{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,18]],"date-time":"2026-09-18T08:54:19Z","timestamp":1789721659175,"version":"4.0.1"},"reference-count":39,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2007,4,4]],"date-time":"2007-04-04T00:00:00Z","timestamp":1175644800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2007,7,30]]},"DOI":"10.1007\/s10845-007-0021-0","type":"journal-article","created":{"date-parts":[[2007,4,3]],"date-time":"2007-04-03T16:11:55Z","timestamp":1175616715000},"page":"261-271","source":"Crossref","is-referenced-by-count":28,"title":["CONWIP based control of a lamp assembly production line"],"prefix":"10.1007","volume":"18","author":[{"given":"W. H.","family":"Ip","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Min","family":"Huang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"K. L.","family":"Yung","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Dingwei","family":"Wang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xingwei","family":"Wang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2007,4,4]]},"reference":[{"issue":"1","key":"21_CR1","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/S0377-2217(97)00390-1","volume":"112","author":"H. Ayhan","year":"1999","unstructured":"Ayhan H., & Wortman M.A. (1999). Approximation for computing the throughput of closed assembly-type queueing networks. European Journal of Operational Research, 112(1): 107\u2013121","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"21_CR2","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1111\/j.1937-5956.1992.tb00004.x","volume":"1","author":"B.J. Berkley","year":"1992","unstructured":"Berkley B.J. (1992). A review of the kanban production control research literature. Production and Operations Management, 1(3): 393\u2013411","journal-title":"Production and Operations Management"},{"key":"21_CR3","doi-asserted-by":"crossref","first-page":"789","DOI":"10.1080\/002075497195713","volume":"35","author":"A.M. Bonvik","year":"1997","unstructured":"Bonvik A.M., Couch C.E., & Gershwin S.B. (1997). Comparison of production-line control mechanisms. International Journal of Production Research, 35: 789\u2013804","journal-title":"International Journal of Production Research"},{"key":"21_CR4","doi-asserted-by":"crossref","first-page":"2845","DOI":"10.1080\/00207540050117332","volume":"38","author":"A.M. Bonvik","year":"2000","unstructured":"Bonvik A.M., Dallery Y., & Gershwin S.B. (2000). Approximate analysis of production systems operated by a CONWIP\/finite buffer hybrid control policy. International Journal of Production Research, 38: 2845\u20132869","journal-title":"International Journal of Production Research"},{"key":"21_CR5","doi-asserted-by":"crossref","first-page":"889","DOI":"10.1080\/00207549408956977","volume":"32","author":"T.M. Chang","year":"1994","unstructured":"Chang T.M., & Yih Y. (1994). Generic kanban systems for dynamic environments. International Journal of Production Research, 32: 889\u2013902","journal-title":"International Journal of Production Research"},{"key":"21_CR6","unstructured":"Dallery, Y., & Liberopoulos, G. (1995). A new Kanban-type pull control mechanism for multi-stage manufacturing systems. Proceedings of the 3rd European Control Conference, Rome, September 5\u20138, 4(2), 3543\u20133548"},{"key":"21_CR7","doi-asserted-by":"crossref","first-page":"50","DOI":"10.1287\/opre.44.1.50","volume":"44","author":"M. Di Mascolo","year":"1996","unstructured":"Di Mascolo M., Frein Y., & Dalley Y. (1996). An analytical method for performance evaluation of kanban controlled production systems. Operations Research, 44: 50\u201364","journal-title":"Operations Research"},{"issue":"6","key":"21_CR8","doi-asserted-by":"crossref","first-page":"1403","DOI":"10.1080\/00207549408957007","volume":"32","author":"I. Duenyas","year":"1994","unstructured":"Duenyas I. (1994). Estimating the throughput of a cyclic assembly system. International Journal of Production Research, 32(6):1403\u20131419","journal-title":"International