{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,5]],"date-time":"2026-06-05T02:21:43Z","timestamp":1780626103299,"version":"3.54.1"},"reference-count":144,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2015,11,3]],"date-time":"2015-11-03T00:00:00Z","timestamp":1446508800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Fuzzy Optim Decis Making"],"published-print":{"date-parts":[[2016,9]]},"DOI":"10.1007\/s10700-015-9225-5","type":"journal-article","created":{"date-parts":[[2015,11,3]],"date-time":"2015-11-03T05:50:57Z","timestamp":1446529857000},"page":"331-366","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":34,"title":["Survey on fuzzy shop scheduling"],"prefix":"10.1007","volume":"15","author":[{"given":"J.","family":"Behnamian","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2015,11,3]]},"reference":[{"issue":"3","key":"9225_CR1","doi-asserted-by":"crossref","first-page":"628","DOI":"10.1016\/0377-2217(95)00091-7","volume":"92","author":"GI Adamopoulos","year":"1996","unstructured":"Adamopoulos, G. I., & Pappis, C. P. (1996). A fuzzy-linguistic approach to a multi-criteria sequencing problem. European Journal of Operational Research, 92(3), 628\u2013636.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"9225_CR2","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1111\/j.1475-3995.1998.tb00110.x","volume":"5","author":"GI Adamopoulos","year":"1998","unstructured":"Adamopoulos, G. I., & Pappis, C. P. (1998). A neighbourhood-based hybrid method for scheduling with fuzzy due-dates. International Transactions in Operational Research, 5(2), 147\u2013153.","journal-title":"International Transactions in Operational Research"},{"issue":"1\u20134","key":"9225_CR3","doi-asserted-by":"crossref","first-page":"581","DOI":"10.1007\/s00170-012-4198-9","volume":"65","author":"F Ahmadizar","year":"2013","unstructured":"Ahmadizar, F., & Hosseini, L. (2013). Minimizing makespan in a single-machine scheduling problem with a learning effect and fuzzy processing times. The International Journal of Advanced Manufacturing Technology, 65(1\u20134), 581\u2013587.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"9225_CR4","doi-asserted-by":"crossref","first-page":"272","DOI":"10.1016\/j.advengsoft.2011.10.004","volume":"45","author":"P Alcan","year":"2012","unstructured":"Alcan, P., & Ba\u015fl\u0131gil, H. (2012). A genetic algorithm application using fuzzy processing times in non-identical parallel machine scheduling problem. Advances in Engineering Software, 45(1), 272\u2013280.","journal-title":"Advances in Engineering Software"},{"key":"9225_CR5","doi-asserted-by":"crossref","first-page":"312","DOI":"10.1016\/S0377-2217(02)00563-5","volume":"147","author":"S Allet","year":"2003","unstructured":"Allet, S. (2003). Handling flexibility in a \u201cgeneralised job shop\u201d with a fuzzy approach. European Journal of Operational Research, 147, 312\u2013333.","journal-title":"European Journal of Operational Research"},{"key":"9225_CR6","doi-asserted-by":"crossref","first-page":"704","DOI":"10.1016\/j.ejor.2003.08.059","volume":"161","author":"A Anglani","year":"2005","unstructured":"Anglani, A., Grieco, A., Guerriero, E., & Musmanno, R. (2005). Robust scheduling of parallel machines with sequence-dependent set-up costs. European Journal of Operational Research, 161, 704\u2013720.","journal-title":"European Journal of Operational Research"},{"key":"9225_CR7","doi-asserted-by":"crossref","DOI":"10.1002\/9780470451793","volume-title":"Principles of sequencing and scheduling","author":"KR Baker","year":"2009","unstructured":"Baker, K. R., & Trietsch, D. (2009). Principles of sequencing and scheduling (1st ed.). New Jersey: Wiley.","edition":"1"},{"key":"9225_CR8","doi-asserted-by":"crossref","first-page":"469","DOI":"10.1016\/S0098-1354(02)00221-1","volume":"27","author":"J Balasubramanian","year":"2003","unstructured":"Balasubramanian, J., & Grossmann, I. E. (2003). Scheduling optimization under uncertainty\u2014an alternative approach. Computers & Chemical Engineering, 27, 469\u2013490.","journal-title":"Computers & Chemical Engineering"},{"issue":"17","key":"9225_CR9","doi-asserted-by":"crossref","first-page":"3551","DOI":"10.1016\/j.ins.2011.04.010","volume":"181","author":"S Balin","year":"2011","unstructured":"Balin, S. (2011). Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation. Information Sciences, 181(17), 3551\u20133569.","journal-title":"Information Sciences"},{"issue":"9\u201312","key":"9225_CR10","doi-asserted-by":"crossref","first-page":"1115","DOI":"10.1007\/s00170-011-3767-7","volume":"61","author":"S Balin","year":"2012","unstructured":"Balin, S. (2012). Non-identical parallel machine scheduling with fuzzy processing times using genetic algorithm and simulation. The International Journal of Advanced Manufacturing Technology, 61(9\u201312), 1115\u20131127.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"9225_CR11","unstructured":"Behnamian, J., & Ghomi, S. M. T. F. (2011). A heuristic algorithm for fuzzy single machine scheduling with specific due date. In 21th international conference on flexible automation and intelligent manufacturing (FAIM2011), Feng Chia University, Taiwan, June 2011."},{"key":"9225_CR12","doi-asserted-by":"crossref","first-page":"139","DOI":"10.1016\/j.asoc.2014.03.031","volume":"21","author":"J Behnamian","year":"2014","unstructured":"Behnamian, J., & Ghomi, S. M. T. F. (2014). Multi-objective fuzzy multiprocessor flowshop scheduling. Applied Soft Computing, 21, 139\u2013148.","journal-title":"Applied Soft Computing"},{"key":"9225_CR13","unstructured":"Ben-Arieh, D., & Lee, E. S. (1995). Fuzzy logic controller for part routing. In H. R. Parsaei & M. Jamshidi (Eds.), Design and implementation of intelligent manufacturing systems: From expert systems, neural network, to fuzzy logic, Chapter 5, pp. 81\u2013106. Englewood Cli9s, NJ: Prentice-Hall PTR."},{"key":"9225_CR14","doi-asserted-by":"crossref","first-page":"606","DOI":"10.1007\/s00170-003-1771-2","volume":"23","author":"O Bilkay","year":"2004","unstructured":"Bilkay, O., Anlagan, O., & Kilic, S. E. (2004). Job shop scheduling using fuzzy logic. International Journal Advanced Manufacturing Technology, 23, 606\u2013619.","journal-title":"International Journal Advanced Manufacturing Technology"},{"key":"9225_CR15","volume-title":"Fuzzy blocks in genetic algorithm for the flowshop problem, HSI, May 2008","author":"W Bozejko","year":"2008","unstructured":"Bozejko, W., Hejducki, Z., & Wodecki, M. (2008). Fuzzy blocks in genetic algorithm for the flowshop problem, HSI, May 2008. Poland: Krakow."