{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T12:03:48Z","timestamp":1770984228415,"version":"3.50.1"},"reference-count":49,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2006,12,1]],"date-time":"2006-12-01T00:00:00Z","timestamp":1164931200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Heuristics"],"published-print":{"date-parts":[[2006,12]]},"DOI":"10.1007\/s10732-006-6017-7","type":"journal-article","created":{"date-parts":[[2006,10,24]],"date-time":"2006-10-24T16:41:28Z","timestamp":1161708088000},"page":"413-426","source":"Crossref","is-referenced-by-count":18,"title":["A tabu search algorithm for solving economic lot scheduling problem"],"prefix":"10.1007","volume":"12","author":[{"given":"S. A.","family":"Raza","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"A.","family":"Akgunduz","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M. Y.","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"3","key":"6017_CR1","first-page":"24","volume":"31","author":"S.J. Allen","year":"1990","unstructured":"Allen, S.J. (1990). \u201cProduction Rate Planning for Two Products Sharing a Single Process Facility: A Real World Case Study.\u201d Production and Inventory Management 31(3), 24\u201329.","journal-title":"Production and Inventory Management"},{"issue":"17","key":"6017_CR2","doi-asserted-by":"crossref","first-page":"3955","DOI":"10.1080\/00207540310001626319","volume":"41","author":"H. Aytug","year":"2003","unstructured":"Aytug, H., M. Khouja, and F.E. Vergara. (2003).\u201cUse of Genetic Algorithm to Solve Production and Operations Management Problems: A Review.\u201d Interantional Journal of Production Research 41(17), 3955\u20134009.","journal-title":"Interantional Journal of Production Research"},{"issue":"1","key":"6017_CR3","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1016\/S0377-2217(97)00136-7","volume":"109","author":"M. Ben-daya","year":"1998","unstructured":"Ben-daya, M. and M. Al-Fawzan. (1998). \u201cA Tabu Search Approach for the Flow Shop Scheduling Problem.\u201d European Journal of Operational Research 109(1), 88\u201395.","journal-title":"European Journal of Operational Research"},{"issue":"11","key":"6017_CR4","doi-asserted-by":"crossref","first-page":"778","DOI":"10.1287\/mnsc.12.11.778","volume":"12","author":"E.E. Bomberger","year":"1966","unstructured":"Bomberger, E.E. (1966). \u201cA Dynamic Programming Approach to a Lot Size Scheduling Problem.\u201d Management Science 12(11), 778\u2013784.","journal-title":"Management Science"},{"key":"6017_CR5","first-page":"103","volume":"29","author":"K.E. Bourland","year":"1997","unstructured":"Bourland, K.E. and C.A. Yano. (1997). \u201cA Comparison of Solution Approaches for the Fixed-Sequence Economic Lot Scheduling Problem.\u201d IIE-Transactions 29, 103\u2013108.","journal-title":"IIE-Transactions"},{"issue":"10","key":"6017_CR6","doi-asserted-by":"crossref","first-page":"1070","DOI":"10.1287\/mnsc.23.10.1070","volume":"23","author":"C. Delporte","year":"1978","unstructured":"Delporte, C. and L. Thomas. (1978). \u201cLot Sizing and Sequencing for N Products on One facility.\u201d Management Science 23(10), 1070\u20131079.","journal-title":"Management Science"},{"issue":"5","key":"6017_CR7","doi-asserted-by":"crossref","first-page":"764","DOI":"10.1287\/opre.35.5.764","volume":"35","author":"G. Dobson","year":"1987","unstructured":"Dobson, G. (1987). \u201cThe Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes.\u201d Operations Research 35(5), 764\u2013771.","journal-title":"Operations Research"},{"issue":"4","key":"6017_CR8","doi-asserted-by":"crossref","first-page":"736","DOI":"10.1287\/opre.40.4.736","volume":"40","author":"G. Dobson","year":"1992","unstructured":"Dobson, G. (1992). \u201cThe Cyclic Lot Scheduling Problem with Sequence-Dependent Setups.