.2007.4419393"},{"key":"9241_CR53","doi-asserted-by":"crossref","unstructured":"Li YF, Xie M, Goh TN (2008) A study of analogy based sampling for interval based cost estimation for software project management. 4th IEEE International Conference on Management of Innovation and Technology, Singapore","DOI":"10.1109\/ICMIT.2008.4654377"},{"key":"9241_CR54","doi-asserted-by":"crossref","first-page":"603","DOI":"10.1007\/s10664-008-9104-6","volume":"14","author":"YF Li","year":"2009","unstructured":"Li YF, Xie M, Goh TN (2009a) A study of the non-linear adjustment for analogy based software cost estimation. Empir Softw Eng 14:603\u2013643","journal-title":"Empir Softw Eng"},{"issue":"2","key":"9241_CR55","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1016\/j.jss.2008.06.001","volume":"82","author":"YF Li","year":"2009","unstructured":"Li YF, Xie M, Goh TN (2009b) A study of project selection and feature weighting for analogy based software cost estimation. J Syst Softw 82(2):241\u2013252","journal-title":"J Syst Softw"},{"key":"9241_CR56","unstructured":"Lin J-C (2010) Applying particle swarm optimization to estimate software effort by multiple factors software project clustering, International Computer Symposium (ICS). Tatung Univ., Taipei Taiwan, IEEE:1039\u20131046"},{"key":"9241_CR57","unstructured":"Madachy R (1994) A software project dynamics model for process cost, schedule and risk assessment, University of Southern California. Ph.D. Dissertation"},{"key":"9241_CR58","doi-asserted-by":"crossref","unstructured":"Marza V, Teshnehlab M (2009) Estimating development time and effort of software projects by using a Neuro_Fuzzy Approach. In: K. Jayanthakumaran (ed) Advanced Technologies. Shanghai,China: InTech, pp. 395\u2013414","DOI":"10.5772\/8220"},{"key":"9241_CR59","volume-title":"Applied statistics for software managers","author":"K Maxwell","year":"2002","unstructured":"Maxwell K (2002) Applied statistics for software managers. Prentice-Hall, Englewood Cliffs"},{"key":"9241_CR60","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1023\/A:1023062629183","volume":"8","author":"E Mendes","year":"2003","unstructured":"Mendes E, Watson I, Triggs C, Mosley N, Counsell S (2003) A comparative study of cost estimation models for web hypermedia applications. Empir Softw Eng 8:163\u2013196","journal-title":"Empir Softw Eng"},{"issue":"2","key":"9241_CR61","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1016\/j.jss.2004.08.034","volume":"77","author":"E Mendes","year":"2005","unstructured":"Mendes E, Mosley N, Counsell S (2005) Investigating Web size metrics for early Web cost estimation. J Syst Softw 77(2):157\u2013172","journal-title":"J Syst Softw"},{"key":"9241_CR62","unstructured":"Menzies T, Butcher A, Marcus A, Zimmermann T, Cok D (2011) Local vs. global models for effort estimation and defect prediction. Proceedings of the 26th IEEE\/ACM International Conference on Automated Software Engineering, IEEE Computer Society: 343\u2013351"},{"key":"9241_CR63","unstructured":"Milios D, Stamelos I, Chatzibagias C (2011) Global optimization of analogy-based software cost estimation with genetic algorithms, artificial intelligence applications and innovations. L. Iliadis, I. Maglogiannis and H. Papadopoulos, Springer Boston. 364:350\u2013359"},{"issue":"5","key":"9241_CR64","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1007\/s10664-010-9128-6","volume":"15","author":"N Mittas","year":"2010","unstructured":"Mittas N, Angelis L (2010) LSEbA: least squares regression and estimation by analogy in a semi-parametric model for software cost estimation. Empir Softw Eng 15(5):523\u2013555","journal-title":"Empir Softw Eng"},{"issue":"3","key":"9241_CR65","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/j.infsof.2007.04.001","volume":"50","author":"N Mittas","year":"2008","unstructured":"Mittas N, Athanasiades M, Angelis L (2008) Improving analogy-based software cost estimation by a resampling method. Inf Softw Technol 50(3):221\u2013230","journal-title":"Inf Softw Technol"},{"key":"9241_CR66","doi-asserted-by":"crossref","first-page":"1749","DOI":"10.1016\/j.neucom.2005.12.119","volume":"69","author":"ALI Oliveira","year":"2006","unstructured":"Oliveira ALI (2006) Estimation of software project effort with support vector regression. Neurocomputing 69:1749\u20131753","journal-title":"Neurocomputing"},{"issue":"11","key":"9241_CR67","doi-asserted-by":"crossref","first-page":"1155","DOI":"10.1016\/j.infsof.2010.05.009","volume":"52","author":"ALI Oliveira","year":"2010","unstructured":"Oliveira ALI, Braga PL, Lima RMF, Corn\u00e9lio ML (2010) GA-based method for feature selection and parameters optimization for machine learning regression applied to software effort estimation. Inf Softw Technol 52(11):1155\u20131166","journal-title":"Inf Softw Technol"},{"key":"9241_CR68","doi-asserted-by":"crossref","unstructured":"Pawlak Z (1991) Rough set: Theoretical aspects of reasoning about data. Kluwer. Boston","DOI":"10.1007\/978-94-011-3534-4"},{"issue":"7","key":"9241_CR69","doi-asserted-by":"crossref","first-page":"615","DOI":"10.1109\/TSE.2005.75","volume":"31","author":"PC Pendharkar","year":"2005","unstructured":"Pendharkar PC, Subramanian GH, Rodger JA (2005) A probabilistic model for predicting software development effort. IEEE Trans Softw Eng 31(7):615\u2013624","journal-title":"IEEE Trans Softw