{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,8]],"date-time":"2026-01-08T08:50:28Z","timestamp":1767862228259,"version":"3.49.0"},"reference-count":62,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2008,5,11]],"date-time":"2008-05-11T00:00:00Z","timestamp":1210464000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2009,2]]},"DOI":"10.1007\/s10845-008-0108-2","type":"journal-article","created":{"date-parts":[[2008,5,10]],"date-time":"2008-05-10T11:02:09Z","timestamp":1210417329000},"page":"123-136","source":"Crossref","is-referenced-by-count":47,"title":["A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems"],"prefix":"10.1007","volume":"20","author":[{"given":"U\u011fur","family":"\u00d6zcan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bilal","family":"Toklu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2008,5,11]]},"reference":[{"key":"108_CR1","doi-asserted-by":"crossref","first-page":"4185","DOI":"10.1080\/0020754031000149176","volume":"41","author":"G.R. Aase","year":"2003","unstructured":"Aase G.R., Schniederjans M.J. and Olson J.R. (2003). U-OPT: An analysis of exact U-shaped line balancing procedures. International Journal of Production Research 41: 4185\u20134210","journal-title":"International Journal of Production Research"},{"key":"108_CR2","doi-asserted-by":"crossref","first-page":"801","DOI":"10.1016\/j.ejor.2004.06.039","volume":"169","author":"A. Agarwal","year":"2006","unstructured":"Agarwal A., Colak S. and Eryarsoy E. (2006). Improvement heuristic for the flow-shop scheduling problem: An adaptive-learning approach. European Journal of Operational Research 169: 801\u2013815","journal-title":"European Journal of Operational Research"},{"key":"108_CR3","doi-asserted-by":"crossref","first-page":"2543","DOI":"10.1080\/002075497194651","volume":"35","author":"H. Aigbedo","year":"1997","unstructured":"Aigbedo H. and Monden Y. (1997). A parametric procedure for multi-criterion sequence scheduling for just-in-time mixed-model assembly lines. International Journal of Production Research 35: 2543\u20132564","journal-title":"International Journal of Production Research"},{"key":"108_CR4","doi-asserted-by":"crossref","unstructured":"Ajenblit, D. A., & Wainwright, R. L. (1998). Applying genetic algorithms to the U-shaped assembly line balancing problem. In Proceedings of the 1998 IEEE International Conference on Evolutionary Computation, Anchorage, Alaska, pp. 96\u2013101.","DOI":"10.1109\/ICEC.1998.699329"},{"key":"108_CR5","doi-asserted-by":"crossref","first-page":"2447","DOI":"10.1080\/00207549308956868","volume":"31","author":"J.J. Bartholdi","year":"1993","unstructured":"Bartholdi J.J. (1993). Balancing two-sided assembly lines: A case study. International Journal of Production Research 31: 2447\u20132461","journal-title":"International Journal of Production Research"},{"key":"108_CR6","doi-asserted-by":"crossref","first-page":"2016","DOI":"10.1016\/j.ejor.2005.12.017","volume":"177","author":"J. Bautista","year":"2007","unstructured":"Bautista J. and Pereira J. (2007). Ant algorithms for a time and space constrained assembly line balancing problem. European Journal of Operational Research 177: 2016\u20132032","journal-title":"European Journal of Operational Research"},{"key":"108_CR7","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1080\/00207548608919719","volume":"24","author":"I. Baybars","year":"1986","unstructured":"Baybars I. (1986a). An efficient heuristic method for the simple assembly line balancing problem. International Journal of Production Research 24: 149\u2013166","journal-title":"International Journal of Production Research"},{"key":"108_CR8","doi-asserted-by":"crossref","first-page":"909","DOI":"10.1287\/mnsc.32.8.909","volume":"32","author":"I. Baybars","year":"1986","unstructured":"Baybars I. (1986b). A survey of exact algorithms for the simple line balancing problem. Management Science 32: 909\u2013932","journal-title":"Management Science"},{"key":"108_CR9","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1007\/s10845-005-6638-y","volume":"17","author":"A. Baykaso\u011flu","year":"2006","unstructured":"Baykaso\u011flu A. (2006). Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems. Journal of Intelligent Manufacturing 17: 217\u2013232","journal-title":"Journal of Intelligent Manufacturing"},{"key":"108_CR10","doi-asserted-by":"crossref","first-page":"694","DOI":"10.1016\/j.ejor.2004.07.023","volume":"168","author":"C. Becker","year":"2006","unstructured":"Becker C. and Scholl A. (2006). A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research 168: 694\u2013715","journal-title":"European Journal of Operational Research"},{"key":"108_CR11","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1287\/opre.8.3.385","volume":"8","author":"E.H. Bowman","year":"1960","unstructured":"Bowman E.H. (1960). Assembly line balancing by linear programming. Operations Research 8: 385\u2013389","journal-title":"Operations Research"},{"key":"108_CR12","doi-asserted-by":"crossref","first-page":"674","DOI":"10.1016\/j.ejor.2006.10.010","volume":"183","author":"N. Boysen","year":"2007","unstructured":"Boysen N., Fliedner M. and Scholl A. (2007). A classification of assembly line balancing problems. European Journal of Operational Research 183: 674\u2013693","journal-title":"European Journal of Operational Research"},{"issue":"11","key":"108_CR13","doi-asserted-by":"crossref","first-page":"2071","DOI":"10.1080\/00207540500386012","volume":"44","author":"F.T.S. Chan","year":"2006","unstructured":"Chan F.T.S., Wong T.C. and Chan L.Y. (2006). Flexible job-shop scheduling problem under resource constraints. International Journal of Production Research 44(11): 2071\u20132089","journal-title":"International Journal of Production Research"},{"key":"108_CR14","author":"F.T.S. Chan","year":"2007","unstructured":"Chan F.T.S., Wong T.C. and Chan L.Y. (2007). Lot streaming for product assembly in job shop environment. Robotics and Computer-Integrated Manufacturing, doi: 10.1016\/j.rcim.2007.01.001 .","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"108_CR15","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1023\/A:1018925411397","volume":"77","author":"W.C. Chiang","year":"1998","unstructured":"Chiang W.C. (1998). The application of a tabu search metaheuristic to the assembly line balancing problem. Annals of Operations Research 77: 209\u2013227","journal-title":"Annals of Operations Research"},{"key":"108_CR16","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1080\/05695557308974922","volume":"5","author":"E.M. Dar-El","year":"1973","unstructured":"Dar-El E.M. (1973). MALB \u2013 a heuristic technique for balancing large scale single-model assembly lines. AIIE Transactions 5: 343\u2013356","journal-title":"AIIE Transactions"},{"key":"108_CR17","doi-asserted-by":"crossref","first-page":"1105","DOI":"10.1287\/mnsc.25.11.1105","volume":"25","author":"E.M. Dar-El","year":"1979","unstructured":"Dar-El E.M. and Rubinovitch Y. (1979). MUST\u2014a multiple solutions technique for balancing single model assembly lines. Management Science 25: 1105\u20131114","journal-title":"Management Science"},{"key":"108_CR18","doi-asserted-by":"crossref","first-page":"3003","DOI":"10.1080\/00207540110051905","volume":"39","author":"E. Erel","year":"2001","unstructured":"Erel E., Sabuncuoglu I. and Aksu B.A. (2001). Balancing of U-type assembly systems using simulated annealing. International Journal of Production Research 39: 3003\u20133015","journal-title":"International Journal of Production Research"},{"key":"108_CR19","doi-asserted-by":"crossref","first-page":"414","DOI":"10.1080\/095372898233902","volume":"9","author":"E. Erel","year":"1998","unstructured":"Erel E. and Sarin S.C. (1998). A survey of the assembly line balancing procedures. Production Planning and Control 9: 414\u2013434","journal-title":"Production Planning and Control"},{"key":"108_CR20","doi-asserted-by":"crossref","first-page":"637","DOI":"10.1080\/00207548908942574","volume":"27","author":"S. Ghosh","year":"1989","unstructured":"Ghosh S. and Gagnon R.J. (1989). A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research 27: 637\u2013670","journal-title":"International Journal of Production Research"},{"key":"108_CR21","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1023\/A:1020377910258","volume":"8","author":"J.F. Goncalves","year":"2002","unstructured":"Goncalves J.F. and Almeida J.R. (2002). A hybrid genetic algorithm for assembly line balancing. Journal of Heuristics 8: 629\u2013642","journal-title":"Journal of Heuristics"},{"key":"108_CR22","doi-asserted-by":"crossref","first-page":"577","DOI":"10.1016\/j.ejor.2004.09.021","volume":"171","author":"H. G\u00f6kcen","year":"2006","unstructured":"G\u00f6kcen H. and A\u011fpak K. (2006). A goal programming approach to simple U-line balancing problem. European Journal of Operational Research 171: 577\u2013585","journal-title":"European Journal of Operational Research"},{"key":"108_CR23","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1016\/j.apm.2004.10.003","volume":"29","author":"H. G\u00f6kcen","year":"2005","unstructured":"G\u00f6kcen