{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,26]],"date-time":"2026-04-26T22:23:45Z","timestamp":1777242225361,"version":"3.51.4"},"reference-count":52,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2021,7,28]],"date-time":"2021-07-28T00:00:00Z","timestamp":1627430400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,7,28]],"date-time":"2021-07-28T00:00:00Z","timestamp":1627430400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100012226","name":"fundamental research funds for the central universities","doi-asserted-by":"publisher","award":["A1420502052101-48"],"award-info":[{"award-number":["A1420502052101-48"]}],"id":[{"id":"10.13039\/501100012226","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Heuristics"],"published-print":{"date-parts":[[2021,12]]},"DOI":"10.1007\/s10732-021-09482-0","type":"journal-article","created":{"date-parts":[[2021,7,28]],"date-time":"2021-07-28T11:02:44Z","timestamp":1627470164000},"page":"991-1020","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["A two-phase approach for integrating preventive maintenance with production and delivery in an unreliable coal mine"],"prefix":"10.1007","volume":"27","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-7053-1945","authenticated-orcid":false,"given":"Song","family":"Jiu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,7,28]]},"reference":[{"issue":"6","key":"9482_CR1","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1080\/07408170490438555","volume":"36","author":"B Adenso-Diaz","year":"2004","unstructured":"Adenso-Diaz, B., Lev, B., Artime, R.: Simulation in dynamic environments: optimization of transportation inside a coal mine. IIE Trans. 36(6), 547\u2013555 (2004)","journal-title":"IIE Trans."},{"issue":"5","key":"9482_CR2","doi-asserted-by":"publisher","first-page":"1319","DOI":"10.1080\/00207543.2012.659351","volume":"51","author":"MM AlDurgam","year":"2013","unstructured":"AlDurgam, M.M., Duffuaa, S.O.: Optimal joint maintenance and operation policies to maximise overall systems effectiveness. Int. J. Prod. Res. 51(5), 1319\u20131330 (2013)","journal-title":"Int. J. Prod. Res."},{"key":"9482_CR3","doi-asserted-by":"crossref","unstructured":"Alexandros, D.C., Chrissoleon, P.T.: Exact analysis of a two-workstation one-buffer flow line with parallel unreliable machines. Eur. J. Oper. Res. 197(2), 572\u2013580 (2009)","DOI":"10.1016\/j.ejor.2008.07.004"},{"issue":"1","key":"9482_CR4","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1016\/j.ijpe.2006.08.017","volume":"112","author":"H Allaoui","year":"2008","unstructured":"Allaoui, H., Lamouri, S., Artiba, A., Aghezzaf, E.: Simultaneously scheduling N jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan. Int. J. Prod. Econ. 112(1), 161\u2013167 (2008)","journal-title":"Int. J. Prod. Econ."},{"issue":"15","key":"9482_CR5","doi-asserted-by":"publisher","first-page":"4668","DOI":"10.1080\/00207543.2015.1030468","volume":"53","author":"M Assid","year":"2015","unstructured":"Assid, M., Gharbi, A., Hajji, A.: Joint production, setup and preventive maintenance policies of unreliable two-product manufacturing systems. Int. J. Prod. Res. 53(15), 4668\u20134683 (2015)","journal-title":"Int. J. Prod. Res."},{"issue":"5","key":"9482_CR6","doi-asserted-by":"publisher","first-page":"471","DOI":"10.1007\/s10951-015-0416-2","volume":"18","author":"M Aramon Bajestani","year":"2015","unstructured":"Aramon Bajestani, M., Beck, J.C.: A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines. J. Sched. 