{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,6]],"date-time":"2026-02-06T00:46:26Z","timestamp":1770338786858,"version":"3.49.0"},"reference-count":33,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2009,6,30]],"date-time":"2009-06-30T00:00:00Z","timestamp":1246320000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Heuristics"],"published-print":{"date-parts":[[2010,8]]},"DOI":"10.1007\/s10732-009-9110-x","type":"journal-article","created":{"date-parts":[[2009,6,29]],"date-time":"2009-06-29T14:24:53Z","timestamp":1246285493000},"page":"617-632","source":"Crossref","is-referenced-by-count":23,"title":["Scheduling in a multi-processor environment with\u00a0deteriorating job processing times and decreasing values: the case of forest fires"],"prefix":"10.1007","volume":"16","author":[{"given":"C. P.","family":"Pappis","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"N. P.","family":"Rachaniotis","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2009,6,30]]},"reference":[{"key":"9110_CR1","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1057\/jors.1993.24","volume":"44","author":"B. Alidaee","year":"1993","unstructured":"Alidaee, B.: Numerical methods for single machine scheduling with non-linear cost functions to minimize total cost. J.\u00a0Oper. Res. Soc. 44, 125\u2013132 (1993)","journal-title":"J.\u00a0Oper. Res. Soc."},{"key":"9110_CR2","doi-asserted-by":"crossref","first-page":"711","DOI":"10.1057\/palgrave.jors.2600740","volume":"50","author":"B. Alidaee","year":"1999","unstructured":"Alidaee, B., Womer, N.K.: Scheduling with time dependent processing times: Review and extensions. J.\u00a0Oper. Res. Soc. 50, 711\u2013720 (1999)","journal-title":"J.\u00a0Oper. Res. Soc."},{"key":"9110_CR3","first-page":"412","volume":"84","author":"M. Bonazountas","year":"2007","unstructured":"Bonazountas, M., Kallidromitou, D., Kassomenos, P., Passas, N.: A\u00a0decision support system for managing forest fire casualties. J.\u00a0Environ. Manag. 84, 412\u2013418 (2007)","journal-title":"J.\u00a0Environ. Manag."},{"key":"9110_CR4","doi-asserted-by":"crossref","first-page":"237","DOI":"10.2307\/1427064","volume":"17","author":"C. Buyukkoc","year":"1985","unstructured":"Buyukkoc, C., Varaiya, P., Walrand, J.: The c\u03bc rule revisited. Adv. Appl. Probab. 17, 237\u2013238 (1985)","journal-title":"Adv. Appl. Probab."},{"key":"9110_CR5","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/0166-218X(96)00102-3","volume":"70","author":"Z.L. Chen","year":"1996","unstructured":"Chen, Z.L.: Parallel machine scheduling with time dependent processing times. Discrete Appl. Math. 70, 81\u201393 (1996)","journal-title":"Discrete Appl. Math."},{"key":"9110_CR6","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1016\/S0166-218X(97)00002-4","volume":"75","author":"Z.-L. Chen","year":"1997","unstructured":"Chen, Z.-L.: Erratum to \u201cparallel machine scheduling with time dependent processing times. Discrete Appl. Math. 75, 103 (1997)","journal-title":"Discrete Appl. Math."},{"key":"9110_CR7","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(02)00909-8","volume":"152","author":"T.C.E. Cheng","year":"2004","unstructured":"Cheng, T.C.E., Ding, Q., Lin, B.M.T.: A\u00a0concise survey with time dependent processing times. Eur. J. Oper. Res. 152, 1\u201313 (2004)","journal-title":"Eur. J. Oper. Res."},{"key":"9110_CR8","doi-asserted-by":"crossref","first-page":"1263","DOI":"10.1002\/1520-6750(199512)42:8<1263::AID-NAV3220420810>3.0.CO;2-A","volume":"42","author":"F. Della Croce","year":"1995","unstructured":"Della Croce, F., Szwarc, W., Tadei, R., Baracco, P., Di Tullio, R.: Minimizing the weighted sum of quadratic completion times on a single machine. Nav. Res. Logist. 42, 1263\u20131270 (1995)","journal-title":"Nav. Res. Logist."},{"issue":"2","key":"9110_CR9","doi-asserted-by":"crossref","first-page":"476","DOI":"10.1016\/S0377-2217(03)00038-9","volume":"152","author":"M. Dimopoulou","year":"2004","unstructured":"Dimopoulou, M., Giannikos, I.: Towards an integrated framework for forest fire control. Eur. J. Oper. Res. 152(2), 476\u2013486 (2004)","journal-title":"Eur. J. Oper. Res."