{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,15]],"date-time":"2026-05-15T02:43:36Z","timestamp":1778813016237,"version":"3.51.4"},"reference-count":49,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2010,1,30]],"date-time":"2010-01-30T00:00:00Z","timestamp":1264809600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2011,12]]},"DOI":"10.1007\/s10845-009-0374-7","type":"journal-article","created":{"date-parts":[[2010,1,29]],"date-time":"2010-01-29T15:26:31Z","timestamp":1264778791000},"page":"979-989","source":"Crossref","is-referenced-by-count":65,"title":["An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times"],"prefix":"10.1007","volume":"22","author":[{"given":"M.","family":"Zandieh","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"N.","family":"Karimi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2010,1,30]]},"reference":[{"key":"374_CR1","first-page":"219","volume":"27","author":"A. Allahverdi","year":"1999","unstructured":"Allahverdi A., Gupta J. N. D., Aldowaisan T. (1999) A survey of scheduling research involving setup considerations, OMEGA. International Journal of Management Science 27: 219\u2013239","journal-title":"International Journal of Management Science"},{"key":"374_CR2","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1080\/07408178808966147","volume":"20","author":"K. R. Baker","year":"1988","unstructured":"Baker K. R. (1988) Scheduling the production of components at a common facility. IIE Transactions 20: 32\u201335","journal-title":"IIE Transactions"},{"key":"374_CR3","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/0895-7177(90)90368-W","volume":"13","author":"K. R. Baker","year":"1990","unstructured":"Baker K. R. (1990) Scheduling groups of jobs in the two-machine flow shop. Mathematical and Computer Modeling 13: 29\u201336","journal-title":"Mathematical and Computer Modeling"},{"key":"374_CR4","doi-asserted-by":"crossref","first-page":"154","DOI":"10.1287\/ijoc.6.2.154","volume":"6","author":"J. C. Bean","year":"1994","unstructured":"Bean J. C. (1994) Genetic algorithms and random keys for sequencing and optimization. ORSA Journal on Computing 6: 154\u2013160","journal-title":"ORSA Journal on Computing"},{"key":"374_CR5","doi-asserted-by":"crossref","first-page":"426","DOI":"10.1016\/j.ejor.2004.08.008","volume":"169","author":"R. P. Beausoleil","year":"2006","unstructured":"Beausoleil R. P. (2006) \u201cMOSS\u201d multiobjective scatter search applied to non-linear multiple criteria optimization. European Journal of Operational Research 169: 426\u2013449","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"374_CR6","doi-asserted-by":"crossref","first-page":"795","DOI":"10.1007\/s00170-008-1885-7","volume":"44","author":"J. Behnamian","year":"2009","unstructured":"Behnamian J., Zandieh M., Fatemi Ghomi S. M. T. (2009) Due windows group scheduling using an effective hybrid optimization approach. International Journal of Advanced Manufacturing Technology 44(7): 795\u2013808","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"374_CR7","volume-title":"The introduction of group technology","author":"J. L. Burbidge","year":"1975","unstructured":"Burbidge J. L. (1975) The introduction of group technology. Heinemann, London"},{"key":"374_CR8","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1023\/A:1008935027685","volume":"9","author":"S. Cavalieri","year":"1998","unstructured":"Cavalieri S., Gaiardelli P. (1998) Hybrid genetic algorithms for a multiple-objective scheduling problem. Journal of intelligent manufacturing 9: 361\u2013367","journal-title":"Journal of intelligent manufacturing"},{"key":"374_CR9","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/0360-8352(92)90045-L","volume":"22","author":"F. C. Cetinkaya","year":"1992","unstructured":"Cetinkaya F. C., Kayaligil M. S. (1992) Unit sized transfer batch scheduling with setup times. Computers and Industrial Engineering 22: 177\u2013183","journal-title":"Computers and Industrial Engineering"},{"key":"374_CR10","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1111\/j.1937-5956.2000.tb00138.x","volume":"9","author":"T. C. E. Cheng","year":"2000","unstructured":"Cheng T. C. E., Gupta J. N. D., Wang G. (2000) A review of flowshop scheduling research with setup times. Production and Operations Management 9: 283\u2013302","journal-title":"Production and Operations Management"},{"key":"374_CR11","doi-asserted-by":"crossref","first-page":"1087","DOI":"10.1016\/S0305-0548(02)00059-X","volume":"30","author":"J.K. Cochran","year":"2003","unstructured":"Cochran, J. K., Horng, S. M., & Fowler, J. W. (2003). A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Computers and Operations Research, 30, 1087\u20131102.","journal-title":"Computers and Operations Research"},{"issue":"9","key":"374_CR12","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1016\/S0895-7177(99)00085-0","volume":"29","author":"D. Danneberg","year":"1999","unstructured":"Danneberg D., Tautenhahn T., Werner F. (1999) A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size. Mathematical and Computer Modelling 