18(5), 471\u2013486 (2015)","journal-title":"J. Sched."},{"key":"9482_CR7","unstructured":"BP: Statistical Review of World Energy 2018. https:\/\/www.bp.com\/en\/global\/corporate\/energy-economics\/statistical-review-of-world-energy.html (2018)"},{"key":"9482_CR8","unstructured":"CNPC Economics & Technology Research Institute. China Energy Outlook 2050. https:\/\/eneken.ieej.or.jp\/data\/8192.pdf (2017)"},{"issue":"1","key":"9482_CR9","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1080\/00207543.2018.1459923","volume":"57","author":"S Chansombat","year":"2019","unstructured":"Chansombat, S., Pongcharoen, P., Hicks, C.: A mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry. Int. J. Prod. Res. 57(1), 61\u201382 (2019)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"9482_CR10","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1016\/j.ijpe.2011.07.011","volume":"134","author":"FI Dehayem Nodem","year":"2011","unstructured":"Dehayem Nodem, F.I., Kenn, J.P., Gharbi, A.: Simultaneous control of production, repair\/replacement and preventive maintenance of deteriorating manufacturing systems. Int. J. Prod. Econ. 134(1), 271\u2013282 (2011)","journal-title":"Int. J. Prod. Econ."},{"key":"9482_CR11","doi-asserted-by":"crossref","unstructured":"Detti, P., Nicosia, G., Pacifici, A., de Lara, G.Z.M.: Robust single machine scheduling with a flexible maintenance activity. Comput. Oper. Res. 107, 19\u201331 (2017)","DOI":"10.1016\/j.cor.2019.03.001"},{"key":"9482_CR12","doi-asserted-by":"crossref","unstructured":"de Paula, M.R., Boland, N., Ernst, A.T., Mendes, A., Savelsbergh, M.: Throughput optimisation in a coal export system with multiple terminals and shared resources. Comput. Ind. Eng. 134, 37\u201351 (2019)","DOI":"10.1016\/j.cie.2019.05.021"},{"issue":"1","key":"9482_CR13","doi-asserted-by":"publisher","first-page":"126","DOI":"10.1016\/j.ijpe.2012.01.023","volume":"137","author":"K Dhouib","year":"2012","unstructured":"Dhouib, K., Gharbi, A., Ben Aziza, M.N.: Joint optimal production control\/preventive maintenance policy for imperfect process manufacturing cell. Int. J. Prod. Econ. 137(1), 126\u2013136 (2012)","journal-title":"Int. J. Prod. Econ."},{"key":"9482_CR14","doi-asserted-by":"crossref","unstructured":"Dong J., Ye, C.M.: Research on two-stage joint optimization problem of green manufacturing and maintenance for semiconductor wafer. Math. Probl. Eng. (2020)","DOI":"10.1155\/2020\/3974024"},{"key":"9482_CR15","doi-asserted-by":"crossref","unstructured":"Duarte A., Pardo, E.G.: Special issue on recent innovations in variable neighborhood search. J. Heuristics 26, 335\u2013338 (2020)","DOI":"10.1007\/s10732-020-09442-0"},{"key":"9482_CR16","doi-asserted-by":"publisher","first-page":"236","DOI":"10.1016\/j.cie.2016.10.019","volume":"106","author":"F El Khoukhi","year":"2017","unstructured":"El Khoukhi, F., Boukachour, J., Alaoui, A.E.: The Dual-Ants Colony: a novel hybrid approach for the flexible job shop scheduling problem with preventive maintenance. Comput. Ind. Eng. 106, 236\u2013255 (2017)","journal-title":"Comput. Ind. Eng."},{"issue":"1","key":"9482_CR17","doi-asserted-by":"publisher","first-page":"9","DOI":"10.1016\/j.cor.2012.05.005","volume":"40","author":"Y Feng","year":"2013","unstructured":"Feng, Y., Ryan, S.M.: Scenario construction and reduction applied to stochastic power generation expansion planning. Comput. Oper. Res. 40(1), 9\u201323 (2013)","journal-title":"Comput. Oper. Res."