},{"key":"9110_CR10","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/0020-0190(95)00174-3","volume":"57","author":"M. Drozdowski","year":"1996","unstructured":"Drozdowski, M.: Real-time scheduling of linear speedup parallel machines. Inf. Process. Lett. 57, 35\u201340 (1996a)","journal-title":"Inf. Process. Lett."},{"key":"9110_CR11","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/0377-2217(96)00123-3","volume":"94","author":"M. Drozdowski","year":"1996","unstructured":"Drozdowski, M.: Scheduling multiprocessor tasks\u2014an overview. Eur. J. Oper. Res. 94, 215\u2013230 (1996b)","journal-title":"Eur. J. Oper. Res."},{"key":"9110_CR12","doi-asserted-by":"crossref","first-page":"218","DOI":"10.1007\/BF02612362","volume":"28","author":"M.L. Fisher","year":"1984","unstructured":"Fisher, M.L., Krieger, A.M.: Analysis of a linearization heuristic for single-machine scheduling to maximize profit. Math. Program. 28, 218\u2013225 (1984)","journal-title":"Math. Program."},{"issue":"3","key":"9110_CR13","first-page":"870","volume":"35","author":"J.S. Fried","year":"1989","unstructured":"Fried, J.S., Gilless, J.K.: Expert opinion estimation of fireline production rates. For. Sci. 35(3), 870\u2013877 (1989)","journal-title":"For. Sci."},{"issue":"3","key":"9110_CR14","first-page":"267","volume":"42","author":"J.S. Fried","year":"1996","unstructured":"Fried, J.S., Fried, B.D.: Simulating wildfire containment with realistic tactics. For. Sci. 42(3), 267\u2013281 (1996)","journal-title":"For. Sci."},{"issue":"4","key":"9110_CR15","doi-asserted-by":"crossref","first-page":"727","DOI":"10.1016\/S0360-8352(97)00025-9","volume":"32","author":"Y. Hsieh","year":"1997","unstructured":"Hsieh, Y., Bricker, D.L.: Scheduling linearly deteriorating jobs on multiple machines. Comput. Ind. Eng. 32(4), 727\u2013734 (1997)","journal-title":"Comput. Ind. Eng."},{"issue":"7","key":"9110_CR16","doi-asserted-by":"crossref","first-page":"1355","DOI":"10.1080\/0020754042000298539","volume":"43","author":"K. Inderfurth","year":"2005","unstructured":"Inderfurth, K., Lindner, G., Rachaniotis, N.P.: Lotsizing in a production system with rework and product deterioration. Int. J. Prod. Res. 43(7), 1355\u20131374 (2005)","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"9110_CR17","first-page":"14","volume":"7","author":"K. Kalabokidis","year":"2004","unstructured":"Kalabokidis, K.: Automated forest fire and flood hazard protection system. Disaster management: linking people and the environment. Geoinformatics 7(2), 14\u201317 (2004)","journal-title":"Geoinformatics"},{"key":"9110_CR18","doi-asserted-by":"crossref","first-page":"1119","DOI":"10.1137\/0215081","volume":"15","author":"T. Kawaguchi","year":"1986","unstructured":"Kawaguchi, T., Kyan, S.: Worst case bound of an LRF schedule for the mean weighted flow-time problem. SIAM J. Comput. 15, 1119\u20131129 (1986)","journal-title":"SIAM J. Comput."},{"key":"9110_CR19","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1023\/A:1018909801944","volume":"70","author":"C.-Y. Lee","year":"1997","unstructured":"Lee, C.-Y., Lei, L., Pinedo, M.: Current trends in deterministic scheduling. Ann. Oper. Res. 70, 1\u201341 (1997)","journal-title":"Ann. Oper. Res."},{"key":"9110_CR20","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1016\/S0167-5060(08)70743-X","volume":"1","author":"J.K. Lenstra","year":"1977","unstructured":"Lenstra, J.K., Kan, R., Brucker, P.: Complexity of machine scheduling problems. Ann. Discrete Math. 1, 343\u2013362 (1977)","journal-title":"Ann. Discrete Math."},{"key":"9110_CR21","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1139\/x82-020","volume":"12","author":"D.L. Martell","year":"1982","unstructured":"Martell, D.L.: A review of operational research studies in forest fire management. Can. J. For. Res. 12, 119\u2013140 (1982)","journal-title":"Can. J. For. Res."},{"issue":"5","key":"9110_CR22","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1287\/inte.14.5.20","volume":"14","author":"D.L. Martell","year":"1984","unstructured":"Martell, D.L., Drysdale, R.J., Doan, G.E., Boychuk, D.: An evaluation of forest fire initial attack resources. Interfaces 14(5), 20\u201332 (1984)","journal-title":"Interfaces"},{"issue":"5","key":"9110_CR23","first-page":"1314","volume":"37","author":"R.S. McAlpine","year":"1991","unstructured":"McAlpine, R.S., Wakimoto, R.H.: The acceleration of fire from point source to equilibrium spread. For. Sci. 37(5), 1314\u20131317 (1991)","journal-title":"For. Sci."