{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T07:20:11Z","timestamp":1740122411275,"version":"3.37.3"},"reference-count":45,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2022,11,25]],"date-time":"2022-11-25T00:00:00Z","timestamp":1669334400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2022,11,25]],"date-time":"2022-11-25T00:00:00Z","timestamp":1669334400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Empir Software Eng"],"published-print":{"date-parts":[[2023,1]]},"DOI":"10.1007\/s10664-022-10245-z","type":"journal-article","created":{"date-parts":[[2022,11,25]],"date-time":"2022-11-25T20:02:34Z","timestamp":1669406554000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["An empirical study on a single company\u2019s cost estimations of 338 software projects"],"prefix":"10.1007","volume":"28","author":[{"given":"Christian","family":"Sch\u00fcrhoff","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5936-2143","authenticated-orcid":false,"given":"Stefan","family":"Hanenberg","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Volker","family":"Gruhn","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2022,11,25]]},"reference":[{"key":"10245_CR1","unstructured":"Addison T, Vallabh S (2002) Controlling software project risks: an empirical study of methods used by experienced project managers. In: Proceedings of the 2002 annual research conference of the South African Institute of Computer Scientists and Information Technologists on enablement through technology, SAICSIT \u201902. South African Institute for Computer Scientists and Information Technologists, Republic of South Africa, pp 128\u2013140"},{"key":"10245_CR2","unstructured":"Albrecht A J (1979) Measuring application development productivity. In: Proceedings of joint share, guide, and IBM application development symposium"},{"key":"10245_CR3","doi-asserted-by":"crossref","unstructured":"Aranda J, Easterbrook S (2005) Anchoring and adjustment in software estimation. In: Proceedings of the 10th European software engineering conference held jointly with 13th ACM SIGSOFT international symposium on foundations of software engineering, ESEC\/FSE-13. ACM, New York, pp 346\u2013355","DOI":"10.1145\/1081706.1081761"},{"issue":"4","key":"10245_CR4","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1016\/0378-7206(92)90026-C","volume":"22","author":"F Bergeron","year":"1992","unstructured":"Bergeron F, St-Arnaud J-Y (1992) Estimation of information systems development efforts: a pilot study. Inf Manag 22(4):239\u2013254","journal-title":"Inf Manag"},{"key":"10245_CR5","doi-asserted-by":"crossref","unstructured":"Boehm B W (2017) Software cost estimation meets software diversity. In: 2017 IEEE\/ACM 39th international conference on software engineering companion (ICSE-c), IEEE, pp 495\u2013496","DOI":"10.1109\/ICSE-C.2017.159"},{"key":"10245_CR6","unstructured":"Boehm B W (1981) Software engineering economics. Prentice-hall advances in computing science and technology series. Prentice-Hall"},{"issue":"1\u20134","key":"10245_CR7","doi-asserted-by":"publisher","first-page":"177","DOI":"10.1023\/A:1018991717352","volume":"10","author":"B Boehm","year":"2000","unstructured":"Boehm B, Abts C, Chulani S (2000a) Software development cost estimation approaches\u2014a survey. Ann Softw Eng 10(1\u20134):177\u2013205","journal-title":"Ann Softw Eng"},{"key":"10245_CR8","volume-title":"Software cost estimation with Cocomo II with Cdrom, 1st edn","author":"BW Boehm","year":"2000","unstructured":"Boehm B W, Clark B K, Horowitz E, Brown A W, Reifer D J, Chulani S, Madachy R, Steece B (2000b) Software cost estimation with Cocomo II with Cdrom, 1st edn. Prentice Hall PTR, Upper Saddle River"},{"key":"10245_CR9","doi-asserted-by":"crossref","unstructured":"Britto R, Freitas V, Mendes E, Usman M (2014) Effort estimation in global software development: a systematic literature review","DOI":"10.1109\/ICGSE.2014.11"},{"key":"10245_CR10","volume-title":"The mythical man-month (anniversary Ed.)","author":"FPJr Brooks","year":"1995","unstructured":"Brooks FP Jr (1995) The mythical man-month (anniversary Ed.) Addison-Wesley Longman Publishing