{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,16]],"date-time":"2026-01-16T09:10:32Z","timestamp":1768554632604,"version":"3.49.0"},"reference-count":37,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2008,5,31]],"date-time":"2008-05-31T00:00:00Z","timestamp":1212192000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2009,8]]},"DOI":"10.1007\/s10845-008-0116-2","type":"journal-article","created":{"date-parts":[[2008,5,30]],"date-time":"2008-05-30T06:35:32Z","timestamp":1212129332000},"page":"421-429","source":"Crossref","is-referenced-by-count":14,"title":["Evolving CBR and data segmentation by SOM for flow time prediction in semiconductor manufacturing factory"],"prefix":"10.1007","volume":"20","author":[{"given":"Pei-Chann","family":"Chang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chin Yuan","family":"Fan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yen-Wen","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2008,5,31]]},"reference":[{"issue":"8","key":"116_CR1","doi-asserted-by":"crossref","first-page":"811","DOI":"10.1057\/jors.1986.140","volume":"37","author":"K.P. Anklesaria","year":"1986","unstructured":"Anklesaria K.P., Drezner Z. (1986) A multivariate approach to estimating the completion time for PERT networks. Journal of the Operational Research Society 37(8): 811\u2013815","journal-title":"Journal of the Operational Research Society"},{"issue":"2","key":"116_CR2","doi-asserted-by":"crossref","first-page":"252","DOI":"10.1109\/TSM.2006.873400","volume":"19","author":"P. Backus","year":"2006","unstructured":"Backus P., Janakiram M., Mowzoon S., Runger G.C., Bhargava A. (2006) Factory cycle-time prediction with a data-mining approach. IEEE Transactions on Semiconductor Manufacturing 19(2): 252\u2013258","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"11","key":"116_CR3","doi-asserted-by":"crossref","first-page":"1017","DOI":"10.1057\/jors.1985.181","volume":"36","author":"J.H. Bookbinder","year":"1985","unstructured":"Bookbinder J.H., Noor A.I. (1985) Setting job-shop due-dates with service-constrains. Journal of the Operational Research Society 36(11): 1017\u20131026","journal-title":"Journal of the Operational Research Society"},{"key":"116_CR4","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1016\/S0925-2312(02)00577-5","volume":"51","author":"L. Cao","year":"2003","unstructured":"Cao L. (2003) Support vector machines experts for time series forecasting. Neurocomputing 51: 321\u2013339","journal-title":"Neurocomputing"},{"issue":"4","key":"116_CR5","doi-asserted-by":"crossref","first-page":"465","DOI":"10.1007\/s00521-006-0072-8","volume":"16","author":"O.A.S. Carpinteiro","year":"2007","unstructured":"Carpinteiro O.A.S., Lima I., Leme R.C, de Souza A.C.Z., Moreira E.M., Pinheiro C.A.M. (2007) A hierarchical neural model with time windows in long-term electrical load forecasting. Neural Computing & Applications 16(4): 465\u2013470","journal-title":"Neural Computing & Applications"},{"key":"116_CR6","first-page":"55","volume":"10","author":"P.C. Chang","year":"2003","unstructured":"Chang P.C., Hsieh J.C. (2003) A neural networks approach for due date assignment in a wafer fabrication factory. International Journal of Industrial Engineering 10: 55\u201361","journal-title":"International Journal of Industrial Engineering"},{"key":"116_CR7","doi-asserted-by":"crossref","first-page":"648","DOI":"10.1007\/3-540-44593-5_46","volume":"2080","author":"P.C. Chang","year":"2001","unstructured":"Chang P.C., Hsieh J.C., Liao T.W. (2001) A case-based reasoning approach for due-date assignment in a wafer fabrication factory. Lecture Notes in Computer Science 2080: 648\u2013659","journal-title":"Lecture Notes in Computer Science"},{"issue":"5","key":"116_CR8","doi-asserted-by":"crossref","first-page":"549","DOI":"10.1007\/s10845-005-1663-4","volume":"16","author":"P.C. Chang","year":"2005","unstructured":"Chang