{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,29]],"date-time":"2022-03-29T20:14:12Z","timestamp":1648584852432},"reference-count":56,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2008,4,8]],"date-time":"2008-04-08T00:00:00Z","timestamp":1207612800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2009,2]]},"DOI":"10.1007\/s10845-008-0100-x","type":"journal-article","created":{"date-parts":[[2008,4,7]],"date-time":"2008-04-07T11:17:00Z","timestamp":1207567020000},"page":"15-27","source":"Crossref","is-referenced-by-count":5,"title":["Optimal assembly plan generation: a simplifying approach"],"prefix":"10.1007","volume":"20","author":[{"given":"Michel","family":"Martinez","sequence":"first","affiliation":[]},{"given":"Viet Hung","family":"Pham","sequence":"additional","affiliation":[]},{"given":"Jo\u00ebl","family":"Favrel","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2008,4,8]]},"reference":[{"issue":"1","key":"100_CR1","doi-asserted-by":"crossref","first-page":"18","DOI":"10.1080\/095119298130949","volume":"11","author":"M. Adamou","year":"1998","unstructured":"Adamou M., Zerhouni S.N. and Bourjault A. (1998). Hierarchical modeling and control of flexible assembly systems using object-oriented Petri nets. International Journal of Computer Integrated Manufacturing 11(1): 18\u201333","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"1","key":"100_CR2","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1109\/70.68072","volume":"7","author":"D.F. Baldwin","year":"1991","unstructured":"Baldwin D.F., Abell T.E., Lui M.C. M., DeFazio T.L. and Whitney D.E. (1991). An integrated computer aid for generating and evaluating assembly sequences for mechanical products. IEEE Transactions On Robotics & Automation 7(1): 78\u201394","journal-title":"IEEE Transactions On Robotics & Automation"},{"key":"100_CR3","doi-asserted-by":"crossref","unstructured":"Baysal, M. M., Roy, U., Sudarsan, R., Sriram, R. D., & Lyons, K. (2005). Product information exchange using open assembly model: Issues related to representation of geometric information. In 2005 ASME IMECE 2005, Orlando, FL, November 5\u201311.","DOI":"10.1115\/IMECE2005-82812"},{"key":"100_CR4","doi-asserted-by":"crossref","unstructured":"Bonneville, F., Perrard, C., & Henrioud, J. M. (1995). A genetic algorithm to generate and evaluate assembly plans. In ETFA\u201995, Paris, October, 1995, Vol. 2, pp. 231\u2013239.","DOI":"10.1109\/ETFA.1995.496663"},{"key":"100_CR5","doi-asserted-by":"crossref","unstructured":"Boud, A. C. (1999). Virtual reality and augmented reality as a training tool for assembly tasks. In 1999 International Conference on Information Visualisation, July 14\u201316, p. 32.","DOI":"10.1109\/IV.1999.781532"},{"key":"100_CR6","unstructured":"Bourjault, A. (1984). Contribution \u00e0 une approchem\u00e9thodologique de l\u2019assemblage automatis\u00e9: Elaboration automatique des s\u00e9quences op\u00e9ratoires. Th\u00e9se d\u2019Etat, Universit\u00e9 de Franche-Comt\u00e9 325\u00a0pp."},{"key":"100_CR7","unstructured":"Bourjault, A., & Henrioud, J. M. (1987). Elaboration automatique des plans d\u2019assemblage \u00e0 l\u2019aide de r\u00e9seaux de P\u00e9tri. APII, 1987, Vol. 21, pp. 323\u2013342."},{"key":"100_CR8","unstructured":"Campagne, J. P., & Favrel, J. (1984). Elaboration automatique des plans d\u2019assemblage: proposition d\u2019une m\u00e9thodologie d\u2019approche, Colloque Int. Productique et Robotique, Bordeaux, 1984, Paru dans l\u2019Onde Electrique, 1984, Mars - Avril, pp. 142\u2013146."},{"issue":"1","key":"100_CR9","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1109\/70.554344","volume":"13","author":"S. Chakrabarty","year":"1987","unstructured":"Chakrabarty, S., Wolter, J. (1987). A structure-oriented approach to assembly sequence planning. IEEE Transaction on Robotics & Automation, 13 (1), 14\u201329.","journal-title":"IEEE Transaction on Robotics & Automation"},{"key":"100_CR10","doi-asserted-by":"crossref","unstructured":"Cittolin, A. (1997). Selection of assembly sequences using universal filtering methods. In ETFA\u201997, International Conference Emerging Technology Factory Automation, Los