{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T23:53:46Z","timestamp":1770508426448,"version":"3.49.0"},"reference-count":38,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2008,12,31]],"date-time":"2008-12-31T00:00:00Z","timestamp":1230681600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2009,4]]},"DOI":"10.1007\/s10845-008-0223-0","type":"journal-article","created":{"date-parts":[[2009,1,5]],"date-time":"2009-01-05T20:01:45Z","timestamp":1231185705000},"page":"211-221","source":"Crossref","is-referenced-by-count":30,"title":["A grammatical optimization approach for integrated process planning and scheduling"],"prefix":"10.1007","volume":"20","author":[{"given":"Adil","family":"Baykaso\u011flu","sequence":"first","affiliation":[]},{"given":"Lale","family":"\u00d6zbak\u0131r","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2008,12,31]]},"reference":[{"issue":"17","key":"223_CR1","first-page":"4523","volume":"40","author":"A. Baykaso\u011flu","year":"2002","unstructured":"Baykaso\u011flu A. (2002) Linguistic based meta-heuristic optimisation model for flexible job shop scheduling. International Journal of Production Research 40(17): 4523\u20134543","journal-title":"Linguistic based meta-heuristic optimisation model for flexible job shop scheduling. International Journal of Production Research"},{"key":"223_CR2","doi-asserted-by":"crossref","first-page":"731","DOI":"10.1080\/03052159908941394","volume":"31","author":"A. Baykaso\u011flu","year":"1999","unstructured":"Baykaso\u011flu A., Owen S., Gindy N. (1999) A taboo search based approach to find the Pareto optimal set in multiple objective optimisation. Engineering Optimization 31: 731\u2013748","journal-title":"Engineering Optimization"},{"issue":"6","key":"223_CR3","doi-asserted-by":"crossref","first-page":"777","DOI":"10.1023\/B:JIMS.0000042663.16199.84","volume":"15","author":"A. Baykaso\u011flu","year":"2004","unstructured":"Baykaso\u011flu A., \u00d6zbak\u0131r L., S\u00f6nmez A. \u0130. (2004) Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems. Journal of Intelligent Manufacturing 15(6): 777\u2013785","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"223_CR4","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1080\/00207548208947745","volume":"20","author":"J.H. Blackstone","year":"1982","unstructured":"Blackstone J.H., Phillips D.T., Hogg G.L. (1982) A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research 20(1): 27\u201345","journal-title":"International Journal of Production Research"},{"key":"223_CR5","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1080\/09511929108944485","volume":"4","author":"B.A. Carton","year":"1991","unstructured":"Carton B.A., Ray S.T. (1991) ALPS\u2014A language for process specification. International Journal of Computer Integrated Manufacturing 4: 105\u2013113","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"4","key":"223_CR6","doi-asserted-by":"crossref","first-page":"983","DOI":"10.1016\/0360-8352(96)00047-2","volume":"30","author":"R. Cheng","year":"1996","unstructured":"Cheng R., Gen M., Tsujimura Y. (1996) A tutorial survey of job-shop scheduling problems using genetic algorithms-1. Representation. Computers and Industrial Engineering 30(4): 983\u2013997","journal-title":"Representation. Computers and Industrial Engineering"},{"key":"223_CR7","first-page":"5","volume":"22","author":"H.A. ElMaraghy","year":"1993","unstructured":"ElMaraghy H.A., ElMaraghy W.H. (1993) Bridging the gap between process planning and production planning and scheduling. Manufacturing Systems 22: 5\u201311","journal-title":"Manufacturing Systems"},{"key":"223_CR8","volume-title":"Syntactic pattern recognition","author":"K.S. Fu","year":"1974","unstructured":"Fu K.S. (1974) Syntactic pattern recognition. Academic Press, London"},{"key":"223_CR9","doi-asserted-by":"crossref","unstructured":"Fuqing, Z., Yi, H., & Dongmei, Y. (2004). A genetic algorithm based approach for integration of process planning and production scheduling. In Proceedings of the 2004 International Conference on Intelligent Mechatronics and Automation. Chengdu, China.","DOI":"10.1109\/ICIMA.2004.1384243"},{"key":"223_CR10","unstructured":"Fuqing, Z., Zhu, A., Ren, Z., & Yang, Y. (2006). Integration of process planning and production scheduling based on a hybrid pso and sa algorithm. In Proceedings of the 2006 IEEE International Conference on Mechatronics and Automation. Luoyang, China."