},{"key":"9225_CR16","doi-asserted-by":"crossref","first-page":"630","DOI":"10.1287\/mnsc.16.10.B630","volume":"16","author":"H Campbell","year":"1970","unstructured":"Campbell, H., Dudek, R., & Smith, M. (1970). A heuristic algorithm for the n-job m-machine sequencing problem. Management Science B, 16, 630\u2013637.","journal-title":"Management Science B"},{"issue":"5","key":"9225_CR17","doi-asserted-by":"crossref","first-page":"1331","DOI":"10.1080\/002075497195353","volume":"35","author":"R Caprihan","year":"1997","unstructured":"Caprihan, R., Kumar, S., & Wadhwa, S. (1997). Fuzzy systems for control of flexible machines operation under information delays. International Journal of Production Research, 35(5), 1331\u20131348.","journal-title":"International Journal of Production Research"},{"key":"9225_CR18","doi-asserted-by":"crossref","first-page":"655","DOI":"10.1142\/S0218488503002466","volume":"11","author":"G Celano","year":"2003","unstructured":"Celano, G., Costa, A., & Fichera, S. (2003). An evolutionary algorithm for pure fuzzy flowshop scheduling problems. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 11, 655\u2013669.","journal-title":"International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems"},{"key":"9225_CR19","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1016\/S0952-1976(01)00011-2","volume":"14","author":"S Chanas","year":"2001","unstructured":"Chanas, S., & Kasperski, A. (2001). Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates. Engineering Applications of Artificial Intelligence, 14, 377\u2013386.","journal-title":"Engineering Applications of Artificial Intelligence"},{"key":"9225_CR20","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1016\/S0377-2217(02)00561-1","volume":"147","author":"S Chanas","year":"2003","unstructured":"Chanas, S., & Kasperski, A. (2003). On two single machine scheduling problems with fuzzy processing times and fuzzy due dates. European Journal of Operational Research, 147, 281\u2013296.","journal-title":"European Journal of Operational Research"},{"key":"9225_CR21","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1016\/S0165-0114(03)00178-7","volume":"142","author":"S Chanas","year":"2004","unstructured":"Chanas, S., & Kasperski, A. (2004). Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters. Fuzzy Sets and Systems, 142, 359\u2013371.","journal-title":"Fuzzy Sets and Systems"},{"issue":"4","key":"9225_CR22","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1080\/0951120010020749","volume":"14","author":"P-T Chang","year":"2001","unstructured":"Chang, P.-T., & Lo, Y.-T. (2001). Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA\/TS mixture approach. International Journal of Computer Integrated Manufacturing, 14(4), 367\u2013384.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"1","key":"9225_CR23","first-page":"4","volume":"1","author":"A Chaudhuri","year":"2010","unstructured":"Chaudhuri, A., & De, K. (2010). Job scheduling problem using rough fuzzy multilayer perception neural networks. Journal of Artificial Intelligence: Theory and Application, 1(1), 4\u201319.","journal-title":"Journal of Artificial Intelligence: Theory and Application"},{"issue":"1","key":"9225_CR24","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/j.jmsy.2010.06.007","volume":"29","author":"B Cheng","year":"2010","unstructured":"Cheng, B., Li, K., & Chen, B. (2010). Scheduling a single batch-processing machine with non-identical job sizes in fuzzy environment using an improved ant colony optimization. Journal of Manufacturing Systems, 29(1), 29\u201334.","journal-title":"Journal of Manufacturing Systems"},{"issue":"3","key":"9225_CR25","doi-asserted-by":"crossref","first-page":"578","DOI":"10.1016\/S0377-2217(96)00083-5","volume":"96","author":"J Cheng","year":"1997","unstructured":"Cheng, J., Kise, H., & Matsumoto, H. (1997). A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem. European Journal of Operational Research, 96(3), 578\u2013590.","journal-title":"European Journal of Operational Research"},{"key":"9225_CR26","unstructured":"Cheng, S. X. (1999). Fuzzy clustering with and application to scheduling, Master\u2019s thesis, Concordia University, March 1999, Montreal, Canada."},{"issue":"5\u20138","key":"9225_CR27","doi-asserted-by":"crossref","first-page":"763","DOI":"10.1007\/s00170-011-3317-3","volume":"57","author":"C-C Chyu","year":"2011","unstructured":"Chyu, C.-C., & Chang, W.-S. (2011). Optimizing fuzzy makespan and tardiness for unrelated parallel machine scheduling with archived metaheuristics. The International Journal of Advanced Manufacturing Technology, 57(5\u20138), 763\u2013776.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"9225_CR28","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1016\/S0165-0114(02)00364-0","volume":"137","author":"K Demirli","year":"2003","unstructured":"Demirli, K., Cheng, S. X., & Muthukumaran, P. (2003). Subtractive clustering based modeling of job sequencing with parametric search. Fuzzy Sets and Systems, 137, 235\u2013270.","journal-title":"Fuzzy Sets and Systems"},{"key":"9225_CR29","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1007\/BF00128646","volume":"6","author":"D Dubois","year":"1995","unstructured":"Dubois, D., Fargier, H., & Prade, H. (1995). Fuzzy constraints in job-shop scheduling. Journal of Intelligent Manufacturing, 6, 215\u2013234.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"9225_CR30","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s10700-007-9026-6","volume":"7","author":"A Duenas","year":"2008","unstructured":"Duenas, A., & Petrovic, D. (2008). Multi-objective genetic algorithm for single machine scheduling problem under fuzziness. Fuzzy Optimization and Decision Making, 7, 87\u2013104.","journal-title":"Fuzzy Optimization and Decision Making"},{"key":"9225_CR31","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1016\/0165-0114(82)90026-4","volume":"8","author":"V Dumitru","year":"1982","unstructured":"Dumitru, V., & Luban, F. (1982). Membership functions, some mathematical programming models and production scheduling. Fuzzy Sets and Systems, 8, 19\u201333.","journal-title":"Fuzzy Sets and Systems"},{"issue":"1","key":"9225_CR32","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1016\/j.asej.2010.09.004","volume":"1","author":"MMM Fahmy","year":"2010","unstructured":"Fahmy, M. M. M. (2010). A fuzzy algorithm for scheduling non-periodic jobs on soft real-time single processor system. Ain Shams Engineering Journal, 1(1), 31\u201338.","journal-title":"Ain Shams Engineering Journal"},{"key":"9225_CR33","doi-asserted-by":"crossref","unstructured":"Fayad, C., & Petrovic, S. (2005). A genetic algorithm for the real world fuzzy job-shop scheduling. In Proceedings of the international conference on industrial and engineering applications of artificial intelligence and expert systems IEA\/AIE-2005. Berlin: Springer.","DOI":"10.1007\/11504894_71"},{"key":"9225_CR34","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1109\/91.649907","volume":"5","author":"P Fortemps","year":"1997","unstructured":"Fortemps, P. (1997). Jobshop scheduling with imprecise durations: A fuzzy approach. IEEE Transactions on Fuzzy Systems, 5, 557\u2013569.","journal-title":"IEEE Transactions on Fuzzy Systems"},{"key":"9225_CR35","doi-asserted-by":"crossref","first-page":"706","DOI":"10.1016\/j.asoc.2007.05.009","volume":"8","author":"C Franke","year":"2008","unstructured":"Franke, C., Hoffmann, F., Lepping, J., & Schwiegelshohn, U. (2008). Development of scheduling strategies with genetic fuzzy systems. Applied Soft Computing, 8, 706\u2013721.","journal-title":"Applied Soft Computing"},{"key":"9225_CR36","first-page":"1161","volume":"2","author":"Z-Q Geng","year":"2001","unstructured":"Geng, Z.