H., A\u011fpak K., Gencer C. and Kizilkaya E. (2005). A shortest route formulation of simple U-type assembly line balancing problem. Applied Mathematical Modelling 29: 373\u2013380","journal-title":"Applied Mathematical Modelling"},{"key":"108_CR24","doi-asserted-by":"crossref","first-page":"600","DOI":"10.1016\/j.ijpe.2005.12.001","volume":"103","author":"H. G\u00f6k\u00e7en","year":"2006","unstructured":"G\u00f6k\u00e7en H., A\u011fpak K. and Benzer R. (2006). Balancing of parallel assembly lines. International Journal of Production Economics 103: 600\u2013609","journal-title":"International Journal of Production Economics"},{"key":"108_CR25","unstructured":"Heinrici, A. (1994). A comparison between simulated annealing and tabu search with an example from the production planning. In H. Dyckhoff, et al. (Eds.), Operations research proceedings 1994 (pp. 498\u2013503). Berlin: Springer."},{"key":"108_CR26","doi-asserted-by":"crossref","first-page":"442","DOI":"10.1287\/opre.11.3.442","volume":"11","author":"M. Held","year":"1963","unstructured":"Held M., Karp R.M. and Shareshian R. (1963). Assembly line balancing\u2014dynamic programming with precedence constraints. Operations Research 11: 442\u2013459","journal-title":"Operations Research"},{"key":"108_CR27","unstructured":"Helgeson, W. B., Salveson, M. E., & Smith, W. W. (1954). How to balance an assembly line. Technical Report, Carr Press, New Caraan, Conn."},{"key":"108_CR28","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1287\/mnsc.38.1.39","volume":"38","author":"T.R. Hoffmann","year":"1992","unstructured":"Hoffmann T.R. (1992). EUREKA: A hybrid system for assembly line balancing. Management Science 38: 39\u201347","journal-title":"Management Science"},{"key":"108_CR29","author":"R.K. Hwang","year":"2007","unstructured":"Hwang R.K., Katayama H. and Gen M. (2007). U-shaped assembly line balancing problem with genetic algorithm. International Journal of Production Research, doi: 10.1080\/00207540701247906 .","journal-title":"International Journal of Production Research"},{"key":"108_CR30","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1287\/mnsc.2.3.261","volume":"2","author":"J.R. Jackson","year":"1956","unstructured":"Jackson J.R. (1956). A computing procedure for a line balancing with a precedence matrix. Management Science 2: 261\u2013272","journal-title":"Management Science"},{"key":"108_CR31","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1080\/00207548108956654","volume":"19","author":"R.V. Johnson","year":"1981","unstructured":"Johnson R.V. (1981). Assembly line balancing algorithms: Computational comparisons. International Journal of Production Research 19: 277\u2013287","journal-title":"International Journal of Production Research"},{"issue":"2","key":"108_CR32","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/S0305-0548(97)00046-4","volume":"25","author":"Y.J. Kim","year":"1998","unstructured":"Kim Y.J., Kim Y.K. and Cho Y. (1998). A heuristic-based genetic algorithm for workload smoothing in assembly lines. Computers and Operations Research 25(2): 99\u2013111","journal-title":"Computers and Operations Research"},{"key":"108_CR33","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S. Kirkpatrick","year":"1983","unstructured":"Kirkpatrick S., Gelatt C.D. and Veechi M.P. (1983). Optimization by simulated annealing. Science 220: 671\u2013679","journal-title":"Science"},{"key":"108_CR34","doi-asserted-by":"crossref","first-page":"274","DOI":"10.1287\/opre.11.2.274","volume":"11","author":"M. Klein","year":"1963","unstructured":"Klein M. (1963). On assembly line balancing. Operations Research 11: 274\u2013281","journal-title":"Operations Research"},{"key":"108_CR35","doi-asserted-by":"crossref","first-page":"826","DOI":"10.1016\/j.ejor.2004.07.031","volume":"168","author":"S.D. Lapierre","year":"2006","unstructured":"Lapierre S.D., Ruiz A. and Soriano P. (2006). Balancing assembly lines with tabu search. European Journal of Operational Research 168: 826\u2013837","journal-title":"European Journal of Operational Research"},{"key":"108_CR36","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1007\/s00170-006-0821-y","volume":"36","author":"S.B. Liu","year":"2008","unstructured":"Liu S.B., Ng K.M. and Ong H.L. (2008). Branch-and-bound algorithms for simple assembly line balancing problem. International Journal Advanced Manufacturing Technology 36: 169\u2013177","journal-title":"International Journal Advanced Manufacturing