{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,6]],"date-time":"2026-03-06T08:42:51Z","timestamp":1772786571077,"version":"3.50.1"},"reference-count":48,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2010,3,24]],"date-time":"2010-03-24T00:00:00Z","timestamp":1269388800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Fuzzy Optim Decis Making"],"published-print":{"date-parts":[[2010,6]]},"DOI":"10.1007\/s10700-010-9076-z","type":"journal-article","created":{"date-parts":[[2010,3,23]],"date-time":"2010-03-23T01:58:31Z","timestamp":1269309511000},"page":"219-231","source":"Crossref","is-referenced-by-count":23,"title":["New fuzzy models for time-cost trade-off problem"],"prefix":"10.1007","volume":"9","author":[{"given":"Hua","family":"Ke","sequence":"first","affiliation":[]},{"given":"Weimin","family":"Ma","sequence":"additional","affiliation":[]},{"given":"Xin","family":"Gao","sequence":"additional","affiliation":[]},{"given":"Weihua","family":"Xu","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2010,3,24]]},"reference":[{"issue":"2","key":"9076_CR1","doi-asserted-by":"crossref","first-page":"1317","DOI":"10.1016\/j.amc.2004.10.021","volume":"168","author":"A. Azaron","year":"2005","unstructured":"Azaron A., Perkgoz C., Sakawa M. (2005) A genetic algorithm approach for the time-cost trade-off in PERT networks. Applied Mathematics and Computation 168(2): 1317\u20131339","journal-title":"Applied Mathematics and Computation"},{"issue":"C01","key":"9076_CR2","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1061\/JCCEAZ.0000191","volume":"93","author":"W. S. Butcher","year":"1967","unstructured":"Butcher W. S. (1967) Dynamic programming for project cost-time curve. Journal of Construction Division 93(C01): 59\u201373","journal-title":"Journal of Construction Division"},{"issue":"1","key":"9076_CR3","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0165-0114(81)90030-0","volume":"5","author":"S. Chanas","year":"1981","unstructured":"Chanas S., Kamburowski J. (1981) The use of fuzzy variables in PERT. Fuzzy Sets and Systems 5(1): 11\u201319","journal-title":"Fuzzy Sets and Systems"},{"key":"9076_CR4","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1287\/mnsc.6.1.73","volume":"6","author":"A. Charnes","year":"1959","unstructured":"Charnes A., Cooper W. W. (1959) Chance-constrained programming. Management Science 6: 73\u201379","journal-title":"Management Science"},{"key":"9076_CR5","first-page":"213","volume":"13","author":"A. Charnes","year":"1962","unstructured":"Charnes A., Cooper W. W. (1962) A network interpretation and a direct sub-dual algorithm for critical path scheduling. Journal of Industrial Engineering 13: 213\u2013219","journal-title":"Journal of Industrial Engineering"},{"key":"9076_CR6","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1080\/02630259708970224","volume":"14","author":"D. K. H. Chua","year":"1997","unstructured":"Chua D. K. H., Chan W. T., Govindan K. (1997) A time-cost trade-off model with resource consideration using genetic algorithm. Civil Engineering Systems 14: 291\u2013311","journal-title":"Civil Engineering Systems"},{"issue":"7","key":"9076_CR7","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1080\/01446190802036128","volume":"26","author":"E. Eshtehardian","year":"2008","unstructured":"Eshtehardian E., Afshar A., Abbasnia R. (2008) Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost. Construction Management and Economics 26(7): 679\u2013691","journal-title":"Construction Management and Economics"},{"issue":"3","key":"9076_CR8","first-page":"184","volume":"11","author":"C. W. Feng","year":"1997","unstructured":"Feng C. W., Liu L., Burns S. A. (1997) Using genetic algorithms to solve construction time-cost trade-off problems. Journal of Construction Engineering and Management 11(3): 184\u2013189","journal-title":"Journal of Construction Engineering and Management"},{"issue":"3","key":"9076_CR9","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1109\/IRET-EM.1960.5007550","volume":"7","author":"R. J. Freeman","year":"1960","unstructured":"Freeman R. J. (1960) A generalized network approach to project activity sequencing. IRE Transactions on Engineering Management 7(3): 103\u2013107","journal-title":"IRE Transactions on Engineering Management"},{"issue":"1","key":"9076_CR10","first-page":"22","volume":"2","author":"M. Ghazanfari","year":"2008","unstructured":"Ghazanfari M., Shahanaghi K., Yousefli A. (2008) An application of possibility goal programming to the time-cost trade off problem. Journal of Uncertain Systems 2(1): 22\u201328","journal-title":"Journal of Uncertain