-Q., & Zou, Y.-R. (2001). Using HGA to solve E\/T scheduling problems with fuzzy processing time and fuzzy due date. Systems, Man, and Cybernetics, 2, 1161\u20131166.","journal-title":"Systems, Man, and Cybernetics"},{"key":"9225_CR37","doi-asserted-by":"crossref","first-page":"853","DOI":"10.1016\/j.rcim.2008.12.005","volume":"25","author":"AH Gharehgozli","year":"2009","unstructured":"Gharehgozli, A. H., Tavakkoli-Moghaddam, R., & Zaerpour, N. (2009). A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates. Robotics and Computer-Integrated Manufacturing, 25, 853\u2013859.","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"9225_CR38","unstructured":"Ghrayeb, O. (2000). An efficient genetic algorithm for JSSP with fuzzy durations. In Proceedings of industrial engineering research conference, Cleveland, OH."},{"issue":"3","key":"9225_CR39","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1016\/S1568-4946(02)00069-8","volume":"2","author":"OA Ghrayeb","year":"2003","unstructured":"Ghrayeb, O. A. (2003). A bi-criteria optimization: Minimizing the integral value and spread of the fuzzy makespan of job shop scheduling problems. Applied Soft Computing, 2(3), 197\u2013210.","journal-title":"Applied Soft Computing"},{"key":"9225_CR40","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1287\/opre.8.4.487","volume":"8","author":"B Giffler","year":"1960","unstructured":"Giffler, B., & Thompson, G. L. (1960). Algorithm for solving production scheduling problems. Operations Research, 8, 487\u2013503.","journal-title":"Operations Research"},{"key":"9225_CR41","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1023\/A:1008847308326","volume":"9","author":"AL Guiffrida","year":"1998","unstructured":"Guiffrida, A. L., & Nagi, R. (1998). Fuzzy set theory applications in production management research: A literature survey. Journal of Intelligent Manufacturing, 9, 39\u201356.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"9225_CR42","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1007\/s12597-012-0094-1","volume":"50","author":"D Gupta","year":"2013","unstructured":"Gupta, D., Sharma, S., & Aggarwal, S. (2013). Flow shop scheduling on 2-machines with setup time and single transport facility under fuzzy environment. OPSEARCH, 50(1), 14\u201324.","journal-title":"OPSEARCH"},{"key":"9225_CR43","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(94)90391-3","volume":"79","author":"S Han","year":"1994","unstructured":"Han, S., Ishii, H., & Fujii, S. (1994). One machine scheduling problem with fuzzy duedates. European Journal of Operational Research, 79, 1\u201312.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"9225_CR44","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1007\/s10700-004-5870-9","volume":"4","author":"KK Harikrishnan","year":"2005","unstructured":"Harikrishnan, K. K., & Ishii, H. (2005). Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date. Fuzzy Optimization and Decision Making, 4(2), 141\u2013147.","journal-title":"Fuzzy Optimization and Decision Making"},{"issue":"4","key":"9225_CR45","doi-asserted-by":"crossref","first-page":"142","DOI":"10.20965\/jaciii.1998.p0142","volume":"2","author":"TP Hong","year":"1998","unstructured":"Hong, T. P., & Chen, W. C. (1998). Fuzzy flexible-flowshops at two machine centers. Journal of Advanced Computational Intelligence, 2(4), 142\u2013149.","journal-title":"Journal of Advanced Computational Intelligence"},{"key":"9225_CR46","doi-asserted-by":"crossref","unstructured":"Hong, T. P., Yu, K. M., & Huang, C. M. (1998). LPT scheduling on fuzzy tasks with triangular membership function. In L. C. Jain & R. K. Jab (Eds.), Second international conference on knowledge-based intelligent elecwonic systems, April 1998. Adelaide.","DOI":"10.1109\/KES.1998.725960"},{"key":"9225_CR47","unstructured":"Hong, T.-P., & Wang, T.-T. (1999). A heuristic palmer-based fuzzy flexible flowshop scheduling algorithm. In IEEE international fuzzy systems conference proceedings, August 1999. Seoul, Korea."},{"key":"9225_CR48","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1016\/S0020-0255(00)00066-9","volume":"129","author":"T-P Hong","year":"2000","unstructured":"Hong, T.-P., & Wang, T.-T. (2000). Fuzzy flexible flowshops at two machine centers for continuous fuzzy domains. Information Sciences, 129, 227\u2013237.","journal-title":"Information Sciences"},{"issue":"9\u201312","key":"9225_CR49","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.1007\/s00170-011-3244-3","volume":"56","author":"Y Hu","year":"2011","unstructured":"Hu, Y., Yin, M., & Li, X. (2011). A novel objective function for jobshop scheduling problem with fuzzy processing time and fuzzy due date using differential evolution algorithm. The International Journal of Advanced Manufacturing Technology, 56(9\u201312), 1125\u20131138.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"5","key":"9225_CR50","doi-asserted-by":"crossref","first-page":"4999","DOI":"10.1016\/j.eswa.2011.10.013","volume":"39","author":"C-S Huang","year":"2012","unstructured":"Huang, C.-S., Huang, Y.-C., & Lai, P.-J. (2012). Modified genetic algorithms for solving fuzzy flow shop scheduling problems and their implementation with CUDA. Expert Systems with Applications, 39(5), 4999\u20135005.","journal-title":"Expert Systems with Applications"},{"key":"9225_CR51","first-page":"113","volume-title":"Scheduling under fuzziness","author":"H Ishibuchi","year":"2000","unstructured":"Ishibuchi, H., & Murata, T. (2000). Flowshop scheduling with fuzzy due date and fuzzy processing time. In R. Slowinski & M. Hapke (Eds.), Scheduling under fuzziness (pp. 113\u2013143). Heidelberg: Physica."},{"key":"9225_CR52","doi-asserted-by":"crossref","unstructured":"Ishibuchi, H., Murata T., & Lee, K. H. (1996a). Formulation of fuzzy flowshop scheduling problems with fuzzy processing time. In Proceedings of the 15th international conference on fuzzy systems, New Orleans.","DOI":"10.1109\/FUZZY.1996.551742"},{"key":"9225_CR53","doi-asserted-by":"crossref","unstructured":"Ishibuchi, H., Murata, T., & Lee, K.