},{"key":"9110_CR24","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/mnsc.6.1.1","volume":"6","author":"R. McNaughton","year":"1959","unstructured":"McNaughton, R.: Scheduling with deadlines and loss functions. Manag. Sci. 6, 1\u201312 (1959)","journal-title":"Manag. Sci."},{"key":"9110_CR25","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/S0377-2217(99)00207-6","volume":"125","author":"S.A. Mondal","year":"2000","unstructured":"Mondal, S.A., Sen, A.K.: An improved precedence rule for single machine scheduling problems with quadratic penalty. Eur. J. Oper. Res. 125, 425\u2013428 (2000)","journal-title":"Eur. J. Oper. Res."},{"key":"9110_CR26","doi-asserted-by":"crossref","first-page":"869","DOI":"10.1016\/0360-8352(95)00006-M","volume":"28","author":"G. Mosheiov","year":"1995","unstructured":"Mosheiov, G.: Scheduling jobs with step-deterioration: Minimizing makespan on a single and multi-machine. Comput. Ind. Eng. 28, 869\u2013879 (1995)","journal-title":"Comput. Ind. Eng."},{"key":"9110_CR27","first-page":"205","volume":"36","author":"G. Mosheiov","year":"1998","unstructured":"Mosheiov, G.: Multi-machine scheduling with linear deterioration. INFOR 36, 205\u2013214 (1998)","journal-title":"INFOR"},{"key":"9110_CR28","unstructured":"Rachaniotis, N.P.: Advances on job scheduling with time dependent parameters: theory and industrial applications. In: Electronic Proceedings of the 9th ELA doctorate workshop, Monchy St. Eloi, France, pp.\u00a0120\u2013131 (2004)"},{"key":"9110_CR29","doi-asserted-by":"crossref","first-page":"652","DOI":"10.1139\/x05-267","volume":"36","author":"N.P. Rachaniotis","year":"2006","unstructured":"Rachaniotis, N.P., Pappis, C.P.: Scheduling fire fighting tasks using the concept of \u201cdeteriorating jobs\u201d. Can. J. For. Res. 36, 652\u2013658 (2006)","journal-title":"Can. J. For. Res."},{"issue":"3","key":"9110_CR30","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1071\/WF00019","volume":"9","author":"G.D. Richards","year":"1999","unstructured":"Richards, G.D.: The mathematical modelling and computer simulation of wildland fire perimeter growth over a 3-dimensional surface. Int. J. Wildland Fire 9(3), 213\u2013221 (1999)","journal-title":"Int. J. Wildland Fire"},{"key":"9110_CR31","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1002\/nav.3800030106","volume":"3","author":"W.E. Smith","year":"1956","unstructured":"Smith, W.E.: Various optimizers for single-stage production. Nav. Res. Logist. Q. 3, 59\u201366 (1956)","journal-title":"Nav. Res. Logist. Q."},{"key":"9110_CR32","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1007\/s00291-002-0105-3","volume":"25","author":"R.H. Teunter","year":"2003","unstructured":"Teunter, R.H., Flapper, S.D.P.: Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum 25, 85\u201396 (2003)","journal-title":"OR Spectrum"},{"issue":"3","key":"9110_CR33","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1016\/S0925-5273(02)00110-X","volume":"79","author":"T.G. Voutsinas","year":"2002","unstructured":"Voutsinas, T.G., Pappis, C.P.: Scheduling jobs with values exponentially deteriorating over time. Int. J. Prod. Econ. 79(3), 163\u2013169 (2002)","journal-title":"Int. J. Prod. Econ."}],"container-title":["Journal of Heuristics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-009-9110-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10732-009-9110-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-009-9110-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T18:54:30Z","timestamp":1559242470000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10732-009-9110-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,6,30]]},"references-count":33,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2010,8]]}},"alternative-id":["9110"],"URL":"https:\/\/doi.org\/10.1007\/s10732-009-9110-x","relation":{},"ISSN":["1381-1231","1572-9397"],"issn-type":[{"value":"1381-1231","type":"print"},{"value":"1572-9397","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009,6,30]]}}}