},{"key":"9482_CR18","doi-asserted-by":"publisher","first-page":"140","DOI":"10.1016\/j.omega.2016.02.005","volume":"66","author":"G Finke","year":"2017","unstructured":"Finke, G., Gara-Ali, A., Espinouse, M.L., Jost, V., Moncel, J.: Unified matrix approach to solve production-maintenance problems on a single machine. Omega 66, 140\u2013146 (2017)","journal-title":"Omega"},{"issue":"2","key":"9482_CR19","doi-asserted-by":"publisher","first-page":"1294","DOI":"10.1016\/j.eswa.2009.06.025","volume":"37","author":"H Guo","year":"2010","unstructured":"Guo, H., Zhu, K., Ding, C., Li, L.: Intelligent optimization for project scheduling of the first mining face in coal mining. Expert Syst. Appl. 37(2), 1294\u20131301 (2010)","journal-title":"Expert Syst. Appl."},{"issue":"2","key":"9482_CR20","doi-asserted-by":"publisher","first-page":"422","DOI":"10.1016\/j.ijpe.2006.09.018","volume":"107","author":"A Gharbi","year":"2007","unstructured":"Gharbi, A., Kenn, J.P., Beit, M.: Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems. Int. J. Prod. Econ. 107(2), 422\u2013434 (2007)","journal-title":"Int. J. Prod. Econ."},{"issue":"15\u201316","key":"9482_CR21","doi-asserted-by":"publisher","first-page":"4694","DOI":"10.1080\/00207543.2015.1041569","volume":"53","author":"Z Hajej","year":"2015","unstructured":"Hajej, Z., Turki, S., Rezg, N.: Modelling and analysis for sequentially optimising production, maintenance and delivery activities taking into account product returns. Int. J. Prod. Res. 53(15\u201316), 4694\u20134719 (2015)","journal-title":"Int. J. Prod. Res."},{"issue":"21","key":"9482_CR22","doi-asserted-by":"publisher","first-page":"6417","DOI":"10.1080\/00207543.2019.1680897","volume":"58","author":"Z Hajej","year":"2020","unstructured":"Hajej, Z., Nidhal, R., Anis, C., Bouzoubaa, M.: An optimal integrated production and maintenance strategy for a multi-wind turbines system. Int. J. Prod. Res. 58(21), 6417\u20136440 (2020)","journal-title":"Int. J. Prod. Res."},{"issue":"19","key":"9482_CR23","doi-asserted-by":"publisher","first-page":"5841","DOI":"10.1080\/00207543.2017.1346843","volume":"55","author":"Y He","year":"2017","unstructured":"He, Y., Gu, C., Chen, Z., Han, X.: Integrated predictive maintenance strategy for manufacturing systems by combining quality control and mission reliability analysis. Int. J. Prod. Res. 55(19), 5841\u2013586 (2017)","journal-title":"Int. J. Prod. Res."},{"issue":"2\u20133","key":"9482_CR24","doi-asserted-by":"publisher","first-page":"187","DOI":"10.1023\/A:1021805924152","volume":"24","author":"H Heitsch","year":"2003","unstructured":"Heitsch, H., R\u00f6misch, W.: Scenario reduction algorithms in stochastic programming. Comput. Optim. Appl. 24(2\u20133), 187\u2013206 (2003)","journal-title":"Comput. Optim. Appl."},{"issue":"3","key":"9482_CR25","doi-asserted-by":"publisher","first-page":"926","DOI":"10.1287\/trsc.2015.0654","volume":"50","author":"IE I\u00e7y\u00fcz-Ay","year":"2016","unstructured":"I\u00e7y\u00fcz-Ay, I.E., Richard, J.P.P., Eskigun, E., Acharya, D.: A two-model solution approach for the monthly coal train reservations planning problem. Transp. Sci. 50(3), 926\u2013946 (2016)","journal-title":"Transp. Sci."},{"issue":"17","key":"9482_CR26","doi-asserted-by":"publisher","first-page":"5309","DOI":"10.1080\/00207543.2013.808773","volume":"51","author":"S Jiu","year":"2013","unstructured":"Jiu, S., Zhou, Z., Liu, J.: The equipment maintenance scheduling problem in a coal production system. Int. J. Prod. Res. 51(17), 5309\u20135336 (2013)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"9482_CR27","doi-asserted-by":"publisher","first-page":"665","DOI":"10.1016\/j.dss.2012.08.012","volume":"54","author":"E Kozan","year":"2012","unstructured":"Kozan, E., Liu, S.: A demand-responsive decision support system for coal transportation. Decis. Support Syst. 54(1), 665\u2013680 (2012)","journal-title":"Decis. Support Syst."