\u201d Operations Research 40(4), 736\u2013749.","journal-title":"Operations Research"},{"issue":"1","key":"6017_CR9","doi-asserted-by":"crossref","first-page":"50","DOI":"10.1287\/mnsc.20.1.50","volume":"20","author":"C.L. Doll","year":"1973","unstructured":"Doll, C.L. and D.C. Whybark. (1973). \u201cAn Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem.\u201d Management Science 20(1), 50\u201355.","journal-title":"Management Science"},{"issue":"4","key":"6017_CR10","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1057\/jors.1959.22","volume":"10","author":"S. Eilon","year":"1959","unstructured":"Eilon, S. (1959). \u201cEconomic Batch-Size Determination for Multi-Product Scheduling.\u201d Operations Research 10(4), 217\u2013227.","journal-title":"Operations Research"},{"issue":"6","key":"6017_CR11","doi-asserted-by":"crossref","first-page":"587","DOI":"10.1287\/mnsc.24.6.587","volume":"24","author":"S. Elmaghraby","year":"1978","unstructured":"Elmaghraby, S. (1978). \u201cThe Economic Lot Scheduling Problem (ELSP): Review and Extension.\u201d Management Science 24(6), 587\u2013598.","journal-title":"Management Science"},{"issue":"7","key":"6017_CR12","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1080\/07408170490278238","volume":"36","author":"B.H. Faaland","year":"2004","unstructured":"Faaland, B.H., T.G. Schmitt, and A. Arreola-Risa. (2004). \u201cEconomic Lot Scheduling with Lost Sales and Setup Times.\u201d IIE Transactions 36(7), 629\u2013640.","journal-title":"IIE Transactions"},{"key":"6017_CR13","unstructured":"French, S. (1982). Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop, Ellis Horwood Limited."},{"issue":"2","key":"6017_CR14","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1080\/07408179008964172","volume":"22","author":"G. Gallego","year":"1990","unstructured":"Gallego, G. (1990). \u201cAn Extension to the Class of Easy Economic Lot Scheduling Problem Easy?\u201d IIE Transactions 22(2), 189\u2013190.","journal-title":"IIE Transactions"},{"issue":"5","key":"6017_CR15","doi-asserted-by":"crossref","first-page":"1035","DOI":"10.1080\/00207549308956774","volume":"31","author":"G. Gallego","year":"1993","unstructured":"Gallego, G. (1993). \u201cReduced Production Rates in the Economic Lot Scheduling Problem.\u201d International Journal of Production Research 31(5), 1035\u20131046.","journal-title":"International Journal of Production Research"},{"issue":"5","key":"6017_CR16","doi-asserted-by":"crossref","first-page":"729","DOI":"10.1002\/1520-6750(199208)39:5<729::AID-NAV3220390510>3.0.CO;2-N","volume":"39","author":"G. Gallego","year":"1992","unstructured":"Gallego, G. and R. Roundy. (1992). \u201cThe Economic Lot Scheduling Problem with Finite Backorder Costs.\u201d Naval Research Logistics 39(5), 729\u2013739.","journal-title":"Naval Research Logistics"},{"issue":"2","key":"6017_CR17","first-page":"109","volume":"29","author":"G. Gallego","year":"1997","unstructured":"Gallego, G. and X. Shaw. (1997). \u201cComplexity of the ELSP with General Cyclic Schedules. IIE Transactions 29(2), 109\u2013113.","journal-title":"IIE Transactions"},{"issue":"3","key":"6017_CR18","doi-asserted-by":"crossref","first-page":"614","DOI":"10.1287\/opre.40.3.614","volume":"40","author":"G. Gellego","year":"1992","unstructured":"Gellego, G. and I. Moon. (1992). \u201cThe Effect of Externalizing Setups in the Economic Lot Scheduling Problem.\u201d Operations Research 40(3), 614\u2013619.","journal-title":"Operations Research"},{"issue":"6","key":"6017_CR19","doi-asserted-by":"crossref","first-page":"650","DOI":"10.1002\/nav.10082","volume":"50","author":"B.C. Giri","year":"2003","unstructured":"Giri, B.C., I. Moon, and W.Y. Yun. (2003). \u201cScheduling Economic Lot Sizes in Deteriorating Production Systems.