Systems"},{"key":"9076_CR11","doi-asserted-by":"crossref","first-page":"408","DOI":"10.1007\/s00170-008-1598-y","volume":"42","author":"M. Ghazanfari","year":"2009","unstructured":"Ghazanfari M., Yousefli A., Ameli M. S. J., Bozorgi-Amiri A. (2009) A new approach to solve time-cost trade-off problem with fuzzy decision variables. The International Journal of Advanced Manufacturing Technology 42: 408\u2013414","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"9076_CR12","volume-title":"Critical chain","author":"E. Goldratt","year":"1997","unstructured":"Goldratt E. (1997) Critical chain. The North River Press, Great Barrington, MA"},{"issue":"1","key":"9076_CR13","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/S0925-5273(96)00019-9","volume":"48","author":"D. Golenko-Ginzburg","year":"1997","unstructured":"Golenko-Ginzburg D., Gonik A. (1997) Stochastic network project scheduling with non-consumable limited resources. International Journal of Production Economics 48(1): 29\u201337","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"9076_CR14","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1287\/ijoc.12.2.125.11894","volume":"12","author":"W. J. Gutjahr","year":"2000","unstructured":"Gutjahr W. J., Strauss C., Wagner E. (2000) A stochastic branch-and-bound approach to activity crashing in project management. INFORMS Journal on Computing 12(2): 125\u2013135","journal-title":"INFORMS Journal on Computing"},{"issue":"11","key":"9076_CR15","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1016\/0165-0114(94)90211-9","volume":"67","author":"M. Hapke","year":"1994","unstructured":"Hapke M., Jaszkiewicz A., Slowinski R. (1994) Fuzzy project scheduling system for software development. Fuzzy Sets and Systems 67(11): 101\u2013117","journal-title":"Fuzzy Sets and Systems"},{"issue":"2","key":"9076_CR16","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1080\/12460125.1993.10511569","volume":"2","author":"M. Hapke","year":"1993","unstructured":"Hapke M., Slowinski R. (1993) A DSS for resource-constrained project scheduling under uncertainty. Journal of Decision Systems 2(2): 111\u2013128","journal-title":"Journal of Decision Systems"},{"issue":"3","key":"9076_CR17","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1016\/0165-0114(95)00338-X","volume":"83","author":"M. Hapke","year":"1996","unstructured":"Hapke M., Slowinski R. (1996) Fuzzy priority heuristics for project scheduling. Fuzzy Sets and Systems 83(3): 291\u2013299","journal-title":"Fuzzy Sets and Systems"},{"key":"9076_CR18","first-page":"197","volume-title":"Scheduling under fuzziness","author":"M. Hapke","year":"2000","unstructured":"Hapke M., Slowinski R. (2000) Fuzzy set approach to multi-objective and multi-mode project scheduling under uncertainty. In: Hapke M., Slowinski R. (eds) Scheduling under fuzziness. Physica-Verlag, Heidelberg, pp 197\u2013221"},{"issue":"3","key":"9076_CR19","doi-asserted-by":"crossref","first-page":"18","DOI":"10.1007\/s11804-005-0016-1","volume":"4","author":"C. Jin","year":"2005","unstructured":"Jin C., Ji Z., Lin Y., Zhao Y., Huang Z. (2005) Research on the fully fuzzy time-cost trade-off based on genetic algorithms. Journal of Marine Science and Application 4(3): 18\u201323","journal-title":"Journal of Marine Science and Application"},{"key":"9076_CR20","volume-title":"Fuzzy mathematical models in engineering and management science","author":"A. Kaufmann","year":"1988","unstructured":"Kaufmann A., Gupta M. M. (1988) Fuzzy mathematical models in engineering and management science. Amsterdam, North-Holland"},{"issue":"1","key":"9076_CR21","doi-asserted-by":"crossref","first-page":"342","DOI":"10.1016\/j.amc.2004.09.002","volume":"168","author":"H. Ke","year":"2005","unstructured":"Ke H., Liu B. (2005) Project scheduling problem with stochastic activity duration times. Applied Mathematics and Computation 168(1): 342\u2013353","journal-title":"Applied Mathematics and Computation"},{"issue":"2","key":"9076_CR22","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1016\/j.apm.2009.04.011","volume":"34","author":"H. Ke","year":"2010","unstructured":"Ke H., Liu B. (2010) Fuzzy project scheduling problem and its hybrid intelligent algorithm. Applied Mathematical Modelling 34(2): 301\u2013308","journal-title":"Applied Mathematical Modelling"},{"key":"9076_CR23","doi-asserted-by":"crossref","first-page":"308","DOI":"10.1016\/j.amc.2009.05.004","volume":"215","author":"H. Ke","year":"2009","unstructured":"Ke H., Ma W., Ni Y. (2009) Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem. Applied Mathematics and Computation 215: 308\u2013313","journal-title":"Applied Mathematics and Computation"},{"issue":"3","key":"9076_CR24","doi-asserted-by":"crossref","first-page":"296","DOI":"10.1287\/opre.9.3.296","volume":"9","author":"J. E. Kelley