-H. (1996b). Relations between conventional scheduling problems and fuzzy scheduling problems. In Proceedings of 35th IEEE conference on decision and control, pp. 106\u2013107.","DOI":"10.1109\/CDC.1996.574265"},{"key":"9225_CR54","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1016\/0925-5273(94)90118-X","volume":"33","author":"H Ishibuchi","year":"1994","unstructured":"Ishibuchi, H., Yamamoto, N., Misaki, S., & Tanaka, H. (1994a). Local search algorithms for flowshop scheduling with fuzzy due-dates. International Journal of Production Economics, 33, 53\u201366.","journal-title":"International Journal of Production Economics"},{"key":"9225_CR55","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/0165-0114(94)90210-0","volume":"67","author":"H Ishibuchi","year":"1994","unstructured":"Ishibuchi, H., Yamamoto, N., Murata, T., & Tanaka, H. (1994b). Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems. Fuzzy Sets and Systems, 67, 81\u2013100.","journal-title":"Fuzzy Sets and Systems"},{"key":"9225_CR56","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1016\/0165-0114(92)90372-B","volume":"46","author":"H Ishii","year":"1992","unstructured":"Ishii, H., Tada, M., & Masuda, T. (1992). Two scheduling problems with fuzzy due dates. Fuzzy Sets and Systems, 46, 339\u2013347.","journal-title":"Fuzzy Sets and Systems"},{"issue":"2","key":"9225_CR57","doi-asserted-by":"crossref","first-page":"284","DOI":"10.1016\/0377-2217(94)00162-6","volume":"87","author":"H Ishii","year":"1995","unstructured":"Ishii, H., & Tada, M. (1995). Single machine scheduling problem with fuzzy precedence relation. European Journal of Operational Research, 87(2), 284\u2013288.","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"9225_CR58","doi-asserted-by":"crossref","first-page":"639","DOI":"10.1111\/j.1475-3995.1999.tb00178.x","volume":"6","author":"T Itoh","year":"1999","unstructured":"Itoh, T., & Ishii, H. (1999). Fuzzy due-date scheduling problem with fuzzy processing time. International Transactions in Operational Research, 6(6), 639\u2013647.","journal-title":"International Transactions in Operational Research"},{"issue":"1","key":"9225_CR59","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1007\/s10700-004-5571-4","volume":"4","author":"T Itoh","year":"2005","unstructured":"Itoh, T., & Ishiiv, H. (2005). One machine scheduling problem with fuzzy random due-dates. Fuzzy Optimization and Decision Making, 4(1), 71\u201378.","journal-title":"Fuzzy Optimization and Decision Making"},{"key":"9225_CR60","doi-asserted-by":"crossref","first-page":"452","DOI":"10.1016\/j.jfranklin.2007.12.003","volume":"345","author":"B Javadi","year":"2008","unstructured":"Javadi, B., Saidi-Mehrabad, M., Haji, A., Mahdavi, I., Jolai, F., & Mahdavi-Amiri, N. (2008). No-wait flowshop scheduling using fuzzy multi-objective linear programming. Journal of the Franklin Institute, 345, 452\u2013467.","journal-title":"Journal of the Franklin Institute"},{"key":"9225_CR61","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1016\/S0378-4754(02)00019-8","volume":"60","author":"I Kacem","year":"2002","unstructured":"Kacem, I., Hammadi, S., & Borne, P. (2002). Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic. Mathematics and Computers in Simulation, 60, 245\u2013276.","journal-title":"Mathematics and Computers in Simulation"},{"key":"9225_CR62","doi-asserted-by":"crossref","unstructured":"Kilic, S. (2007). Scheduling a fuzzy flowshop problem with flexible due dates using ant colony optimization. In M. Giacobini et al. (Eds.), EvoWorkshops 2007, LNCS 4448, pp. 742\u2013751.","DOI":"10.1007\/978-3-540-71805-5_80"},{"key":"9225_CR63","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1016\/S0165-0114(97)00380-1","volume":"109","author":"T Konno","year":"2000","unstructured":"Konno, T., & Ishii, H. (2000). An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint. Fuzzy Sets and Systems, 109, 141\u2013147.","journal-title":"Fuzzy Sets and Systems"},{"key":"9225_CR64","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/0925-5273(95)00091-7","volume":"44","author":"M Kuroda","year":"1996","unstructured":"Kuroda, M., & Wang, Z. (1996). Fuzzy job shop scheduling. International Journal of Production Economic, 44, 45\u201351.","journal-title":"International Journal of Production Economic"},{"key":"9225_CR65","unstructured":"Lai, P.-J., & Shu, M.-H. (2008). Tardiness in fuzzy flowshop scheduling problems based on possibility and necessity measures. In 8th international conference on intelligent systems design and applications."},{"issue":"8","key":"9225_CR66","doi-asserted-by":"crossref","first-page":"4540","DOI":"10.1016\/j.asoc.2011.08.012","volume":"11","author":"P-J Lai","year":"2011","unstructured":"Lai, P.-J., & Wu, H.-C. (2011). Evaluate the fuzzy completion times in the fuzzy flow shop scheduling problems using the virus-evolutionary genetic algorithms. Applied Soft Computing, 11(8), 4540\u20134550.","journal-title":"Applied Soft Computing"},{"key":"9225_CR67","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1016\/S1468-1218(01)00030-X","volume":"3","author":"SS Lam","year":"2002","unstructured":"Lam, S. S., & Cai, X. (2002). Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates. Nonlinear Analysis: Real World Applications, 3, 307\u2013316.","journal-title":"Nonlinear Analysis: Real World Applications"},{"issue":"5","key":"9225_CR68","doi-asserted-by":"crossref","first-page":"1221","DOI":"10.1080\/00207540110098832","volume":"40","author":"HT Lee","year":"2002","unstructured":"Lee, H. T., Chen, S. H., & Kang, H. Y. (2002). Multicriteria scheduling using fuzzy theory and tabu search. International Journal of Production Research, 40(5), 1221\u20131234.","journal-title":"International Journal of Production Research"},{"issue":"1\u20132","key":"9225_CR69","first-page":"157","volume":"37","author":"DM Lei","year":"2007","unstructured":"Lei, D. M. (2007). Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems. International Journal Advanced Manufacturing Technology, 37(1\u20132), 157\u2013165.","journal-title":"International Journal Advanced Manufacturing Technology"},{"key":"9225_CR70","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/s00170-007-0945-8","volume":"37","author":"DM Lei","year":"2008","unstructured":"Lei, D. M. (2008). Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems. International Journal of Advanced Manufacturing Technology, 37, 157\u2013165.