{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,28]],"date-time":"2026-05-28T04:04:02Z","timestamp":1779941042300,"version":"3.53.1"},"reference-count":30,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2008,1,20]],"date-time":"2008-01-20T00:00:00Z","timestamp":1200787200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2008,4]]},"DOI":"10.1007\/s10845-008-0073-9","type":"journal-article","created":{"date-parts":[[2008,1,19]],"date-time":"2008-01-19T09:33:05Z","timestamp":1200735185000},"page":"191-201","source":"Crossref","is-referenced-by-count":84,"title":["A neural network job-shop scheduler"],"prefix":"10.1007","volume":"19","author":[{"given":"Gary R.","family":"Weckman","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Chandrasekhar V.","family":"Ganduri","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"David A.","family":"Koonce","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2008,1,20]]},"reference":[{"issue":"3","key":"73_CR1","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J. Adams","year":"1988","unstructured":"Adams J., Balas E., Zawack D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science 34(3): 391\u2013401","journal-title":"Management Science"},{"issue":"3","key":"73_CR2","doi-asserted-by":"crossref","first-page":"801","DOI":"10.1016\/j.ejor.2004.06.039","volume":"169","author":"A. Agarwal","year":"2006","unstructured":"Agarwal A., Colak S., Eryarsoy E. (2006). Improvement heuristic for the flow-shop scheduling problem: An adaptive-learning approach. European Journal of Operational Research 169(3): 801\u2013815","journal-title":"European Journal of Operational Research"},{"key":"73_CR3","volume-title":"Introduction to sequencing and scheduling","author":"K.R. Baker","year":"1974","unstructured":"Baker K.R. (1974). Introduction to sequencing and scheduling. New York, Wiley"},{"issue":"1","key":"73_CR4","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1080\/00207548208947745","volume":"20","author":"J.H. Blackstone Jr.","year":"1982","unstructured":"Blackstone J.H., Jr., Phillips D.T., Hogg G.L. (1982). A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research 20(1): 27","journal-title":"International Journal of Production Research"},{"key":"73_CR5","first-page":"469","volume-title":"Artificial neural networks for intelligent manufacturing (1st ed.)","author":"J.Y. Cheung","year":"1994","unstructured":"Cheung J.Y. (1994). Scheduling. In: Dagli C.H. (ed) Artificial neural networks for intelligent manufacturing (1st ed). London New York, Chapman & Hall, pp. 469"},{"issue":"1\u20133","key":"73_CR6","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1016\/0925-5273(95)00072-0","volume":"41","author":"C.H. Dagli","year":"1995","unstructured":"Dagli C.H., Sittisathanchai S. (1995). Genetic neuro-scheduler: A new approach for job shop scheduling. International Journal of Production Economics 41(1\u20133): 135\u2013145","journal-title":"International Journal of Production Economics"},{"key":"73_CR7","doi-asserted-by":"crossref","unstructured":"Dietterich, T. (1996). Machine learning. ACM Computing Surveys (CSUR), 28(4es), 3-es.","DOI":"10.1145\/242224.242229"},{"key":"73_CR8","first-page":"225","volume-title":"Industrial scheduling.","author":"H. Fisher","year":"1963","unstructured":"Fisher H., Thompson G.L. (1963). Probabilistic learning combinations of local job-shop scheduling rules. In: Muth J.F., Thompson G.L. (eds) Industrial scheduling. Englewood Cliffs New Jersy, Prentice Hall, pp. 225\u2013251"},{"issue":"4","key":"73_CR9","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1016\/S1474-0346(03)00005-3","volume":"16","author":"D.J. Fonseca","year":"2002","unstructured":"Fonseca D.J., Navaresse D. (2002). Artificial neural networks for job shop simulation. Advanced Engineering Informatics 16(4): 241\u2013246","journal-title":"Advanced Engineering Informatics"},{"key":"73_CR10","unstructured":"Foo, Y. S., & Takefuji, T. (1988). Integer linear programming neural networks for job-shop scheduling. IEEE International Conference on Neural Networks, San Diego, California, July 24\u201327 (Vol. 2, pp. 341\u2013348)."},{"issue":"1","key":"73_CR11","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1016\/0925-2312(94)00011-5","volume":"8","author":"S.Y. Foo","year":"1995","unstructured":"Foo S.Y., Takefuji Y., Szu H. (1995). Scaling properties of neural networks for job-shop scheduling. Neurocomputing 8(1): 79\u201391","journal-title":"Neurocomputing"},{"key":"73_CR12","volume-title":"Sequencing and scheduling: An introduction to the mathematics of the job-shop","author":"S. French","year":"1982","unstructured":"French S. (1982). Sequencing and scheduling: An introduction to the mathematics of the job-shop. Chichester, West Sussex: E. Horwood"},{"issue":"4","key":"73_CR13","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1287\/opre.8.4.487","volume":"8","author":"B. Giffler","year":"1960","unstructured":"Giffler B., Thompson G.L. (1960). Algorithms for solving production-scheduling problems. Operations Research 8(4): 487\u2013503","journal-title":"Operations Research"},{"key":"73_CR14","unstructured":"Jain, A. S., & Meeran, S. (1996). Scheduling a job-shop using a modified back-error propagation neural network. Paper presented at the Proceedings of the IMS\u201996 First Symposium on Intelligent Manufacturing Systems Conference, Adapazari, Turkey, May 30\u201331 (pp. 462\u2013474)."