Angeles, September 1997, pp. 195\u2013200.","DOI":"10.1109\/ETFA.1997.616268"},{"issue":"6","key":"100_CR11","doi-asserted-by":"crossref","first-page":"640","DOI":"10.1109\/JRA.1987.1087132","volume":"3","author":"T.L. Fazio De","year":"1987","unstructured":"De Fazio T.L. and Whitney D.E. (1987). Simplified generation of all mechanical assembly sequences. IEEE Transactions of Robotics & Automation RA- 3(6): 640\u2013658","journal-title":"IEEE Transactions of Robotics & Automation RA-"},{"key":"100_CR12","doi-asserted-by":"crossref","unstructured":"De Lit, P., et al. (1999). A new philosophy for the design of a product and its assembly line. In Proceedings of the 1999 IEEE Int. Symposium on Assembly and Task Planning, Porto, Portugal, July 1999.","DOI":"10.1109\/ISATP.1999.782988"},{"issue":"2","key":"100_CR13","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1108\/17410380510576859","volume":"16","author":"J. Du","year":"2005","unstructured":"Du J., Jiao Y.Y. and Jiao J. (2005). Integrated BOM and routing generator for variety synchronization in assembly-to-order production. Internatioal Journal of Manufacturing Technology Management 16(2): 233\u2013243. Emerald group Publishing ISSN: 1741\u2013038X","journal-title":"Internatioal Journal of Manufacturing Technology Management"},{"issue":"2","key":"100_CR14","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1023\/A:1014482419706","volume":"14","author":"M.P. Fanti","year":"2002","unstructured":"Fanti M.P., Maione G. and Turchiano B. (2002). Design of supervisors to avoid deadlock in flexible assembly systems. International Journal of Flexible Manufacturing Systems 14(2): 153\u2013171, Springer Science, ISSN: 0920\u20136299","journal-title":"International Journal of Flexible Manufacturing Systems"},{"key":"100_CR15","first-page":"191","volume-title":"Computer-aided mechanical assembly planning, Chapter 8.","author":"J.-M. Henrioud","year":"1988","unstructured":"Henrioud J.-M. and Bourjault A. (1988). LEGA: A computer-aided generator of assembly plans. In: Homemde Mello, L. and Lee, S. (eds) Computer-aided mechanical assembly planning, Chapter 8., pp 191\u2013215. Orwell, USA, Kluwer Academic Publishing"},{"issue":"2","key":"100_CR16","doi-asserted-by":"crossref","first-page":"188","DOI":"10.1109\/70.54734","volume":"6","author":"L.S. Homem de Mello","year":"1990","unstructured":"Homem de Mello L.S. and Sanderson A.C. (1990). And\/or graph representation of assembly plans. IEEE Transactions on Robotics & Automation 6(2): 188\u2013199","journal-title":"IEEE Transactions on Robotics & Automation"},{"issue":"2","key":"100_CR17","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1109\/70.75904","volume":"7","author":"L.S. Homem de Mello","year":"1991","unstructured":"Homem de Mello L.S. and Sanderson A.C. (1991). Representation of mechanical assembly sequences. IEEE Transactions on Robotics & Automation 7(2): 211\u2013227","journal-title":"IEEE Transactions on Robotics & Automation"},{"issue":"2","key":"100_CR18","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1109\/70.75905","volume":"7","author":"L.S. Homem de Mello","year":"1991","unstructured":"Homem de Mello L.S. and Sanderson A.C. (1991). A correct and complete algorithm for the generation of mechanical assembly sequences. IEEE Transactions on Robotics & Automation 7(2): 228\u2013240","journal-title":"IEEE Transactions on Robotics & Automation"},{"key":"100_CR19","doi-asserted-by":"crossref","unstructured":"Huang, Y. F., & Lee, C. S. G. (1991). A framework of knowledge-based assembly planning. In IEEE International Conference Robotics & Automation, Sacramento, CA, 1991, April, pp. 599\u2013604.","DOI":"10.1109\/ROBOT.1991.131647"},{"issue":"2","key":"100_CR20","first-page":"19","volume":"4","author":"G. Ikonomov Pavel","year":"2001","unstructured":"Ikonomov Pavel G., Mikova E.D. and Dwivedi S.N. (2001). Virtual reality process simulation system. International Journal of Advanced Manufacturing System 4(2): 19\u201331","journal-title":"International Journal of Advanced Manufacturing System"},{"key":"100_CR21","doi-asserted-by":"crossref","unstructured":"Jones, R. E., Wilson, R. H. (1996). A survey of