Co., Inc., Boston"},{"issue":"5","key":"10245_CR11","doi-asserted-by":"publisher","first-page":"84","DOI":"10.1109\/MS.2008.107","volume":"25","author":"KE Emam","year":"2008","unstructured":"Emam K E, Koru A G (2008) A replicated survey of it software project failures. IEEE Softw 25(5):84\u201390","journal-title":"IEEE Softw"},{"key":"10245_CR12","doi-asserted-by":"publisher","first-page":"148","DOI":"10.1016\/j.jss.2015.06.036","volume":"108","author":"V Garousi","year":"2014","unstructured":"Garousi V, Coskuncay A, Betin-Can A, Demirors O (2014) A survey of software engineering practices in Turkey. J Syst Softw 108:148\u2013177","journal-title":"J Syst Softw"},{"issue":"8","key":"10245_CR13","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1145\/1145287.1145301","volume":"49","author":"RL Glass","year":"2006","unstructured":"Glass R L (2006) The standish report: does it really describe a software crisis? Commun ACM 49(8):15\u201316","journal-title":"Commun ACM"},{"issue":"11","key":"10245_CR14","doi-asserted-by":"publisher","first-page":"1770","DOI":"10.1016\/j.jss.2007.03.001","volume":"80","author":"S Grimstad","year":"2007","unstructured":"Grimstad S, J\u00f8rgensen M (2007) Inconsistency of expert judgment-based estimates of software development effort. J Syst Softw 80(11):1770\u20131777","journal-title":"J Syst Softw"},{"key":"10245_CR15","doi-asserted-by":"crossref","unstructured":"Grimstad S, J\u00f8rgensen M (2008) A preliminary study of sequence effects in judgment-based software development work-effort estimation. In: Proceedings of the 12th international conference on evaluation and assessment in software engineering, EASE\u201908. BCS Learning & Development Ltd, Swindon, pp 129\u2013135","DOI":"10.14236\/ewic\/EASE2008.14"},{"issue":"2","key":"10245_CR16","doi-asserted-by":"publisher","first-page":"238","DOI":"10.1037\/a0025996","volume":"138","author":"T Halkjelsvik","year":"2012","unstructured":"Halkjelsvik T, J\u00f8rgensen M (2012) From origami to software development: a review of studies on judgment-based predictions of performance time. Psychol Bull 138(2):238\u2013271","journal-title":"Psychol Bull"},{"issue":"1","key":"10245_CR17","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/S0263-7863(98)00062-3","volume":"18","author":"J Hill","year":"2000","unstructured":"Hill J, Thomas L C, Allen D E (2000) Experts\u2019 estimates of task durations in software development projects. Int J Proj Manag 18(1):13\u201321","journal-title":"Int J Proj Manag"},{"issue":"2","key":"10245_CR18","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1016\/0378-7206(84)90012-0","volume":"7","author":"AM Jenkins","year":"1984","unstructured":"Jenkins A M, Naumann J D, Wetherbe J C (1984) Empirical investigation of systems development practices and results. Inf Manag 7(2):73\u201382","journal-title":"Inf Manag"},{"issue":"4","key":"10245_CR19","doi-asserted-by":"publisher","first-page":"297","DOI":"10.1023\/B:EMSE.0000039881.57613.cb","volume":"9","author":"M J\u00f8rgensen","year":"2004","unstructured":"J\u00f8rgensen M (2004) Regression models of software development effort estimation accuracy and bias. Empir Softw Eng 9(4):297\u2013314","journal-title":"Empir Softw Eng"},{"issue":"1","key":"10245_CR20","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1109\/TSE.2007.256943","volume":"33","author":"M J\u00f8rgensen","year":"2007","unstructured":"J\u00f8rgensen M, Shepperd M (2007) A systematic review of software development cost estimation studies. IEEE Trans Softw Eng 33(1):33\u201353","journal-title":"IEEE Trans Softw Eng"},{"key":"10245_CR21","first-page":"381","volume-title":"Software development effort estimation\u2014demystifying and improving expert estimation","author":"M J\u00f8rgensen","year":"2010","unstructured":"J\u00f8rgensen M, Grimstad S (2010) Software development effort estimation\u2014demystifying and improving expert estimation. Springer, Berlin, pp 381\u2013403"},{"key":"10245_CR22","doi-asserted-by":"publisher","first-page":"839","DOI":"10.1016\/j.ijproman.2012.01.007","volume":"30","author":"M J\u00f8rgensen","year":"2012","unstructured":"J\u00f8rgensen M, Halkjelsvik T, Kitchenham B (2012) How does project size affect cost estimation error? Statistical artifacts and methodological challenges. Int J Proj Manag 