Eng"},{"issue":"6","key":"9241_CR70","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1049\/ip-sen:20010621","volume":"148","author":"L Pickard","year":"2001","unstructured":"Pickard L, Kitchenham B, Linkman S (2001) Using simulated data sets to compare data analysis techniques used for software cost modeling. IEE Proc Softw 148(6):165\u2013174","journal-title":"IEE Proc Softw"},{"key":"9241_CR71","doi-asserted-by":"crossref","unstructured":"Posnett D, Filkov V, Devanbu P (2011) Ecological inference in empirical software engineering. Proceedings of the 26th IEEE\/ACM International Conference on Automated Software Engineering, IEEE Computer Society: 362\u2013371","DOI":"10.1109\/ASE.2011.6100074"},{"issue":"4","key":"9241_CR72","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1109\/TSE.1978.231521","volume":"SE-4","author":"LH Putnam","year":"1978","unstructured":"Putnam LH (1978) A general empirical solution to the macro software sizing and estimating problem. IEEE Trans Softw Eng SE-4(4):345\u2013361","journal-title":"IEEE Trans Softw Eng"},{"issue":"2","key":"9241_CR73","first-page":"12","volume":"1","author":"P Reddy","year":"2011","unstructured":"Reddy P (2011) Particle swarm optimization in the fine-tuning of fuzzy software cost estimation models. Int J Softw Eng Knowl Eng 1(2):12\u201323","journal-title":"Int J Softw Eng Knowl Eng"},{"key":"9241_CR74","unstructured":"Seo Y-S, Yoon K-A, Bae D-H (2008) An empirical analysis of software effort estimation with outlier elimination. Proceedings of the 4th international workshop on Predictor models in software engineering. Leipzig, Germany, ACM: 25\u201332"},{"issue":"11","key":"9241_CR75","doi-asserted-by":"crossref","first-page":"736","DOI":"10.1109\/32.637387","volume":"23","author":"M Shepperd","year":"1997","unstructured":"Shepperd M, Schofield C (1997) Estimating software project effort using analogies. IEEE Trans Softw Eng 23(11):736\u2013743","journal-title":"IEEE Trans Softw Eng"},{"issue":"6","key":"9241_CR76","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1504\/IJBIC.2010.037016","volume":"2","author":"AF Sheta","year":"2010","unstructured":"Sheta AF, Ayesh A, Rine D (2010) Evaluating software cost estimation models using particle swarm optimisation and fuzzy logic for NASA projects; a comparative study. Int J Bio-Inspired Comput 2(6):365\u2013373","journal-title":"Int J Bio-Inspired Comput"},{"issue":"6","key":"9241_CR77","doi-asserted-by":"crossref","first-page":"7302","DOI":"10.1016\/j.eswa.2010.12.005","volume":"38","author":"Q Song","year":"2011","unstructured":"Song Q, Shepperd M (2011) Predicting software project effort: a grey relational analysis based method. Expert Syst Appl 38(6):7302\u20137316","journal-title":"Expert Syst Appl"},{"issue":"3","key":"9241_CR78","first-page":"181","volume":"1","author":"RC Tausworthe","year":"1980","unstructured":"Tausworthe RC (1980) The work breakdown structure in software project management. J Syst Softw 1(3):181\u2013186","journal-title":"J Syst Softw"},{"issue":"11","key":"9241_CR79","doi-asserted-by":"crossref","first-page":"1853","DOI":"10.1016\/j.jss.2007.12.793","volume":"81","author":"K Vinay Kumar","year":"2008","unstructured":"Vinay Kumar K, Ravi V, Carr M, Raj Kiran N (2008) Software development cost estimation using wavelet neural networks. J Syst Softw 81(11):1853\u20131867","journal-title":"J Syst Softw"},{"issue":"2","key":"9241_CR80","first-page":"30","volume":"7","author":"HKV Vishal Sharma","year":"2010","unstructured":"Vishal Sharma HKV (2010) Optimized fuzzy logic based framework for effort estimation in software development. Int J Comput Sci 7(2):30\u201338","journal-title":"Int J Comput Sci"},{"key":"9241_CR81","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/S0065-2458(08)60337-X","volume":"44","author":"F Walkerden","year":"1997","unstructured":"Walkerden F, Jeffery R (1997) Software cost estimation: a review of models, process, and practice. Adv Comput 44:59\u2013125, V. Z. Marvin, Elsevier","journal-title":"Adv Comput"},{"issue":"2","key":"9241_CR82","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1023\/A:1009872202035","volume":"4","author":"F Walkerden","year":"1999","unstructured":"Walkerden F, Jeffery R (1999) An empirical study of analogy-based software effort estimation. Empir Softw Eng 4(2):135\u2013158","journal-title":"Empir Softw Eng"},{"key":"9241_CR83","doi-asserted-by":"crossref","unstructured":"Wu D, Li J, Liang Y (2010) Linear combination of multiple case-based reasoning with optimized weight for software effort estimation. J Supercomput 1\u201321. doi: 10.1007\/s11227-010-0525-9","DOI":"10.1007\/s11227-010-0525-9"}],"container-title":["Empirical Software Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10664-013-9241-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10664-013-9241-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10664-013-9241-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,9]],"date-time":"2019-07-09T02:26:29Z","timestamp":1562639189000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10664-013-9241-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,2,1]]},"references-count":83,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2014,8]]}},"alternative-id":["9241"],"URL":"https:\/\/doi.org\/10.1007\/s10664-013-9241-4","relation":{},"ISSN":["1382-3256","1573-7616"],"issn-type":[{"value":"1382-3256","type":"print"},{"value":"1573-7616","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,2,1]]}}}