\u201d Naval Research Logistics 50(6), 650\u2013661.","journal-title":"Naval Research Logistics"},{"issue":"3","key":"6017_CR20","doi-asserted-by":"crossref","first-page":"190","DOI":"10.1287\/ijoc.1.3.190","volume":"1","author":"F. Glover","year":"1989","unstructured":"Glover, F. (1989). \u201cTabu Search- Part I.\u201d ORSA 1(3), 190\u2013206.","journal-title":"ORSA"},{"issue":"1","key":"6017_CR21","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1287\/ijoc.2.1.4","volume":"2","author":"F. Glover","year":"1990","unstructured":"Glover, F. (1990). \u201cTabu Search- Part II.\u201d ORSA 2(1), 4\u201332.","journal-title":"ORSA"},{"key":"6017_CR22","doi-asserted-by":"crossref","unstructured":"Glover, F.W. and M. Laguna. (1998). Tabu Search, Kluwer Academic Publishers.","DOI":"10.1007\/978-1-4615-6089-0"},{"key":"6017_CR23","volume-title":"Operations Research in Production Planning and Control","author":"F. Hanssmann","year":"1962","unstructured":"Hanssmann, F. (1962). Operations Research in Production Planning and Control, John Wiley, New York."},{"issue":"1","key":"6017_CR24","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1287\/mnsc.29.1.93","volume":"29","author":"W. Hsu","year":"1983","unstructured":"Hsu, W. (1983). \u201cOn the General Feasibility Test for Scheduling Lot Sizes for Several Products on One Machine.\u201d Management Science 29(1), 93\u2013105.","journal-title":"Management Science"},{"issue":"3","key":"6017_CR25","doi-asserted-by":"crossref","first-page":"691","DOI":"10.1080\/00207549308956751","volume":"31","author":"H. Hwang","year":"1993","unstructured":"Hwang, H., D. Kim, and Y. Kim (1993). \u201cMultiproduct Economic Lot Size Models with Investment Costs for Set-Up Reduction and Quality Improvement.\u201d International Journal of Production Research 31(3), 691\u2013703.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"6017_CR26","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1080\/07408178908966202","volume":"21","author":"P. Jones","year":"1989","unstructured":"Jones, P. and R. Inman. (1989). \u201cWhen is the Economic Lot Scheduling Problem Easy?\u201d IIE Transactions 21(1), 11\u201320.","journal-title":"IIE Transactions"},{"issue":"1","key":"6017_CR27","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/S0925-5273(96)00064-3","volume":"48","author":"M. Khouja","year":"1997","unstructured":"Khouja, M. (1997). \u201cThe Economic Lot Scheduling Problem Under Volume Flexibility.\u201d International Journal of Production Economics 48(1), 73\u201386.","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"6017_CR28","doi-asserted-by":"crossref","first-page":"509","DOI":"10.1016\/S0377-2217(97)00270-1","volume":"110","author":"M. Khouja","year":"1998","unstructured":"Khouja, M., Z. Michalewicz, and M. Wilmot. (1998). \u201cThe Use of Genetic Algorithms to Solve the Economic Lot Size Scheduling Problem.\u201d European Journal of Operational Research 110(3), 509\u2013524.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"6017_CR29","doi-asserted-by":"crossref","first-page":"529","DOI":"10.1016\/0305-0483(92)90027-5","volume":"20","author":"R. Mallya","year":"1992","unstructured":"Mallya, R. (1992). \u201cMulti-Product Scheduling on A Single Machine: A Case Study.\u201d OMEGA 20(4), 529\u2013534.","journal-title":"OMEGA"},{"key":"6017_CR30","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1002\/nav.3800110202","volume":"11","author":"W.L. Maxwell","year":"1964","unstructured":"Maxwell, W.L. (1964). \u201cThe Scheduling of Economic Lot Sizes.\u201d Naval Research Logistics Quarterly 11, 89\u2013124.","journal-title":"Naval Research Logistics Quarterly"},{"issue":"1","key":"6017_CR31","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/S0925-5273(97)00128-X","volume":"54","author":"D. Moon","year":"1998","unstructured":"Moon, D. and D. Christy. (1998). \u201cDetermination of Optimal Production Rates on a Single Facility with Dependent Mold Lifespan.