{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,12]],"date-time":"2026-05-12T12:01:07Z","timestamp":1778587267689,"version":"3.51.4"},"reference-count":53,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2009,3,19]],"date-time":"2009-03-19T00:00:00Z","timestamp":1237420800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2010,12]]},"DOI":"10.1007\/s10845-009-0260-3","type":"journal-article","created":{"date-parts":[[2009,3,18]],"date-time":"2009-03-18T01:02:03Z","timestamp":1237338123000},"page":"843-851","source":"Crossref","is-referenced-by-count":37,"title":["Parallel machine scheduling problem to minimize the earliness\/tardiness costs with learning effect and deteriorating jobs"],"prefix":"10.1007","volume":"21","author":[{"given":"M. Duran","family":"Toksar\u0131","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ertan","family":"G\u00fcner","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2009,3,19]]},"reference":[{"key":"260_CR1","doi-asserted-by":"crossref","first-page":"128","DOI":"10.1057\/jors.1995.14","volume":"46","author":"B. Alidaee","year":"1995","unstructured":"Alidaee B., Rosa D. (1995) A note on the V-shaped property in one machine scheduling. The Journal of the Operational Research Society 46: 128\u2013132","journal-title":"The Journal of the Operational Research Society"},{"issue":"7","key":"260_CR2","doi-asserted-by":"crossref","first-page":"711","DOI":"10.1057\/palgrave.jors.2600740","volume":"50","author":"B. Alidaee","year":"1999","unstructured":"Alidaee B., Womer N.K. (1999) Scheduling with time dependent processing times: Review and extensions. The Journal of the Operational Research Society 50(7): 711\u2013720","journal-title":"The Journal of the Operational Research Society"},{"issue":"1","key":"260_CR3","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1287\/opre.39.1.64","volume":"39","author":"E.M. Arkin","year":"1991","unstructured":"Arkin E.M., Roundy R.O. (1991) Weighted-tardiness scheduling on parallel machines with proportional weights. Operations Research 39(1): 64\u201381. doi: 10.1287\/opre.39.1.64","journal-title":"Operations Research"},{"key":"260_CR4","volume-title":"Elements of sequencing and scheduling","author":"K.R. Baker","year":"1994","unstructured":"Baker K.R. (1994) Elements of sequencing and scheduling. Hanover, HN"},{"issue":"1","key":"260_CR5","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1287\/opre.38.1.22","volume":"38","author":"K.R. Baker","year":"1990","unstructured":"Baker K.R., Scudder G.D. (1990) Sequencing with earliness and tardiness penalties: A review. Operations Research 38(1): 22\u201336. doi: 10.1287\/opre.38.1.22","journal-title":"Operations Research"},{"key":"260_CR6","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1016\/S0895-7177(00)00250-8","volume":"33","author":"J. Bank","year":"2001","unstructured":"Bank J., Werner F. (2001) Heuristics algorithms for unrelated parallel machine scheduling with a common due date, release dates and linear earliness tardiness penalties. Mathematical and Computer Modelling 33: 363\u2013383. doi: 10.1016\/S0895-7177(00)00250-8","journal-title":"Mathematical and Computer Modelling"},{"key":"260_CR7","doi-asserted-by":"crossref","first-page":"3219","DOI":"10.1016\/j.cor.2005.02.037","volume":"33","author":"J. Bauman","year":"2006","unstructured":"Bauman J., Jozefowska J. (2006) Minimizing the earliness-tardiness costs on a single machine. Computers & Operations Research 33: 3219\u20133230. doi: 10.1016\/j.cor.2005.02.037","journal-title":"Computers & Operations Research"},{"key":"260_CR8","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/S0377-2217(98)00246-X","volume":"115","author":"D. Biskup","year":"1999","unstructured":"Biskup D. (1999) Single-machine scheduling with learning considerations. European Journal of Operational Research 115: 173\u2013178. doi: 