{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T03:54:36Z","timestamp":1777607676618,"version":"3.51.4"},"reference-count":35,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2007,4,27]],"date-time":"2007-04-27T00:00:00Z","timestamp":1177632000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Heuristics"],"published-print":{"date-parts":[[2007,8]]},"DOI":"10.1007\/s10732-007-9011-9","type":"journal-article","created":{"date-parts":[[2007,4,26]],"date-time":"2007-04-26T12:31:55Z","timestamp":1177590715000},"page":"337-358","source":"Crossref","is-referenced-by-count":77,"title":["Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups"],"prefix":"10.1007","volume":"13","author":[{"given":"Silvio A.","family":"de Araujo","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Marcos N.","family":"Arenales","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alistair R.","family":"Clark","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2007,4,27]]},"reference":[{"key":"9011_CR1","volume-title":"Local Search in Combinatorial Optimization","author":"E.H.L. Aarts","year":"1997","unstructured":"Aarts, E.H.L., Lenstra, J.K.: Local Search in Combinatorial Optimization. Wiley, Chichester (1997)"},{"key":"9011_CR2","unstructured":"Araujo, S.A., Arenales, M.N., Clark, A.R.: A Lot-sizing and furnace scheduling in small market-driven foundries. Comput. Oper. Res. (2007, in press)"},{"key":"9011_CR3","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1080\/00207549308956743","volume":"31","author":"M. Arosio","year":"1993","unstructured":"Arosio, M., Sianesi, A.: A heuristic algorithm for master production scheduling generation with finite capacity and sequence dependent setups. Int. J. Prod. Res. 31, 531\u2013553 (1993)","journal-title":"Int. J. Prod. Res."},{"key":"9011_CR4","doi-asserted-by":"crossref","first-page":"993","DOI":"10.1287\/mnsc.47.7.993.9800","volume":"47","author":"G. Belvaux","year":"2001","unstructured":"Belvaux, G., Wolsey, L.A.: Modelling practical lot-sizing problems as mixed integer programs. Manag. Sci. 47, 993\u20131007 (2001)","journal-title":"Manag. Sci."},{"issue":"1","key":"9011_CR5","doi-asserted-by":"crossref","first-page":"140","DOI":"10.1016\/j.ijpe.2005.05.018","volume":"101","author":"P. Beraldi","year":"2006","unstructured":"Beraldi, P., Ghianib, G., Guerrieroc, E., Grieco, A.: Scenario-based planning for lot-sizing and scheduling with uncertain processing times. Int. J. Prod. Econ. 101(1), 140\u2013149 (2006)","journal-title":"Int. J. Prod. Econ."},{"key":"9011_CR6","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1016\/S0925-5273(02)00400-0","volume":"84","author":"A.R. Clark","year":"2003","unstructured":"Clark, A.R.: Optimization approximations for capacity constrained material requirements planning problems. Int. J. Prod. Econ. 84, 115\u2013131 (2003a)","journal-title":"Int. J. Prod. Econ."},{"key":"9011_CR7","doi-asserted-by":"crossref","first-page":"545","DOI":"10.1016\/S0360-8352(03)00073-1","volume":"45","author":"A.R. Clark","year":"2003","unstructured":"Clark, A.R.: Hybrid heuristics for planning lot sizes and setups. Comput. Ind. Eng. 45, 545\u2013562 (2003b)","journal-title":"Comput. Ind. Eng."},{"key":"9011_CR8","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1080\/09537280412331286565","volume":"16","author":"A.R. Clark","year":"2005","unstructured":"Clark, A.R.: Rolling horizon heuristics for production and setup planning with backlogs and error-prone demand forecasts. Prod. Plan. Control 16, 81\u201397 (2005)","journal-title":"Prod. Plan. Control"},{"key":"9011_CR9","volume-title":"Optimizaci\u00f3n Heur\u00edstica y Redes Neuronales","author":"A. Diaz","year":"1996","unstructured":"Diaz, A., Glover, F., Ghaziri, H.M., Gonz\u00e1lez, J.L., Laguna, M., Moscato, P., Tseng, F.T., Optimizaci\u00f3n Heur\u00edstica y Redes Neuronales. Editorial Paraninfo, Spain (1996)"},{"key":"9011_CR10","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1016\/0377-2217(94)90074-4","volume":"75","author":"C. Dillenberger","year":"1994","unstructured":"Dillenberger, C., Escudero, L.F., Wollensak, A., Zhang, W.: On practical resource allocation for production planning and scheduling with period overlapping setups. Eur. J. Oper. Res. 75, 275\u2013286 (1994)","journal-title":"Eur. J. Oper. Res."