},{"key":"9482_CR28","doi-asserted-by":"publisher","first-page":"106320","DOI":"10.1016\/j.cie.2020.106320","volume":"141","author":"DM Lei","year":"2020","unstructured":"Lei, D.M., Liu, M.Y.: An artificial bee colony with division for distributed unrelated parallel machine scheduling with preventive maintenance. Comput. Ind. Eng. 141, 106320 (2020)","journal-title":"Comput. Ind. Eng."},{"key":"9482_CR29","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ijpe.2017.01.014","volume":"186","author":"G Li","year":"2017","unstructured":"Li, G., Liu, M.Q., Sethi, S.P., Xu, D.H.: Parallel-machine scheduling with machine-dependent maintenance periodic recycles. Int. J. Prod. Econ. 186, 1\u20137 (2017)","journal-title":"Int. J. Prod. Econ."},{"issue":"2","key":"9482_CR30","doi-asserted-by":"publisher","first-page":"90","DOI":"10.1007\/s10696-010-9069-9","volume":"23","author":"S Liu","year":"2011","unstructured":"Liu, S., Kozan, E.: Optimising a coal rail network under capacity constraints. Flexible Serv. Manuf. J. 23(2), 90\u2013110 (2011)","journal-title":"Flexible Serv. Manuf. J."},{"issue":"2","key":"9482_CR31","doi-asserted-by":"publisher","first-page":"296","DOI":"10.1016\/j.ejor.2011.12.025","volume":"219","author":"J Liu","year":"2012","unstructured":"Liu, J., Yang, S., Wu, A., Hu, S.J.: Multi-state throughput analysis of a two-stage manufacturing system with parallel unreliable machines and a finite buffer. Eur. J. Oper. Res. 219(2), 296\u2013304 (2012)","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"9482_CR32","doi-asserted-by":"publisher","first-page":"725","DOI":"10.1007\/s11590-016-1041-5","volume":"11","author":"M Masoud","year":"2017","unstructured":"Masoud, M., Kozan, E., Kent, G., Liu, S.: A new constraint programming approach for optimising a coal rail system. Optim. Lett. 11(4), 725\u2013738 (2017)","journal-title":"Optim. Lett."},{"key":"9482_CR33","doi-asserted-by":"publisher","first-page":"79","DOI":"10.1016\/j.cie.2019.05.034","volume":"135","author":"HH Miyata","year":"2019","unstructured":"Miyata, H.H., Nagano, M.S., Gupta, J.N.D.: Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Comput. Ind. Eng. 135, 79\u2013104 (2019)","journal-title":"Comput. Ind. Eng."},{"issue":"11","key":"9482_CR34","doi-asserted-by":"publisher","first-page":"1097","DOI":"10.1016\/S0305-0548(97)00031-2","volume":"24","author":"N Mladenovi\u0107","year":"1997","unstructured":"Mladenovi\u0107, N., Hansen, P.: Variable neighborhood search. Comput. Oper. Res. 24(11), 1097\u20131100 (1997)","journal-title":"Comput. Oper. Res."},{"issue":"1\u20134","key":"9482_CR35","doi-asserted-by":"publisher","first-page":"365","DOI":"10.1007\/s00170-009-2514-9","volume":"50","author":"E Pan","year":"2010","unstructured":"Pan, E., Liao, W., Xi, L.: Single-machine-based production scheduling model integrated preventive maintenance planning. Int. J. Adv. Manuf. Technol. 50(1\u20134), 365\u2013375 (2010)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"12","key":"9482_CR36","doi-asserted-by":"publisher","first-page":"1141","DOI":"10.1016\/S0305-0548(97)00024-5","volume":"24","author":"PC Pendharkar","year":"1997","unstructured":"Pendharkar, P.C.: A fuzzy linear programming model for production planning in coal mines. Comput. Oper. Res. 24(12), 1141\u20131149 (1997)","journal-title":"Comput. Oper. Res."