{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,6]],"date-time":"2025-12-06T04:54:09Z","timestamp":1764996849247},"reference-count":35,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2008,8,31]],"date-time":"2008-08-31T00:00:00Z","timestamp":1220140800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2009,12]]},"DOI":"10.1007\/s10845-008-0157-6","type":"journal-article","created":{"date-parts":[[2008,8,30]],"date-time":"2008-08-30T01:46:13Z","timestamp":1220060773000},"page":"683-694","source":"Crossref","is-referenced-by-count":34,"title":["A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling"],"prefix":"10.1007","volume":"20","author":[{"given":"B.","family":"Naderi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Zandieh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S. M. T.","family":"Fatemi Ghomi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2008,8,31]]},"reference":[{"key":"157_CR1","doi-asserted-by":"crossref","first-page":"534","DOI":"10.1016\/S0377-2217(03)00261-3","volume":"153","author":"R. Aggoune","year":"2004","unstructured":"Aggoune R. (2004) Minimizing the makespan for the flow shop scheduling problem with availability constraints. European Journal of Operational Research 153: 534\u2013543 doi: 10.1016\/S0377-2217(03)00261-3","journal-title":"European Journal of Operational Research"},{"key":"157_CR2","doi-asserted-by":"crossref","first-page":"896","DOI":"10.1057\/jors.1995.122","volume":"46","author":"A. Allahverdi","year":"1995","unstructured":"Allahverdi A. (1995) Two-stage production scheduling with separated setup times and stochastic breakdowns. The Journal of the Operational Research Society 46: 896\u2013904","journal-title":"The Journal of the Operational Research Society"},{"key":"157_CR3","doi-asserted-by":"crossref","first-page":"955","DOI":"10.1016\/S0305-0548(97)00006-3","volume":"24","author":"A. Allahverdi","year":"1997","unstructured":"Allahverdi A. (1997) Scheduling in stochastic flowshops with independent setup, processing and removal times. Computers & Operations Research 24: 955\u2013960 doi: 10.1016\/S0305-0548(97)00006-3","journal-title":"Computers & Operations Research"},{"issue":"3","key":"157_CR4","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A. Allahverdi","year":"2008","unstructured":"Allahverdi A., Ng C.T., Cheng T.C.E., Kovalyov Y.M. (2008) A survey of scheduling problems with setup times or costs. European Journal of Operational Research 187(3): 985\u20131032 doi: 10.1016\/j.ejor.2006.06.060","journal-title":"European Journal of Operational Research"},{"key":"157_CR5","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/j.cie.2004.09.002","volume":"47","author":"H. Allaoui","year":"2004","unstructured":"Allaoui H., Artiba A. (2004) Integrating simulation and optimization to schedule a hybrid flowshop with maintenance constraints. Computers & Industrial Engineering 47: 431\u2013450 doi: 10.1016\/j.cie.2004.09.002","journal-title":"Computers & Industrial Engineering"},{"key":"157_CR6","doi-asserted-by":"crossref","first-page":"1399","DOI":"10.1016\/j.cor.2004.09.034","volume":"33","author":"H. Allaoui","year":"2006","unstructured":"Allaoui H., Artiba A. (2006) Scheduling two-stage hybrid flow shop with availability constraints. Computers & Operations Research 33: 1399\u20131419 doi: 10.1016\/j.cor.2004.09.034","journal-title":"Computers & Operations Research"},{"key":"157_CR7","doi-asserted-by":"crossref","first-page":"599","DOI":"10.1016\/S0305-0483(01)00048-2","volume":"29","author":"J. Blazewicz","year":"2001","unstructured":"Blazewicz J., Breit J., Formanowicz P., Kubiak W., Schmidt G. (2001) Heuristic algorithms for the two-machine flowshop problem with limited machine availability. Omega, 29: 599\u2013608 doi: 