{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,19]],"date-time":"2026-02-19T08:51:10Z","timestamp":1771491070249,"version":"3.50.1"},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2017,7,4]],"date-time":"2017-07-04T00:00:00Z","timestamp":1499126400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/501100002790","name":"Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","doi-asserted-by":"publisher","award":["CRDPJ 411270-10"],"award-info":[{"award-number":["CRDPJ 411270-10"]}],"id":[{"id":"10.13039\/501100002790","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Heuristics"],"published-print":{"date-parts":[[2017,10]]},"DOI":"10.1007\/s10732-017-9349-6","type":"journal-article","created":{"date-parts":[[2017,7,4]],"date-time":"2017-07-04T19:14:58Z","timestamp":1499195698000},"page":"397-415","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":59,"title":["A heuristic approach for the stochastic optimization of mine production schedules"],"prefix":"10.1007","volume":"23","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-4449-3778","authenticated-orcid":false,"given":"Luis","family":"Montiel","sequence":"first","affiliation":[]},{"given":"Roussos","family":"Dimitrakopoulos","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,7,4]]},"reference":[{"key":"9349_CR1","first-page":"80","volume":"118","author":"F Albor","year":"2009","unstructured":"Albor, F., Dimitrakopoulos, R.: Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis. IMM Trans. Min. Technol. 118, 80\u201391 (2009)","journal-title":"IMM Trans. Min. Technol."},{"issue":"1","key":"9349_CR2","doi-asserted-by":"crossref","first-page":"68","DOI":"10.1134\/S1062739149010097","volume":"49","author":"J Bendorf","year":"2013","unstructured":"Bendorf, J., Dimitrakopoulos, R.: Stochastic long-term production scheduling of iron ore deposits: integrating joint multi-element geological uncertainty. J. Min. Sci. 49(1), 68\u201381 (2013)","journal-title":"J. Min. Sci."},{"key":"9349_CR3","unstructured":"Boland, N., Dumitrescu, I., Froyland, G.: A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology, Retrieved (2013). http:\/\/www.optimization-online.org\/DB_FILE\/2008\/10\/2123.pdf"},{"key":"9349_CR4","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1023\/A:1024835022186","volume":"27","author":"L Caccetta","year":"2003","unstructured":"Caccetta, L., Hill, S.P.: An application of branch and cut to open pit mine scheduling. J. Glob. Optim. 27, 349\u2013365 (2003)","journal-title":"J. Glob. Optim."},{"issue":"3","key":"9349_CR5","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1007\/s11004-012-9387-4","volume":"44","author":"S Chatterjee","year":"2012","unstructured":"Chatterjee, S., Dimitrakopoulos, R., Mustapha, H.: Dimensional reduction of pattern-based simulation using wavelet analysis. Math. Geosci. 44(3), 343\u2013374 (2012)","journal-title":"Math. Geosci."},{"issue":"2","key":"9349_CR6","doi-asserted-by":"crossref","first-page":"110","DOI":"10.1179\/1743286313Y.0000000040","volume":"122","author":"R Dimitrakopoulos","year":"2013","unstructured":"Dimitrakopoulos, R., Jewbali, A.: Joint stochastic optimisation of short and long term mine production planning: method and application in a large operating gold mine. Min. Technol. 122(2), 110\u2013123 (2013)","journal-title":"Min. Technol."},{"key":"9349_CR7","unstructured":"Godoy, M.: The effective management of geological risk in long-term production scheduling of open pit mines, Ph.D. thesis, University of Queensland, Brisbane, Australia, pp. 1\u2013354 (2003)"},{"key":"9349_CR8","first-page":"43","volume":"316","author":"M Godoy","year":"2004","unstructured":"Godoy, M., Dimitrakopoulos, R.: Managing risk and waste mining in long-term production scheduling. SME Trans. 316, 43\u201350 (2004)","journal-title":"SME Trans."},{"key":"9349_CR9","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1179\/147490013X13639459465736","volume":"122","author":"R Goodfellow","year":"2013","unstructured":"Goodfellow, R., Dimitrakopoulos, R.: Algorithmic integration of geological uncertainty in pushback designs for complex multiprocess open pit mines. IMM Trans. Min. Technol. 122, 67\u201377 (2013)","journal-title":"IMM Trans. Min. Technol."},{"key":"9349_CR10","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1093\/oso\/9780195115383.001.0001","volume-title":"Geostatistics for Natural Resource Evaluation","author":"P Goovaerts","year":"1997","unstructured":"Goovaerts, P.: Geostatistics for Natural Resource Evaluation, pp. 409\u2013420. Oxford University Press, NY (1997)"},{"key":"9349_CR11","first-page":"26","volume":"51","author":"S Hoerger","year":"1999","unstructured":"Hoerger, S., Seymour, F., Hoffman, L.: Mine planning at Newmont\u2019s Nevada operations. Min. Eng. 51, 26\u201330 (1999)","journal-title":"Min. Eng."