constraints in automated assembly planning. IEEE International Conference on robotics & automation, Minneapolis, Minnesota, April, pp. 1525\u20131532.","DOI":"10.1109\/ROBOT.1996.506921"},{"issue":"6","key":"100_CR22","doi-asserted-by":"crossref","first-page":"849","DOI":"10.1109\/70.736770","volume":"14","author":"R.E. Jones","year":"1998","unstructured":"Jones R.E., Wilson R.H. and Calton T.L. (1998). On constraints in assembly planning. IEEE Transactions on Robotics & Automation 14(6): 849","journal-title":"IEEE Transactions on Robotics & Automation"},{"key":"100_CR23","unstructured":"Kusiak, A. (1992). Concurrent engineering\u2013automation, tools and techniques. Wiley."},{"issue":"1","key":"100_CR24","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1016\/S0007-8506(07)61141-X","volume":"41","author":"L. Laperri\u00e8re","year":"1992","unstructured":"Laperri\u00e8re L. and ElMaraghy H.A. (1992). Planning of products assembly and disassembly. CIRP Annals 41(1): 5\u201310","journal-title":"CIRP Annals"},{"key":"100_CR25","unstructured":"Lebkowski, P. (1997). A two-level procedure for generating assembly sequences using a generic algorithm. In IEPM\u201997 International Conference Industrial Engineering Production and Management Lyon, October, 1997, Vol. 1, pp. 129\u2013138."},{"key":"100_CR26","doi-asserted-by":"crossref","unstructured":"Martinez, M., Pham, V. H., & Favrel J. (1997). Dynamic generation of disassembly sequences. In ETFA\u201997, International Conference Emerging Technology on Factory Automation, Los Angeles, September 1997, pp. 177\u2013182.","DOI":"10.1109\/ETFA.1997.616265"},{"key":"100_CR27","doi-asserted-by":"crossref","unstructured":"Martinez, M., Campagne, J. P., et al. (1995). Dynamic assembly sequences\u2013A multi-agent control system. In ETFA\u201995, International Conference Emerging Technology on Factory Automation, Paris, October, Vol. 2, pp. 250\u2013258.","DOI":"10.1109\/ETFA.1995.496665"},{"issue":"1\/2","key":"100_CR28","doi-asserted-by":"crossref","first-page":"12","DOI":"10.1177\/1063293X0000800102","volume":"8","author":"M. Martinez","year":"2000","unstructured":"Martinez M., Favrel J. and Ghodous P. (2000). Product family manufacturing plan generation and classification. CERA Journal, Concurrent Engineering Research and Applications 8(1\/2): 12\u201323","journal-title":"CERA Journal, Concurrent Engineering Research and Applications"},{"issue":"5\u20136","key":"100_CR29","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1016\/S0736-5845(02)00030-3","volume":"18","author":"C. Mascle","year":"2002","unstructured":"Mascle C. (2002). Feature-based assembly model for integration in computer-aided assembly. Robotics and Computer-Integrated Manufacturing 18(5\u20136): 373\u2013378","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"100_CR30","doi-asserted-by":"crossref","unstructured":"Mascle, C., & Figour, J. (1990). Methodological approach of sequences determination using the disassembly method. In Rensselear\u2019s Second Internatioal Conference on CIM, Troy, NY, May 1990, pp. 483\u2013490.","DOI":"10.1109\/CIM.1990.128149"},{"issue":"3","key":"100_CR31","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1023\/A:1025466401869","volume":"37","author":"S.Y. Nof","year":"2003","unstructured":"Nof S.Y. and Chen J. (2003). Assembly and disassembly: An overview and framework for cooperation requirement planning with conflict resolution. Journal of Intelligent and Robotic Systems 37(3): 307\u2013320, Springer Netherlands","journal-title":"Journal of Intelligent and Robotic Systems"},{"issue":"1","key":"100_CR32","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/S0007-8506(07)62381-6","volume":"42","author":"S.Y. Nof","year":"1993","unstructured":"Nof S.Y. and Rajan V.N. (1993). Automatic generation of assembly constraints and cooperation task planning. Annals of CIRP 42(1): 13\u201316","journal-title":"Annals of CIRP"},{"key":"100_CR33","doi-asserted-by":"crossref","unstructured":"Nof, S. Y., Wilhelm, W. E., & Warnecke, H.