10.1016\/S0305-0483(01)00048-2","journal-title":"Omega,"},{"key":"157_CR8","doi-asserted-by":"crossref","first-page":"2143","DOI":"10.1016\/j.cor.2005.01.004","volume":"33","author":"J. Breit","year":"2006","unstructured":"Breit J. (2006) A polynomial-time approximation scheme for the two-machine flowshop scheduling problem with an availability constraint. Computers & Operations Research 33: 2143\u20132153 doi: 10.1016\/j.cor.2005.01.004","journal-title":"Computers & Operations Research"},{"issue":"6","key":"157_CR9","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1080\/07408170304416","volume":"35","author":"C.R. Cassady","year":"2003","unstructured":"Cassady C.R., Kutanoglu E. (2003) Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Transactions 35(6): 503\u2013513 doi: 10.1080\/07408170304416","journal-title":"IIE Transactions"},{"key":"157_CR10","doi-asserted-by":"crossref","first-page":"402","DOI":"10.1016\/S0377-2217(02)00884-6","volume":"155","author":"K. Flesza","year":"2004","unstructured":"Flesza K., Hindi K.S. (2004) Solving the resource-constrained project scheduling problem by a variable neighborhood search. European Journal of Operational Research 155: 402\u2013413 doi: 10.1016\/S0377-2217(02)00884-6","journal-title":"European Journal of Operational Research"},{"issue":"9","key":"157_CR11","doi-asserted-by":"crossref","first-page":"2892","DOI":"10.1016\/j.cor.2007.01.001","volume":"35","author":"J. Gao","year":"2008","unstructured":"Gao J., Sun L., Gen M. (2008) A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems. Computers & Operations Research 35(9): 2892\u20132907 doi: 10.1016\/j.cor.2007.01.001","journal-title":"Computers & Operations Research"},{"key":"157_CR12","doi-asserted-by":"crossref","unstructured":"Graves, G. H., & Lee, C. Y. (1999). Scheduling maintenance and semiresumable jobs on a single machine. Naval Research Logistics, 46, 845\u2013863. doi:10.1002\/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#.","DOI":"10.1002\/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#"},{"issue":"3","key":"157_CR13","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1016\/0377-2217(86)90037-8","volume":"24","author":"J.N.D. Gupta","year":"1986","unstructured":"Gupta J.N.D., Darrow W.P. (1986) The two-machine sequence dependent flow shop scheduling problem. European Journal of Operational Research 24(3): 439\u2013446 doi: 10.1016\/0377-2217(86)90037-8","journal-title":"European Journal of Operational Research"},{"key":"157_CR14","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S.M. Johnson","year":"1954","unstructured":"Johnson S.M. (1954) Optimal two and three-stage production schedules with setup times included. Naval Research Logistics Quarterly 1: 61\u201367 doi: 10.1002\/nav.3800010110","journal-title":"Naval Research Logistics Quarterly"},{"key":"157_CR15","doi-asserted-by":"crossref","first-page":"371","DOI":"10.1016\/S0925-5273(03)00123-3","volume":"85","author":"M.E. Kurz","year":"2003","unstructured":"Kurz M.E., Askin R.G. (2003) Comparing scheduling rules for flexible flow lines. International Journal of Production Economics 85: 371\u2013388 doi: 10.1016\/S0925-5273(03)00123-3","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"157_CR16","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/S0377-2217(03)00401-6","volume":"159","author":"M.E. Kurz","year":"2004","unstructured":"Kurz M.E., Askin R.G. (2004) Scheduling flexible flow lines with sequence-dependent setup times. European Journal of Operational Research 159(1): 66\u201382 doi: 10.1016\/S0377-2217(03)00401-6","journal-title":"European Journal of Operational Research"},{"key":"157_CR17","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/S0167-6377(96)00041-7","volume":"20","author":"C.Y. Lee","year":"1997","unstructured":"Lee C.Y. (1997) Minimizing the makespan in the two-machine flow-shop scheduling problem with an availability constraint. Operations Research Letters 20: 129\u2013139 