},{"issue":"5","key":"73_CR15","doi-asserted-by":"crossref","first-page":"1249","DOI":"10.1080\/002075498193309","volume":"36","author":"A.S. Jain","year":"1998","unstructured":"Jain A.S., Meeran S. (1998). Job-shop scheduling using neural networks. International Journal of Production Research 36(5): 1249\u20131272","journal-title":"International Journal of Production Research"},{"key":"73_CR16","unstructured":"K\u00e4schel, J., Teich, T., K\u00f6bernik, G., & Meier, B. (1999). Algorithms for the job shop scheduling problem: A comparison of different methods. In European Symposium on Intelligent Techniques, Greece (pp. 3\u20134)."},{"issue":"3","key":"73_CR17","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1016\/S0360-8352(00)00050-4","volume":"38","author":"D.A. Koonce","year":"2000","unstructured":"Koonce D.A., Tsai S.-C. (2000). Using data mining to find patterns in genetic algorithm solutions to a job shop schedule. Computers and Industrial Engineering 38(3): 361\u2013374","journal-title":"Computers and Industrial Engineering"},{"key":"73_CR18","unstructured":"Lawrence, S. (1984). Resource constrained project scheduling: An experimental investigation of heuristic scheduling techniques (supplement). Pittsburgh, PA: Graduate School of Industrial Administration, Carnegie-Mellon University."},{"key":"73_CR19","volume-title":"Machine learning","author":"T.M. Mitchell","year":"1997","unstructured":"Mitchell T.M. (1997). Machine learning. New York, McGraw-Hill"},{"key":"73_CR20","volume-title":"Neural and adaptive systems: Fundamentals through simulations","author":"J.C. Pr\u00edncipe","year":"2000","unstructured":"Pr\u00edncipe J.C., Euliano N.R., Lefebvre W.C. (2000). Neural and adaptive systems: Fundamentals through simulations. New York, Wiley"},{"key":"73_CR21","unstructured":"Rabelo, L. C., & Alptekin, S. (1989). Using hybrid neural networks\/expert systems for intelligent scheduling in flexible manufacturing systems. In IJCNN: International Joint Conference on Neural Networks, June 18\u201322, Washington (Vol. 2, 608\u00a0pp)."},{"key":"73_CR22","doi-asserted-by":"crossref","first-page":"533","DOI":"10.1038\/323533a0","volume":"323","author":"D.E. Rumelhart","year":"1986","unstructured":"Rumelhart D.E., Hinton G.E., Williams R.J. (1986). Learning representations by back-propagating errors. Nature 323: 533\u2013536","journal-title":"Nature"},{"key":"73_CR23","unstructured":"Shah, N., & Koonce, D. A. (2004). Using distributed genetic algorithms for solving job shop scheduling problems. In Proceedings of the IIE 2004 Annual Conference, Houston, TX."},{"key":"73_CR24","unstructured":"Sormaz, D. N. (2003). Application of space search tools in intelligent manufacturing planning. In Industrial Engineering Research Conference, May 18\u201320, Portland, OR."},{"key":"73_CR25","volume-title":"Decision support systems and intelligent systems","author":"E. Turban","year":"2001","unstructured":"Turban E., Aronson J.E. (2001). Decision support systems and intelligent systems (6th ed). Upper Saddle River, NJ, Prentice Hall","edition":"6"},{"issue":"3","key":"73_CR26","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1145\/175247.175257","volume":"37","author":"B. Widrow","year":"1994","unstructured":"Widrow B., Rumelhart D.E., Lehr M.A. (1994). Neural networks: Applications in industry, business and science. Communications of the ACM 37(3): 93\u2013105","journal-title":"Communications of the ACM"},{"key":"73_CR27","first-page":"281","volume-title":"Parallel instance solving from nature 2","author":"T. Yamada","year":"1992","unstructured":"Yamada T., Nakano R. (1992). A genetic algorithm applicable to large-scale job-shop instances. In: Manner R., Manderick B. (eds) Parallel instance solving from nature 2. Amsterdam, North-Holland, pp. 281\u2013290"},{"key":"73_CR28","doi-asserted-by":"crossref","unstructured":"Yamada, T., & Nakano, R. (1997). Job-shop scheduling. In A. M. S. Zalzala & P. J. Fleming (Eds.), Genetic algorithms in engineering systems (pp. 134\u2013160). The Institution of Electrical Engineers.","DOI":"10.1049\/PBCE055E_ch7"},{"issue":"2","key":"73_CR29","doi-asserted-by":"crossref","first-page":"474","DOI":"10.1109\/72.839016","volume":"11","author":"S. Yang","year":"2000","unstructured":"Yang S., Wang D. (2000). Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling. IEEE Transactions on Neural Networks 11(2): 474\u2013486","journal-title":"IEEE Transactions on Neural Networks"},{"issue":"3\u20134","key":"73_CR30","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1016\/S0360-8352(01)00010-9","volume":"39","author":"H. Yu","year":"2001","unstructured":"Yu H., Liang W. (2001). Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling. Computers and Industrial Engineering 39(3\u20134): 337\u2013356","journal-title":"Computers and Industrial Engineering"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0073-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-008-0073-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0073-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:40Z","timestamp":1559254300000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-008-0073-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,1,20]]},"references-count":30,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2008,4]]}},"alternative-id":["73"],"URL":"https:\/\/doi.org\/10.1007\/s10845-008-0073-9","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,1,20]]}}}