Jr.","year":"1961","unstructured":"Kelley J. E. Jr. (1961) Critical path planning and scheduling mathematical basis. Operations Research 9(3): 296\u2013320","journal-title":"Operations Research"},{"key":"9076_CR25","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/S0360-8352(02)00214-0","volume":"44","author":"Z. Laslo","year":"2003","unstructured":"Laslo Z. (2003) Activity time-cost tradeoffs under time and cost chance constraints. Computers & Industrial Engineering 44: 365\u2013384","journal-title":"Computers & Industrial Engineering"},{"key":"9076_CR26","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1016\/S0263-7863(99)00035-6","volume":"19","author":"S. S. Leu","year":"2001","unstructured":"Leu S. S., Chen A. T., Yang C. H. (2001) A GA-based fuzzy optimal model for construction time-cost trade-off. International Journal of Project Management 19: 47\u201358","journal-title":"International Journal of Project Management"},{"issue":"12","key":"9076_CR27","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/S0898-1221(97)00237-X","volume":"34","author":"B. Liu","year":"1997","unstructured":"Liu B. (1997) Dependent-chance programming: A class of stochastic programming. Computers & Mathematics with Applications 34(12): 89\u2013104","journal-title":"Computers & Mathematics with Applications"},{"key":"9076_CR28","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1016\/S0165-0114(96)00236-9","volume":"94","author":"B. Liu","year":"1998","unstructured":"Liu B., Iwamura K. (1998a) Chance constrained programming with fuzzy parameters. Fuzzy Sets and Systems 94: 227\u2013237","journal-title":"Fuzzy Sets and Systems"},{"key":"9076_CR29","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/S0165-0114(97)00291-1","volume":"100","author":"B. Liu","year":"1998","unstructured":"Liu B., Iwamura K. (1998b) A note on chance constrained programming with fuzzy coefficients. Fuzzy Sets and Systems 100: 229\u2013233","journal-title":"Fuzzy Sets and Systems"},{"key":"9076_CR30","doi-asserted-by":"crossref","first-page":"354","DOI":"10.1109\/91.771090","volume":"7","author":"B. Liu","year":"1999","unstructured":"Liu B. (1999) Dependent-chance programming with fuzzy decisions. IEEE Transactions on Fuzzy Systems 7: 354\u2013360","journal-title":"IEEE Transactions on Fuzzy Systems"},{"key":"9076_CR31","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-7908-1781-2","volume-title":"Theory and practice of uncertain programming","author":"B. Liu","year":"2002","unstructured":"Liu B. (2002) Theory and practice of uncertain programming. Physica-Verlag, Heidelberg"},{"key":"9076_CR32","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1109\/TFUZZ.2002.800692","volume":"10","author":"B. Liu","year":"2002","unstructured":"Liu B., Liu Y. K. (2002) Expected value of fuzzy variable and fuzzy expected value models. IEEE Transactions on Fuzzy Systems 10: 445\u2013450","journal-title":"IEEE Transactions on Fuzzy Systems"},{"key":"9076_CR33","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-39987-2","volume-title":"Uncertainty theory: An introduction to its axiomatic foundations","author":"B. Liu","year":"2004","unstructured":"Liu B. (2004) Uncertainty theory: An introduction to its axiomatic foundations. Springer-Verlag, Berlin"},{"key":"9076_CR34","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1007\/s10700-006-0016-x","volume":"5","author":"B. Liu","year":"2006","unstructured":"Liu B. (2006a) A survey of credibility theory. Fuzzy Optimization and Decision Making 5: 387\u2013408","journal-title":"Fuzzy Optimization and Decision Making"},{"key":"9076_CR35","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1109\/TFUZZ.2005.864077","volume":"14","author":"Y. K. Liu","year":"2006","unstructured":"Liu Y. K. (2006b) Convergent results about the use of fuzzy simulation in fuzzy optimization problems. IEEE Transactions on Fuzzy Systems 14: 295\u2013304","journal-title":"IEEE Transactions on Fuzzy Systems"},{"issue":"6","key":"9076_CR36","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1016\/j.ijproman.2007.09.012","volume":"26","author":"L. D. Long","year":"2008","unstructured":"Long L. D., Ohsato A. (2008) Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of Project Management 26(6): 688\u2013698","journal-title":"International Journal of Project Management"},{"issue":"1\u20134","key":"9076_CR37","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1023\/A:1010906116000","volume":"102","author":"L. \u00d6zdamar","year":"2001","unstructured":"\u00d6zdamar L., Alanya E. (2001) Uncertainty modelling in software development projects (with case study). Annals of