{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,5]],"date-time":"2025-11-05T06:23:02Z","timestamp":1762323782892},"reference-count":20,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2014,12,7]],"date-time":"2014-12-07T00:00:00Z","timestamp":1417910400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Heuristics"],"published-print":{"date-parts":[[2015,2]]},"DOI":"10.1007\/s10732-014-9272-z","type":"journal-article","created":{"date-parts":[[2014,12,8]],"date-time":"2014-12-08T13:49:35Z","timestamp":1418046575000},"page":"47-72","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["A fast greedy heuristic for scheduling modular projects"],"prefix":"10.1007","volume":"21","author":[{"given":"Martijn","family":"Huysmans","sequence":"first","affiliation":[]},{"given":"Kris","family":"Coolen","sequence":"additional","affiliation":[]},{"given":"Fabrice","family":"Talla Nobibon","sequence":"additional","affiliation":[]},{"given":"Roel","family":"Leus","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,12,7]]},"reference":[{"key":"9272_CR1","doi-asserted-by":"crossref","DOI":"10.7551\/mitpress\/2366.001.0001","volume-title":"Design Rules: The Power of Modularity","author":"CY Baldwin","year":"2000","unstructured":"Baldwin, C.Y., Clark, K.B.: Design Rules: The Power of Modularity. The MIT Press, Cambridge MA (2000)"},{"issue":"3","key":"9272_CR2","doi-asserted-by":"crossref","first-page":"284","DOI":"10.1016\/0377-2217(81)90350-7","volume":"7","author":"Y Ben-Dov","year":"1981","unstructured":"Ben-Dov, Y.: A branch and bound algorithm for minimizing the expected cost of testing coherent systems. Eur. J. Oper. Res. 7(3), 284\u2013289 (1981a)","journal-title":"Eur. J. Oper. Res."},{"issue":"12","key":"9272_CR3","doi-asserted-by":"crossref","first-page":"1410","DOI":"10.1287\/mnsc.27.12.1410","volume":"27","author":"Y Ben-Dov","year":"1981","unstructured":"Ben-Dov, Y.: Optimal testing procedures for special structures of coherent systems. Manag. Sci. 27(12), 1410\u20131420 (1981b)","journal-title":"Manag. Sci."},{"key":"9272_CR4","first-page":"15","volume-title":"Multivariate Analysis-II","author":"ZW Birnbaum","year":"1969","unstructured":"Birnbaum, Z.W.: On the importance of different components in a multi-component system. In: Krishnaiah, P.R. (ed.) Multivariate Analysis-II, vol. 1913, pp. 15\u201326. Academic Press, New York (1969)"},{"issue":"2","key":"9272_CR5","doi-asserted-by":"crossref","first-page":"335","DOI":"10.1287\/opre.20.2.335","volume":"20","author":"RW Butterworth","year":"1972","unstructured":"Butterworth, R.W.: Some reliability fault-testing models. Oper. Res. 20(2), 335\u2013343 (1972)","journal-title":"Oper. Res."},{"issue":"1","key":"9272_CR6","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1007\/s10951-012-0294-9","volume":"17","author":"K Coolen","year":"2014","unstructured":"Coolen, K., Wei, W., Talla Nobibon, F., Leus, R.: Project scheduling with modular project completion on a bottleneck resource. J. Sched. 17(1), 67\u201385 (2014)","journal-title":"J. Sched."},{"key":"9272_CR7","doi-asserted-by":"crossref","unstructured":"Creemers, S., De Reyck, B., Leus, R.: Project planning with alternative technologies in uncertain environments. Eur. J.Oper. Res. doi: 10.1016\/j.ejor.2014.11.014 (2014)","DOI":"10.1016\/j.ejor.2014.11.014"},{"key":"9272_CR8","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1016\/0377-2217(94)00187-H","volume":"81","author":"P De","year":"1995","unstructured":"De, P., Dunne, E.J., Gosh, J.B., Wells, C.E.: The discrete time\/cost trade-off problem revisited. Eur. J. Oper. Res. 81, 225\u2013238 (1995)","journal-title":"Eur. J. Oper. Res."},{"key":"9272_CR9","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1002\/(SICI)1520-6750(199809)45:6<553::AID-NAV2>3.0.CO;2-1","volume":"45","author":"B Reyck De","year":"1998","unstructured":"De Reyck, B., Demeulemeester, E.: Local search methods for the discrete time\/resource trade-off problem in project networks. Naval Res. Logist. Q. 45, 553\u2013578 (1998)","journal-title":"Naval Res. Logist. Q."},{"issue":"4","key":"9272_CR10","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1080\/07408170701413944","volume":"40","author":"B Reyck De","year":"2008","unstructured":"De Reyck, B., Leus, R.: R&D-project scheduling when activities may fail. IIE Trans. 