-J. (1997). Industrial assembly. Chapman & Hall.","DOI":"10.1007\/978-1-4615-6393-8"},{"issue":"1","key":"100_CR34","doi-asserted-by":"crossref","first-page":"34","DOI":"10.1108\/01445150610645648","volume":"26","author":"Y. Pang","year":"2006","unstructured":"Pang Y., Nee Andrew Y.C., Ong S.K., Yuan M. and Youcef-Toumi K. (2006). Assembly feature design in an augmented reality environment. Journal of Assembly Automation 26(1): 34\u201343, ISSN: 0144\u201351542006","journal-title":"Journal of Assembly Automation"},{"issue":"4","key":"100_CR35","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1108\/01445150210446201","volume":"22","author":"J.i. Ping","year":"2002","unstructured":"Ping J.i., Choi Albert C.K. and Tu L. (2002). VDAS: a virtual design and assembly system in a virtual reality environment. Assembly Automation 22(4): 337\u2013342, ISSN: 0144\u20135154","journal-title":"Assembly Automation"},{"issue":"3\/4","key":"100_CR36","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1504\/IJMTM.2006.010058","volume":"9","author":"X. Pingjun","year":"2006","unstructured":"Pingjun X., Yingxue Y., Jiangsheng L. and Jianguang L. (2006). Optimising assembly planning based on virtual reality and bionic algorithm. International Journal of Manufacturing Technology and Management 9(3\/4): 265\u2013293","journal-title":"International Journal of Manufacturing Technology and Management"},{"key":"100_CR37","doi-asserted-by":"crossref","unstructured":"Pham, V. H., Martinez, M., & Favrel, J. (1998). Assembly sequence generation\u2013Heuristic research. In IFAC Workshop Intelligent Manufacturing System IMS\u201998, Gramado, Brazil, November 1998, pp. 159\u2013164.","DOI":"10.1016\/S1474-6670(17)41018-4"},{"key":"100_CR38","doi-asserted-by":"crossref","unstructured":"Rajan, V. N., Lyons, K. W., & Sreerangam, R. (1997). Assembly representations for capturing mating constraints and component kinematics. In IEEE ISATP 97, 7\u20139 Aug, pp. 206\u2013211.","DOI":"10.1109\/ISATP.1997.615409"},{"issue":"2","key":"100_CR39","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1109\/70.488939","volume":"12","author":"V.N. Rajan","year":"1996","unstructured":"Rajan V.N. and Nof S.Y. (1996). Minimal precedence constraints for integrated assembly and execution planning. IEEE Transaction on Robotics and Automation, Special Issue on Assembly and Task Planning 12(2): 175\u2013186","journal-title":"IEEE Transaction on Robotics and Automation, Special Issue on Assembly and Task Planning"},{"key":"100_CR40","unstructured":"Rea, H. J., Falconer, R. A., Murray, J. L., & Simmons, J. E. (1998). A structured approach for assembly planning. In International Congress and Exposition\u20131st Symposium on Assembly Modeling and Assembly Systems, 1998 Anaheim, CA: AMSE."},{"key":"100_CR41","doi-asserted-by":"crossref","unstructured":"Sawik, T. (1997). Flexible assembly line balancing with alternate assembly plans and duplicate task assignments. In ETFA\u201997, Emerging Technology on Factory Automation, Los Angeles, September, pp. 171\u2013176.","DOI":"10.1109\/ETFA.1997.616264"},{"key":"100_CR42","unstructured":"Sedqui, A., Martinez, M., & Favrel, J. (1999). Assembly process\u2013plan dynamic assignment. International Conference on Advanced Computer Systems, ACS\u201999, Szczecin, Poland, November, pp. 448\u2013455."},{"key":"100_CR43","doi-asserted-by":"crossref","first-page":"7","DOI":"10.1017\/S0263574700018130","volume":"12","author":"C.K. Shin","year":"1994","unstructured":"Shin C.K. and Cho H.S. (1994). On the generation of robotic assembly sequences based on separability and assembly motion stability. Robotica 12: 7\u201315","journal-title":"Robotica"},{"key":"100_CR44","first-page":"1290","volume":"2","author":"P.C. Stadzisz","year":"1995","unstructured":"Stadzisz P.C. and Henrioud J.