},{"key":"9011_CR11","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/S0377-2217(97)00030-1","volume":"99","author":"A. Drexl","year":"1997","unstructured":"Drexl, A., Kimms, A.: Lot sizing and scheduling\u2014survey and extensions. Eur. J. Oper. Res. 99, 221\u2013235 (1997)","journal-title":"Eur. J. Oper. Res."},{"key":"9011_CR12","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1080\/002075400189572","volume":"38","author":"A. Dumoulin","year":"2000","unstructured":"Dumoulin, A., Vercellis, C.: Tactical models for hierarchical capacitated lot-sizing problems with setups and changeovers. Int. J. Prod. Res. 38, 51\u201367 (2000)","journal-title":"Int. J. Prod. Res."},{"key":"9011_CR13","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1016\/0377-2217(90)90001-R","volume":"46","author":"R.W. Eglese","year":"1990","unstructured":"Eglese, R.W.: Simulated annealing: a tool for operational research. Eur. J. Oper. Res. 46, 271\u2013281 (1990)","journal-title":"Eur. J. Oper. Res."},{"key":"9011_CR14","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1007\/BF01539800","volume":"19","author":"B. Fleischmann","year":"1997","unstructured":"Fleischmann, B., Meyr, H.: The general lotsizing and scheduling problem. Oper. Res. Spectr. 19, 11\u201321 (1997)","journal-title":"Oper. Res. Spectr."},{"key":"9011_CR15","doi-asserted-by":"crossref","first-page":"2987","DOI":"10.1016\/j.cor.2004.04.012","volume":"32","author":"S. Ghosh Dastidar","year":"2005","unstructured":"Ghosh Dastidar, S., Nagi, R.: Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs. Comput. Oper. Res. 32, 2987\u20133005 (2005)","journal-title":"Comput. Oper. Res."},{"key":"9011_CR16","volume-title":"Handbook of Metaheuristics","year":"2003","unstructured":"Glover, F.W., Kochenberger, G.A. (eds.): Handbook of Metaheuristics. Kluwer Academic, Boston (2003)"},{"key":"9011_CR17","doi-asserted-by":"crossref","first-page":"1973","DOI":"10.1080\/00207549508904793","volume":"33","author":"M. Gopalakrishnan","year":"1995","unstructured":"Gopalakrishnan, M., Miller, D.M., Schmidt, C.P.: A framework for modelling setup carryover in the capacitated lot-sizing problem. Int. J. Prod. Res. 33, 1973\u20131988 (1995)","journal-title":"Int. J. Prod. Res."},{"key":"9011_CR18","doi-asserted-by":"crossref","first-page":"727","DOI":"10.1016\/j.cor.2003.08.014","volume":"32","author":"D. Gupta","year":"2005","unstructured":"Gupta, D., Magnusson, T.: The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Comput. Oper. Res. 32, 727\u2013747 (2005)","journal-title":"Comput. Oper. Res."},{"key":"9011_CR19","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/S0925-5273(99)00119-X","volume":"66","author":"K. Haase","year":"2000","unstructured":"Haase, K., Kimms, A.: Lot sizing and scheduling with sequence dependent setup costs and times and efficient rescheduling opportunities. Int. J. Prod. Econ. 66, 159\u2013169 (2000)","journal-title":"Int. J. Prod. Econ."},{"key":"9011_CR20","unstructured":"ILOG: Cplex 7.1 User\u2019s manual. ILOG SA BP 85 9 Rue de Verdun 94253. Gentilly, France. http:\/\/www.ilog.com (2001)"},{"key":"9011_CR21","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/S0305-0483(03)00059-8","volume":"31","author":"B. Karimi","year":"2003","unstructured":"Karimi, B., Fatemi Ghomi, S.M.T., Wilson, J.M.: The capacitated lot sizing problem: a review of models and algorithms. Omega 31, 365\u2013378 (2003)","journal-title":"Omega"},{"key":"9011_CR22","doi-asserted-by":"crossref","first-page":"2193","DOI":"10.1016\/j.compchemeng.2004.03.009","volume":"28","author":"J.D. Kelly","year":"2004","unstructured":"Kelly, J.D., Mann, J.L.: Flowsheet decomposition heuristic for scheduling: a relax-and-fix method. Comput. Chem. Eng. 28, 2193\u20132200 (2004)","journal-title":"Comput. Chem. Eng."},{"issue":"1","key":"9011_CR23","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1080\/07408179308964266","volume":"25","author":"R. Kuik","year":"1993","unstructured":"Kuik, R., van Wassenhove, L.N., Maes, J.: Linear programming, simulated annealing and tabu search heuristics for lotsizing in bottleneck assembly systems. IIE Trans. 25(1), 62\u201372 (1993)","journal-title":"IIE Trans."},{"key":"9011_CR24","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1016\/S0377-2217(99)00159-9","volume":"120","author":"H. Meyr","year":"2000","unstructured":"Meyr, H.: Simultaneous lotsizing and scheduling by combining local search with dual reoptimization. Eur. J. Oper. Res. 120, 311\u2013326 (2000)","journal-title":"Eur. J. Oper. Res."