10.1016\/S0377-2217(98)00246-X","journal-title":"European Journal of Operational Research"},{"key":"260_CR9","doi-asserted-by":"crossref","first-page":"606","DOI":"10.1016\/j.ejor.2003.06.001","volume":"159","author":"D. Biskup","year":"2004","unstructured":"Biskup D., Simons D. (2004) Common due date scheduling with autonomous and induced learning. European Journal of Operational Research 159: 606\u2013616. doi: 10.1016\/j.ejor.2003.06.001","journal-title":"European Journal of Operational Research"},{"key":"260_CR10","doi-asserted-by":"crossref","first-page":"495","DOI":"10.1287\/opre.38.3.495","volume":"38","author":"S. Browne","year":"1990","unstructured":"Browne S., Yechiali U. (1990) Scheduling deteriorating jobs on a single processor. Operations Research 38: 495\u2013498. doi: 10.1287\/opre.38.3.495","journal-title":"Operations Research"},{"issue":"9","key":"260_CR11","doi-asserted-by":"crossref","first-page":"1113","DOI":"10.1057\/palgrave.jors.2602095","volume":"57","author":"P. Chen","year":"2006","unstructured":"Chen P., Wu C.-C., Lee W.-C. (2006) A bi-criteria two-machine flowshop scheduling problem with a learning effect. The Journal of the Operational Research Society 57(9): 1113\u20131125. doi: 10.1057\/palgrave.jors.2602095","journal-title":"The Journal of the Operational Research Society"},{"issue":"5","key":"260_CR12","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1007\/s11741-007-0503-3","volume":"11","author":"M.-B. Cheng","year":"2007","unstructured":"Cheng M.-B., Sun S.-J. (2007) A heuristic MBLS algorithm for the two semi-online parallel machine scheduling problems with deterioration jobs. Journal of Shanghai University 11(5): 451\u2013456 (English edition). doi: 10.1007\/s11741-007-0503-3","journal-title":"Journal of Shanghai University"},{"issue":"6","key":"260_CR13","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1002\/nav.10073","volume":"50","author":"T.C.E. Cheng","year":"2003","unstructured":"Cheng T.C.E., Ding Q., Kovalyov M.Y., Bachman A., Janiak A. (2003a) Scheduling jobs with piecewise linear decreasing processing times. Naval Research Logistics 50(6): 531\u2013554. doi: 10.1002\/nav.10073","journal-title":"Naval Research Logistics"},{"key":"260_CR14","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(02)00909-8","volume":"152","author":"T.C.E. Cheng","year":"2003","unstructured":"Cheng T.C.E., Ding Q., Lin B.M.T. (2003b) A concise survey on the scheduling problems with deteriorating processing times. European Journal of Operational Research 152: 1\u201313. doi: 10.1016\/S0377-2217(02)00909-8","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"260_CR15","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1057\/palgrave.jors.2601681","volume":"55","author":"T.C.E. Cheng","year":"2004","unstructured":"Cheng T.C.E., Kang L., Ng C.T. (2004) Due-date assignment and single machine scheduling with deteriorating jobs. The Journal of the Operational Research Society 55(2): 198\u2013203. doi: 10.1057\/palgrave.jors.2601681","journal-title":"The Journal of the Operational Research Society"},{"key":"260_CR16","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1111\/j.1937-5956.1992.tb00354.x","volume":"1","author":"B.J. Colemon","year":"1992","unstructured":"Colemon B.J. (1992) A simple model for optimizing the single machine early\/tardy problem with sequence-dependent setups. Production and Operations Management 1: 225\u2013228","journal-title":"Production and Operations Management"},{"key":"260_CR17","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1287\/mnsc.23.6.567","volume":"23","author":"S. Eilon","year":"1977","unstructured":"Eilon S., Chowdhury I. (1977) Minimizing waiting time variance in the single machine. Management Science 23: 567\u2013575. doi: 10.1287\/mnsc.23.6.567","journal-title":"Management