doi: 10.1016\/S0167-6377(96)00041-7","journal-title":"Operations Research Letters"},{"key":"157_CR18","doi-asserted-by":"crossref","first-page":"420","DOI":"10.1016\/S0377-2217(97)00452-9","volume":"114","author":"C.Y. Lee","year":"1999","unstructured":"Lee C.Y. (1999) Two-machine flowshop scheduling with availability constraints. European Journal of Operational Research 114: 420\u2013429 doi: 10.1016\/S0377-2217(97)00452-9","journal-title":"European Journal of Operational Research"},{"key":"157_CR19","doi-asserted-by":"crossref","unstructured":"Lee, C. Y., & Chen, Z. L. (2000). Scheduling jobs and maintenance activities on parallel machines. Naval Research Logistics, 47, 145\u2013165. doi:10.1002\/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3.","DOI":"10.1002\/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3"},{"key":"157_CR20","doi-asserted-by":"crossref","DOI":"10.1201\/9780203489802","volume-title":"Handbook of scheduling: Algorithms, models, and performance analysis","author":"J.Y.T. Leung","year":"2004","unstructured":"Leung J.Y.T. (2004) Handbook of scheduling: Algorithms, models, and performance analysis. Chapman & Hall, USA"},{"key":"157_CR21","doi-asserted-by":"crossref","first-page":"404","DOI":"10.1016\/j.cie.2007.01.004","volume":"52","author":"C.J. Liao","year":"2007","unstructured":"Liao C.J., Cheng C.C. (2007) A variable neighborhood search for minimizing single machine weighted earliness and tardiness with common due date. Computers & Industrial Engineering 52: 404\u2013413 doi: 10.1016\/j.cie.2007.01.004","journal-title":"Computers & Industrial Engineering"},{"key":"157_CR22","doi-asserted-by":"crossref","first-page":"493","DOI":"10.1287\/mnsc.11.5.493","volume":"11","author":"J.J. McCall","year":"1965","unstructured":"McCall J.J. (1965) Maintenance policies for stochastically failing equipment: A survey. Management Science 11: 493\u2013524","journal-title":"Management Science"},{"issue":"1","key":"157_CR23","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"M. Nawaz","year":"1983","unstructured":"Nawaz M., Enscore E.E. Jr., Ham I. (1983) A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. OMEGA, The International Journal of Management Science 11(1): 91\u201395","journal-title":"OMEGA, The International Journal of Management Science"},{"issue":"6","key":"157_CR24","doi-asserted-by":"crossref","first-page":"551","DOI":"10.1016\/0305-0483(89)90059-5","volume":"17","author":"I. Osman","year":"1989","unstructured":"Osman I., Potts C. (1989) Simulated annealing for permutation flowshop scheduling. OMEGA, the International Journal of Management Science 17(6): 551\u2013557","journal-title":"OMEGA, the International Journal of Management Science"},{"key":"157_CR25","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1002\/nav.3800230302","volume":"23","author":"W.P. Pierskalla","year":"1976","unstructured":"Pierskalla W.P., Voelker J.A. (1976) A survey of maintenance models: The control and surveillance of deteriorating systems. Naval Logistics Research Quarterly 23: 353\u2013388 doi: 10.1002\/nav.3800230302","journal-title":"Naval Logistics Research Quarterly"},{"key":"157_CR26","doi-asserted-by":"crossref","first-page":"1071","DOI":"10.1057\/palgrave.jors.2600791","volume":"50","author":"X. Qi","year":"1999","unstructured":"Qi X., Chen T., Tu F. (1999) Scheduling the maintenance on a single machine. The Journal of the Operational Research Society 50: 1071\u20131078","journal-title":"The Journal of the Operational Research Society"},{"key":"157_CR27","doi-asserted-by":"crossref","first-page":"3314","DOI":"10.1016\/j.cor.2005.12.007","volume":"34","author":"R. Ruiz","year":"2007","unstructured":"Ruiz R., Garc\u00eda-D\u00edaz J.C., Maroto C. (2007) Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers & Operations Research 34: 3314\u20133330 doi: 