\u201d International Journal of Production Economics 54(1), 29\u201340.","journal-title":"International Journal of Production Economics"},{"issue":"12","key":"6017_CR32","doi-asserted-by":"crossref","first-page":"2795","DOI":"10.1080\/00207549408957100","volume":"32","author":"I. Moon","year":"1994","unstructured":"Moon, I. (1994). \u201cMultiproduct Economic Lot Size Models with Investment Costs for Setup Reduction and Quality Improvements: Reviews and Extensions.\u201d International Journal of Production Research 32(12), 2795\u20132801.","journal-title":"International Journal of Production Research"},{"issue":"12","key":"6017_CR33","doi-asserted-by":"crossref","first-page":"2459","DOI":"10.1080\/00207549108948096","volume":"29","author":"I. Moon","year":"1991","unstructured":"Moon, I., G. Gallego, and D. Simchi-Levi. (1991). \u201cControllable Production Rates in a Family Production Context.\u201d International Journal of Production Research 29(12), 2459\u20132470.","journal-title":"International Journal of Production Research"},{"issue":"6","key":"6017_CR34","doi-asserted-by":"crossref","first-page":"620","DOI":"10.1057\/palgrave.jors.2601350","volume":"53","author":"I. Moon","year":"2002","unstructured":"Moon, I., B. Giri, and K. Choi. (2002). \u201cEconomic Lot Scheduling Problem with Imperfect Production Processes and Setup Times.\u201d Journal of Operational Research Society 53(6), 620\u2013629.","journal-title":"Journal of Operational Research Society"},{"issue":"11","key":"6017_CR35","first-page":"1009","volume":"30","author":"I. Moon","year":"1998","unstructured":"Moon, I., J. Hahm, and C. Lee. (1998). \u201cThe Effect of the Stabilization Period on the Economic Lot Scheduling Problem.\u201d IIE Transactions 30(11), 1009\u20131017.","journal-title":"IIE Transactions"},{"issue":"4","key":"6017_CR36","doi-asserted-by":"crossref","first-page":"809","DOI":"10.1080\/00207540110095222","volume":"20","author":"I. Moon","year":"2002","unstructured":"Moon, I., E. Silver, and S. Choi, (2002). \u201cHybrid Genetic Algorithm for the Economic Lot-Scheduling Problem.\u201d International Journal of Production Research 20(4), 809\u2013824.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"6017_CR37","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.1080\/002075498193552","volume":"36","author":"J. Ouenniche","year":"1998","unstructured":"Ouenniche, J. and F. Boctor. (1998). \u201cSequencing, Lot Sizing and Scheduling of Several Products in Job Shops: The common cycle approach. Interantional Journal of Production Research 36(4), 1125\u20131140.","journal-title":"Interantional Journal of Production Research"},{"issue":"3","key":"6017_CR38","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1287\/mnsc.4.3.264","volume":"4","author":"J. Rogers","year":"1958","unstructured":"Rogers, J. (1958). \u201cA Computational Approach to the Economic Lot Scheduling Problem.\u201d Management Science 4(3), 264\u2013291.","journal-title":"Management Science"},{"issue":"12","key":"6017_CR39","doi-asserted-by":"crossref","first-page":"1433","DOI":"10.1287\/mnsc.35.12.1433","volume":"35","author":"R. Roundy","year":"1989","unstructured":"Roundy, R. (1989). \u201cRounding off to Powers of Two in Continuous Relaxation of Capacitated Lot Sizing Problems.\u201d Management Science 35(12), 1433\u20131442.","journal-title":"Management Science"},{"key":"6017_CR40","unstructured":"Sait, S.M. and H. Youssef. (1999). Iterative Computer Algorithms with Applications in Engineering, IEEE Computer Society."},{"issue":"1","key":"6017_CR41","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1080\/00207549008942681","volume":"28","author":"E. Silver","year":"1990","unstructured":"Silver, E. (1990). \u201cDeliberately Slowing Down Output in a Family Production Context.