{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,6,12]],"date-time":"2024-06-12T06:35:46Z","timestamp":1718174146492},"reference-count":27,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2009,10,24]],"date-time":"2009-10-24T00:00:00Z","timestamp":1256342400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2012,2]]},"DOI":"10.1007\/s10845-009-0336-0","type":"journal-article","created":{"date-parts":[[2009,10,23]],"date-time":"2009-10-23T14:05:48Z","timestamp":1256306748000},"page":"37-48","source":"Crossref","is-referenced-by-count":6,"title":["Dynamic programming model for multi-stage single-product Kanban-controlled serial production line"],"prefix":"10.1007","volume":"23","author":[{"given":"Mohammad D.","family":"Al-Tahat","sequence":"first","affiliation":[]},{"given":"Doraid","family":"Dalalah","sequence":"additional","affiliation":[]},{"given":"Mahmoud A.","family":"Barghash","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2009,10,24]]},"reference":[{"issue":"17","key":"336_CR1","doi-asserted-by":"crossref","first-page":"3859","DOI":"10.1080\/002075499189808","volume":"37","author":"M. S. Akturk","year":"1999","unstructured":"Akturk M. S., Erhun F. (1999) An overview of design and operational issues of Kanban systems. International Journal of Production Research 37(17): 3859\u20133881","journal-title":"International Journal of Production Research"},{"issue":"2","key":"336_CR2","first-page":"123","volume":"32","author":"M.D. Al-Tahat","year":"2005","unstructured":"Al-Tahat M.D. (2005) Optimizing of work in progress (WIP) in Kanban controlled production lines. Dirasat International Journal for Engineering Sciences 32(2): 123\u2013132","journal-title":"Dirasat International Journal for Engineering Sciences"},{"issue":"2","key":"336_CR3","doi-asserted-by":"crossref","first-page":"230","DOI":"10.1504\/IJISM.2008.016619","volume":"4","author":"M. D. Al-Tahat","year":"2008","unstructured":"Al-Tahat M. D., Jalham S. I. (2008) Tracking production rate of CONstant Work-In Process (CONWIP) controlled job shop. International Journal of Integrated Supply Management 4(2): 230\u2013245","journal-title":"International Journal of Integrated Supply Management"},{"key":"336_CR4","unstructured":"Askin, R. G., & Goldberg, J. B. (2002). Design and analysis of lean production systems (1st ed.). London: Wiley. ISBN 0-471-11593-2."},{"issue":"4","key":"336_CR5","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1111\/j.1937-5956.1992.tb00004.x","volume":"1","author":"B. J. Berkley","year":"1992","unstructured":"Berkley B. J. (1992) A review of the Kanban production control research literature. Production and Operations Management 1(4): 393\u2013411","journal-title":"Production and Operations Management"},{"key":"336_CR6","first-page":"999","volume":"32","author":"C. Chaouiya","year":"2000","unstructured":"Chaouiya C., Liberopoulos G., Dallery Y. (2000) The extended Kanban control system for production coordination of assembly manufacturing systems. IIE Transactions 32: 999\u20131012","journal-title":"IIE Transactions"},{"key":"336_CR7","doi-asserted-by":"crossref","first-page":"381","DOI":"10.1023\/B:JIMS.0000026575.95980.c7","volume":"15","author":"P. Corry","year":"2004","unstructured":"Corry P., Kozan E. (2004) Meta-heuristics for a complex push-pull production system. Journal of Intelligent Manufacturing 15: 381\u2013393","journal-title":"Journal of Intelligent Manufacturing"},{"key":"336_CR8","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1023\/B:ANOR.0000011184.94163.8c","volume":"125","author":"M. Di Mascolo","year":"2004","unstructured":"Di Mascolo M., Frein Y. (2004) Unified framework for describing and comparing the dynamics of pull control policies. Annals of Operations Research 125: 21\u201345 Kluwer Academic Publishers, Manufactured in The Netherlands","journal-title":"Annals of Operations Research"},{"key":"336_CR9","unstructured":"Di Mascolo, M., Frein, Y., & Dallery, Y. (1992). Queuing network modeling and analysis of Kanban systems, 0-8186-2615-1\/92 $3.00\u00a9 1992 IEEE."},{"key":"336_CR10","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1023\/A:1008938816257","volume":"11","author":"E. G. A. Gaury","year":"2000","unstructured":"Gaury E. G. A., Pierreval H., Kleijnen J. P. C. (2000) An evolution approach to select a pull system among Kanban, Conwip and Hybrid. Journal of Intelligent Manufacturing 11: 157\u2013167","journal-title":"Journal of Intelligent Manufacturing"},{"key":"336_CR11","unstructured":"Grasman, E., Tava, L. O., & John, R. B. (2003). Setting base stock levels in multi product systems with setups and random yield. University of Missouri-Rolla, Rolla, Missouri 65409-0370."},{"issue":"11","key":"336_CR12","doi-asserted-by":"crossref","first-page":"3253","DOI":"10.1080\/00207549608905087","volume":"34","author":"S. Gstettner","year":"1996","unstructured":"Gstettner S., Kuhn H. (1996) Analysis of production control systems Kanban and CONWIP. International Journal of Production Research 34(11): 3253\u20133273","journal-title":"International Journal of Production Research"},{"key":"336_CR13","unstructured":"Gupta, S. M., Al-Turki, Y. A. Y., & Perry R. F. (1995). Coping with processing time variation in a JIT environment. In Proceedings of the 1995 Northeast decision sciences institute conference (pp. 419\u2013421)."