Technology"},{"key":"108_CR37","doi-asserted-by":"crossref","first-page":"2717","DOI":"10.1080\/002075498192454","volume":"36","author":"P.R. McMullen","year":"1998","unstructured":"McMullen P.R. and Frazier G.V. (1998). Using simulated annealing to solve a multi objective assembly line balancing problem with parallel workstations. International Journal of Production Research 36: 2717\u20132741","journal-title":"International Journal of Production Research"},{"key":"108_CR38","doi-asserted-by":"crossref","first-page":"605","DOI":"10.1080\/07408170304354","volume":"35","author":"P.R. McMullen","year":"2003","unstructured":"McMullen P.R. and Tarasewich P. (2003). Using ant techniques to solve the assembly line balancing problem. IIE Transactions 35: 605\u2013617","journal-title":"IIE Transactions"},{"key":"108_CR39","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(97)00169-0","volume":"109","author":"J. Miltenburg","year":"1998","unstructured":"Miltenburg J. (1998). Balancing U-lines in a multiple U-line facility. European Journal of Operational Research 109: 1\u201323","journal-title":"European Journal of Operational Research"},{"key":"108_CR40","doi-asserted-by":"crossref","first-page":"1378","DOI":"10.1287\/mnsc.40.10.1378","volume":"40","author":"J. Miltenburg","year":"1994","unstructured":"Miltenburg J. and Wijngaard J. (1994). The U-line line balancing problem. Management Science 40: 1378\u20131388","journal-title":"Management Science"},{"key":"108_CR41","first-page":"23","volume":"16","author":"C.L. Moodie","year":"1965","unstructured":"Moodie C.L. and Young H.H. (1965). A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering 16: 23\u201329","journal-title":"Journal of Industrial Engineering"},{"key":"108_CR42","author":"A.C. Nearchou","year":"2007","unstructured":"Nearchou A.C. (2007). Multi-objective balancing of assembly lines by population heuristics. International Journal of Production Research, doi: 10.1080\/00207540600988089 .","journal-title":"International Journal of Production Research"},{"key":"108_CR43","doi-asserted-by":"crossref","first-page":"529","DOI":"10.1287\/mnsc.18.9.529","volume":"18","author":"A.J. Nevins","year":"1972","unstructured":"Nevins A.J. (1972). Assembly line balancing using best bud search. Management Science 18: 529\u2013539","journal-title":"Management Science"},{"key":"108_CR44","doi-asserted-by":"crossref","first-page":"166","DOI":"10.1287\/opre.23.1.166","volume":"23","author":"J.H. Patterson","year":"1975","unstructured":"Patterson J.H. and Albracht J.J. (1975). Assembly-line balancing: Zero-one programming with fibonacci search. Operations Research 23: 166\u2013172","journal-title":"Operations Research"},{"key":"108_CR45","doi-asserted-by":"crossref","first-page":"341","DOI":"10.1007\/s001700050166","volume":"16","author":"S.G. Ponnambalam","year":"2000","unstructured":"Ponnambalam S.G., Aravindan P. and Naidu G.M. (2000). A multi-objective genetic algorithm for solving assembly line balancing problem. International Journal of Advanced Manufacturing Technology 16: 341\u2013352","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"108_CR46","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1023\/A:1008923410076","volume":"11","author":"I. Sabuncuo\u011flu","year":"2000","unstructured":"Sabuncuo\u011flu I., Erel E. and Tanyer M. (2000). Assembly line balancing using genetic algorithms. Journal of intelligent Manufacturing 11: 295\u2013310","journal-title":"Journal of intelligent Manufacturing"},{"key":"108_CR47","first-page":"18","volume":"6","author":"M.E. Salveson","year":"1955","unstructured":"Salveson M.E. (1955). The assembly line balancing problem. Journal of Industrial Engineering 6: 18\u201325","journal-title":"Journal of Industrial Engineering"},{"key":"108_CR48","unstructured":"Scholl, A. (1993). Data of the assembly line balancing problems. Working Paper, TH Darmstadt."},{"key":"108_CR49","doi-asserted-by":"crossref","first-page":"666","DOI":"10.1016\/j.ejor.2004.07.022","volume":"168","author":"A. Scholl","year":"2006","unstructured":"Scholl A. and Becker C. (2006). State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research 168: 666\u2013693","journal-title":"European Journal of Operational Research"},{"key":"108_CR50","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1287\/ijoc.9.4.319","volume":"9","author":"A. Scholl","year":"1997","unstructured":"Scholl A. and Klein R. (1997). SALOME: A bidirectional branch and bound procedure for assembly line balancing. INFORMS Journal on Computing 9: 319\u2013334","journal-title":"INFORMS Journal on