Science"},{"issue":"7","key":"260_CR18","doi-asserted-by":"crossref","first-page":"1351","DOI":"10.1016\/j.apm.2006.03.030","volume":"31","author":"T. Eren","year":"2007","unstructured":"Eren T., G\u00fcner E. (2007) Minimizing total tardiness in a scheduling problem with a learning effect. Applied Mathematical Modelling 31(7): 1351\u20131361. doi: 10.1016\/j.apm.2006.03.030","journal-title":"Applied Mathematical Modelling"},{"key":"260_CR19","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/0360-8352(88)90041-1","volume":"14","author":"J.N.D. Gupta","year":"1988","unstructured":"Gupta J.N.D., Gupta S.K. (1988) Single facility scheduling with nonlinear processing times. Computers & Industrial Engineering 14: 387\u2013393. doi: 10.1016\/0360-8352(88)90041-1","journal-title":"Computers & Industrial Engineering"},{"key":"260_CR20","doi-asserted-by":"crossref","first-page":"108","DOI":"10.1016\/j.ejor.2004.11.022","volume":"173","author":"Y. Hendel","year":"2006","unstructured":"Hendel Y., Sourd F. (2006) Efficient neighborhood search for the one-machine earliness-tardiness scheduling problem. European Journal of Operational Research 173: 108\u2013119. doi: 10.1016\/j.ejor.2004.11.022","journal-title":"European Journal of Operational Research"},{"key":"260_CR21","doi-asserted-by":"crossref","first-page":"459","DOI":"10.1016\/j.omega.2003.08.003","volume":"31","author":"Y.S. Hsu","year":"2003","unstructured":"Hsu Y.S., Lin B.M.T. (2003) Minimization of maximum lateness under linear deterioration. Omega 31: 459\u2013469. doi: 10.1016\/j.omega.2003.08.003","journal-title":"Omega"},{"issue":"2","key":"260_CR22","doi-asserted-by":"crossref","first-page":"342","DOI":"10.1016\/j.ejor.2007.04.050","volume":"188","author":"M. Ji","year":"2008","unstructured":"Ji M., Cheng T.C.E. (2008) Parallel-machine scheduling with simple linear deterioration to minimize total completion time. European Journal of Operational Research 188(2): 342\u2013347. doi: 10.1016\/j.ejor.2007.04.050","journal-title":"European Journal of Operational Research"},{"issue":"12","key":"260_CR23","doi-asserted-by":"crossref","first-page":"3327","DOI":"10.1080\/00207549608905093","volume":"34","author":"V.R. Kannan","year":"1996","unstructured":"Kannan V.R. (1996) Incorporating the impact of learning in assessing the effectiveness of cellular manufacturing. International Journal of Production Research 34(12): 3327\u20133340. doi: 10.1080\/00207549608905093","journal-title":"International Journal of Production Research"},{"key":"260_CR24","doi-asserted-by":"crossref","unstructured":"Kannan, V. R., & Palocsay, S. W. (1999). Cellular vs process layouts: An analytic investigation of the impact of learning on shop performance, OMEGA\u2014International Journal of Production Research, 27, 583\u2013592.","DOI":"10.1016\/S0305-0483(99)00020-1"},{"issue":"2","key":"260_CR25","doi-asserted-by":"crossref","first-page":"402","DOI":"10.1016\/j.ejor.2006.01.030","volume":"178","author":"C. Koulamas","year":"2007","unstructured":"Koulamas C., Kyparisis G.J. (2007) Single machine and two machine flowshop scheduling with general learning functions. European Journal of Operational Research 178(2): 402\u2013407. doi: 10.1016\/j.ejor.2006.01.030","journal-title":"European Journal of Operational Research"},{"key":"260_CR26","doi-asserted-by":"crossref","first-page":"511","DOI":"10.1002\/(SICI)1520-6750(199808)45:5<511::AID-NAV5>3.0.CO;2-6","volume":"45","author":"W. Kubiak","year":"1998","unstructured":"Kubiak W., Vande Velde S. (1998) Scheduling deteriorating jobs to minimize makespan. Naval Research Logistics 45: 511\u2013523. doi: 10.1002\/(SICI)1520-6750(199808)45:5<511::AID-NAV5>3.0.CO;2-6","journal-title":"Naval Research Logistics"},{"key":"260_CR27","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1016\/0377-2217(90)90089-T","volume":"47","author":"A.S. Kunnatur","year":"1990","unstructured":"Kunnatur A.S., Gupta