},{"issue":"2","key":"336_CR14","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1080\/095372897235398","volume":"8","author":"S. M. Gupta","year":"1997","unstructured":"Gupta S. M., Al-Turki Y. A. Y. (1997) An algorithm to dynamically adjust the number of Kansans in a stochastic processing times and variable demand environment. Production Planning and Control 8(2): 133\u2013141","journal-title":"Production Planning and Control"},{"issue":"10","key":"336_CR15","doi-asserted-by":"crossref","first-page":"1065","DOI":"10.1108\/01443579910271700","volume":"19","author":"S. M. Gupta","year":"1999","unstructured":"Gupta S. M., Al-Turki Y. A. Y., Perry R. F. (1999) Flexible Kanban system. International Journal of Operations and Production Management 19(10): 1065\u20131093","journal-title":"International Journal of Operations and Production Management"},{"issue":"11","key":"336_CR16","doi-asserted-by":"crossref","first-page":"2529","DOI":"10.1080\/00207540050031904","volume":"38","author":"B. Hemamalini","year":"2000","unstructured":"Hemamalini B., Rajendran C. (2000) Determination of the number of containers, production Kanbans and withdrawal Kanbans; and scheduling in Kanban flowshops-part 1. International Journal of Production Research 38(11): 2529\u20132548","journal-title":"International Journal of Production Research"},{"issue":"3","key":"336_CR17","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1080\/095119296131643","volume":"9","author":"C.-C. Huang","year":"1996","unstructured":"Huang C.-C., Kusiak A. (1996) Overview of Kanban systems. International Journal of Computer Integrated Manufacturing 9(3): 169\u2013189","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"336_CR18","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1023\/A:1014532129642","volume":"13","author":"W. H. Ip","year":"2002","unstructured":"Ip W. H., Young K. L., Huang M., Wang D. (2002) A CONWIP model for FMS control. Journal of Intelligent Manufacturing 13: 109\u2013117","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1\u20132","key":"336_CR19","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/S0360-8352(98)00028-X","volume":"35","author":"E. Kizilkaya","year":"1998","unstructured":"Kizilkaya E., Gupta S. M. (1998) Material flow control and scheduling in a disassembly environment. Computers and Industrial Engineering 35(1\u20132): 93\u201396","journal-title":"Computers and Industrial Engineering"},{"issue":"2","key":"336_CR20","doi-asserted-by":"crossref","first-page":"310","DOI":"10.1016\/j.ejor.2003.09.035","volume":"166","author":"A. Matta","year":"2004","unstructured":"Matta A., Dallery Y., Di Mascolo M. (2004) Analysis of assembly systems controlled with Kanbans. European Journal of Operational Research 166(2): 310\u2013336","journal-title":"European Journal of Operational Research"},{"issue":"9","key":"336_CR21","doi-asserted-by":"crossref","first-page":"2135","DOI":"10.1080\/002075499190941","volume":"37","author":"K. E. Moore","year":"1999","unstructured":"Moore K. E., Gupta S. E. (1999) Stochastic colored Petri net (SCPN) models of traditional and flexible Kanban systems. International Journal of Production Research 37(9): 2135\u20132158","journal-title":"International Journal of Production Research"},{"key":"336_CR22","volume-title":"Toyota production system: Beyond large scale production","author":"T. Ohno","year":"1988","unstructured":"Ohno T. (1988) Toyota production system: Beyond large scale production. Productivity Press, Cambridge, MA"},{"issue":"3","key":"336_CR23","doi-asserted-by":"crossref","first-page":"695","DOI":"10.1080\/00207549508930174","volume":"33","author":"C. H. Paik","year":"1995","unstructured":"Paik C. H., Tcha D. W. (1995) Throughput equivalencies in fork\/join queuing networks with finite buffers and general service times. International Journal of Production Research 33(3): 695\u2013703","journal-title":"International Journal of Production Research"},{"issue":"6","key":"336_CR24","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1080\/00207547708943149","volume":"15","author":"Y. Sugimori","year":"1977","unstructured":"Sugimori Y., Kusunoki K., Cho F., Uchikawa S. (1977) Toyota production system and Kanban system materialization of just in-time and respect-for-human system. International Journal of Production Research 15(6): 553\u2013564","journal-title":"International Journal of Production Research"},{"issue":"12","key":"336_CR25","doi-asserted-by":"crossref","first-page":"2723","DOI":"10.1080\/00207540110048963","volume":"39","author":"Z. Wen","year":"2001","unstructured":"Wen Z., Mingyuan C. (2001) A mathematical programming model for production planning using CONWIP. International Journal of Production Research 39(12): 2723\u20132734","journal-title":"International Journal of Production Research"},{"key":"336_CR26","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1023\/A:1018548519287","volume":"8","author":"B. A. Wray","year":"1997","unstructured":"Wray B. A., Rakes T. R., Rees L. P. (1997) Neural network identification of critical factors in a dynamic just-in-time Kanban environment. Journal of Intelligent Manufacturing 8: 83\u201396","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"5","key":"336_CR27","doi-asserted-by":"crossref","first-page":"1155","DOI":"10.1080\/00207540110098454","volume":"40","author":"X. Zhao","year":"2002","unstructured":"Zhao X., Qiguo G., Jiancai W. (2002) On control strategies in a multi-stage production system. International Journal of Production Research 40(5): 1155\u20131171","journal-title":"International Journal of Production Research"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-009-0336-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-009-0336-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-009-0336-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:46Z","timestamp":1559268706000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-009-0336-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,10,24]]},"references-count":27,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2012,2]]}},"alternative-id":["336"],"URL":"https:\/\/doi.org\/10.1007\/s10845-009-0336-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009,10,24]]}}}