40(4), 367\u2013384 (2008)","journal-title":"IIE Trans."},{"issue":"12","key":"9272_CR11","doi-asserted-by":"crossref","first-page":"1590","DOI":"10.1287\/mnsc.37.12.1590","volume":"37","author":"A Drexl","year":"1991","unstructured":"Drexl, A.: Scheduling of project networks by job assignment. Manag. Sci. 37(12), 1590\u20131602 (1991)","journal-title":"Manag. Sci."},{"key":"9272_CR12","doi-asserted-by":"crossref","first-page":"3013","DOI":"10.1021\/ie9807809","volume":"38","author":"V Jain","year":"1999","unstructured":"Jain, V., Grossmann, I.E.: Resource-constrained scheduling of tests in new product development. Ind. Eng. Chem. Res. 38, 3013\u20133026 (1999)","journal-title":"Ind. Eng. Chem. Res."},{"issue":"1","key":"9272_CR13","first-page":"67","volume":"R\u201332","author":"P J\u0229drzejowicz","year":"1983","unstructured":"J\u0229drzejowicz, P.: Minimizing the average cost of testing coherent systems: complexity and approximate algorithms. IEEE Trans. Reliab. R\u201332(1), 67\u201370 (1983)","journal-title":"IEEE Trans. Reliab."},{"key":"9272_CR14","unstructured":"Mitten, L.G.: An analytic solution to the least cost testing sequence problem. J. Ind. Eng. 11(1), 17 (1960)"},{"key":"9272_CR15","doi-asserted-by":"crossref","DOI":"10.1002\/9780470316887","volume-title":"Markov Decision Processes: Discrete Stochastic Dynamic Programming","author":"ML Puterman","year":"1994","unstructured":"Puterman, M.L.: Markov Decision Processes: Discrete Stochastic Dynamic Programming. Wiley, New York (1994)"},{"key":"9272_CR16","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1016\/j.cor.2012.07.005","volume":"40","author":"M Ranjbar","year":"2013","unstructured":"Ranjbar, M., Davari, M.: An exact method for scheduling of the alternative technologies in R&D projects. Comput. Oper. Res. 40, 395\u2013405 (2013)","journal-title":"Comput. Oper. Res."},{"issue":"3","key":"9272_CR17","doi-asserted-by":"crossref","first-page":"284","DOI":"10.1109\/4235.873238","volume":"4","author":"TP Runarsson","year":"2000","unstructured":"Runarsson, T.P., Yao, X.: Stochastic ranking for constrained evolutionary optimization. IEEE Trans. Evolut. Comput. 4(3), 284\u2013294 (2000)","journal-title":"IEEE Trans. Evolut. Comput."},{"key":"9272_CR18","doi-asserted-by":"crossref","first-page":"3498","DOI":"10.1021\/ie9601099","volume":"35","author":"CW Schmidt","year":"1996","unstructured":"Schmidt, C.W., Grossmann, I.E.: Optimization models for the scheduling of testing tasks in new product development. Ind. Eng. Chem. Res. 35, 3498\u20133510 (1996)","journal-title":"Ind. Eng. Chem. Res."},{"key":"9272_CR19","doi-asserted-by":"crossref","first-page":"1197","DOI":"10.1287\/mnsc.28.10.1197","volume":"28","author":"FB Talbot","year":"1982","unstructured":"Talbot, F.B.: Resource-constrained project scheduling problem with time-resource trade-offs: the nonpreemptive case. Manag. Sci. 28, 1197\u20131210 (1982)","journal-title":"Manag. Sci."},{"key":"9272_CR20","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1016\/j.dam.2002.08.001","volume":"142","author":"T \u00dcnl\u00fcyurt","year":"2004","unstructured":"\u00dcnl\u00fcyurt, T.: Sequential testing of complex systems: a review. Discret. Appl. Math. 142, 189\u2013205 (2004)","journal-title":"Discret. Appl. Math."}],"container-title":["Journal of Heuristics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-014-9272-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10732-014-9272-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-014-9272-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,18]],"date-time":"2019-08-18T06:49:10Z","timestamp":1566110950000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10732-014-9272-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12,7]]},"references-count":20,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,2]]}},"alternative-id":["9272"],"URL":"https:\/\/doi.org\/10.1007\/s10732-014-9272-z","relation":{},"ISSN":["1381-1231","1572-9397"],"issn-type":[{"value":"1381-1231","type":"print"},{"value":"1572-9397","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,12,7]]}}}