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"9225_CR71","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s00170-009-2379-y","volume":"49","author":"D Lei","year":"2010","unstructured":"Lei, D. (2010a). Solving fuzzy job shop scheduling problems using random, key genetic algorithm. International Journal Advanced Manufacturing Technology, 49, 1\u20134. doi: 10.1007\/s00170-009-2379-y .","journal-title":"International Journal Advanced Manufacturing Technology"},{"key":"9225_CR72","doi-asserted-by":"publisher","unstructured":"Lei, D. (2010b). Fuzzy job shop scheduling problem with availability constraints. Computers & Industrial Engineering. doi: 10.1016\/j.cie.2010.01.002 .","DOI":"10.1016\/j.cie.2010.01.002"},{"issue":"10","key":"9225_CR73","doi-asserted-by":"crossref","first-page":"2995","DOI":"10.1080\/00207540902814348","volume":"48","author":"DM Lei","year":"2010","unstructured":"Lei, D. M. (2010c). A genetic algorithm for flexible job shop scheduling with fuzzy processing time. International Journal of Production Research, 48(10), 2995\u20133013.","journal-title":"International Journal of Production Research"},{"issue":"8","key":"9225_CR74","doi-asserted-by":"crossref","first-page":"2237","DOI":"10.1016\/j.asoc.2012.03.025","volume":"12","author":"D Lei","year":"2012","unstructured":"Lei, D. (2012). Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling. Applied Soft Computing, 12(8), 2237\u20132245.","journal-title":"Applied Soft Computing"},{"issue":"6","key":"9225_CR75","doi-asserted-by":"crossref","first-page":"1639","DOI":"10.1080\/00207543.2011.575412","volume":"50","author":"D Lei","year":"2012","unstructured":"Lei, D., & Guo, X. (2012). Swarm-based neighbourhood search algorithm for fuzzy flexible job shop scheduling. International Journal of Production Research, 50(6), 1639\u20131649.","journal-title":"International Journal of Production Research"},{"key":"9225_CR76","first-page":"992","volume-title":"Advance in natural computation","author":"FM Li","year":"2005","unstructured":"Li, F. M., Zhu, Y. L., Yin, C. W., & Song, X. Y. (2005). Fuzzy programming for multi-objective fuzzy job shop scheduling with alternative machines through genetic algorithm. In L. Wang, K. Chen, & Y. S. Ong (Eds.), Advance in natural computation (pp. 992\u20131004). Berlin: Springer."},{"issue":"3","key":"9225_CR77","doi-asserted-by":"crossref","first-page":"849","DOI":"10.1016\/j.asoc.2009.10.002","volume":"10","author":"J Li","year":"2010","unstructured":"Li, J., Sun, K., Xu, D., & Li, H. (2010a). Single machine due date assignment scheduling problem with customer service level in fuzzy environment. Applied Soft Computing, 10(3), 849\u2013858.","journal-title":"Applied Soft Computing"},{"issue":"1","key":"9225_CR78","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1016\/j.ijpe.2012.11.005","volume":"145","author":"J-Q Li","year":"2013","unstructured":"Li, J.-Q., & Pan, Q.-K. (2013a). Chemical-reaction optimization for solving fuzzy job-shop scheduling problem with flexible maintenance activities. International Journal of Production Economics, 145(1), 4\u201317.","journal-title":"International Journal of Production Economics"},{"issue":"1\u20134","key":"9225_CR79","first-page":"583","volume":"66","author":"J-Q Li","year":"2013","unstructured":"Li, J.-Q., & Pan, Y.-X. (2013b). A hybrid discrete particle swarm optimization algorithm for solving fuzzy job shop scheduling problem. The International Journal of Advanced Manufacturing Technology, 66(1\u20134), 583\u2013596.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"9225_CR80","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1016\/j.cie.2011.12.021","volume":"62","author":"X Li","year":"2012","unstructured":"Li, X., Ishii, H., & Masuda, T. (2012). Single machine batch scheduling problem with fuzzy batch size. Computers & Industrial Engineering, 62(3), 688\u2013692.","journal-title":"Computers & Industrial Engineering"},{"key":"9225_CR81","unstructured":"Li, Y., Luh, P. B., & Guan, X. (1994). Fuzzy optimization-based scheduling of identical machines with possible breakdown. In Robotics and automation, proceedings, IEEE international conference, May 1994, vol. 4, pp. 3447\u20133452, San Diego, CA."},{"key":"9225_CR82","doi-asserted-by":"publisher","unstructured":"Li, Y., Zheng, J.-Q., & Yang, S.-L. (2010b). Multi-agent-based fuzzy scheduling for shop floor. International journal advanced manufacturing technology. doi: 10.1007\/s00170-009-2410-3 .","DOI":"10.1007\/s00170-009-2410-3"},{"issue":"4","key":"9225_CR83","doi-asserted-by":"crossref","first-page":"510","DOI":"10.1109\/TFUZZ.2002.800659","volume":"10","author":"F-T Lin","year":"2002","unstructured":"Lin, F.-T. (2002). Fuzzy job-shop scheduling based on ranking level ( $$\\lambda $$ \u03bb , 1) interval-valued fuzzy numbers. IEEE Transactions on Fuzzy Systems, 10(4), 510\u2013522.","journal-title":"IEEE Transactions on Fuzzy Systems"},{"key":"9225_CR84","doi-asserted-by":"crossref","unstructured":"Liu, J.-J. (2009). Application of optimization genetic algorithm in fuzzy job shop scheduling problem. In Proceedings of the 2009 WRI global congress on intelligent systems, vol. 1, pp. 436-440.","DOI":"10.1109\/GCIS.2009.172"},{"key":"9225_CR85","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1016\/j.camwa.2005.08.031","volume":"51","author":"M Liu","year":"2006","unstructured":"Liu, M., Chen, D., Wu, C., & Li, H. (2006a). Approximation theorem of the fuzzy transform in fuzzy reasoning and its application to the scheduling problem. Computers & Mathematics with Applications, 51, 515\u2013526.","journal-title":"Computers & Mathematics with Applications"},{"key":"9225_CR86","doi-asserted-by":"crossref","first-page":"1507","DOI":"10.1016\/j.camwa.2005.12.003","volume":"51","author":"M Liu","year":"2006","unstructured":"Liu, M., Chen, D., Wu, C., & Li, H. (2006b). Fuzzy reasoning based on a new fuzzy rough set and its application to scheduling problems. Computers & Mathematics with Applications, 51, 1507\u20131518.","journal-title":"Computers & Mathematics with Applications"},{"key":"9225_CR87","unstructured":"Liu, Q., & Gu, X. (2002). A kind of flowshop schedule problem with uncertain processing time. In Proceedings of the 4th world congress on intelligent control and automation, June 2002, Shanghai, China."},{"issue":"7","key":"9225_CR88","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1016\/0898-1221(90)90191-L","volume":"19","author":"S McCahon","year":"1990","unstructured":"McCahon, S., & Lee, E. S. (1990). Job sequencing with fuzzy processing times. Computers & Mathematics with Applications, 19(7), 31\u201341.","journal-title":"Computers & Mathematics with Applications"},{"key":"9225_CR89","doi-asserted-by":"crossref","first-page":"294","DOI":"10.1016\/0377-2217(92)90119-T","volume":"62","author":"CS McCahon","year":"1992","unstructured":"McCahon, C. S., & Lee, E. S. (1992). Fuzzy job sequencing for a flowshop. European Journal of Operational Research, 62, 294\u2013305.","journal-title":"European Journal of Operational Research"},{"issue":"1\u20132","key":"9225_CR90","doi-asserted-by":"crossref","first-page":"122","DOI":"10.1007\/s00170-009-1947-5","volume":"45","author":"MS Mehrabad","year":"2009","unstructured":"Mehrabad, M. S., & Pahlavani, A. (2009). A fuzzy multi-objective programming for scheduling of weighted jobs on a single machine. The International Journal of Advanced Manufacturing Technology, 45(1\u20132), 122\u2013139.