Operations Research 102(1\u20134): 157\u2013178","journal-title":"Annals of Operations Research"},{"issue":"4","key":"9076_CR38","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1287\/mnsc.24.4.393","volume":"24","author":"S. Phillips Jr.","year":"1997","unstructured":"Phillips S. Jr., Dessouky M. I. (1997) Solving the project time\/cost tradeoff problem using minimal cut concept. Management Science 24(4): 393\u2013400","journal-title":"Management Science"},{"issue":"2","key":"9076_CR39","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/0165-0114(79)90022-8","volume":"2","author":"H. Prade","year":"1979","unstructured":"Prade H. (1979) Using fuzzy set theory in a scheduling problem: A case study. Fuzzy Sets and Systems 2(2): 153\u2013165","journal-title":"Fuzzy Sets and Systems"},{"issue":"6","key":"9076_CR40","doi-asserted-by":"crossref","first-page":"354","DOI":"10.1287\/mnsc.17.6.B354","volume":"17","author":"N. Siemens","year":"1971","unstructured":"Siemens N. (1971) A simple CPM time-cost trade-off algorithm. Management Science 17(6): 354\u2013363","journal-title":"Management Science"},{"key":"9076_CR41","doi-asserted-by":"crossref","first-page":"1197","DOI":"10.1287\/mnsc.28.10.1197","volume":"28","author":"F. B. Talbot","year":"1982","unstructured":"Talbot F. B. (1982) Resource-constrained project scheduling with time-resource tradeoffs: The non-preemptive case. Management Science 28: 1197\u20131210","journal-title":"Management Science"},{"key":"9076_CR42","doi-asserted-by":"crossref","first-page":"1217","DOI":"10.1057\/palgrave.jors.2600814","volume":"50","author":"J. R. Wang","year":"1999","unstructured":"Wang J. R. (1999) A fuzzy set approach to activity scheduling for product development. Journal of the Operational Research Society 50: 1217\u20131228","journal-title":"Journal of the Operational Research Society"},{"issue":"2","key":"9076_CR43","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/S0165-0114(01)00146-4","volume":"127","author":"J. R. Wang","year":"2002","unstructured":"Wang J. R. (2002) A fuzzy project scheduling approach to minimize schedule risk for product development. Fuzzy Sets and Systems 127(2): 99\u2013116","journal-title":"Fuzzy Sets and Systems"},{"key":"9076_CR44","doi-asserted-by":"crossref","first-page":"164","DOI":"10.1007\/BFb0121082","volume":"25","author":"R. D. Wollmer","year":"1985","unstructured":"Wollmer R. D. (1985) Critical path planning under uncertainty. Mathematical Programming Study 25: 164\u2013171","journal-title":"Mathematical Programming Study"},{"key":"9076_CR45","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","volume":"8","author":"L. A. Zadeh","year":"1965","unstructured":"Zadeh L. A. (1965) Fuzzy sets. Information and Control 8: 338\u2013353","journal-title":"Information and Control"},{"key":"9076_CR46","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/0165-0114(78)90029-5","volume":"1","author":"L. A. Zadeh","year":"1978","unstructured":"Zadeh L. A. (1978) Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems 1: 3\u201328","journal-title":"Fuzzy Sets and Systems"},{"key":"9076_CR47","doi-asserted-by":"crossref","first-page":"1162","DOI":"10.1061\/(ASCE)CO.1943-7862.0000092","volume":"135","author":"B. Zahraie","year":"2009","unstructured":"Zahraie B., Tavakolan M. (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management 135: 1162\u20131171","journal-title":"Journal of Construction Engineering and Management"},{"issue":"2","key":"9076_CR48","doi-asserted-by":"crossref","first-page":"176","DOI":"10.1061\/(ASCE)0733-9364(2005)131:2(176)","volume":"131","author":"D. X. M. Zheng","year":"2005","unstructured":"Zheng D. X. M., Ng S. T. (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management 131(2): 176\u2013186","journal-title":"Journal of Construction Engineering and Management"}],"container-title":["Fuzzy Optimization and Decision Making"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10700-010-9076-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10700-010-9076-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10700-010-9076-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,10,25]],"date-time":"2021-10-25T02:52:27Z","timestamp":1635130347000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10700-010-9076-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,3,24]]},"references-count":48,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2010,6]]}},"alternative-id":["9076"],"URL":"https:\/\/doi.org\/10.1007\/s10700-010-9076-z","relation":{},"ISSN":["1568-4539","1573-2908"],"issn-type":[{"value":"1568-4539","type":"print"},{"value":"1573-2908","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,3,24]]}}}