{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,20]],"date-time":"2024-09-20T15:48:07Z","timestamp":1726847287214},"reference-count":10,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2008,1,24]],"date-time":"2008-01-24T00:00:00Z","timestamp":1201132800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2008,6]]},"DOI":"10.1007\/s10845-008-0080-x","type":"journal-article","created":{"date-parts":[[2008,1,23]],"date-time":"2008-01-23T03:09:23Z","timestamp":1201057763000},"page":"273-282","source":"Crossref","is-referenced-by-count":8,"title":["Capacitated lot sizing by using multi-chromosome crossover strategy"],"prefix":"10.1007","volume":"19","author":[{"given":"G\u00fcrsel A.","family":"S\u00fcer","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fazleena","family":"Badurdeen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Nishantha","family":"Dissanayake","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2008,1,24]]},"reference":[{"key":"80_CR1","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1016\/S0925-5273(00)00084-0","volume":"68","author":"N. Dellaert","year":"2000","unstructured":"Dellaert N., Jeunet J., Jonard N. (2000) A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs. International Journal of Production Economics 68: 241\u2013257","journal-title":"International Journal of Production Economics"},{"key":"80_CR2","unstructured":"Gutierrez, E., Hernandez, W., & S\u00fcer, G. (2002). Genetic algorithms in capacitated lot sizing decisions. Working Paper, Department of Industrial Engineering, University of Puerto Rico."},{"issue":"4","key":"80_CR3","first-page":"473","volume":"137","author":"Y. Hong-hang","year":"2003","unstructured":"Hong-hang Y., Zhi-ming W. (2003) Two level GA-based approach to the capacitated lot sizing problem for multi-plants supply chain. Journal of Shanghai Jiaotong University 137(4): 473\u2013478","journal-title":"Journal of Shanghai Jiaotong University"},{"key":"80_CR4","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/S0305-0483(03)00059-8","volume":"31","author":"B. Karimi","year":"2003","unstructured":"Karimi B., Ghomi S.M.T.F., Wilson J.M. (2003) The capacitated lot sizing problem: A review of models and algorithms. Omega 31: 365\u2013378","journal-title":"Omega"},{"issue":"3","key":"80_CR5","doi-asserted-by":"crossref","first-page":"525","DOI":"10.1016\/S0377-2217(97)00269-5","volume":"110","author":"L. \u00d6zdamar","year":"1998","unstructured":"\u00d6zdamar L., Birbil S.I. (1998) Theory and methodology: Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions. European Journal of Operational Research 110(3): 525\u2013547","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"80_CR6","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1080\/09537280110049272","volume":"13","author":"L. \u00d6zdamar","year":"2002","unstructured":"\u00d6zdamar L., Birbil S., Portmann M. (2002) Technical note: New results for the capacitated lot sizing problem with overtime decisions and setup times. Production Planning & Control 13(1): 2\u201310","journal-title":"Production Planning & Control"},{"key":"80_CR7","doi-asserted-by":"crossref","first-page":"520","DOI":"10.1007\/s001700170045","volume":"18","author":"P.S.S. Prasad","year":"2001","unstructured":"Prasad P.S.S., Krishnaiah Chetty O.V. (2001) Multilevel lot sizing with a genetic algorithm under fixed and rolling horizons. International Journal of Advanced Manufacturing Technology 18: 520\u2013527","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"80_CR8","first-page":"87","volume":"19","author":"M. Sambasivan","year":"2002","unstructured":"Sambasivan M., Schmidt C.P. (2002) A heuristic procedure for solving multi-plant, multi-item, multi-period capacitated lot sizing problems. Asia-Pacific Journal of Operational Research 19: 87\u2013105","journal-title":"Asia-Pacific Journal of Operational Research"},{"issue":"4","key":"80_CR9","doi-asserted-by":"crossref","first-page":"969","DOI":"10.1016\/0360-8352(96)00046-0","volume":"3","author":"R. Sikora","year":"1996","unstructured":"Sikora R. (1996) A genetic algorithm for integrating lot-sizing and sequencing in scheduling a capacitated flow line. Computers in Industrial Engineering 3(4): 969\u2013981","journal-title":"Computers in Industrial Engineering"},{"key":"80_CR10","doi-asserted-by":"crossref","first-page":"743","DOI":"10.1016\/j.cie.2004.12.008","volume":"48","author":"M. Watanabe","year":"2005","unstructured":"Watanabe M., Ida K., Gen M. (2005) A genetic algorithm with modified crossover operator and search area adaptation for the job-shop scheduling problem. Computers & Industrial Engineering 48: 743\u2013752","journal-title":"Computers & Industrial Engineering"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0080-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-008-0080-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0080-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:40Z","timestamp":1559268700000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-008-0080-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,1,24]]},"references-count":10,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2008,6]]}},"alternative-id":["80"],"URL":"https:\/\/doi.org\/10.1007\/s10845-008-0080-x","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,1,24]]}}}