10.1016\/j.cor.2005.12.007","journal-title":"Computers & Operations Research"},{"key":"157_CR28","doi-asserted-by":"crossref","first-page":"781","DOI":"10.1016\/j.ejor.2004.06.038","volume":"169","author":"R. Ruiz","year":"2006","unstructured":"Ruiz R., Maroto C. (2006) A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility. European Journal of Operational Research 169: 781\u2013800 doi: 10.1016\/j.ejor.2004.06.038","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"157_CR29","doi-asserted-by":"crossref","first-page":"1143","DOI":"10.1016\/j.ejor.2006.07.029","volume":"187","author":"R. Ruiz","year":"2008","unstructured":"Ruiz R., St\u00fctzle T. (2008) An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives. European Journal of Operational Research 187(3): 1143\u20131159 doi: 10.1016\/j.ejor.2006.07.029","journal-title":"European Journal of Operational Research"},{"key":"157_CR30","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(98)00367-1","volume":"121","author":"G. Schmidt","year":"2000","unstructured":"Schmidt G. (2000) Scheduling with limited machine availability. European Journal of Operational Research 121: 1\u201315 doi: 10.1016\/S0377-2217(98)00367-1","journal-title":"European Journal of Operational Research"},{"key":"157_CR31","first-page":"47","volume":"23","author":"Y.S. Sherif","year":"1976","unstructured":"Sherif Y.S., Smith M.L. (1976) Optimal maintenance models for systems subject to failure\u2014a review. Naval Logistics Research Quarterly 23: 47\u201374","journal-title":"Optimal maintenance models for systems subject to failure\u2014a review. Naval Logistics Research Quarterly"},{"key":"157_CR32","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1016\/j.compind.2004.06.005","volume":"56","author":"N. Sortrakul","year":"2005","unstructured":"Sortrakul N., Nachtmann H.L., Cassady C.R. (2005) Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine. Computers in Industry 56: 161\u2013168 doi: 10.1016\/j.compind.2004.06.005","journal-title":"Computers in Industry"},{"issue":"3","key":"157_CR33","doi-asserted-by":"crossref","first-page":"876","DOI":"10.1016\/j.cor.2006.04.007","volume":"35","author":"D.L. Yanga","year":"2008","unstructured":"Yanga D.L., Hsub C.J., Kuoc W.H. (2008) A two-machine flowshop scheduling problem with a separated maintenance constraint. Computers & Operations Research 35(3): 876\u2013883 doi: 10.1016\/j.cor.2006.04.007","journal-title":"Computers & Operations Research"},{"key":"157_CR34","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1080\/05695557908974469","volume":"11","author":"T. Yoshida","year":"1979","unstructured":"Yoshida T., Hitomi K. (1979) Optimal two-stage production with setup times separated. AIIE Transactions 11: 261\u2013263","journal-title":"AIIE Transactions"},{"key":"157_CR35","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.amc.2005.11.136","volume":"180","author":"M. Zandieh","year":"2006","unstructured":"Zandieh M., Fatemi Ghomi S.M.T., Moattar Husseini S.M. (2006) An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Journal of Applied Mathematics and Computation 180: 111\u2013127 doi: 10.1016\/j.amc.2005.11.136","journal-title":"Journal of Applied Mathematics and Computation"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0157-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-008-0157-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0157-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,9,15]],"date-time":"2021-09-15T19:53:31Z","timestamp":1631735611000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-008-0157-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,8,31]]},"references-count":35,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2009,12]]}},"alternative-id":["157"],"URL":"https:\/\/doi.org\/10.1007\/s10845-008-0157-6","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,8,31]]}}}