Journal of Production Research"},{"key":"21_CR9","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1007\/BF01153531","volume":"14","author":"I. Duenyas","year":"1992a","unstructured":"Duenyas I., & Hopp W.J. (1992a). Estimating the throughput of an exponential CONWIP Assembly system. Queueing Systems: Theory and Applications, 14: 135\u2013157","journal-title":"Queueing Systems: Theory and Applications"},{"issue":"3","key":"21_CR10","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1080\/07408179208964237","volume":"24","author":"I. Duenyas","year":"1992b","unstructured":"Duenyas I., & Hopp W.J. (1992b). CONWIP assembly with deterministic process and random outages. IIE Transactions, 24(3): 97","journal-title":"IIE Transactions"},{"issue":"6","key":"21_CR11","doi-asserted-by":"crossref","first-page":"975","DOI":"10.1287\/mnsc.39.8.975","volume":"39","author":"I. Duenyas","year":"1993","unstructured":"Duenyas I., Hopp W.J., & Spearman M.L. (1993). Characterizing the output process of a CONWIP line with deterministic processing and random outages. Management Science, 39(6): 975\u2013988","journal-title":"Management Science"},{"issue":"1","key":"21_CR12","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1016\/S0925-5273(99)00060-2","volume":"64","author":"C. Duri","year":"2000","unstructured":"Duri C., Frein Y., & Lee H.-S. (2000). Performance evaluation and design of a CONWIP system with inspections. International Journal of Production Economics, 64(1): 219\u2013229","journal-title":"International Journal of Production Economics"},{"key":"21_CR13","unstructured":"Ettl, M., & Schwehm, M. (1994). A design methodology for Kanban-controlled production lines using queueing networks and genetic algorithms. Proceedings of tenth international conference on systems engineering, ICSE\u201894 in Coventry, UK, Coventry University Press, pp. 307\u2013314."},{"key":"21_CR14","doi-asserted-by":"crossref","DOI":"10.1002\/9780470172254","volume-title":"Genetic algorithms and engineering design","author":"M. Gen","year":"1996","unstructured":"Gen M., & Cheng R. (1996). Genetic algorithms and engineering design. New York: John Wiley & Son Press"},{"issue":"8","key":"21_CR15","first-page":"771","volume":"31","author":"B. Golany","year":"1999","unstructured":"Golany B., Dar-El E. M., & Zeev N. (1999). Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process. IIE Transactions, 31(8): 771\u2013781","journal-title":"IIE Transactions"},{"key":"21_CR16","volume-title":"Genetic algorithm in search, optimization & Machine learning","author":"D.E. Goldberg","year":"1989","unstructured":"Goldberg D.E. (1989). Genetic algorithm in search, optimization & Machine learning. Reading, MA: Addison-Wesley"},{"key":"21_CR17","doi-asserted-by":"crossref","first-page":"3253","DOI":"10.1080\/00207549608905087","volume":"34","author":"S. Gstettner","year":"1996","unstructured":"Gstettner S., & Kuhn H. (1996). Analysis of production control systems kanban and CONWIP. International Journal of Production Research, 34: 3253\u20133273","journal-title":"International Journal of Production Research"},{"key":"21_CR18","volume-title":"Driving the productivity machine: production planning and control in Japan","author":"W.R. Hall","year":"1981","unstructured":"Hall W.R. (1981). Driving the productivity machine: production planning and control in Japan. Falls Church, Virginia: American Production and Inventory Control Society"},{"issue":"4","key":"21_CR19","doi-asserted-by":"crossref","first-page":"1067","DOI":"10.1080\/002075497195542","volume":"35","author":"Y.T. Herer","year":"1997","unstructured":"Herer Y.T., & Masin M. (1997). Mathematical programming formulation of CONWIP based production lines; and relationships to MRP. International Journal of Production Research, 35(4): 1067\u20131076","journal-title":"International Journal of Production Research"},{"key":"21_CR20","volume-title":"Adaptation in natural and artificial systems","author":"J.H. Holland","year":"1975","unstructured":"Holland