Computing"},{"issue":"4","key":"108_CR51","doi-asserted-by":"crossref","first-page":"721","DOI":"10.1080\/002075499191481","volume":"37","author":"A. Scholl","year":"1999","unstructured":"Scholl A. and Klein R. (1999). ULINO: Optimally balancing U-shaped JIT assembly lines. International Journal of Production Research 37(4): 721\u2013736","journal-title":"International Journal of Production Research"},{"key":"108_CR52","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1007\/BF00127358","volume":"2","author":"A. Scholl","year":"1996","unstructured":"Scholl A. and Vo\u00df S. (1996). Simple assembly line balancing\u2014heuristic approaches. Journal of Heuristics 2: 217\u2013244","journal-title":"Journal of Heuristics"},{"key":"108_CR53","doi-asserted-by":"crossref","first-page":"444","DOI":"10.1287\/opre.26.3.444","volume":"26","author":"L. Schrage","year":"1978","unstructured":"Schrage L. and Baker K.R. (1978). Dynamic programming solution of sequencing problems with precedence constraints. Operations Research 26: 444\u2013449","journal-title":"Operations Research"},{"key":"108_CR54","doi-asserted-by":"crossref","first-page":"1801","DOI":"10.1080\/00207549408957042","volume":"32","author":"G. Suresh","year":"1994","unstructured":"Suresh G. and Sahu S. (1994). Stochastic assembly line balancing using simulated annealing. International Journal of Production Research 32: 1801\u20131810","journal-title":"International Journal of Production Research"},{"key":"108_CR55","unstructured":"Tabucanon, M. T. (1988). Multiple criteria decision making in industry (Studies in production and engineering economics; 8) (pp 39\u201344). Amsterdam: Elsevier."},{"key":"108_CR56","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1287\/mnsc.30.1.85","volume":"30","author":"F.B. Talbot","year":"1984","unstructured":"Talbot F.B. and Patterson J.H. (1984). An integer programming algorithm with network cuts for solving the assembly line balancing problem. Management Science 30: 85\u201399","journal-title":"Management Science"},{"key":"108_CR57","doi-asserted-by":"crossref","first-page":"430","DOI":"10.1287\/mnsc.32.4.430","volume":"32","author":"F.B. Talbot","year":"1986","unstructured":"Talbot F.B., Patterson J.H. and Gehrlein W.V. (1986). A comperative evaluation of heuristic line balancing techniques. Management Science 32: 430\u2013454","journal-title":"Management Science"},{"key":"108_CR58","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1287\/mnsc.16.9.593","volume":"16","author":"N.T. Thomopoulos","year":"1970","unstructured":"Thomopoulos N.T. (1970). Mixed model line balancing with smoothed station assignments. Management Science 16: 593\u2013603","journal-title":"Management Science"},{"issue":"3","key":"108_CR59","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1080\/03052150701651642","volume":"40","author":"B. Toklu","year":"2008","unstructured":"Toklu B. and \u00d6zcan U. (2008). A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives. Engineering Optimization 40(3): 191\u2013204","journal-title":"Engineering Optimization"},{"key":"108_CR60","doi-asserted-by":"crossref","first-page":"727","DOI":"10.1287\/mnsc.11.7.727","volume":"11","author":"F.M. Tonge","year":"1965","unstructured":"Tonge F.M. (1965). Assembly line balancing using probabilistic combinations of heuristics. Management Science 11: 727\u2013735","journal-title":"Management Science"},{"key":"108_CR61","doi-asserted-by":"crossref","first-page":"738","DOI":"10.1287\/mnsc.44.5.738","volume":"44","author":"T.L. Urban","year":"1998","unstructured":"Urban T.L. (1998). Optimal balancing of U-shaped assembly lines. Management Science 44: 738\u2013741","journal-title":"Management Science"},{"key":"108_CR62","unstructured":"Wee, T. S., & Magazine, M. (1981). An efficient branch and bound algorithm for an assembly line balancing problem \u2013 part I: Minimize the number of work stations. University of Waterloo, Ontario, Canada."}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0108-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-008-0108-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0108-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:41Z","timestamp":1559254301000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-008-0108-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,5,11]]},"references-count":62,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2009,2]]}},"alternative-id":["108"],"URL":"https:\/\/doi.org\/10.1007\/s10845-008-0108-2","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,5,11]]}}}