S.K. (1990) Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem. European Journal of Operational Research 47: 56\u201364. doi: 10.1016\/0377-2217(90)90089-T","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"260_CR28","doi-asserted-by":"crossref","first-page":"1184","DOI":"10.1016\/j.ejor.2005.03.020","volume":"174","author":"W.H. Kuo","year":"2006","unstructured":"Kuo W.H., Yang D.L. (2006a) Minimizing the total completion time in a single machine scheduling problem with a time dependent learning effect. European Journal of Operational Research 174(2): 1184\u20131190. doi: 10.1016\/j.ejor.2005.03.020","journal-title":"European Journal of Operational Research"},{"key":"260_CR29","first-page":"2099","volume":"33","author":"W.H. Kuo","year":"2006","unstructured":"Kuo W.H., Yang D.L. (2006b) Single machine group scheduling with a time dependent learning effect. European Journal of Operational Research 33: 2099\u20132112","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"260_CR30","doi-asserted-by":"crossref","first-page":"362","DOI":"10.1016\/j.apm.2006.12.008","volume":"32","author":"W.-C. Lee","year":"2008","unstructured":"Lee W.-C., Wu C.-C. (2008) Multi-machine scheduling with deteriorating jobs and scheduled maintenance. Applied Mathematical Modelling 32(3): 362\u2013373. doi: 10.1016\/j.apm.2006.12.008","journal-title":"Applied Mathematical Modelling"},{"key":"260_CR31","doi-asserted-by":"crossref","first-page":"649","DOI":"10.1016\/S0305-0548(99)00153-7","volume":"28","author":"S.A. Mondal","year":"2001","unstructured":"Mondal S.A., Sen A.K. (2001) Single machine weighted earliness-tardiness penalty problem with a common due date. Computers & Operations Research 28: 649\u2013669. doi: 10.1016\/S0305-0548(99)00153-7","journal-title":"Computers & Operations Research"},{"key":"260_CR32","doi-asserted-by":"crossref","first-page":"979","DOI":"10.1287\/opre.39.6.979","volume":"39","author":"G. Mosheiov","year":"1991","unstructured":"Mosheiov G. (1991) V-shaped policies for scheduling deteriorating jobs. Operations Research 39: 979\u2013991. doi: 10.1287\/opre.39.6.979","journal-title":"Operations Research"},{"issue":"6","key":"260_CR33","doi-asserted-by":"crossref","first-page":"653","DOI":"10.1016\/0305-0548(94)90080-9","volume":"21","author":"G. Mosheiov","year":"1994","unstructured":"Mosheiov G. (1994) Scheduling jobs under simple linear deterioration. Computers and Operations 21(6): 653\u2013659. doi: 10.1016\/0305-0548(94)90080-9","journal-title":"Computers and Operations"},{"key":"260_CR34","doi-asserted-by":"crossref","first-page":"1184","DOI":"10.1057\/jors.1996.146","volume":"47","author":"G. Mosheiov","year":"1996","unstructured":"Mosheiov G. (1996) \u039b-shaped policies to schedule deteriorating jobs. The Journal of the Operational Research Society 47: 1184\u20131191","journal-title":"The Journal of the Operational Research Society"},{"key":"260_CR35","doi-asserted-by":"crossref","first-page":"687","DOI":"10.1016\/S0377-2217(00)00175-2","volume":"132","author":"G. Mosheiov","year":"2001","unstructured":"Mosheiov G. (2001) Scheduling problems with a learning effect. European Journal of Operational Research 132: 687\u2013693. doi: 10.1016\/S0377-2217(00)00175-2","journal-title":"European Journal of Operational Research"},{"key":"260_CR36","doi-asserted-by":"crossref","first-page":"638","DOI":"10.1016\/S0377-2217(99)00432-4","volume":"130","author":"G. Mosheiov","year":"2001","unstructured":"Mosheiov G., Shadmon M. (2001) Minmax earliness-tardiness costs with unit processing time jobs. European Journal of Operational Research 130: 638\u2013652. doi: 10.1016\/S0377-2217(99)00432-4","journal-title":"European Journal of Operational Research"},{"key":"260_CR37","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1016\/S0377-2217(02)00358-2","volume":"147","author":"G. Mosheiov","year":"2003","unstructured":"Mosheiov G., Sidney J.B. (2003) Scheduling with general job-dependent learning curves. European Journal of Operational Research 147: 665\u2013670. doi: 10.1016\/S0377-2217(02)00358-2","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"260_CR38","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1007\/s11741-007-0406-3","volume":"11","author":"C.