},{"key":"9349_CR12","doi-asserted-by":"crossref","first-page":"642","DOI":"10.1016\/j.ejor.2012.05.029","volume":"222","author":"A Lamghari","year":"2012","unstructured":"Lamghari, A., Dimitrakopoulos, R.: A diversified Tabu search approach for the open pit mine production scheduling problem with metal uncertainty. Eur. J. Oper. Res. 222, 642\u2013652 (2012)","journal-title":"Eur. J. Oper. Res."},{"issue":"9","key":"9349_CR13","doi-asserted-by":"crossref","first-page":"1305","DOI":"10.1057\/jors.2013.81","volume":"65","author":"A Lamghari","year":"2013","unstructured":"Lamghari, A., Dimitrakopoulos, R., Ferland, J.: A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty. J. Oper. Res. Soc. 65(9), 1305\u20131314 (2013)","journal-title":"J. Oper. Res. Soc."},{"key":"9349_CR14","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1179\/174328607X228848","volume":"116","author":"A Leite","year":"2007","unstructured":"Leite, A., Dimitrakopoulos, R.: Stochastic optimization model for open pit mine planning: application and risk analysis at a copper deposit. IMM Trans. Min. Technol. 116, 109\u2013118 (2007)","journal-title":"IMM Trans. Min. Technol."},{"issue":"6","key":"9349_CR15","doi-asserted-by":"crossref","first-page":"755","DOI":"10.1016\/j.ijmst.2014.10.004","volume":"24","author":"A Leite","year":"2014","unstructured":"Leite, A., Dimitrakopoulos, R.: Stochastic optimization of mine production scheduling with uncertain ore\/metal\/waste supply. Int. J. Min. Sci. Technol. 24(6), 755\u2013762 (2014)","journal-title":"Int. J. Min. Sci. Technol."},{"key":"9349_CR16","first-page":"47","volume":"58","author":"H Lerchs","year":"1965","unstructured":"Lerchs, H., Grossman, I.F.: Optimum design of open pit mines. Can. Inst. Min. Bull. 58, 47\u201354 (1965)","journal-title":"Can. Inst. Min. Bull."},{"key":"9349_CR17","unstructured":"Menabde, M., Froyland, G., Stone, P., Yeates, G.: Mining schedule optimisation for conditionally simulated orebodies. In: Proceedings, Orebody Modelling and Strategic Mine Planning, AusIMM, Spectrum Series 14, pp. 379\u2013384 (2007)"},{"key":"9349_CR18","unstructured":"Montiel, L.: On globally optimizing a mining complex under supply uncertainty: integrating components from deposits to transportation systems. Ph.D. Thesis, McGill University, Montreal, Quebec, Canada (2014)"},{"key":"9349_CR19","doi-asserted-by":"crossref","first-page":"1268","DOI":"10.1287\/mnsc.22.11.1268","volume":"22","author":"JC Picard","year":"1976","unstructured":"Picard, J.C.: Maximum closure of a graph and applications to combinatorial problems. Manag. Sci. 22, 1268\u20131272 (1976)","journal-title":"Manag. Sci."},{"issue":"2","key":"9349_CR20","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1007\/s11081-012-9186-2","volume":"14","author":"S Ramazan","year":"2013","unstructured":"Ramazan, S., Dimitrakopoulos, R.: Production scheduling with uncertain supply: a new solution to the open pit mining problem. Optim. Eng. 14(2), 361\u2013380 (2013)","journal-title":"Optim. Eng."},{"key":"9349_CR21","unstructured":"Wharton, C.: The use of extractive blending optimisation for improved profitability. In: Proceedings, Orebody Modelling and Strategic Mine Planning, AusIMM, Spectrum Series, pp. 273-280 (2005)"},{"key":"9349_CR22","unstructured":"Whittle, G.: Global asset optimisation. In: Proceedings, Orebody Modelling and Strategic Mine Planning, AusIMM, Spectrum Series 14, pp. 331-336 (2007)"},{"key":"9349_CR23","unstructured":"Whittle J.: The global optimiser works - what next?, In: Proceedings, Orebody Modelling and Strategic Mine Planning, AusIMM, Spectrum Series 17, pp. 3\u20135 (2010)"},{"issue":"7","key":"9349_CR24","doi-asserted-by":"crossref","first-page":"863","DOI":"10.1007\/s11004-012-9412-7","volume":"44","author":"T Zhang","year":"2012","unstructured":"Zhang, T., Pedersen, S., Knudby, C., McCormick, D.: Memory-efficient categorical multi-point statistics algorithms based on compact search trees. Math. Geosci. 44(7), 863\u2013879 (2012)","journal-title":"Math. Geosci."}],"container-title":["Journal of Heuristics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10732-017-9349-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-017-9349-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-017-9349-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,21]],"date-time":"2025-06-21T06:40:42Z","timestamp":1750488042000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10732-017-9349-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,7,4]]},"references-count":24,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2017,10]]}},"alternative-id":["9349"],"URL":"https:\/\/doi.org\/10.1007\/s10732-017-9349-6","relation":{},"ISSN":["1381-1231","1572-9397"],"issn-type":[{"value":"1381-1231","type":"print"},{"value":"1572-9397","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,7,4]]}}}