{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T13:14:27Z","timestamp":1762521267178},"reference-count":28,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2009,3,3]],"date-time":"2009-03-03T00:00:00Z","timestamp":1236038400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2010,12]]},"DOI":"10.1007\/s10845-009-0250-5","type":"journal-article","created":{"date-parts":[[2009,3,2]],"date-time":"2009-03-02T01:12:06Z","timestamp":1235956326000},"page":"731-743","source":"Crossref","is-referenced-by-count":31,"title":["A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems"],"prefix":"10.1007","volume":"21","author":[{"given":"M.","family":"Zandieh","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"E.","family":"Mozaffari","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Gholami","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2009,3,3]]},"reference":[{"issue":"1","key":"250_CR1","doi-asserted-by":"crossref","first-page":"272","DOI":"10.1016\/j.ejor.2004.03.026","volume":"167","author":"C. Andr\u00e9s","year":"2005","unstructured":"Andr\u00e9s C., Albarrac\u00edn J.M., Tormo G., Vicens E., Garc\u00eda-Sabater J.P. (2005) Group technology in a hybrid flowshop environment: A case study. European Journal of Operational Research 167(1): 272\u2013281. doi: 10.1016\/j.ejor.2004.03.026","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"250_CR2","doi-asserted-by":"crossref","first-page":"651","DOI":"10.1016\/S0377-2217(03)00434-X","volume":"159","author":"S. Bertel","year":"2004","unstructured":"Bertel S., Billaut J.C. (2004) A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation. European Journal of Operational Research 159(3): 651\u2013662. doi: 10.1016\/S0377-2217(03)00434-X","journal-title":"European Journal of Operational Research"},{"issue":"1\u20133","key":"250_CR3","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1016\/S0925-5273(99)00048-1","volume":"64","author":"V. Botta-Genoulaz","year":"2000","unstructured":"Botta-Genoulaz V. (2000) Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. International Journal of Production Economics 64(1\u20133): 101\u2013111. doi: 10.1016\/S0925-5273(99)00048-1","journal-title":"International Journal of Production Economics"},{"key":"250_CR4","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1016\/j.eswa.2005.12.002","volume":"32","author":"B.-W. Cheng","year":"2007","unstructured":"Cheng B.-W., Chang C.-L. (2007) A study on flowshop scheduling problem combining Taguchi experimental design and genetic algorithm. Expert Systems with Applications 32: 415\u2013421. doi: 10.1016\/j.eswa.2005.12.002","journal-title":"Expert Systems with Applications"},{"key":"250_CR5","doi-asserted-by":"crossref","first-page":"753","DOI":"10.1016\/j.cie.2004.12.005","volume":"48","author":"H.-S. Cho","year":"2005","unstructured":"Cho H.-S., Paik C.-H., Yoon H.-M., Kim H.-G. (2005) A robust design of simulated annealing approach for mixed-model sequencing. Computers & Industrial Engineering 48: 753\u2013764. doi: 10.1016\/j.cie.2004.12.005","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"250_CR6","first-page":"59","volume":"28","author":"F.N. Ford","year":"1987","unstructured":"Ford F.N., Bradbard D.A., Ledbetter W.N., Cox J.F. (1987) Use of operations research in production management. Production and Inventory Management 28(3): 59\u201362","journal-title":"Production and Inventory Management"},{"key":"250_CR7","doi-asserted-by":"crossref","unstructured":"Gholami, M., Zandieh, M., & Alem-Tabriz, A. (2008). Scheduling hybrid flow shop with sequence-dependant setup times and machines with random breakdowns. International Journal of Advanced Manufacturing Technology. doi: 10.1007\/s00170-008-1577-3","DOI":"10.1007\/s00170-008-1577-3"},{"issue":"1","key":"250_CR8","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S.M. Johnson","year":"1954","unstructured":"Johnson S.M. (1954) Optimal two- and three-stage production schedules with setup times include. Naval Research Logistics Quarterly 1(1): 61\u201368. doi: 10.1002\/nav.3800010110","journal-title":"Naval Research Logistics Quarterly"},{"issue":"2","key":"250_CR9","doi-asserted-by":"crossref","first-page":"358","DOI":"10.1016\/j.cor.2007.10.004","volume":"36","author":"J. Jungwattanakit","year":"2009","unstructured":"Jungwattanakit J., Reodecha M., Chaovalitwongse P., Werner F. (2009) A