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"11","key":"9225_CR91","first-page":"2141","volume":"4","author":"A Muralidhar","year":"2009","unstructured":"Muralidhar, A., & Alwarsamy, T. (2009). Multi-objective optimization of parallel machine scheduling using fuzzy logic and simulated annealing. International Journal of Applied Engineering Research, 4(11), 2141\u20132143.","journal-title":"International Journal of Applied Engineering Research"},{"issue":"3\u20134","key":"9225_CR92","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1016\/S0360-8352(98)00128-4","volume":"35","author":"T Murata","year":"1998","unstructured":"Murata, T., Gen, M., & Ishibuchi, H. (1998). Multi-objective scheduling with fuzzy due-date. Computers & Industrial Engineering, 35(3\u20134), 439\u2013442.","journal-title":"Computers & Industrial Engineering"},{"key":"9225_CR93","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/S0165-0114(02)00138-0","volume":"134","author":"K Muthusamy","year":"2003","unstructured":"Muthusamy, K., Sung, S., Vlach, M., & Ishii, H. (2003). Scheduling with fuzzy delays and fuzzy precedences. Fuzzy Sets and Systems, 134, 387\u2013395.","journal-title":"Fuzzy Sets and Systems"},{"issue":"5\u20138","key":"9225_CR94","doi-asserted-by":"crossref","first-page":"1047","DOI":"10.1007\/s00170-012-4388-5","volume":"66","author":"M Nakhaeinejad","year":"2013","unstructured":"Nakhaeinejad, M., & Nahavandi, N. (2013). An interactive algorithm for multi-objective flow shop scheduling with fuzzy processing time through resolution method and TOPSIS. The International Journal of Advanced Manufacturing Technology, 66(5\u20138), 1047\u20131064.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"9225_CR95","doi-asserted-by":"crossref","first-page":"759","DOI":"10.1016\/j.asoc.2007.06.004","volume":"8","author":"SS Nezhad","year":"2008","unstructured":"Nezhad, S. S., & Assadi, R. G. (2008). Preference ratio-based maximum operator approximation and its application in fuzzy flowshop scheduling. Applied Soft Computing, 8, 759\u2013766.","journal-title":"Applied Soft Computing"},{"key":"9225_CR96","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1016\/j.amc.2008.05.086","volume":"205","author":"Q Niu","year":"2008","unstructured":"Niu, Q., Jiao, B., & Gu, X. (2008). Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time. Applied Mathematics and Computation, 205, 148\u2013158.","journal-title":"Applied Mathematics and Computation"},{"issue":"4","key":"9225_CR97","doi-asserted-by":"crossref","first-page":"1399","DOI":"10.1016\/j.asoc.2011.11.019","volume":"12","author":"S Noori-Darvish","year":"2012","unstructured":"Noori-Darvish, S., Mahdavi, I., & Mahdavi-Amiri, N. (2012). A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due dates. Applied Soft Computing, 12(4), 1399\u20131416.","journal-title":"Applied Soft Computing"},{"key":"9225_CR98","unstructured":"Okabe, T., Maeda, M., & Murakami, S. (1999). On the fuzzy scheduling for flowshop jobs by using genetic algorithm. In Systems, man, and cybernetics, IEEE SMC \u201999 conference proceedings, pp. 528\u2013539, Oct. 1999."},{"issue":"1\u20134","key":"9225_CR99","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1016\/j.ins.2003.05.012","volume":"166","author":"J Peng","year":"2004","unstructured":"Peng, J., & Liu, B. (2004). Parallel machine scheduling models with fuzzy processing times. Information Sciences, 166(1\u20134), 49\u201366.","journal-title":"Information Sciences"},{"key":"9225_CR100","unstructured":"Peng, J., & Song, K. (2001). Expected value goal programming models for fuzzy scheduling problem. In Proceedings of the tenth IEEE international conference on fuzzy systems, December 2001, pp. 292\u2013295. Melbourne, Australia."},{"key":"9225_CR101","first-page":"1423","volume":"2","author":"J Peng","year":"2003","unstructured":"Peng, J., & Song, K. (2003). Fuzzy flowshop scheduling models based on credibility measure. The IEEE International Conference on Fuzzy Systems, 2, 1423\u20131427.","journal-title":"The IEEE International Conference on Fuzzy Systems"},{"key":"9225_CR102","doi-asserted-by":"crossref","first-page":"2273","DOI":"10.1016\/j.fss.2006.04.009","volume":"157","author":"D Petrovic","year":"2006","unstructured":"Petrovic, D., & Duenas, A. (2006). A fuzzy logic based production scheduling\/rescheduling in the presence of uncertain disruptions. Fuzzy Sets and Systems, 157, 2273\u20132285.","journal-title":"Fuzzy Sets and Systems"},{"issue":"4","key":"9225_CR103","doi-asserted-by":"crossref","first-page":"1527","DOI":"10.1016\/j.dss.2006.06.006","volume":"43","author":"D Petrovic","year":"2007","unstructured":"Petrovic, D., Duenas, A., & Petrovic, S. (2007). Decision support tool for multi-objective job shop scheduling problems with linguistically quantified decision functions. Decision Support Systems, 43(4), 1527\u20131538.","journal-title":"Decision Support Systems"},{"key":"9225_CR104","unstructured":"Petrovic, S., & Fayad, C. (2004). A fuzzy shifting bottleneck hybridised with genetic algorithm for real-world job shop scheduling. In C. H. Antunes & L. C. Dias (Eds.), Proceedings of mini-EURO conference, managing uncertainty in decision support models, MUDSM 2004(22\u201324), September 2004, pp. 1\u20136. Portugal: Coimbra."},{"key":"9225_CR105","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1007\/s11081-006-9975-6","volume":"7","author":"S Petrovic","year":"2006","unstructured":"Petrovic, S., & Song, X. (2006). A new approach to two-machine flowshop problem with uncertain processing times. Optimization and Engineering, 7, 329\u2013342.","journal-title":"Optimization and Engineering"},{"key":"9225_CR106","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1007\/s10479-007-0287-9","volume":"159","author":"S Petrovic","year":"2008","unstructured":"Petrovic, S., Fayad, C., Petrovic, D., Burke, E., & Kendall, G. (2008). Fuzzy job shop scheduling with lot-sizing. Annals of Operations Research, 159, 275\u2013292.","journal-title":"Annals of Operations Research"},{"key":"9225_CR107","volume-title":"Scheduling theory, algorithms, and systems","author":"ML Pinedo","year":"2008","unstructured":"Pinedo, M. L. (2008). Scheduling theory, algorithms, and systems (3rd ed.). New York: Springer.","edition":"3"},{"key":"9225_CR108","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/0165-0114(79)90022-8","volume":"2","author":"H Prade","year":"1979","unstructured":"Prade, H. (1979). Using fuzzy set theory in a scheduling problem: A case study. Fuzzy Sets and Systems, 2, 153\u2013165.","journal-title":"Fuzzy Sets and Systems"},{"key":"9225_CR109","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1016\/S0377-2217(99)00094-6","volume":"120","author":"M Sakawa","year":"2000","unstructured":"Sakawa, M., & Kubota, R. (2000). Theory and methodology fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European Journal of Operational Research, 120, 393\u2013407.