P.C., Hsieh J.C., Liao T.W. (2005) Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. Journal of Intelligent Manufacturing 16(5): 549\u2013557","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"116_CR9","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1016\/j.eswa.2005.01.018","volume":"29","author":"P.C. Chang","year":"2005","unstructured":"Chang P.C., Lai C.Y. (2005) A hybrid system combining self-organizing maps with case-based reasoning in wholesaler\u2019s new-release book forecasting. Expert Systems with Applications 29(1): 183\u2013192","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"116_CR10","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1016\/j.asoc.2004.12.004","volume":"6","author":"P.C. Chang","year":"2006","unstructured":"Chang P.C., Liao T.W. (2006) Combing SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Applied Soft Computing 6(2): 198\u2013206","journal-title":"Applied Soft Computing"},{"issue":"4","key":"116_CR11","doi-asserted-by":"crossref","first-page":"1017","DOI":"10.1080\/00207540600905620","volume":"46","author":"P.C. Chang","year":"2008","unstructured":"Chang P.C., Wang Y.W., Ting C.J. (2008) A fuzzy neural network for the flow time estimation in a semiconductor manufacturing factory. International Journal of Production Research 46(4): 1017\u20131029","journal-title":"International Journal of Production Research"},{"issue":"3","key":"116_CR12","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1007\/s11063-006-9027-4","volume":"24","author":"T. Chen","year":"2006","unstructured":"Chen T. (2006) A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Processing Letters 24(3): 271\u2013288","journal-title":"Neural Processing Letters"},{"key":"116_CR13","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1016\/j.aei.2006.10.002","volume":"21","author":"T. Chen","year":"2007","unstructured":"Chen T. (2007a) An intelligent hybrid system for wafer lot output time prediction. Advanced Engineering Informatics 21: 55\u201365","journal-title":"Advanced Engineering Informatics"},{"issue":"4","key":"116_CR14","doi-asserted-by":"crossref","first-page":"784","DOI":"10.1109\/TSMCB.2007.895364","volume":"37","author":"T. Chen","year":"2007","unstructured":"Chen T. (2007b) Predicting wafer lot output time with a hybrid FCM-FBPN approach. IEEE Transactions on Systems, Man, and Cybernetics\u2014Part B: Cybernetics 37(4): 784\u2013793","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics\u2014Part B: Cybernetics"},{"key":"116_CR15","doi-asserted-by":"crossref","first-page":"580","DOI":"10.1007\/978-3-540-72432-2_59","volume":"41","author":"T. Chen","year":"2007","unstructured":"Chen T. (2007c) A fuzzy-neural approach with BPN post-classification for job completion time prediction in a semiconductor fabrication plant. Advances in Soft Computing 41: 580\u2013589","journal-title":"Advances in Soft Computing"},{"key":"116_CR16","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1007\/PL00009897","volume":"10","author":"D. Chen","year":"2001","unstructured":"Chen D., Burrell P. (2001) Case-based reasoning system and artificial neural networks: A review. Neural Computing & Applications 10: 264\u2013276","journal-title":"Neural Computing & Applications"},{"issue":"11","key":"116_CR17","doi-asserted-by":"crossref","first-page":"1017","DOI":"10.1057\/jors.1985.181","volume":"36","author":"T.C. Cheng","year":"1985","unstructured":"Cheng T.C., Gupta E. (1985) Survey of scheduling research involving due-date determination decisions. European Journal of Operational Research 36(11): 1017\u20131026","journal-title":"European Journal of Operational Research"},{"issue":"3\u20134","key":"116_CR18","doi-asserted-by":"crossref","first-page":"328","DOI":"10.1007\/s00521-006-0031-4","volume":"15","author":"C.C Chiang","year":"2006","unstructured":"Chiang C.C, Ho M.C., Chen J.A. (2006) A hybrid approach of neural