J.H. (1975). Adaptation in natural and artificial systems. Ann Arbor: University of Michigan"},{"key":"21_CR21","doi-asserted-by":"crossref","first-page":"867","DOI":"10.1080\/002075498193435","volume":"36","author":"W.J. Hopp","year":"1998","unstructured":"Hopp W.J., & Roof M.L. (1998). Setting WIP levels with statistical throughput control (STC) in CONWIP production lines. International Journal of Production Research, 36: 867\u2013882","journal-title":"International Journal of Production Research"},{"issue":"3","key":"21_CR22","doi-asserted-by":"crossref","first-page":"635","DOI":"10.1080\/00207549108930093","volume":"29","author":"W.J. Hopp","year":"1991","unstructured":"Hopp W.J., & Spearman M.L. (1991). Throughput of a constant work in process manufacturing line subject to failures. International Journal of Production Research, 29(3): 635\u2013655","journal-title":"International Journal of Production Research"},{"key":"21_CR23","volume-title":"Factory physics: Foundations of manufacturing management","author":"W.J. Hopp","year":"1996","unstructured":"Hopp W.J., & Spearman M.L. (1996). Factory physics: Foundations of manufacturing management. Burr Ridge, IL: Irwin"},{"key":"21_CR24","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1080\/095119296131643","volume":"9","author":"C.-C. Huang","year":"1996","unstructured":"Huang C.-C., & Kusiak A. (1996). Overview of Kanban system. International Journal of Computer Integrated Manufacturing, 9: 169\u2013189","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"21_CR25","doi-asserted-by":"crossref","first-page":"803","DOI":"10.1080\/095372898233579","volume":"9","author":"M. Huang","year":"1998","unstructured":"Huang M., Wang D., & Ip W.H. (1998). Simulation and comparative study of the CONWIP, kanban and MRP production control systems in a cold rolling plant. Production Planning and Control, 9: 803\u2013812","journal-title":"Production Planning and Control"},{"key":"21_CR26","doi-asserted-by":"crossref","first-page":"26","DOI":"10.1080\/00207548108956651","volume":"19","author":"O. Kimura","year":"1981","unstructured":"Kimura O., & Terada H. (1981). Design and analysis of push system, a method of multi-stage production controls. International Journal of Production Research, 19: 26\u201349","journal-title":"International Journal of Production Research"},{"issue":"4","key":"21_CR27","doi-asserted-by":"crossref","first-page":"268","DOI":"10.1109\/3476.650956","volume":"20","author":"Ch.-E. Lee","year":"1997","unstructured":"Lee Ch.-E., & Chen Ch.-W. (1997). Dispatching scheme involving move control and weighted due date for wafer foundries. IEEE Transactions on Components, Packaging, and Manufacturing Technology Part C: Manufacturing, 20(4): 268\u2013277","journal-title":"IEEE Transactions on Components, Packaging, and Manufacturing Technology Part C: Manufacturing"},{"issue":"4","key":"21_CR28","doi-asserted-by":"crossref","first-page":"420","DOI":"10.1109\/70.864236","volume":"16","author":"P.B. Luh","year":"2000","unstructured":"Luh P.B., Zhou X., & Tomastik R.N. (2000). Effective method to reduce inventory in job shops. IEEE Transactions on Robotics and Automation, 16(4): 420\u2013424","journal-title":"IEEE Transactions on Robotics and Automation"},{"key":"21_CR29","volume-title":"Genetic algorithms\u00a0+\u00a0data structure\u00a0=\u00a0evolution programs (thirded)","author":"Z. Michalewicz","year":"1996","unstructured":"Michalewicz Z. (1996). Genetic algorithms\u00a0+\u00a0data structure\u00a0=\u00a0evolution programs (thirded). New York: Springer-Verlag"},{"key":"21_CR30","doi-asserted-by":"crossref","first-page":"140","DOI":"10.1080\/07408179508936726","volume":"27","author":"J.A. Muckstadt","year":"1995a","unstructured":"Muckstadt J.A., & Tayur S.R. (1995a). Comparison of alternative kanban control mechanisms. I. Background and structural results. IIE Transactions, 27: 140\u2013150","journal-title":"IIE