},{"key":"223_CR11","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1287\/opre.8.4.487","volume":"8","author":"B. Giffler","year":"1960","unstructured":"Giffler B., Thompson G. (1960) Algorithms for solving production scheduling problems. Operations Research 8: 487\u2013503","journal-title":"Operations Research"},{"key":"223_CR12","doi-asserted-by":"crossref","first-page":"2399","DOI":"10.1080\/002075499190572","volume":"37","author":"N.N. Gindy","year":"1999","unstructured":"Gindy N.N., Saad S.M., Yue Y. (1999) Manufacturing responsiveness through integrated process planning and scheduling. International Journal of Production Research 37: 2399\u20132418","journal-title":"International Journal of Production Research"},{"key":"223_CR13","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1287\/inte.20.4.74","volume":"20","author":"F. Glover","year":"1990","unstructured":"Glover F. (1990) Tabu search: A tutorial. Interfaces 20: 74\u201394","journal-title":"Interfaces"},{"key":"223_CR14","doi-asserted-by":"crossref","first-page":"477","DOI":"10.1016\/S0360-8352(96)00056-3","volume":"32","author":"P. Gu","year":"1997","unstructured":"Gu P., Balasubramanian S., Norrie D.H. (1997) Bidding based process planning and scheduling in a multi-agent system. Computers and Industrial Engineering 32: 477\u2013496","journal-title":"Computers and Industrial Engineering"},{"key":"223_CR15","unstructured":"Iwata, K., & Fukuda, Y. (1989). A new proposal dynamic process planning in machine shop. In Proceedings of the CIRP International Workshop on Computer Aided Process Planning, Hanover University. Germany, Sept. 21\u201322, pp. 73\u201383."},{"key":"223_CR16","doi-asserted-by":"crossref","first-page":"1111","DOI":"10.1007\/s00170-005-0142-6","volume":"30","author":"A. Jain","year":"2006","unstructured":"Jain A., Jain P.K., Singh I.P. (2006) An integrated scheme for process planning and scheduling. International Journal of Advanced Manufacturing Technology 30: 1111\u20131118","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"223_CR17","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1016\/S0378-4754(02)00019-8","volume":"60","author":"I. Kacem","year":"2002","unstructured":"Kacem I., Hammadi S., Borne P. (2002a) Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic. Mathematics and Computers in Simulation 60: 245\u2013276","journal-title":"Mathematics and Computers in Simulation"},{"issue":"1","key":"223_CR18","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1109\/TSMCC.2002.1009117","volume":"32","author":"I. Kacem","year":"2002","unstructured":"Kacem I., Hammadi S., Borne P. (2002b) Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems. IEEE Transactions on Systems, Man and Cybernetics-Part C 32(1): 1\u201313","journal-title":"IEEE Transactions on Systems, Man and Cybernetics-Part C"},{"key":"223_CR19","doi-asserted-by":"crossref","unstructured":"Kacem, I., Hammadi, S., & Borne, P. (2002c). Flexible job shop scheduling problem and controlled evolutionary approach: Some results. http:\/\/www.ec-ille.fr\/kacem\/testsPareto.pdf .","DOI":"10.4018\/978-1-59140-037-0.ch014"},{"key":"223_CR20","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/0965-9978(95)00080-1","volume":"25","author":"J. Kempenaers","year":"1996","unstructured":"Kempenaers J., Pinte J., Detand J., Kruth J.-P. (1996) A collaborative process planning and scheduling system. Advances in Engineering Software 25: 3\u20138","journal-title":"Advances in Engineering Software"},{"key":"223_CR21","unstructured":"Khoshnevis, B., & Chen, Q. (1989). Integration of process planning and scheduling Functions. In IEE Integrated Systems Conference and Society Integrated Manufacturing Conference Proceedings, pp. 415\u2013420."},{"key":"223_CR22","doi-asserted-by":"crossref","first-page":"1601","DOI":"10.1080\/002075499191157","volume":"37","author":"N. Krothapalli","year":"1999","unstructured":"Krothapalli N., Deshmukh A. (1999) Design of negotiation protocols for multi-agent manufacturing systems. International Journal of Production Research 37: 1601\u20131624","journal-title":"International Journal of Production Research"},{"key":"223_CR23","unstructured":"Larsen, N. E., & Clausen, J. (1992). Applied methods for integration of process planning and production control. In Proceedings of Manufacturing International\u201992, ASME, pp. 349\u2013364."},{"key":"223_CR24","doi-asserted-by":"crossref","first-page":"586","DOI":"10.1007\/s001700170035","volume":"18","author":"H. Lee","year":"2001","unstructured":"Lee H., Kim S.S. (2001) Integration of process planning and scheduling using simulation based genetic algorithms. International Journal of Advanced Manufacturing Technology 18: 586\u2013590","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"223_CR25","doi-asserted-by":"crossref","first-page":"80","DOI":"10.1080\/09511920600667366","volume":"20","author":"W.D. Li","year":"2007","unstructured":"Li W.D., McMahon C.S. (2007) A simulated annealing-based optimization approach for integrated process planning and scheduling. International Journal of Computer Integrated Manufacturing 20(1): 80\u201395","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"223_CR26","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1023\/A:1008976720878","volume":"10","author":"N. Morad","year":"1999","unstructured":"Morad N., Zalzala A.M.S. (1999) Genetic algorithms in integrated process planning and scheduling. Journal of Intelligent Manufacturing 10: 169\u2013179","journal-title":"Journal of Intelligent