{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,26]],"date-time":"2025-10-26T14:13:23Z","timestamp":1761488003296},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2008,2,28]],"date-time":"2008-02-28T00:00:00Z","timestamp":1204156800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2008,8]]},"DOI":"10.1007\/s10845-008-0093-5","type":"journal-article","created":{"date-parts":[[2008,2,29]],"date-time":"2008-02-29T11:14:22Z","timestamp":1204283662000},"page":"421-432","source":"Crossref","is-referenced-by-count":15,"title":["Fuzzy-based methodology for multi-objective scheduling in a robot-centered flexible manufacturing cell"],"prefix":"10.1007","volume":"19","author":[{"given":"Indira Molina","family":"Restrepo","sequence":"first","affiliation":[]},{"given":"S.","family":"Balakrishnan","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2008,2,28]]},"reference":[{"key":"93_CR1","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1016\/S0377-2217(99)00258-1","volume":"123","author":"A. Agentis","year":"2000","unstructured":"Agentis A. (2000). Scheduling no-wait robotic cells with two and three machines. European Journal of Operational Research 123:303\u2013314","journal-title":"European Journal of Operational Research"},{"key":"93_CR2","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/S0167-6377(00)00046-8","volume":"27","author":"A. Agentis","year":"2000","unstructured":"Agentis A., Pacciarelli D. (2000). Part sequencing in three machine no-wait robotic cells. Operations Research Letters 27:185\u2013192","journal-title":"Operations Research Letters"},{"key":"93_CR3","unstructured":"Balakrishnan, S., Hathout, L., & Popplewell, N. (2001). Sequential versus Non-sequential loading and influences on Intra-Cell sequences. In Proceedings of the IASTED International Conference, Robotics and Applications (pp. 95\u2013100). ISBN:0-88986-313-X."},{"key":"93_CR4","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1287\/mnsc.17.4.B141","volume":"17","author":"R.E. Bellman","year":"1970","unstructured":"Bellman R.E., Zadeh L.A. (1970). Decision-making in a fuzzy environment. Management Science 17:141\u2013164","journal-title":"Management Science"},{"key":"93_CR5","first-page":"269","volume":"74","author":"N. Brauner","year":"2001","unstructured":"Brauner N., Finke G. (2001). Optimal moves of the material handling system in a robotic cell. International Journal of Flexible Manufacturing Systems 74:269\u2013277","journal-title":"International Journal of Flexible Manufacturing Systems"},{"issue":"13","key":"93_CR6","doi-asserted-by":"crossref","first-page":"2939","DOI":"10.1080\/002075499190365","volume":"37","author":"S. Chen","year":"1999","unstructured":"Chen S., Lin L. (1999). Reducing total tardiness cost in manufacturing cell scheduling by a multi-factor priority rule. International Journal of Production Research 37(13):2939\u20132956","journal-title":"International Journal of Production Research"},{"key":"93_CR7","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1023\/A:1007930010707","volume":"9","author":"H. Chen","year":"1997","unstructured":"Chen H., Chu C., Proth J. (1997). Sequencing of parts in robotic cells. The International Journal of Flexible Manufacturing Systems 9:81\u2013103","journal-title":"The International Journal of Flexible Manufacturing Systems"},{"key":"93_CR8","volume-title":"The fuzzy systems handbook (2nd ed)","author":"E. Cox","year":"1998","unstructured":"Cox E. (1998). The fuzzy systems handbook (2nd ed). New York, AP Professional"},{"key":"93_CR9","doi-asserted-by":"crossref","first-page":"474","DOI":"10.1016\/S0377-2217(99)00302-1","volume":"126","author":"A. El-Bouri","year":"2000","unstructured":"El-Bouri A., Balakrishnan S., Popplewell N. (2000). Sequencing jobs on a single machine: A neural network approach. European Journal of Operational Research 126:474\u2013490","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"93_CR10","doi-asserted-by":"crossref","first-page":"539","DOI":"10.1080\/002075497195894","volume":"35","author":"O. Holthaus","year":"1997","unstructured":"Holthaus O., Ziegler H. (1997). Improving job shop performance by coordinating dispatching rules. International Journal of Production Research 35(2):539\u2013549","journal-title":"International Journal of Production Research"},{"key":"93_CR11","unstructured":"Jain, A. S., & Meeran, S. (1996). Scheduling a job-shop using a modified back-error propagation neural network. In Proceedings of the First Turkish Symposium on Intelligent Manufacturing Systems (pp. 30\u201331, 462\u2013474)."