{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,26]],"date-time":"2026-07-26T17:50:13Z","timestamp":1785088213483,"version":"3.55.0"},"reference-count":23,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2008,12,3]],"date-time":"2008-12-03T00:00:00Z","timestamp":1228262400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2010,8]]},"DOI":"10.1007\/s10845-008-0207-0","type":"journal-article","created":{"date-parts":[[2008,12,2]],"date-time":"2008-12-02T02:06:10Z","timestamp":1228183570000},"page":"501-510","source":"Crossref","is-referenced-by-count":61,"title":["Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups"],"prefix":"10.1007","volume":"21","author":[{"given":"M.","family":"Mohammadi","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"S. M. T.","family":"Fatemi Ghomi","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"B.","family":"Karimi","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"S. A.","family":"Torabi","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2008,12,3]]},"reference":[{"issue":"20","key":"207_CR1","doi-asserted-by":"crossref","first-page":"4873","DOI":"10.1080\/00207540601094465","volume":"45","author":"B. Almada-Lobo","year":"2007","unstructured":"Almada-Lobo B., Klabjan D., Carravilla M.A., Oliveira J. (2007) Single machine multi-product capacitated lot sizing with sequence-dependent setups. International Journal of Production Research 45(20): 4873\u20134894. doi: 10.1080\/00207540601094465","journal-title":"International Journal of Production Research"},{"issue":"4","key":"207_CR2","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1007\/s10732-007-9011-9","volume":"13","author":"S.A. Araujo","year":"2007","unstructured":"Araujo S.A., Arenales M.N., Clark A.R. (2007) Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. Journal of Heuristics 13(4): 337\u2013358. doi: 10.1007\/s10732-007-9011-9","journal-title":"Journal of Heuristics"},{"issue":"3","key":"207_CR3","doi-asserted-by":"crossref","first-page":"916","DOI":"10.1016\/j.cor.2006.05.010","volume":"35","author":"S.A. Araujo","year":"2008","unstructured":"Araujo S.A., Arenales M.N., Clark A.R. (2008) Lot sizing and furnace scheduling in small foundries. Computers & Operations Research 35(3): 916\u2013932. doi: 10.1016\/j.cor.2006.05.010","journal-title":"Computers & Operations Research"},{"issue":"11","key":"207_CR4","doi-asserted-by":"crossref","first-page":"3644","DOI":"10.1016\/j.cor.2007.04.003","volume":"35","author":"P. Beraldi","year":"2008","unstructured":"Beraldi P., Ghiani G., Grieco A., Guerriero E. (2008) Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs. Computers & Operations Research, 35(11): 3644\u20133656. doi: 10.1016\/j.cor.2007.04.003","journal-title":"Computers & Operations Research,"},{"issue":"2","key":"207_CR5","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1016\/S0925-5273(02)00400-0","volume":"84","author":"A.R. Clark","year":"2003","unstructured":"Clark A.R. (2003) Optimization approximations for capacity constrained material requirements planning. International Journal of Production Economics 84(2): 115\u2013131. doi: 10.1016\/S0925-5273(02)00400-0","journal-title":"International Journal of Production Economics"},{"issue":"10","key":"207_CR6","doi-asserted-by":"crossref","first-page":"2287","DOI":"10.1080\/00207540050028106","volume":"38","author":"A.R. Clark","year":"2000","unstructured":"Clark A.R., Clark S.J. (2000) Rolling-horizon lot-sizing when setup times are sequence-dependent. International Journal of Production Research 38(10): 2287\u20132308. doi: 10.1080\/00207540050028106","journal-title":"International Journal of Production Research"},{"issue":"2","key":"207_CR7","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1016\/0377-2217(94)90074-4","volume":"75","author":"C. Dillenberger","year":"1994","unstructured":"Dillenberger C., Escudero L.F., Wollensak A., Zhang W. (1994) On practical resource allocation for production planning and scheduling with period overlapping setups. European Journal of Operational Research 75(2): 275\u2013286. doi: 10.1016\/0377-2217(94)90074-4","journal-title":"European Journal of Operational Research"},{"key":"207_CR8","unstructured":"Dillenberger, C., Wollensak, A., & Zhang, W. (1992). On practical resource allocation for production planning and scheduling with different setup products, Draft paper. Germany: German Manufacturing Technology Centre, IBM, Sindelfigen."