Manufacturing"},{"key":"223_CR27","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1007\/BF00118077","volume":"7","author":"G.J. Palmer","year":"1996","unstructured":"Palmer G.J. (1996) A simulated annealing approach to integrated production scheduling. Journal of Intelligent Manufacturing 7: 163\u2013176","journal-title":"Journal of Intelligent Manufacturing"},{"key":"223_CR28","doi-asserted-by":"crossref","unstructured":"Park, B. J., & Choi, H. R. (2006). A genetic algorithm for integration of process planning and scheduling in a job shop. In A. Sattar & B. H. Kang (Eds.), AI 2006, LNAI 4304 (pp. 647\u2013657). Springer-Verlag.","DOI":"10.1007\/11941439_69"},{"key":"223_CR29","doi-asserted-by":"crossref","first-page":"268","DOI":"10.1007\/s001700050066","volume":"15","author":"C. Sayg\u0131n","year":"1999","unstructured":"Sayg\u0131n C., K\u0131l\u0131\u00e7 S.E. (1999) Integrating flexible process plans with scheduling in flexible manufacturing systems. International Journal of Advanced Manufacturing Technology 15: 268\u2013280","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"4","key":"223_CR30","doi-asserted-by":"crossref","first-page":"563","DOI":"10.1109\/TSMCC.2006.874022","volume":"36","author":"W. Shen","year":"2006","unstructured":"Shen W., Wang L., Hao Q. (2006) Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey. IEEE Transactions on Systems, Man and Cybernetics-Part C 36(4): 563\u2013576","journal-title":"IEEE Transactions on Systems, Man and Cybernetics-Part C"},{"key":"223_CR31","doi-asserted-by":"crossref","first-page":"509","DOI":"10.1023\/A:1027302604072","volume":"14","author":"D.N. Sormaz","year":"2003","unstructured":"Sormaz D.N., Khoshnevis B. (2003) Generation of alternative process plans in integrated manufacturing systems. Journal of Intelligent Manufacturing 14: 509\u2013526","journal-title":"Journal of Intelligent Manufacturing"},{"key":"223_CR32","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1023\/A:1008952024606","volume":"11","author":"W. Tan","year":"2000","unstructured":"Tan W., Khoshnevis B. (2000) Integration of process planning and scheduling: A review. Journal of Intelligent Manufacturing 11: 51\u201363","journal-title":"Journal of Intelligent Manufacturing"},{"key":"223_CR33","unstructured":"Tonshoff, H. K., Beckendorff, U., & Andress, N. (1989). FLEXPLAN\u2014A concept for intelligent process planning and scheduling. In Proceedings of the CIRP International Workshop on Computer Aided Process Planning, Hanover University, Germany, Sept. 21\u201322."},{"key":"223_CR34","doi-asserted-by":"crossref","first-page":"1331","DOI":"10.1080\/00207540500409723","volume":"44","author":"T.N. Wong","year":"2006","unstructured":"Wong T.N., Leung C.W., Mak K.L., Fung R.Y.K. (2006) An agent-based negotiation approach to integrate process planning and scheduling. International Journal of Production Research 44: 1331\u20131351","journal-title":"International Journal of Production Research"},{"key":"223_CR35","doi-asserted-by":"crossref","first-page":"513","DOI":"10.1016\/S0007-8506(07)62498-6","volume":"42","author":"H.C. Zhang","year":"1993","unstructured":"Zhang H.C. (1993) IPPM\u2014A prototype to integrate process planning and job shop scheduling functions. Annals of the CIRP 42: 513\u2013518","journal-title":"Annals of the CIRP"},{"key":"223_CR36","volume-title":"Computerized manufacturing process planning systems","author":"H.C. Zhang","year":"1994","unstructured":"Zhang H.C., Alting L. (1994) Computerized manufacturing process planning systems. Chapman and Hall, London"},{"key":"223_CR37","doi-asserted-by":"crossref","first-page":"876","DOI":"10.1007\/s00170-003-2042-y","volume":"26","author":"X.D. Zhang","year":"2005","unstructured":"Zhang X.D., Yan H.S. (2005) Integrated optimization of production planning and scheduling for a kind of job-shop. International Journal of Advanced Manufacturing Technology 26: 876\u2013886","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"223_CR38","doi-asserted-by":"crossref","first-page":"611","DOI":"10.1080\/0020754021000037874","volume":"41","author":"Y.F. Zhang","year":"2003","unstructured":"Zhang Y.F., Saravanan A.N., Fuh J.Y.H. (2003) Integration of process planning and scheduling by exploring the flexibility of process planning. International Journal of Production Research 41(3): 611\u2013628","journal-title":"International Journal of Production Research"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0223-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-008-0223-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-008-0223-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,9,29]],"date-time":"2021-09-29T10:06:19Z","timestamp":1632909979000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-008-0223-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,12,31]]},"references-count":38,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2009,4]]}},"alternative-id":["223"],"URL":"https:\/\/doi.org\/10.1007\/s10845-008-0223-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,12,31]]}}}