},{"key":"93_CR12","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1016\/S0166-3615(97)00074-2","volume":"35","author":"N. Jawahar","year":"1998","unstructured":"Jawahar N., Aravindam S.G., Ponnambalam S.G., Karthikeyan A.A. (1998). Genetic algorithm-based scheduler for setup-constrained FMC. Computers in Industry 35:291\u2013310","journal-title":"Computers in Industry"},{"key":"93_CR13","doi-asserted-by":"crossref","first-page":"771","DOI":"10.1080\/095372897234669","volume":"8","author":"A. Kazerooni","year":"1997","unstructured":"Kazerooni A., Chan F.T.S., Abhary K. (1997). Real-time operation selection in an FMS using simulation\u2014a fuzzy approach. Production Planning & Control 8:771\u2013779","journal-title":"Production Planning & Control"},{"issue":"1","key":"93_CR14","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1080\/002075499191995","volume":"37","author":"E. Kutanoglu","year":"1999","unstructured":"Kutanoglu E., Sabuncuoglu I. (1999). An analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research 37(1):165\u2013187","journal-title":"International Journal of Production Research"},{"issue":"5","key":"93_CR15","doi-asserted-by":"crossref","first-page":"1157","DOI":"10.1080\/00207549308956781","volume":"31","author":"A. Moreno","year":"1993","unstructured":"Moreno A., Ding F. (1993). A constructive algorithm for concurrently selecting and sequencing jobs in an FMS environment. International Journal of Production Research 31(5):1157\u20131169","journal-title":"International Journal of Production Research"},{"key":"93_CR16","unstructured":"Restrepo, I. M., & Balakrishnan, S. (2001). Fuzzy logic based robot controller for intelligent scheduling. In Proceedings of the 32nd. International Conference on Applied Modeling and Simulation (Vol. 2, pp. 358\u2013363)."},{"key":"93_CR17","doi-asserted-by":"crossref","unstructured":"Sannomiya, N., & Iima, H. (1996). Application of genetic algorithm to scheduling problems in manufacturing processes. In Proceedings of the IEEE Conference on Evolutionary Computation (pp. 523\u2013528).","DOI":"10.1109\/ICEC.1996.542654"},{"key":"93_CR18","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1287\/opre.1030.0073","volume":"52","author":"S.P. Sethi","year":"2004","unstructured":"Sethi S.P., Chandrasekaran R., Drobouchevitch I., Sriskandarajah C. (2004). Scheduling multiple parts in a robotic cell served by a dual-gripper robot. Operations Research 52:65\u201382","journal-title":"Operations Research"},{"issue":"6","key":"93_CR19","doi-asserted-by":"crossref","first-page":"1126","DOI":"10.1109\/70.817676","volume":"15","author":"A. Yalcin","year":"1999","unstructured":"Yalcin A., Boucher T. (1999). An architecture for flexible manufacturing cells with alternate machining and alternate sequencing. IEEE transactions on Robotics and Automation 15(6):1126\u20131130","journal-title":"IEEE transactions on Robotics and Automation"},{"issue":"5","key":"93_CR20","doi-asserted-by":"crossref","first-page":"953","DOI":"10.1080\/00207540010010244","volume":"39","author":"N.K. Vidyarthi","year":"2001","unstructured":"Vidyarthi N.K., Tiwari M.K. (2001). Machine loading problem of FMS: a fuzzy-based heuristic approach. International Journal of Production Research 39(5):953\u2013979","journal-title":"International Journal of Production Research"},{"key":"93_CR21","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/0165-0114(78)90010-6","volume":"1","author":"R. Yager","year":"1978","unstructured":"Yager R. (1978). Fuzzy decision making including unequal objectives. Fuzzy Sets and Systems 1:87\u201395","journal-title":"Fuzzy Sets and Systems"},{"key":"93_CR22","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","volume":"8","author":"L.A. Zadeh","year":"1965","unstructured":"Zadeh L.A. (1965). Fuzzy sets. Information and Control 8:338\u2013353","journal-title":"Information and Control"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0093-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-008-0093-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0093-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:40Z","timestamp":1559254300000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-008-0093-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,2,28]]},"references-count":22,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2008,8]]}},"alternative-id":["93"],"URL":"https:\/\/doi.org\/10.1007\/s10845-008-0093-5","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,2,28]]}}}