-R. Ren","year":"2007","unstructured":"Ren C.-R., Kang L.-Y. (2007) An approximation algorithm for parallel machine scheduling with simple linear deterioration. Journal of Shanghai University 11(4): 351\u2013354 (English edition). doi: 10.1007\/s11741-007-0406-3","journal-title":"Journal of Shanghai University"},{"key":"260_CR39","doi-asserted-by":"crossref","first-page":"1849","DOI":"10.1016\/j.cor.2003.12.002","volume":"32","author":"F. Sourd","year":"2005","unstructured":"Sourd F. (2005) Earliness\/tardiness scheduling with setup considerations. Computers & Operations Research 32: 1849\u20131865. doi: 10.1016\/j.cor.2003.12.002","journal-title":"Computers & Operations Research"},{"key":"260_CR40","doi-asserted-by":"crossref","first-page":"801","DOI":"10.1016\/S0305-0548(02)00055-2","volume":"30","author":"H. Sun","year":"2003","unstructured":"Sun H., Wang G. (2003) Parallel machine earliness and tardiness scheduling with proportional weights. Computers & Operations Research 30: 801\u2013808. doi: 10.1016\/S0305-0548(02)00055-2","journal-title":"Computers & Operations Research"},{"issue":"3","key":"260_CR41","doi-asserted-by":"crossref","first-page":"394","DOI":"10.1016\/0377-2217(94)90048-5","volume":"78","author":"P.S. Sundararaghavan","year":"1994","unstructured":"Sundararaghavan P.S., Kunnathur A.S. (1994) Single machine scheduling with start time dependent processing time: Some solvable cases. European Journal of Operational Research 78(3): 394\u2013403. doi: 10.1016\/0377-2217(94)90048-5","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"260_CR42","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1002\/1520-6750(199303)40:2<229::AID-NAV3220400207>3.0.CO;2-R","volume":"40","author":"W. Szwarc","year":"1993","unstructured":"Szwarc W. (1993) Adjacent orderings in single-machine scheduling with earliness and tardiness penalties. Naval Research Logistics 40(2): 229\u2013243. doi: 10.1002\/1520-6750(199303)40:2<229::AID-NAV3220400207>3.0.CO;2-R","journal-title":"Naval Research Logistics"},{"key":"260_CR43","doi-asserted-by":"crossref","first-page":"801","DOI":"10.1007\/s00170-007-1128-3","volume":"38","author":"D. Toksar\u0131","year":"2008","unstructured":"Toksar\u0131 D., Guner E. (2008) Minimizing the earliness\/tardiness costs on parallel machine with learning effects and deteriorating jobs: a mixed nonlinear integer programming approach. International Journal of Advanced Manufacturing Technology 38: 801\u2013808. doi: 10.1007\/s00170-007-1128-3","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"260_CR44","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1016\/S0377-2217(01)00292-2","volume":"142","author":"J.S. Ventura","year":"2005","unstructured":"Ventura J.S., Kim D., Garriga F. (2005) Single machine earliness-tardiness scheduling with resource-dependent release dates. European Journal of Operational Research 142: 52\u201369. doi: 10.1016\/S0377-2217(01)00292-2","journal-title":"European Journal of Operational Research"},{"key":"260_CR45","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1016\/S0925-5273(02)00110-X","volume":"79","author":"G.T. Voutsinas","year":"2002","unstructured":"Voutsinas G.T., Pappis C.P. (2002) Scheduling jobs with values exponentially deteriorating over time. International Journal of Production Economics 79: 163\u2013169. doi: 10.1016\/S0925-5273(02)00110-X","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"260_CR46","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1016\/j.omega.2005.07.008","volume":"35","author":"J.B. Wang","year":"2007","unstructured":"Wang