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"9225_CR110","doi-asserted-by":"crossref","first-page":"60","DOI":"10.1002\/1520-6440(200104)84:4<60::AID-ECJC7>3.0.CO;2-V","volume":"84","author":"M Sakawa","year":"2001","unstructured":"Sakawa, M., & Kubota, R. (2001). Two-objective fuzzy job shop scheduling through genetic algorithms. Electronics and Communications in Japan, 84(4), 60\u201367.","journal-title":"Electronics and Communications in Japan"},{"key":"9225_CR111","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1016\/S0360-8352(99)00135-7","volume":"36","author":"M Sakawa","year":"1999","unstructured":"Sakawa, M., & Mori, T. (1999). An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due-date. Computers & Industrial Engineering, 36, 325\u2013341.","journal-title":"Computers & Industrial Engineering"},{"key":"9225_CR112","doi-asserted-by":"crossref","unstructured":"Song, X. Y., Zhu, Y. L., Yin, C. W., & Li, F. M. (2006). Study on the combination of genetic algorithms and ant colony algorithms for solving fuzzy job shop scheduling problems. In Proceedings of the IMACS multi-conferences on computational engineering in systems applications, Beijing, pp. 1904\u20131909.","DOI":"10.1109\/CESA.2006.4281949"},{"key":"9225_CR113","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1016\/0377-2217(89)90208-7","volume":"43","author":"C Sriskandarajah","year":"1989","unstructured":"Sriskandarajah, C., & Sethi, S. P. (1989). Scheduling algorithms for flexible flowshops: Worst and average case performance. European Journal of Operational Research, 43, 143\u2013160.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"9225_CR114","first-page":"131","volume":"11","author":"V Subramaniam","year":"2002","unstructured":"Subramaniam, V., Ramesh, T., & Raheja, A. S. (2002). Exploiting the flexibility of multiple job routes in a dynamic job shop. Studies in Informatics and Control Journal, 11(2), 131\u2013143.","journal-title":"Studies in Informatics and Control Journal"},{"key":"9225_CR115","unstructured":"Sun, K.-T. (1998). Job scheduling using ranking fuzzy number method. In L. C. Jain & R. K. Jab (Eds.), Second international conference on knowledge-based intelligent electronic system, April 1998. Adelaide."},{"key":"9225_CR116","unstructured":"Sun, K. T. (1999). A two dimensional fuzzy ranking approach to job scheduling problems. In Proceedings of the 1998 IEEE international conference on fuzzy systems, May 1998 Anchorage, Alaska, USA, pp. 873\u2013878."},{"issue":"2","key":"9225_CR117","doi-asserted-by":"crossref","first-page":"421","DOI":"10.1016\/S0165-0114(02)00505-5","volume":"139","author":"SC Sung","year":"2003","unstructured":"Sung, S. C., & Vlach, M. (2003). Single machine scheduling to minimize the number of late jobs under uncertainty. Fuzzy Sets and Systems, 139(2), 421\u2013430.","journal-title":"Fuzzy Sets and Systems"},{"key":"9225_CR118","unstructured":"Tanaka, K., & Vlach, M. (1997). Single machine scheduling with fuzzy due dates. In Proceedings of the seventh IFSA world congress (pp. 195\u2013199). Prague: Academia."},{"key":"9225_CR119","unstructured":"Tavakkoli-Moghaddam, R., Javadi, B., & Safaei, N. (2006). Solving a mixed-integer model of a single machine scheduling problem by a fuzzy goal programming pproach. WSEAS Transactions on Business and Economics, 3(2), 45\u201352."},{"key":"9225_CR120","doi-asserted-by":"crossref","first-page":"919","DOI":"10.1016\/j.asoc.2009.10.010","volume":"10","author":"R Tavakkoli-Moghaddam","year":"2010","unstructured":"Tavakkoli-Moghaddam, R., Javadi, B., Jolai, F., & Ghodratnama, A. (2010). The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem. Applied Soft Computing, 10, 919\u2013925.","journal-title":"Applied Soft Computing"},{"key":"9225_CR121","doi-asserted-by":"crossref","first-page":"449","DOI":"10.1023\/B:JIMS.0000034107.72423.b6","volume":"15","author":"I Temiz","year":"2004","unstructured":"Temiz, I., & Erol, S. (2004). Fuzzy branch-and-bound algorithm for flowshop scheduling. Journal of Intelligent Manufacturing, 15, 449\u2013454.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"12","key":"9225_CR122","doi-asserted-by":"crossref","first-page":"4750","DOI":"10.1016\/j.asoc.2013.07.029","volume":"13","author":"SA Torabi","year":"2013","unstructured":"Torabi, S. A., Sahebjamnia, N., Mansouri, S. A., & Aramon Bajestani, M. (2013). A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem. Applied Soft Computing, 13(12), 4750\u20134762.","journal-title":"Applied Soft Computing"},{"key":"9225_CR123","unstructured":"Tsujimura, Y., Gen, M., & Kubota, E. (1995). Flowshop scheduling with fuzzy processing time using genetic algorithms. In Proceedings of 11th fuzzy system symposium, Okinawa, Japan, July 12\u201314, pp. 249\u2013252."},{"key":"9225_CR124","doi-asserted-by":"crossref","first-page":"308","DOI":"10.1117\/12.165037","volume":"1993","author":"IB T\u00fcrksen","year":"1993","unstructured":"T\u00fcrksen, I. B., Yurtsever, T., & Demirli, K. (1993). Fuzzy expert system shell for scheduling. Proceedings, SPIE, 1993, 308\u2013319.","journal-title":"Proceedings, SPIE"},{"key":"9225_CR125","doi-asserted-by":"crossref","unstructured":"Wang, B., & Yang, Z. (2007). A particle swarm optimization algorithm for robust flowshop scheduling with fuzzy processing times. In Proceedings of the IEEE, international conference on automation and logistics, August 2007, Jinan, China.","DOI":"10.1109\/ICAL.2007.4338678"},{"key":"9225_CR126","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1016\/S0165-0114(01)00084-7","volume":"127","author":"C Wang","year":"2002","unstructured":"Wang, C., Wanga, D., Ip, W. H., & Yuen, D. W. (2002). The single machine ready time scheduling problem with fuzzy processing times. Fuzzy Sets and Systems, 127, 117\u2013129.","journal-title":"Fuzzy Sets and Systems"},{"key":"9225_CR127","unstructured":"Wang, L., Du, G., & Zhang, Q. (2006). A FLC-GA for fuzzy flowshop scheduling problem with distinct due window. In Proceedings of the 6th world congress on intelligent control and automation, June, 2006, Dalian, China."