networks and grey modeling for adaptive electricity load forecasting. Neural Computing & Applications 15(3\u20134): 328\u2013338","journal-title":"Neural Computing & Applications"},{"key":"116_CR19","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1023\/A:1024693524603","volume":"14","author":"C.C. Chiu","year":"2003","unstructured":"Chiu C.C., Chang P.C., Chiu N.H. (2003) A case-based expert support system for due date assignment in a wafer fabrication factory. Journal of Intelligent Manufacturing 14: 287\u2013296","journal-title":"Journal of Intelligent Manufacturing"},{"key":"116_CR20","volume-title":"Theory of scheduling","author":"R.W. Conway","year":"1967","unstructured":"Conway R.W., Maxwell W.L., Miller L. W. (1967) Theory of scheduling. Addison-Wesley, Massachusetts"},{"key":"116_CR21","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/S0925-5273(99)00054-7","volume":"64","author":"S.E. Elmaghraby","year":"2000","unstructured":"Elmaghraby S.E., Ferreira A.A., Tavares L.V. (2000) Optimal start times under stochastic activity durations. International Journal of Production Economics 64: 153\u2013164","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"116_CR22","doi-asserted-by":"crossref","first-page":"293","DOI":"10.1016\/0098-1354(92)80049-F","volume":"16","author":"W.R. Foster","year":"1992","unstructured":"Foster W.R., Gollopy F., Ungar L.H. (1992) Neural network forecasting of short, noisy time series. Computers in Chemical Engineering 16(4): 293\u2013297","journal-title":"Computers in Chemical Engineering"},{"issue":"3","key":"116_CR23","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/S0378-7796(02)00123-2","volume":"63","author":"K. Kalaitzakis","year":"2002","unstructured":"Kalaitzakis K., Stavrakakis G.S., Anagnostakis E.M. (2002) Short-term load forecasting based on artificial neural networks parallel implementation. Electric Power Systems Research 63(3): 185\u2013196","journal-title":"Electric Power Systems Research"},{"issue":"2","key":"116_CR24","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1007\/s005210200021","volume":"11","author":"V. Kodogiannis","year":"2002","unstructured":"Kodogiannis V., Lolis A. (2002) Forecasting financial time series using neural network and fuzzy system-based techniques. Neural Computing & Applications 11(2): 90\u2013102","journal-title":"Neural Computing & Applications"},{"issue":"12","key":"116_CR25","doi-asserted-by":"crossref","first-page":"1711","DOI":"10.1016\/j.envsoft.2005.09.001","volume":"21","author":"T. Koutroumanidis","year":"2006","unstructured":"Koutroumanidis T., Iliadis L., Sylaios G.K. (2006) Time-series modeling of fishery landings using ARIMA models and fuzzy expected intervals software. Environmental Modelling and Software 21(12): 1711\u20131721","journal-title":"Environmental Modelling and Software"},{"issue":"8","key":"116_CR26","doi-asserted-by":"crossref","first-page":"1036","DOI":"10.1016\/j.fss.2005.09.001","volume":"157","author":"C.J. Lin","year":"2006","unstructured":"Lin C.J., Xu Y.J. (2006) A self-adaptive neural fuzzy network with group-based symbiotic evolution and its prediction applications. Fuzzy Sets and Systems 157(8): 1036\u20131056","journal-title":"Fuzzy Sets and Systems"},{"issue":"1\u20133","key":"116_CR27","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1016\/S0925-2312(98)00120-9","volume":"28","author":"R.L. Milidi\u00fa","year":"1999","unstructured":"Milidi\u00fa R.L., Machado R.J., Renter\u00eda R.P. (1999) Time-series forecasting through wavelets transformation and a mixture of expert models. Neurocomputing 28(1\u20133): 145\u2013156","journal-title":"Neurocomputing"},{"key":"116_CR28","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1002\/(SICI)1520-6750(199702)44:1<21::AID-NAV2>3.0.CO;2-O","volume":"44","author":"P.R. Philipoom","year":"1997","unstructured":"Philipoom P.R., Wiegmann L., Rees L.P. (1997) Cost-based