},{"issue":"1","key":"207_CR9","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1016\/j.ejor.2007.02.040","volume":"187","author":"F.M. Defersha","year":"2008","unstructured":"Defersha F.M., Chen M. (2008) A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality. European Journal of Operational Research 187(1): 46\u201369. doi: 10.1016\/j.ejor.2007.02.040","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"207_CR10","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/S0377-2217(97)00030-1","volume":"99","author":"A. Drexl","year":"1997","unstructured":"Drexl A., Kimms A. (1997) Lot sizing and scheduling, survey and extensions. European Journal of Operational Research 99(2): 221\u2013235. doi: 10.1016\/S0377-2217(97)00030-1","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"207_CR11","doi-asserted-by":"crossref","first-page":"832","DOI":"10.1287\/opre.35.6.832","volume":"35","author":"G.D. Eppen","year":"1987","unstructured":"Eppen G.D., Martin R.K. (1987) Solving multi-item capacitated lot-sizing problems using variable redefinition. Operations Research 35(6): 832\u2013848","journal-title":"Operations Research"},{"issue":"2","key":"207_CR12","doi-asserted-by":"crossref","first-page":"308","DOI":"10.1016\/j.ijpe.2005.04.011","volume":"104","author":"G. Fandel","year":"2006","unstructured":"Fandel G., Stammen-Hegene C. (2006) Simultaneous lot sizing and scheduling for multi-product multi-level production. International Journal of Production Economics 104(2): 308\u2013316. doi: 10.1016\/j.ijpe.2005.04.011","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"207_CR13","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1007\/BF01539800","volume":"19","author":"B. Fleischmann","year":"1997","unstructured":"Fleischmann B., Meyr H. (1997) The general lotsizing and scheduling problem. OR-Spektrum 19(2): 11\u201321","journal-title":"OR-Spektrum"},{"issue":"4","key":"207_CR14","doi-asserted-by":"crossref","first-page":"727","DOI":"10.1016\/j.cor.2003.08.014","volume":"32","author":"D. Gupta","year":"2005","unstructured":"Gupta D., Magnusson T. (2005) The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers & Operations Research 32(4): 727\u2013747. doi: 10.1016\/j.cor.2003.08.014","journal-title":"Computers & Operations Research"},{"issue":"3","key":"207_CR15","doi-asserted-by":"crossref","first-page":"1851","DOI":"10.1016\/j.ejor.2005.12.008","volume":"177","author":"R. Jans","year":"2007","unstructured":"Jans R., Degraeve Z. (2007) Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches. European Journal of Operational Research 177(3): 1851\u20131875. doi: 10.1016\/j.ejor.2005.12.008","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"207_CR16","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/S0305-0483(03)00059-8","volume":"31","author":"B. Karimi","year":"2003","unstructured":"Karimi B., Fatemi Ghomi S.M.T., Wilson J.M. (2003) The capacitated lot sizing problem: A review of models and algorithms. Omega 31(5): 365\u2013378. doi: 10.1016\/S0305-0483(03)00059-8","journal-title":"Omega"},{"key":"207_CR17","unstructured":"Kimms, A. (1993). Multi-level, single-machine lot sizing and scheduling(with initial inventory). Manuskripte aus den Instituten f\u00fbr Betriebswirtschaftslehre der universit\u00e4t Kiel, No.329, Kiel."},{"issue":"1","key":"207_CR18","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1016\/S0377-2217(96)90056-9","volume":"89","author":"A. Kimms","year":"1996","unstructured":"Kimms A. (1996) Multi-level, single-machine lotsizing and scheduling (with initial inventory). European Journal of Operational Research 89(1): 86\u201399. doi: 10.1016\/S0377-2217(96)90056-9","journal-title":"European Journal of Operational Research"},{"key":"207_CR19","unstructured":"Kimms, A., & Drexl, A. (1996). Some insights into proportional lotsizing and scheduling. Manuskripte aus den Instituten der universit\u00e4t Kiel, No.406, Kiel."},{"issue":"1","key":"207_CR20","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1016\/S0925-5273(03)00090-2","volume":"85","author":"C. Merece","year":"2003","unstructured":"Merece C., Fonton G. (2003) MIP-based heuristics for capacitated lotsizing problems. International Journal of Production Economics 85(1): 97\u2013111. doi: 10.1016\/S0925-5273(03)00090-2","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"207_CR21","doi-asserted-by":"crossref","first-page":"401","DOI":"10.1016\/j.ijpe.2007.10.001","volume":"113","author":"H. Tempelmeier","year":"2008","unstructured":"Tempelmeier H., Buschkuhl L. (2008) Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource. International Journal of Production Economics 113(1): 401\u2013402. doi: 10.1016\/j\/ijpe.2007.10.001","journal-title":"International Journal of Production Economics"},{"key":"207_CR22","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1287\/mnsc.5.1.89","volume":"5","author":"H.M. Wagner","year":"1958","unstructured":"Wagner H.M., Whithin T.M. (1958) Dynamic version of the economic lot size model. Management Science 5: 89\u201396","journal-title":"Management Science"},{"key":"207_CR23","volume-title":"Integer Programming","author":"L.A. Wolsey","year":"1998","unstructured":"Wolsey L.A. (1998) Integer Programming. Wiley, New York"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0207-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-008-0207-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0207-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:43Z","timestamp":1559254303000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-008-0207-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,12,3]]},"references-count":23,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2010,8]]}},"alternative-id":["207"],"URL":"https:\/\/doi.org\/10.1007\/s10845-008-0207-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,12,3]]}}}