comparison of Scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria. Computers & Operations Research 36(2): 358\u2013378","journal-title":"Computers & Operations Research"},{"issue":"3","key":"250_CR10","doi-asserted-by":"crossref","first-page":"371","DOI":"10.1016\/S0925-5273(03)00123-3","volume":"85","author":"M.E. Kurz","year":"2003","unstructured":"Kurz M.E., Askin R.G. (2003) Comparing scheduling rules for flexible flow lines. International Journal of Production Economics 85(3): 371\u2013388. doi: 10.1016\/S0925-5273(03)00123-3","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"250_CR11","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/S0377-2217(03)00401-6","volume":"159","author":"M.E. Kurz","year":"2004","unstructured":"Kurz M.E., Askin R.G. (2004) Scheduling flexible flow lines with sequence-dependent setup times. European Journal of Operational Research 159(1): 66\u201382. doi: 10.1016\/S0377-2217(03)00401-6","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"250_CR12","first-page":"84","volume":"18","author":"W.N. Ledbetter","year":"1977","unstructured":"Ledbetter W.N., Cox J.F. (1977) Operations research in production management: An investigation of past and present utilization. Production and Inventory Management 18(3): 84\u201391","journal-title":"Production and Inventory Management"},{"key":"250_CR13","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/0167-6377(94)90026-4","volume":"16","author":"C.-Y. Lee","year":"1994","unstructured":"Lee C.-Y., Vairaktarakis G.L. (1994) Minimizing makespan in hybrid flow shops. Operations Research Letters 16: 149\u2013158. doi: 10.1016\/0167-6377(94)90026-4","journal-title":"Operations Research Letters"},{"key":"250_CR14","doi-asserted-by":"crossref","first-page":"408","DOI":"10.1109\/70.864235","volume":"16","author":"C.Y. Liu","year":"2000","unstructured":"Liu C.Y., Chang S.C. (2000) Scheduling flexible flow shops with sequence-dependent setup effects. IEEE Transactions on Robotics and Automation 16: 408\u2013419. doi: 10.1109\/70.864235","journal-title":"IEEE Transactions on Robotics and Automation"},{"issue":"8","key":"250_CR15","doi-asserted-by":"crossref","first-page":"2013","DOI":"10.1016\/j.cor.2004.01.003","volume":"32","author":"C. Low","year":"2005","unstructured":"Low C. (2005) Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines. Computers & Operations Research 32(8): 2013\u20132025. doi: 10.1016\/j.cor.2004.01.003","journal-title":"Computers & Operations Research"},{"issue":"1","key":"250_CR16","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1080\/00207549308956713","volume":"31","author":"B.L. MacCarthy","year":"1993","unstructured":"MacCarthy B.L., Liu J. (1993) Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling. International Journal of Production Research 31(1): 59\u201379. doi: 10.1080\/00207549308956713","journal-title":"International Journal of Production Research"},{"issue":"1","key":"250_CR17","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"M. Nawaz","year":"1983","unstructured":"Nawaz M., Enscore E.E. Jr., Ham I. (1983) A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. OMEGA. The International Journal of Management Science 11(1): 91\u201395","journal-title":"OMEGA. The International Journal of Management Science"},{"key":"250_CR18","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1002\/(SICI)1520-6750(199903)46:2<199::AID-NAV5>3.0.CO;2-L","volume":"46","author":"B.A. Norman","year":"1999","unstructured":"Norman B.A., Bean J.C. (1999) A genetic algorithm method- ology for complex scheduling problems. Naval Research Logistics 46: 199\u2013211. doi: 10.1002\/(SICI)1520-6750(199903)46:2<199::AID-NAV5>3.0.CO;2-L","journal-title":"Naval Research Logistics"},{"issue":"1","key":"250_CR19","doi-asserted-by":"crossref","first-page":"7","DOI":"10.1111\/j.1475-3995.1995.tb00003.x","volume":"2","author":"J. Olhager","year":"1995","unstructured":"Olhager J., Rapp B. (1995) Operational research techniques in manufacturing planning and control system. International Transactions in Operational Research 2(1): 7\u201313. doi: 10.1111\/j.1475-3995.1995.tb00003.x","journal-title":"International Transactions in Operational Research"},{"key":"250_CR20","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1007\/s00170-002-1525-6","volume":"23","author":"S. Pugazhendhi","year":"2004","unstructured":"Pugazhendhi