},{"issue":"1\u20134","key":"9482_CR37","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1023\/A:1018958209290","volume":"95","author":"PC Pendharkar","year":"2000","unstructured":"Pendharkar, P.C., Rodger, J.A.: Nonlinear programming and genetic search application for production scheduling in coal mines. Ann. Oper. Res. 95(1\u20134), 251\u2013267 (2000)","journal-title":"Ann. Oper. Res."},{"issue":"1","key":"9482_CR38","doi-asserted-by":"publisher","first-page":"94","DOI":"10.1016\/j.ejor.2016.02.027","volume":"253","author":"H Peng","year":"2016","unstructured":"Peng, H., Van Houtum, G.J.: Joint optimization of condition-based maintenance and production lot-sizing. Eur. J. Oper. Res. 253(1), 94\u2013107 (2016)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"9482_CR39","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1080\/07408170490447339","volume":"37","author":"SC Sarin","year":"2005","unstructured":"Sarin, S.C., West-Hansen, J.: The long-term mine production scheduling problem. IIE Trans. 37(2), 109\u2013121 (2005)","journal-title":"IIE Trans."},{"issue":"9","key":"9482_CR40","doi-asserted-by":"publisher","first-page":"3204","DOI":"10.1080\/00207543.2017.1403660","volume":"56","author":"J Seif","year":"2017","unstructured":"Seif, J., Yu, A.J., Rahmanniyay, F.: Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements. Int. J. Prod. Res. 56(9), 3204\u20133225 (2017)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"9482_CR41","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1108\/13552511111116222","volume":"17","author":"A Sharma","year":"2011","unstructured":"Sharma, A., Yadava, G., Deshmukh, S.: A literature review and future perspectives on maintenance optimization. J. Qual. Maint. Eng. 17(1), 5\u201325 (2011)","journal-title":"J. Qual. Maint. Eng."},{"issue":"3","key":"9482_CR42","doi-asserted-by":"publisher","first-page":"1108","DOI":"10.1016\/j.ejor.2018.12.015","volume":"275","author":"MS Shishvan","year":"2019","unstructured":"Shishvan, M.S., Benndorf, J.: Simulation-based optimization approach for material dispatching in continuous mining systems. Eur. J. Oper. Res. 275(3), 1108\u20131125 (2019)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"9482_CR43","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1016\/j.ijpe.2009.01.009","volume":"119","author":"DP Song","year":"2009","unstructured":"Song, D.P.: Production and preventive maintenance control in a stochastic manufacturing system. Int. J. Prod. Econ. 119(1), 101\u201311 (2009)","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"9482_CR44","doi-asserted-by":"publisher","first-page":"126","DOI":"10.1504\/EJIE.2015.067451","volume":"9","author":"K Thornblad","year":"2015","unstructured":"Thornblad, K., Stromberg, A.B., Patriksson, M., Almgren, T.: Scheduling optimisation of a real flexible job shop including fixture availability and preventive maintenance. Eur. J. Ind. Eng. 9(1), 126\u2013145 (2015)","journal-title":"Eur. J. Ind. Eng."},{"issue":"3","key":"9482_CR45","doi-asserted-by":"publisher","first-page":"826","DOI":"10.1016\/j.ejor.2018.05.050","volume":"271","author":"T Wang","year":"2018","unstructured":"Wang, T., Baldacci, R., Lim, A., Hu, Q.: A branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machine. Eur. J. Oper. Res. 271(3), 826\u2013838 (2018)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"9482_CR46","doi-asserted-by":"publisher","first-page":"672","DOI":"10.1080\/00207721.2014.900137","volume":"47","author":"S Wang","year":"2016","unstructured":"Wang, S., Liu, M.: Two-machine flow shop scheduling integrated with preventive maintenance planning. Int. J. Syst. Sci. 47(3), 672\u2013690 (2016)","journal-title":"Int. J. Syst. Sci."