},{"key":"9011_CR25","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1016\/S0377-2217(01)00373-3","volume":"139","author":"H. Meyr","year":"2002","unstructured":"Meyr, H.: Simultaneous lotsizing and scheduling on parallel machines. Eur. J. Oper. Res. 139, 277\u2013292 (2002)","journal-title":"Eur. J. Oper. Res."},{"key":"9011_CR26","doi-asserted-by":"crossref","first-page":"1133","DOI":"10.1080\/0020754021000042995","volume":"41","author":"P. Porkka","year":"2003","unstructured":"Porkka, P., Vepsalainen, A.P.J., Kuula, M.: Multiperiod production planning carrying over set-up time. Int. J. Prod. Res. 41, 1133\u20131148 (2003)","journal-title":"Int. J. Prod. Res."},{"key":"9011_CR27","doi-asserted-by":"crossref","first-page":"3173","DOI":"10.1080\/00207549508904867","volume":"33","author":"I.M. Ovacik","year":"1995","unstructured":"Ovacik, I.M., Uzsoy, R.: Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent setup time. Int. J. Prod. Res. 33, 3173\u20133192 (1995)","journal-title":"Int. J. Prod. Res."},{"key":"9011_CR28","doi-asserted-by":"crossref","first-page":"490","DOI":"10.1016\/S0377-2217(01)00196-5","volume":"139","author":"E. Santos-Meza","year":"2002","unstructured":"Santos-Meza, E., Santos, M.O., Arenales, M.N.: Lot-sizing problem in an automated foundry. Eur. J. Oper. Res. 139, 490\u2013500 (2002)","journal-title":"Eur. J. Oper. Res."},{"key":"9011_CR29","doi-asserted-by":"crossref","first-page":"647","DOI":"10.1080\/00207548808947890","volume":"26","author":"V.L. Smith-Daniels","year":"1988","unstructured":"Smith-Daniels, V.L., Ritzman, L.P.: A model for lot sizing and sequencing in process industries. Int. J. Prod. Res. 26, 647\u2013674 (1988)","journal-title":"Int. J. Prod. Res."},{"key":"9011_CR30","doi-asserted-by":"crossref","first-page":"278","DOI":"10.1080\/07408178608974705","volume":"18","author":"V.L. Smith-Daniels","year":"1986","unstructured":"Smith-Daniels, V.L., Smith-Daniels, D.E.: A mixed integer programming model for lot sizing and sequencing packaging lines in the process industries. IIE Trans. 18, 278\u2013285 (1986)","journal-title":"IIE Trans."},{"key":"9011_CR31","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1287\/opre.51.3.487.14949","volume":"51","author":"H. Stadtler","year":"2003","unstructured":"Stadtler, H.: Multilevel lot sizing with setup times and multiple constrained resources: internally rolling schedules with lot-sizing windows. Oper. Res. 51, 487\u2013502 (2003)","journal-title":"Oper. Res."},{"key":"9011_CR32","doi-asserted-by":"crossref","first-page":"1039","DOI":"10.1287\/mnsc.49.8.1039.16406","volume":"49","author":"C. Suerie","year":"2003","unstructured":"Suerie, C., Stadtler, H.: The capacitated lot-sizing problem with linked lot-sizes. Manag. Sci. 49, 1039\u20131054 (2003)","journal-title":"Manag. Sci."},{"key":"9011_CR33","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/0377-0427(95)00009-7","volume":"64","author":"J. Teghem","year":"1995","unstructured":"Teghem, J., Pirlot, M., Antoniadis, C.: Embedding of linear programming in a simulated annealing algorithm for solving a mixed integer production planning problem. J. Comput. Appl. Math. 64, 91\u2013102 (1995)","journal-title":"J. Comput. Appl. Math."},{"key":"9011_CR34","volume-title":"Integer Programming","author":"L.A. Wolsey","year":"1998","unstructured":"Wolsey, L.A., Integer Programming. Wiley, New York (1998)"},{"key":"9011_CR35","doi-asserted-by":"crossref","first-page":"1587","DOI":"10.1287\/mnsc.48.12.1587.442","volume":"48","author":"L.A. Wolsey","year":"2002","unstructured":"Wolsey, L.A.: Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation. Manag. Sci. 48, 1587\u20131602 (2002)","journal-title":"Manag. Sci."}],"container-title":["Journal of Heuristics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-007-9011-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10732-007-9011-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-007-9011-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T18:54:28Z","timestamp":1559242468000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10732-007-9011-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,4,27]]},"references-count":35,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2007,8]]}},"alternative-id":["9011"],"URL":"https:\/\/doi.org\/10.1007\/s10732-007-9011-9","relation":{},"ISSN":["1381-1231","1572-9397"],"issn-type":[{"value":"1381-1231","type":"print"},{"value":"1572-9397","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,4,27]]}}}