S., Thiagarajan S., Rajendran C., Anantharaman N. (2004) Generating non-permutation schedules in flow line based manufacturing systems with sequence-dependent setup times of jobs: A heuristic approach. International Journal of Advanced Manufacturing Technology 23: 64\u201378. doi: 10.1007\/s00170-002-1525-6","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"250_CR21","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1109\/17.618173","volume":"44","author":"A. Reisman","year":"1997","unstructured":"Reisman A., Kumar A., Motwani J. (1997) Flowshop scheduling\/ sequencing research: A statistical review of the literature 1952\u20131994. IEEE Transactions on Engineering Management 44(3): 316\u2013329. doi: 10.1109\/17.618173","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"3","key":"250_CR22","doi-asserted-by":"crossref","first-page":"781","DOI":"10.1016\/j.ejor.2004.06.038","volume":"169","author":"R. Ruiz","year":"2006","unstructured":"Ruiz R., Maroto C. (2006) A genetic algorithm for hybrid flow shops with sequence dependent setup times and machine eligibility. European Journal of Operational Research 169(3): 781\u2013800. doi: 10.1016\/j.ejor.2004.06.038","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"250_CR23","doi-asserted-by":"crossref","first-page":"1151","DOI":"10.1016\/j.cor.2006.07.014","volume":"35","author":"R. Ruiz","year":"2006","unstructured":"Ruiz R., Sivrikay Serifoglu F., Urlings T. (2006) Modeling realistic hybrid flexible flowshop scheduling problems. Computers & Operations Research 35(4): 1151\u20131175. doi: 10.1016\/j.cor.2006.07.014","journal-title":"Computers & Operations Research"},{"key":"250_CR24","doi-asserted-by":"crossref","first-page":"1143","DOI":"10.1016\/j.ejor.2006.07.029","volume":"187","author":"R. Ruiz","year":"2008","unstructured":"Ruiz R., St\u00fctzle T. (2008) An iterated greedy heuristic for the sequence dependent setup times flow shop with makespan and weighted tardiness objectives. European Journal of Operational Research 187: 1143\u20131159. doi: 10.1016\/j.ejor.2006.07.029","journal-title":"European Journal of Operational Research"},{"issue":"13","key":"250_CR25","first-page":"39","volume":"31","author":"T. Sawik","year":"2000","unstructured":"Sawik T. (2000) Mixed integer programming for scheduling flexi- ble flow lines with limited intermediate buffers. Mathematical and Computer Modelling 31(13): 39\u201352","journal-title":"Mixed integer programming for scheduling flexi- ble flow lines with limited intermediate buffers. Mathematical and Computer Modelling"},{"key":"250_CR26","first-page":"985","volume":"31","author":"H. Soewnadi","year":"2001","unstructured":"Soewnadi H., Elmaghraby S.E. (2001) Sequencing three-stage flexible flowshops with identical machines to minimize makespan. IIE Transactions 31: 985\u2013993","journal-title":"IIE Transactions"},{"key":"250_CR27","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1016\/S0305-0548(98)00079-3","volume":"26","author":"T.-Y. Wang","year":"1999","unstructured":"Wang T.-Y., Wu K.-B. (1999) A parameter set design procedure for the simulated annealing algorithm under the computational time constraint. Computers & Operations Research 26: 665\u2013678. doi: 10.1016\/S0305-0548(98)00079-3","journal-title":"Computers & Operations Research"},{"key":"250_CR28","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.amc.2005.11.136","volume":"180","author":"M. Zandieh","year":"2006","unstructured":"Zandieh M., Fatemi Ghomi S.M.T., Moattar Husseini S.M. (2006) An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Applied Mathematics and Computation 180: 111\u2013127. doi: 10.1016\/j.amc.2005.11.136","journal-title":"Applied Mathematics and Computation"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-009-0250-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-009-0250-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-009-0250-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:44Z","timestamp":1559254304000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-009-0250-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,3,3]]},"references-count":28,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2010,12]]}},"alternative-id":["250"],"URL":"https:\/\/doi.org\/10.1007\/s10845-009-0250-5","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009,3,3]]}}}