J.B. (2007a) Single-machine scheduling problems with the effects of learning and deterioration. Omega 35(4): 397\u2013402. doi: 10.1016\/j.omega.2005.07.008","journal-title":"Omega"},{"issue":"7","key":"260_CR47","doi-asserted-by":"crossref","first-page":"2043","DOI":"10.1016\/j.cor.2005.08.008","volume":"34","author":"J.B. Wang","year":"2007","unstructured":"Wang J.B. (2007b) Flow shop scheduling problems with decreasing linear deterioration under dominant machines. Computers & Operations Research 34(7): 2043\u20132058. doi: 10.1016\/j.cor.2005.08.008","journal-title":"Computers & Operations Research"},{"issue":"1","key":"260_CR48","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/j.ejor.2006.01.017","volume":"178","author":"X. Wang","year":"2007","unstructured":"Wang X., Cheng T.C.E. (2007) Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan. European Journal of Operational Research 178(1): 57\u201370. doi: 10.1016\/j.ejor.2006.01.017","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"260_CR49","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/j.amc.2005.11.162","volume":"180","author":"J.B. Wang","year":"2006","unstructured":"Wang J.B., Ng C.T.D., Cheng T.C.E., Liu L.L. (2006) Minimizing total completion time in a two-machine flow shop with deteriorating jobs. Applied Mathematics and Computation 180(1): 185\u2013193. doi: 10.1016\/j.amc.2005.11.162","journal-title":"Applied Mathematics and Computation"},{"key":"260_CR50","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1016\/j.omega.2004.10.006","volume":"34","author":"J.B. Wang","year":"2006","unstructured":"Wang J.B., Xia Z.Q. (2006) Flow shop scheduling with deteriorating jobs under dominating machines. Omega 34: 327\u2013336. doi: 10.1016\/j.omega.2004.10.006","journal-title":"Omega"},{"issue":"2","key":"260_CR51","doi-asserted-by":"crossref","first-page":"572","DOI":"10.1016\/j.ijpe.2005.11.005","volume":"103","author":"C.C. Wu","year":"2006","unstructured":"Wu C.C., Lee W.C. (2006) Two-machine flowshop scheduling to minimize mean flow time under linear deterioration. International Journal of Production Economics 103(2): 572\u2013584. doi: 10.1016\/j.ijpe.2005.11.005","journal-title":"International Journal of Production Economics"},{"issue":"7","key":"260_CR52","doi-asserted-by":"crossref","first-page":"1611","DOI":"10.1080\/00207549308956812","volume":"31","author":"W.X. Zeng","year":"1993","unstructured":"Zeng W.X., Nagasawa H., Nishiyama N. (1993) Single-machine scheduling for minimizing total cost with identical, asymmetrical earliness and tardiness penalties. International Journal of Production Research 31(7): 1611\u20131620. doi: 10.1080\/00207549308956812","journal-title":"International Journal of Production Research"},{"key":"260_CR53","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/S0360-8352(00)00048-6","volume":"38","author":"Z. Zhu","year":"2000","unstructured":"Zhu Z., Heady R.B. (2000) Minimizing the sum of earliness\/tardiness in multi-machine scheduling: A mixed integer programming approach. Computers & Industrial Engineering 38: 297\u2013305. doi: 10.1016\/S0360-8352(00)00048-6","journal-title":"Computers & Industrial Engineering"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-009-0260-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-009-0260-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-009-0260-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:44Z","timestamp":1559254304000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-009-0260-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,3,19]]},"references-count":53,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2010,12]]}},"alternative-id":["260"],"URL":"https:\/\/doi.org\/10.1007\/s10845-009-0260-3","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009,3,19]]}}}