-M. (1995). Integrated design of product families and assembly systems. IEEE ICRA 2: 1290\u20131295","journal-title":"IEEE ICRA"},{"issue":"3","key":"100_CR45","doi-asserted-by":"crossref","first-page":"207","DOI":"10.1504\/IJPD.2005.007248","volume":"2","author":"R. Sudarsan","year":"2005","unstructured":"Sudarsan R., Baysal M.M., Roy U., Foufou S., Bock C., Eswaran S., Lyons K. and Sriram R. (2005). Information models for product representation core and assembly models. International Journal of Product Development 2(3): 207\u2013235","journal-title":"International Journal of Product Development"},{"issue":"1","key":"100_CR46","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1115\/1.2164451","volume":"6","author":"R. Sudarsan","year":"2006","unstructured":"Sudarsan R., Han Y.H., Foufou S., Feng S.C., Roy U., Wang F., Sriram R.D. and Lyons K. (2006). A model for capturing product assembly information. Journal of Computing and Information Science in Engineering 6(1): 11\u201321","journal-title":"Journal of Computing and Information Science in Engineering"},{"issue":"3","key":"100_CR47","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1023\/A:1025466401869","volume":"37","author":"R. L. Sun","year":"2003","unstructured":"Sun, R. L., Xiong, Y., Du, R., Ding, H. (2002). FAS scheduling based on operation flexibility. Journal Assembly Automation, MCB UP, 22(3), 277\u2013282. ISSN: 0144\u20135154.","journal-title":"Journal of Intelligent and Robotic Systems"},{"key":"100_CR48","unstructured":"Svensson, C. (2001). A discussion of future challenges to \u2018built to order\u2019 SMEs. Mass customization: A threat or a challenge? In paper presented at the 4th SMESME International Conference on Stimulating Manufacturing Excellence in Small and Medium Enterprises, Aalborg, May 14\u201316."},{"key":"100_CR49","unstructured":"Venugopal, T., Dwivedi, S. N., & Chambers, T. L. (2002). Identifying features of a CAD model from a part feature database. In ASEE Gulf-Southwest Annual Conference, Lafayette, LA, March 20\u201322."},{"key":"100_CR50","unstructured":"Whitney, D. E. (2004). Mechanical assemblies their design, manufacture, and role in product development. Oxford University Press."},{"key":"100_CR51","doi-asserted-by":"crossref","unstructured":"Wilson, R. H. (1998). Geometric reasoning about assembly tools. Elsevier Journal of Artificial Intelligence, Artificial, 98 (1), 237\u2013279(43).","DOI":"10.1016\/S0004-3702(97)00062-3"},{"issue":"2","key":"100_CR52","first-page":"93","volume":"2","author":"J. Wolter","year":"1992","unstructured":"Wolter J. (1992). A combinatorial analysis of enumerative data structures for assembly planning. Journal of Design and Manufacturing 2(2): 93\u2013104","journal-title":"Journal of Design and Manufacturing"},{"key":"100_CR53","volume-title":"Customer-driven manufacturing","author":"J.C. Wortmannm","year":"1997","unstructured":"Wortmannm J.C., Muntslag D.R. and Timmermans P.J.M. (1997). Customer-driven manufacturing. Chapman & Hall, London"},{"key":"100_CR54","doi-asserted-by":"crossref","unstructured":"Xu, Y., Mattikalli, R., & Kosla, P. (1991). Generation of partial medial axis for disassembly motion planning. In Proceedings of the 1991 IEEE International Conference on Systems, Man, and Cybernetics. \u2018Decision Aiding for Complex Systems, Vol. 2, October, 1991, pp. 997\u20131003.","DOI":"10.1109\/ICSMC.1991.169818"},{"key":"100_CR55","doi-asserted-by":"crossref","unstructured":"Zauner, J., Haller, M., Brandl, A., & Hartman, W. (2003). Authoring of a mixed reality assembly instructor for hierarchical structures. In IEEE-ACM ISMAR 2003, 7\u201310 Oct. 2003, pp. 237\u2013246.","DOI":"10.1109\/ISMAR.2003.1240707"},{"key":"100_CR56","doi-asserted-by":"crossref","unstructured":"Zhao, W., & Madhavan, V. (2006). Virtual assembly operations with grasp and verbal interaction. In 2006 ACM International conference on Virtual Reality Continuum and its Applications Hong Kong, New York, NY, USA: China ACM Press. ISBN:1-59593-324-7\u00a0pp. 245\u2013254","DOI":"10.1145\/1128923.1128964"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0100-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-008-0100-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0100-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:41Z","timestamp":1559268701000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-008-0100-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,4,8]]},"references-count":56,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2009,2]]}},"alternative-id":["100"],"URL":"https:\/\/doi.org\/10.1007\/s10845-008-0100-x","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,4,8]]}}}