{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,9]],"date-time":"2026-06-09T15:24:19Z","timestamp":1781018659915,"version":"3.54.1"},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2008,8,10]],"date-time":"2008-08-10T00:00:00Z","timestamp":1218326400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2009,8]]},"DOI":"10.1007\/s10845-008-0150-0","type":"journal-article","created":{"date-parts":[[2008,8,8]],"date-time":"2008-08-08T23:36:13Z","timestamp":1218238573000},"page":"481-498","source":"Crossref","is-referenced-by-count":98,"title":["Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop"],"prefix":"10.1007","volume":"20","author":[{"given":"M.","family":"Gholami","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"M.","family":"Zandieh","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2008,8,10]]},"reference":[{"key":"150_CR1","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/j.cie.2004.09.002","volume":"47","author":"H. Allaoui","year":"2004","unstructured":"Allaoui H., Artiba A. (2004) Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. Computers & Industrial Engineering 47: 431\u2013450 doi: 10.1016\/j.cie.2004.09.002","journal-title":"Computers & Industrial Engineering"},{"key":"150_CR2","volume-title":"Introduction to sequencing and scheduling","author":"K.R. Baker","year":"1974","unstructured":"Baker K.R. (1974) Introduction to sequencing and scheduling. John Wiley and Sons, New York"},{"key":"150_CR3","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/BF02023073","volume":"41","author":"P. Brandimarte","year":"1993","unstructured":"Brandimarte P. (1993) Routing and scheduling in a flexible job shop by tabu search. Annals of Operations Research 41: 157\u2013183 doi: 10.1007\/BF02023073","journal-title":"Annals of Operations Research"},{"issue":"3","key":"150_CR4","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1023\/A:1011253011638","volume":"12","author":"G. Chryssolouris","year":"2001","unstructured":"Chryssolouris G., Subramaniam V. (2001) Dynamic scheduling of manufacturing job shops using genetic algorithms. Journal of Intelligent Manufacturing 12(3): 281\u2013293 doi: 10.1023\/A:1011253011638","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"150_CR5","doi-asserted-by":"crossref","first-page":"230","DOI":"10.1016\/S0377-2217(01)00355-1","volume":"139","author":"P.I. Cowling","year":"2002","unstructured":"Cowling P.I., Johansson M. (2002) Using real-time information for effective dynamic scheduling. European Journal of Operational Research 139(2): 230\u2013244 doi: 10.1016\/S0377-2217(01)00355-1","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"150_CR6","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/s10845-007-0026-8","volume":"18","author":"P. Fattahi","year":"2007","unstructured":"Fattahi P., Mehrabad M.S., Jolai F. (2007) Mathematical modeling and heuristic approaches to flexible job shop scheduling problems. Journal of Intelligent Manufacturing 18(3): 331\u2013342 doi: 10.1007\/s10845-007-0026-8","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"9","key":"150_CR7","doi-asserted-by":"crossref","first-page":"2892","DOI":"10.1016\/j.cor.2007.01.001","volume":"35","author":"J. Gao","year":"2008","unstructured":"Gao J., Sun L., Gen M. (2008) A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems. Computers & Operations Research 35(9): 2892\u20132907 doi: 10.1016\/j.cor.2007.01.001","journal-title":"Computers & Operations Research"},{"issue":"2","key":"150_CR8","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1287\/moor.1.2.117","volume":"1","author":"M.R. Garey","year":"1976","unstructured":"Garey M.R., Johnson D.S., Sethi R. (1976) The complexity of flow shop and job shop scheduling. Mathematics of Operations Research 1(2): 117\u2013129","journal-title":"Mathematics of Operations Research"},{"key":"150_CR9","doi-asserted-by":"crossref","unstructured":"Gholami, M., Zandieh, M., Alem-Tabriz, A. Scheduling hybrid flow shop with sequence-dependant setup times and machines with random breakdowns. International Journal of Advanced Manufacturing Technology. doi: 10.1007\/s00170-008-1577-3 .","DOI":"10.1007\/s00170-008-1577-3"},{"key":"150_CR10","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1016\/j.ejor.2006.04.007","volume":"179","author":"N.B. Ho","year":"2007","unstructured":"Ho N.B., Tay J.C., Lai E.M.