},{"key":"9225_CR128","doi-asserted-by":"publisher","unstructured":"Wang, S., Wang, L., Xu, Y., & Liu, M. (2013a). An effective estimation of distribution algorithm for the flexible jobshop scheduling problem with fuzzy processing time. International Journal of Production Research. doi: 10.1080\/00207543.2013.765077 .","DOI":"10.1080\/00207543.2013.765077"},{"key":"9225_CR129","doi-asserted-by":"publisher","unstructured":"Wang, L., Zhou, G., Xu, Y., & Liu, M. (2013b). A hybrid artificial bee colony algorithm for the fuzzy flexible jobshop scheduling problem. International Journal of Production Research. doi: 10.1080\/00207543.2012.754549 .","DOI":"10.1080\/00207543.2012.754549"},{"key":"9225_CR130","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/0167-6377(91)90080-9","volume":"10","author":"D Werra","year":"1991","unstructured":"Werra, D., et al. (1991). A preemtive open shop scheduling problem with one resource. Operations Research Letters, 10, 9\u201315.","journal-title":"Operations Research Letters"},{"key":"9225_CR131","unstructured":"Wu, C., & Gu, X. (2004). A genetic algorithm for flowshop scheduling with fuzzy processing time and due date. In Proceedings of the 5th world congress on intelligent control and automation, June, 2004, Hangzhou, China."},{"issue":"1\u20132","key":"9225_CR132","first-page":"98","volume":"31","author":"C-S Wu","year":"2006","unstructured":"Wu, C.-S., Li, D.-C., & Tsai, T.-I. (2006). Applying the fuzzy ranking method to the shifting bottleneck procedure to solve scheduling problems of uncertainty. International Journal Advanced Manufacturing Technology, 31(1\u20132), 98\u2013106.","journal-title":"International Journal Advanced Manufacturing Technology"},{"key":"9225_CR133","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2009.12.029","author":"H-C Wu","year":"2010","unstructured":"Wu, H.-C. (2010). Solving the fuzzy earliness and tardiness in scheduling problems by using genetic algorithms. Expert Systems with Applications,. doi: 10.1016\/j.eswa.2009.12.029 .","journal-title":"Expert Systems with Applications"},{"issue":"12","key":"9225_CR134","doi-asserted-by":"crossref","first-page":"4704","DOI":"10.1016\/j.asoc.2013.07.015","volume":"13","author":"AS Xanthopoulos","year":"2013","unstructured":"Xanthopoulos, A. S., Koulouriotis, D. E., Tourassis, V. D., & Emiris, D. M. (2013). Intelligent controllers for bi-objective dynamic scheduling on a single machine with sequence-dependent setups. Applied Soft Computing, 13(12), 4704\u20134717.","journal-title":"Applied Soft Computing"},{"issue":"5","key":"9225_CR135","doi-asserted-by":"crossref","first-page":"450","DOI":"10.1007\/s11741-005-0032-z","volume":"9","author":"Y Xie","year":"2005","unstructured":"Xie, Y., Xie, J.-Y., & Huang, Q.-H. (2005). Single machine scheduling problem with fuzzy due dates and fuzzy precedence. Journal of Shanghai University, 9(5), 450\u2013454.","journal-title":"Journal of Shanghai University"},{"key":"9225_CR136","unstructured":"Xu, Z., & Gu, X. (2006). A hybrid algorithm for scheduling problems of flowshop with uncertain processing time. In Proceedings of the 6th world congress on intelligent control and automation, June 2006, Dalian, China."},{"key":"9225_CR137","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/S0888-613X(01)00064-0","volume":"29","author":"J-S Yao","year":"2002","unstructured":"Yao, J.-S., & Lin, F.-T. (2002). Constructing a fuzzy flowshop sequencing model based on statistical data. International Journal of Approximate Reasoning, 29, 215\u2013234.","journal-title":"International Journal of Approximate Reasoning"},{"key":"9225_CR138","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1016\/j.ijar.2007.08.013","volume":"50","author":"AD Yimer","year":"2009","unstructured":"Yimer, A. D., & Demirli, K. (2009). Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines. International Journal of Approximate Reasoning, 50, 117\u2013137.","journal-title":"International Journal of Approximate Reasoning"},{"key":"9225_CR139","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1016\/S0360-8352(02)00130-4","volume":"43","author":"YS Yun","year":"2002","unstructured":"Yun, Y. S. (2002). Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job-shop scheduling problems. Computers & Industrial Engineering, 43, 623\u2013644.","journal-title":"Computers & Industrial Engineering"},{"issue":"17","key":"9225_CR140","doi-asserted-by":"crossref","first-page":"5100","DOI":"10.1080\/00207543.2013.793425","volume":"51","author":"X Zhang","year":"2013","unstructured":"Zhang, X., Denga, Y., Chan, F. T. S., Xu, P., Mahadevan, S., & Hu, Y. (2013). IFSJSP: A novel methodology for the Job-shop scheduling problem based on intuitionistic fuzzy sets. International Journal of Production Research, 51(17), 5100\u20135119.","journal-title":"International Journal of Production Research"},{"key":"9225_CR141","unstructured":"Zheng, L., & Gu, X. (2004a). Fuzzy FIS flowshop production scheduling with no-wait restrictions. In Proceedings of the 5th world congress on intelligent control and automation, Hangzhou, China."},{"key":"9225_CR142","unstructured":"Zheng, L., & Gu, X. (2004b). Fuzzy production scheduling in no-wait flowshop to minimize the makespan with e\/t constraints using SA. In Proceedings of the 5th world congress on intelligent control and automation, June 2004, Hangzhou, China."},{"issue":"9\u201312","key":"9225_CR143","doi-asserted-by":"crossref","first-page":"1063","DOI":"10.1007\/s00170-011-3646-2","volume":"60","author":"Y-L Zheng","year":"2012","unstructured":"Zheng, Y.-L., Li, Y.-X., & Lei, D.-M. (2012). Multi-objective swarm-based neighborhood search for fuzzy flexible job shop scheduling. The International Journal of Advanced Manufacturing Technology, 60(9\u201312), 1063\u20131069.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"9225_CR144","unstructured":"Zhou, Y., & Gu, X. (2009). Research on no-wait flowshop scheduling problem with fuzzy due date based on evolution games. In ICCSIT, 2nd IEEE international conference on computer science and information technology, pp. 495\u2013499."}],"container-title":["Fuzzy Optimization and Decision Making"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10700-015-9225-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10700-015-9225-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10700-015-9225-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,25]],"date-time":"2022-05-25T01:48:53Z","timestamp":1653443333000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10700-015-9225-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,11,3]]},"references-count":144,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2016,9]]}},"alternative-id":["9225"],"URL":"https:\/\/doi.org\/10.1007\/s10700-015-9225-5","relation":{},"ISSN":["1568-4539","1573-2908"],"issn-type":[{"value":"1568-4539","type":"print"},{"value":"1573-2908","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,11,3]]}}}