},{"key":"9482_CR47","doi-asserted-by":"publisher","first-page":"436","DOI":"10.1016\/j.cie.2010.05.016","volume":"59","author":"S Wang","year":"2010","unstructured":"Wang, S., Yu, J.: An effective heuristic for flexible job-shop scheduling problem with maintenance activities. Comput. Ind. Eng. 59, 436\u2013447 (2010)","journal-title":"Comput. Ind. Eng."},{"issue":"6","key":"9482_CR48","doi-asserted-by":"publisher","first-page":"1791","DOI":"10.1080\/00207543.2016.1245451","volume":"55","author":"X Wu","year":"2016","unstructured":"Wu, X., Zhang, K., Cheng, M.: Computational method for optimal machine scheduling problem with maintenance and production. Int. J. Prod. Res. 55(6), 1791\u20131814 (2016)","journal-title":"Int. J. Prod. Res."},{"issue":"6","key":"9482_CR49","doi-asserted-by":"publisher","first-page":"1644","DOI":"10.1080\/00207543.2013.843037","volume":"52","author":"YS Xiang","year":"2014","unstructured":"Xiang, Y.S., Cassady, C.R., Jin, T.: Joint production and maintenance planning with machine deterioration and random yield. Int. J. Prod. Res. 52(6), 1644\u20131657 (2014)","journal-title":"Int. J. Prod. Res."},{"key":"9482_CR50","doi-asserted-by":"publisher","first-page":"361","DOI":"10.1016\/j.cie.2016.09.020","volume":"101","author":"J Yoo","year":"2016","unstructured":"Yoo, J., Lee, I.S.: Parallel machine scheduling with maintenance activities. Comput. Ind. Eng. 101, 361\u2013371 (2016)","journal-title":"Comput. Ind. Eng."},{"issue":"12","key":"9482_CR51","doi-asserted-by":"publisher","first-page":"2015","DOI":"10.1057\/jors.2015.20","volume":"66","author":"F Zhao","year":"2015","unstructured":"Zhao, F., Wang, W., Peng, R.: Delay-time-based preventive maintenance modelling for a production plant: a case study in a steel mill. J. Oper. Res. Soc. 66(12), 2015\u20132024 (2015)","journal-title":"J. Oper. Res. Soc."},{"key":"9482_CR52","first-page":"1","volume":"2018","author":"R Zhang","year":"2018","unstructured":"Zhang, R., Sun, X.: Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time. Math. Probl. Eng. 2018, 1\u201310 (2018)","journal-title":"Math. Probl. Eng."}],"container-title":["Journal of Heuristics"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-021-09482-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10732-021-09482-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10732-021-09482-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,10,18]],"date-time":"2021-10-18T20:20:13Z","timestamp":1634588413000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10732-021-09482-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,7,28]]},"references-count":52,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2021,12]]}},"alternative-id":["9482"],"URL":"https:\/\/doi.org\/10.1007\/s10732-021-09482-0","relation":{},"ISSN":["1381-1231","1572-9397"],"issn-type":[{"value":"1381-1231","type":"print"},{"value":"1572-9397","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,7,28]]},"assertion":[{"value":"12 October 2020","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"24 June 2021","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"14 July 2021","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"28 July 2021","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}