-K. (2007) An effective architecture for learning and evolving flexible job-shop schedules. European Journal of Operational Research 179: 316\u2013333 doi: 10.1016\/j.ejor.2006.04.007","journal-title":"European Journal of Operational Research"},{"key":"150_CR11","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1016\/S0360-8352(99)00006-6","volume":"36","author":"O. Holthaus","year":"1999","unstructured":"Holthaus O. (1999) Scheduling in job shops with machine breakdowns: An experimental study. Computers & Industrial Engineering 36: 137\u2013162 doi: 10.1016\/S0360-8352(99)00006-6","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"150_CR12","doi-asserted-by":"crossref","first-page":"390","DOI":"10.1016\/S0377-2217(98)00113-1","volume":"113","author":"A.S. Jain","year":"1998","unstructured":"Jain A.S., Meeran S. (1998) Deterministic job-shop scheduling: Past, present and future. European Journal of Operational Research 113(2): 390\u2013434 doi: 10.1016\/S0377-2217(98)00113-1","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"150_CR13","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1109\/TSMCC.2002.1009117","volume":"32","author":"I. Kacem","year":"2002","unstructured":"Kacem I., Hammadi S., Borne P. (2002) Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems. IEEE Transactions on Systems, Man, and Cybernetics 32(1): 1\u201313 doi: 10.1109\/TSMCC.2002.1009117","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics"},{"issue":"10","key":"150_CR14","first-page":"3202","volume":"35","author":"F. Pezzella","year":"2008","unstructured":"Pezzella F., Morganti G., Ciaschetti G. (2008) A genetic algorithm for the flexible job-shop scheduling problem. Computers & Operations Research 35(10): 3202\u20133212 doi: 10.1016\/j.cor.2007.02.014","journal-title":"A genetic algorithm for the flexible job-shop scheduling problem. Computers & Operations Research"},{"key":"150_CR15","volume-title":"Scheduling theory, algorithms, and systems","author":"M. Pinedo","year":"1995","unstructured":"Pinedo M. (1995) Scheduling theory, algorithms, and systems. Prentice-Hall, Englewood Cliffs, NJ"},{"issue":"3","key":"150_CR16","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1016\/S0377-2217(99)00311-2","volume":"126","author":"I. Sabuncuoglu","year":"2000","unstructured":"Sabuncuoglu I., Bayiz M. (2000) Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research 126(3): 567\u2013586 doi: 10.1016\/S0377-2217(99)00311-2","journal-title":"European Journal of Operational Research"},{"issue":"10","key":"150_CR17","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1108\/01443579610130682","volume":"16","author":"P.P.M. Stoop","year":"1996","unstructured":"Stoop P.P.M., Weirs V.C.S. (1996) The complexity of scheduling in practice. International Journal of Operations & Production Management 16(10): 37\u201353 doi: 10.1108\/01443579610130682","journal-title":"International Journal of Operations & Production Management"},{"issue":"1","key":"150_CR18","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1016\/0925-5273(93)90007-8","volume":"32","author":"V. Suresh","year":"1993","unstructured":"Suresh V., Chaudhuri D. (1993) Dynamic scheduling a survey of research. International Journal of Production Economics 32(1): 53\u201363 doi: 10.1016\/0925-5273(93)90007-8","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"150_CR19","doi-asserted-by":"crossref","first-page":"453","DOI":"10.1016\/j.cie.2007.08.008","volume":"54","author":"J.C. Tay","year":"2008","unstructured":"Tay J.C., Ho N.B. (2008) Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems. Computers & Industrial Engineering 54(3): 453\u2013473 doi: 10.1016\/j.cie.2007.08.008","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"150_CR20","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1023\/A:1022235519958","volume":"6","author":"G.E. Vieira","year":"2003","unstructured":"Vieira G.E., Hermann J.W., Lin E. (2003) Rescheduling manufacturing systems: a framework of strategies, policies and methods. Journal of Scheduling 6(1): 39\u201362 doi: 10.1023\/A:1022235519958","journal-title":"Journal of Scheduling"},{"issue":"2","key":"150_CR21","doi-asserted-by":"crossref","first-page":"398","DOI":"10.1016\/j.ejor.2007.06.039","volume":"190","author":"G. Vilcot","year":"2008","unstructured":"Vilcot G., Billaut J.-C. (2008) A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem. European Journal of Operational Research 190(2): 398\u2013411 doi: 10.1016\/j.ejor.2007.06.039","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"150_CR22","doi-asserted-by":"crossref","first-page":"705","DOI":"10.1080\/00207548508904739","volume":"23","author":"M. Yamamoto","year":"1985","unstructured":"Yamamoto M., Nof S.Y. (1985) Scheduling\/rescheduling in the manufacturing operating system environment. International Journal of Production Research 23(4): 705\u2013722 doi: 10.1080\/00207548508904739","journal-title":"International Journal of Production Research"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0150-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-008-0150-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0150-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:42Z","timestamp":1559254302000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-008-0150-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,8,10]]},"references-count":22,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2009,8]]}},"alternative-id":["150"],"URL":"https:\/\/doi.org\/10.1007\/s10845-008-0150-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,8,10]]}}}