30:839\u2013849","journal-title":"Int J Proj Manag"},{"issue":"1","key":"10245_CR23","doi-asserted-by":"publisher","first-page":"57","DOI":"10.1016\/S0164-1212(02)00021-3","volume":"64","author":"B Kitchenham","year":"2002","unstructured":"Kitchenham B, Pfleeger S L, McColl B, Eagan S (2002) An empirical study of maintenance and development estimation accuracy. J Syst Softw 64(1):57\u201377","journal-title":"J Syst Softw"},{"key":"10245_CR24","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1002\/pmj.20272","volume":"43","author":"Y Kwak","year":"2012","unstructured":"Kwak Y, Anbari F (2012) History, practices, and future of earned value management in government: perspectives from nasa. Project Manag J 43:77\u201390","journal-title":"Project Manag J"},{"key":"10245_CR25","doi-asserted-by":"publisher","first-page":"16","DOI":"10.1016\/j.infsof.2016.01.003","volume":"73","author":"WB Langdon","year":"2016","unstructured":"Langdon W B, Dolado J, Sarro F, Harman M (2016) Exact mean absolute error of baseline predictor, marp0. Inf Softw Technol 73:16\u201318","journal-title":"Inf Softw Technol"},{"issue":"6","key":"10245_CR26","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1109\/MC.2003.1204375","volume":"36","author":"C Larman","year":"2003","unstructured":"Larman C, Basili V R (2003) Iterative and incremental developments. A brief history. Computer 36(6):47\u201356","journal-title":"Computer"},{"key":"10245_CR27","unstructured":"Larman C (2004) Agile and iterative development: a manager\u2019s guide. Addison-Wesley"},{"issue":"2","key":"10245_CR28","doi-asserted-by":"publisher","first-page":"159","DOI":"10.2307\/248774","volume":"14","author":"AL Lederer","year":"1990","unstructured":"Lederer A L, Mirani R, Neo B S, Pollard C, Prasad J, Ramamurthy K (1990) Information system cost estimating: a management perspective. MIS Q 14(2):159\u2013176","journal-title":"MIS Q"},{"issue":"1","key":"10245_CR29","first-page":"11","volume":"5","author":"B Lo","year":"1997","unstructured":"Lo B, Gao X (1997) Assessing software cost estimation models: criteria for accuracy, consistency and regression. Australas J Inf Syst 5(1):11","journal-title":"Australas J Inf Syst"},{"key":"10245_CR30","doi-asserted-by":"crossref","unstructured":"M\u00f8loekken K, J\u00f8rgensen M (2003) A review of software surveys on software effort estimation. In: 2003 International symposium on empirical software engineering. ISESE 2003. Proceedings, pp 223\u2013230","DOI":"10.1109\/ISESE.2003.1237981"},{"key":"10245_CR31","doi-asserted-by":"crossref","unstructured":"M\u00f8loekken-\u00d8stvold K, J\u00f8rgensen M, Tanilkan SS, Gallis H, Lien AC, Hove SW (2004) A survey on software estimation in the Norwegian industry. In: 10th International symposium on software metrics. Proceedings, pp 208\u2013219","DOI":"10.1109\/METRIC.2004.1357904"},{"key":"10245_CR32","unstructured":"Mol\u00f8kken K, J\u00f8rgensen M (2003) Software effort estimation: unstructured group discussion as a method to reduce individual biasis. In: Proceedings of the 15th annual workshop of the psychology of programming interest group, PPIG 2003, Keele, UK, April 8\u201310, 2003, p 4"},{"issue":"39","key":"10245_CR33","first-page":"95","volume":"22","author":"D Phan","year":"1988","unstructured":"Phan D, Vogel D, Nunamaker J (1988) The search for perfect project management. Computerworld 22(39):95\u2013100","journal-title":"Computerworld"},{"issue":"04","key":"10245_CR34","doi-asserted-by":"publisher","first-page":"345","DOI":"10.1109\/TSE.1978.231521","volume":"4","author":"L Putnam","year":"1978","unstructured":"Putnam L (1978) A general empirical solution to the macro software sizing and estimating problem. IEEE Trans Softw Eng 4(04):345\u2013361","journal-title":"IEEE Trans Softw Eng"},{"key":"10245_CR35","doi-asserted-by":"crossref","unstructured":"Sarro F, Petrozziello A, Harman M (2016) Multi-objective software effort estimation. In: Dillon LK, Visser W, Williams LA (eds) Proceedings of the 38th international conference on software engineering, ICSE 2016, Austin, TX, USA, May 14\u201322, 2016. ACM, pp 619\u2013630","DOI":"10.1145\/2884781.2884830"},{"key":"10245_CR36","unstructured":"Sauer C, Cuthbertson C (2003) The state of it project management