\u201d International Journal of Production Research 28(1), 17\u201327.","journal-title":"International Journal of Production Research"},{"key":"6017_CR42","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1007\/978-1-4615-3166-1_2","volume-title":"Perspectives in Operations Management: Essays in Honor of E. S. Buffa.","author":"E. Silver","year":"1993","unstructured":"Silver, E. (1993). Perspectives in Operations Management: Essays in Honor of E. S. Buffa., Kluwer Academic Publishers, Massachusetts, USA, pp. 23\u201344."},{"issue":"3","key":"6017_CR43","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1080\/00207549508930169","volume":"33","author":"E. Silver","year":"1995","unstructured":"Silver, E. (1995). \u201cDealing with Shelf Life Constraint in Cyclic Scheduling by Adjusting Both Cycle Time and Production Rate.\u201d International Journal of Production Research 33(3), 623\u2013629.","journal-title":"International Journal of Production Research"},{"issue":"9","key":"6017_CR44","doi-asserted-by":"crossref","first-page":"936","DOI":"10.1057\/palgrave.jors.2601758","volume":"55","author":"E.A. Silver","year":"2004","unstructured":"Silver, E.A. (2004). \u201cAn Overview of Heuristic Solution Methods.\u201d Journal of Operational Research Society 55(9), 936\u2013956.","journal-title":"Journal of Operational Research Society"},{"key":"6017_CR45","volume-title":"Inventory Management and Production Planning and Scheduling","author":"E. Silver","year":"1998","unstructured":"Silver, E., D. Pyke, and R. Peterson. (1998). Inventory Management and Production Planning and Scheduling, 3rd edn., John Wiley, New York.","edition":"3"},{"issue":"1","key":"6017_CR46","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1016\/0377-2217(90)90090-X","volume":"47","author":"E. Tillard","year":"1990","unstructured":"Tillard, E. (1990). \u201cSome Efficient Heuristic Methods for the Flow Shop Sequencing Problem.\u201d European Journal of Operational Research 47(1), 65\u201374.","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"6017_CR47","doi-asserted-by":"crossref","first-page":"1703","DOI":"10.1080\/002075497195218","volume":"35","author":"S. Viswanathan","year":"1997","unstructured":"Viswanathan, S. and S.K. Goyal. (1997). \u201cOptimal Cycle Time and Production Rate in a Family Production Context with Shelf Life Considerations.\u201d International Journal of Production Research 35(6), 1703\u20131711.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"6017_CR48","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1016\/S0377-2217(01)00265-X","volume":"141","author":"B.J. Wagner","year":"2002","unstructured":"Wagner, B.J. and D.J. Davis. (2002). \u201cA Search Heuristic for the Sequence-Dependent Economic Lot Scheduling.\u201d European Journal of Operational Research 141(1), 133\u2013146.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"6017_CR49","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1287\/opre.39.1.56","volume":"39","author":"P.H. Zipkin","year":"1991","unstructured":"Zipkin, P.H. (1991). \u201cComputing Optimal Lot Sizes in the Economic Lot Scheduling Problem.\u201d Operations Research 39(1), 56\u201363.","journal-title":"Operations Research"}],"container-title":["Journal of Heuristics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-006-6017-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10732-006-6017-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-006-6017-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:54:27Z","timestamp":1559256867000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10732-006-6017-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,12]]},"references-count":49,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2006,12]]}},"alternative-id":["6017"],"URL":"https:\/\/doi.org\/10.1007\/s10732-006-6017-7","relation":{},"ISSN":["1381-1231","1572-9397"],"issn-type":[{"value":"1381-1231","type":"print"},{"value":"1572-9397","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,12]]}}}