due date assignment with the use of classical and neural network approaches. Naval Research Logistics 44: 21\u201346","journal-title":"Naval Research Logistics"},{"key":"116_CR29","doi-asserted-by":"crossref","first-page":"310","DOI":"10.1016\/S0377-2217(97)00398-6","volume":"112","author":"S. Piramuthu","year":"1991","unstructured":"Piramuthu S. (1991) Theory and methodology financial credit-risk evaluation with neural and euralfuzzy systems. European Journal of Operational Research 112: 310\u2013332","journal-title":"European Journal of Operational Research"},{"key":"116_CR30","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/S0263-7863(99)00015-0","volume":"18","author":"P. Pontrandolfo","year":"2000","unstructured":"Pontrandolfo P. (2000) Project duration in stochastic networks by the PERT-Path technique. International Journal of Project Management 18: 215\u2013222","journal-title":"International Journal of Project Management"},{"key":"116_CR31","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/0272-6963(84)90005-6","volume":"5","author":"G.L. Ragatz","year":"1984","unstructured":"Ragatz G.L., Mabert V.A. (1984) A simulation analysis of due date assignment. Journal of Operations Management 5: 27\u201339","journal-title":"Journal of Operations Management"},{"issue":"2","key":"116_CR32","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1057\/jors.1983.27","volume":"34","author":"D. Sculli","year":"1983","unstructured":"Sculli D. (1983) The completion time of PERT networks. Journal of the Operational Research Society 34(2): 155\u2013158","journal-title":"Journal of the Operational Research Society"},{"key":"116_CR33","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1007\/s00521-003-0391-y","volume":"13","author":"A. Sfetsos","year":"2004","unstructured":"Sfetsos A., Siriopoulos C. (2004) Combinatorial time series forecasting based on clustering algorithms and neural networks. Neural Computing & Applications 13: 56\u201364","journal-title":"Neural Computing & Applications"},{"key":"116_CR34","doi-asserted-by":"crossref","first-page":"243","DOI":"10.1016\/S0925-5273(01)00170-0","volume":"76","author":"D.P. Song","year":"2002","unstructured":"Song D.P., Hicks C., Earl C.F. (2002) Product due date assignment for complex assemblies. International Journal of Production Economics 76: 243\u2013256","journal-title":"International Journal of Production Economics"},{"key":"116_CR35","unstructured":"Watson, I., & Gardingen, D. (1999). A distributed cased-based reasoning application for engineering sales support. In Proceedings of the 16th International Joint Conference on Artificial Intelligence (Vol. 1, pp. 600\u2013605)."},{"key":"116_CR36","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1287\/mnsc.25.4.363","volume":"25","author":"J.K. Weeks","year":"1979","unstructured":"Weeks J.K. (1979) A simulation study of predictable due-dates. Management Science 25: 363\u2013373","journal-title":"Management Science"},{"issue":"4","key":"116_CR37","doi-asserted-by":"crossref","first-page":"371","DOI":"10.1080\/07408178708975409","volume":"19","author":"C.A. Yano","year":"1987","unstructured":"Yano C.A. (1987) Stochastic lead-times in two-level assembly systems. IIE Transactions 19(4): 371\u2013378","journal-title":"IIE Transactions"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0116-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-008-0116-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0116-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:41Z","timestamp":1559268701000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-008-0116-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,5,31]]},"references-count":37,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2009,8]]}},"alternative-id":["116"],"URL":"https:\/\/doi.org\/10.1007\/s10845-008-0116-2","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,5,31]]}}}