Transactions"},{"key":"21_CR31","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1080\/07408179508936727","volume":"27","author":"J.A. Muckstadt","year":"1995b","unstructured":"Muckstadt J.A., & Tayur S.R. (1995b). Comparison of alternative kanban control mechanisms II Experimental results. IIE Transactions, 27: 151\u2013161","journal-title":"IIE Transactions"},{"issue":"6","key":"21_CR32","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1016\/S0305-0548(98)00035-5","volume":"26","author":"R. Ostermark","year":"1999","unstructured":"Ostermark R. (1999). Solving a nonlinear non-convex trim loss problem with a genetic hybrid algorithm. Computers & Operations Research, 26(6): 623\u2013635","journal-title":"Computers & Operations Research"},{"key":"21_CR33","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(94)90182-1","volume":"75","author":"W. Price","year":"1994","unstructured":"Price W., Gravel M., & Nsakanda A.L. (1994). A review of optimization models of kanban-based production systems. European Journal of Operational Research, 75: 1\u201312","journal-title":"European Journal of Operational Research"},{"key":"21_CR34","doi-asserted-by":"crossref","first-page":"237","DOI":"10.1016\/0360-8352(94)90058-2","volume":"26","author":"L.M. Roderick","year":"1994","unstructured":"Roderick L.M., Toland J., & Rodriguez P. (1994). A simulation studies of CONWIP versus MRP at Westinghouse. Computer Industrial Engineering, 26: 237\u2013242","journal-title":"Computer Industrial Engineering"},{"key":"21_CR35","doi-asserted-by":"crossref","first-page":"948","DOI":"10.1287\/opre.40.5.948","volume":"40","author":"M.L. Spearman","year":"1992","unstructured":"Spearman M.L. (1992). Customer service in pull production systems. Operations Research, 40: 948\u2013958","journal-title":"Operations Research,"},{"key":"21_CR36","doi-asserted-by":"crossref","first-page":"879","DOI":"10.1080\/00207549008942761","volume":"28","author":"M.L. Spearman","year":"1990","unstructured":"Spearman M.L., Woodruff D.L., & Hopp W.J. (1990). CONWIP: A pull alternative to kanban. International Journal of Production Research, 28: 879\u2013894","journal-title":"International Journal of Production Research"},{"key":"21_CR37","doi-asserted-by":"crossref","first-page":"521","DOI":"10.1287\/opre.40.3.521","volume":"40","author":"M.L. Spearman","year":"1992","unstructured":"Spearman M.L., & Zazanis M.A. (1992). Push and pull production systems: Issue and comparison. Operations Research, 40: 521\u2013532","journal-title":"Operations Research"},{"key":"21_CR38","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1080\/00207547708943149","volume":"15","author":"Y. Sugimori","year":"1977","unstructured":"Sugimori Y., Kusunoki K., Cho F., & Uchikawa S. (1977). Toyota production system and kanban system materialization of just-in-time and respect-for-human system. International Journal of Production Research, 15: 553\u2013564","journal-title":"International Journal of Production Research"},{"key":"21_CR39","doi-asserted-by":"crossref","first-page":"595","DOI":"10.1080\/00207549608904922","volume":"34","author":"K. Venkatesh","year":"1996","unstructured":"Venkatesh K., Zhou M.C., Kaighobadi M., & Caudill R. (1996). A petri net approach to investigating push and pull paradigms in flexible factory automated systems. International Journal of Production Research, 34, 595\u2013620","journal-title":"International Journal of Production Research"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-007-0021-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-007-0021-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-007-0021-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,2,12]],"date-time":"2024-02-12T18:21:03Z","timestamp":1707762063000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-007-0021-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,4,4]]},"references-count":39,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2007,7,30]]}},"alternative-id":["21"],"URL":"https:\/\/doi.org\/10.1007\/s10845-007-0021-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,4,4]]}}}