in the UK 2002\u20132003. Computer Weekly"},{"key":"10245_CR37","doi-asserted-by":"crossref","unstructured":"Shepperd M J (2014) Cost prediction and software project management. In: Ruhe G, Wohlin C (eds) Software project management in a changing world. Springer, pp 51\u201371","DOI":"10.1007\/978-3-642-55035-5_3"},{"issue":"8","key":"10245_CR38","doi-asserted-by":"publisher","first-page":"820","DOI":"10.1016\/j.infsof.2011.12.008","volume":"54","author":"MJ Shepperd","year":"2012","unstructured":"Shepperd M J, Macdonell SG (2012) Evaluating prediction systems in software project estimation. Inf Softw Technol 54(8):820\u2013827","journal-title":"Inf Softw Technol"},{"key":"10245_CR39","doi-asserted-by":"crossref","unstructured":"Shepperd M, Schofield C, Kitchenham B (1996) Effort estimation using analogy. In: Proceedings of the 18th international conference on software engineering, ICSE \u201996. IEEE Computer Society, Washington, DC, pp 170\u2013178","DOI":"10.1109\/ICSE.1996.493413"},{"issue":"4","key":"10245_CR40","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1287\/isre.2.4.243","volume":"2","author":"SS Vicinanza","year":"1991","unstructured":"Vicinanza S S, Mukhopadhyay T, Prietula M J (1991) Software-effort estimation: an exploratory study of expert performance. Info Sys Res 2 (4):243\u2013262","journal-title":"Info Sys Res"},{"key":"10245_CR41","unstructured":"Whitfield D (2007) Cost overruns, delays and terminations in 105 outsourced public sector ict contracts. In: ESSU Research report no. 3. The European services strategy unit"},{"key":"10245_CR42","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-4625-2","volume-title":"Experimentation in software engineering: an introduction","author":"C Wohlin","year":"2000","unstructured":"Wohlin C, Runeson P, H\u00f6st M, Ohlsson M C, Regnell B, Wessl\u00e9n A (2000) Experimentation in software engineering: an introduction. Kluwer Academic Publishers, Norwell"},{"key":"10245_CR43","doi-asserted-by":"publisher","first-page":"0","DOI":"10.3923\/itj.2010.1104.1114","volume":"9","author":"X Zhu","year":"2010","unstructured":"Zhu X, Zhou B (2010) An earned-value approach to assess and monitor software project uncertainty: a case study in software test execution. Inf Technol J 9:0","journal-title":"Inf Technol J"},{"key":"10245_CR44","doi-asserted-by":"crossref","unstructured":"Yang D, Wang Q, Li M, Yang Y, Ye K, Du J (2008) A survey on software cost estimation in the chinese software industry. In: Proceedings of the second ACM-IEEE international symposium on empirical software engineering and measurement, ESEM \u201908. ACM, New York, pp 253\u2013262","DOI":"10.1145\/1414004.1414045"},{"key":"10245_CR45","volume-title":"Death march: the complete software developer\u2019s guide to surviving mission impossible projects","author":"E Yourdon","year":"1997","unstructured":"Yourdon E (1997) Death march: the complete software developer\u2019s guide to surviving mission impossible projects. Prentice Hall PTR, Upper Saddle River"}],"container-title":["Empirical Software Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10664-022-10245-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10664-022-10245-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10664-022-10245-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,1,10]],"date-time":"2023-01-10T03:19:42Z","timestamp":1673320782000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10664-022-10245-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,11,25]]},"references-count":45,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2023,1]]}},"alternative-id":["10245"],"URL":"https:\/\/doi.org\/10.1007\/s10664-022-10245-z","relation":{},"ISSN":["1382-3256","1573-7616"],"issn-type":[{"type":"print","value":"1382-3256"},{"type":"electronic","value":"1573-7616"}],"subject":[],"published":{"date-parts":[[2022,11,25]]},"assertion":[{"value":"20 September 2022","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"25 November 2022","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"Volker Gruhn co-founded adesso in 1997 and is currently chairman of adesso\u2019s supervisory board.","order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}}],"article-number":"11"}}