29(9): 101\u2013126","journal-title":"Mathematical and Computer Modelling"},{"issue":"2","key":"374_CR13","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1109\/4235.996017","volume":"6","author":"K. Deb","year":"2002","unstructured":"Deb K., Pratap A., Agarwal S., Meyarivan T. (2002) A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation 6(2): 182\u2013197","journal-title":"IEEE Transactions on Evolutionary Computation"},{"key":"374_CR14","unstructured":"Fonseca, C. M., & Fleming, P. J. (1993). Genetic algorithms for multiobjective optimization: Formulation, discussion and generalization. In S. Forrest (Ed.), Proceedings of the fifth international conference on genetic algorithms (pp. 416\u2013423). Morgan Kaufman Publishers San Mateo, California University of Illinois at Urbana-Champaign."},{"key":"374_CR15","doi-asserted-by":"crossref","first-page":"491","DOI":"10.1016\/j.cie.2003.11.004","volume":"48","author":"P. M. Franca","year":"2005","unstructured":"Franca P. M., Gupta J. N. D., Mendes A., Moscato P., Veltink K. J. (2005) Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Computers and Industrial Engineering 48: 491\u2013506","journal-title":"Computers and Industrial Engineering"},{"key":"374_CR16","doi-asserted-by":"crossref","first-page":"266","DOI":"10.1016\/S0924-0136(98)00405-1","volume":"88","author":"V. Gunaraj","year":"1999","unstructured":"Gunaraj V., Murugan N. (1999) Application of response surface methodology for predicting weld bead quality in submerged arc welding of pipes. Journal of Materials Processing Technology 88: 266\u2013275","journal-title":"Journal of Materials Processing Technology"},{"key":"374_CR17","first-page":"6","volume":"1","author":"J. N. D. Gupta","year":"1985","unstructured":"Gupta J. N. D., Darrow W. P. (1985) Approximate schedules for the two-machine flowshop with sequence dependent setup times. Indian Journal of Management and Systems 1: 6\u201311","journal-title":"Indian Journal of Management and Systems"},{"key":"374_CR18","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1016\/0377-2217(86)90037-8","volume":"24","author":"J. N. D. Gupta","year":"1986","unstructured":"Gupta J. N. D., Darrow W. P. (1986) The two-machine sequence dependent flowshop scheduling problem. European Journal of Operational Research 24: 439\u2013446","journal-title":"European Journal of Operational Research"},{"key":"374_CR19","doi-asserted-by":"crossref","DOI":"10.1007\/978-94-009-4976-8","volume-title":"Group technology: Applications to production management","author":"I. Ham","year":"1985","unstructured":"Ham I., Hitomi K., Yoshida T. (1985) Group technology: Applications to production management. Kluwer, Hingham, MA"},{"key":"374_CR20","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1007\/s10845-008-0088-2","volume":"19","author":"T. H. Hou","year":"2008","unstructured":"Hou T. H., Su C. H., Chang H. Z. (2008) An integrated multi-objective immune algorithm for optimizing the wire bonding process of integrated circuits. Journal of intelligent manufacturing 19: 361\u2013374","journal-title":"Journal of intelligent manufacturing"},{"key":"374_CR21","doi-asserted-by":"crossref","first-page":"675","DOI":"10.1016\/S0305-0548(98)00026-4","volume":"25","author":"C. J. Hyun","year":"1998","unstructured":"Hyun C. J., Kim Y., Kin Y. K. (1998) A genetic algorithm for multiple objective sequencing problems in mixedmodel assembly. Computers & Operations Research 25: 675\u2013690","journal-title":"Computers & Operations Research"},{"key":"374_CR22","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1016\/j.ejor.2002.11.004","volume":"162","author":"A. Janiak","year":"2005","unstructured":"Janiak A., Kovalyov M. Y., Portmann M. C. (2005) Single machine group scheduling with resource dependent setup and processing times. European Journal of Operational Research 162: 112\u2013121","journal-title":"European Journal of Operational Research"},{"key":"374_CR23","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1057\/jors.1993.3","volume":"44","author":"Y. D. Kim","year":"1993","unstructured":"Kim Y. D. (1993) Heuristics for flowshop scheduling problems minimizing mean tardiness. Journal of Operational Research Society 44: 19\u201328","journal-title":"Journal of Operational Research Society"},{"key":"374_CR24","doi-asserted-by":"crossref","first-page":"124","DOI":"10.1016\/0377-2217(95)00119-0","volume":"91","author":"Y. D. Kim","year":"1996","unstructured":"Kim Y. D., Lim H. G., Park M. W. (1996) Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process. European Journal of Operational Research 91: 124\u2013 143","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"374_CR25","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1162\/106365600568167","volume":"8","author":"J. D. Knowles","year":"2000","unstructured":"Knowles J. D., Corne D. W. (2000) Approximating the nondominated front using the Pareto archived evolution strategy. Evolutionary Computation 8(2): 149\u2013172","journal-title":"Evolutionary Computation"},{"key":"374_CR26","doi-asserted-by":"crossref","first-page":"2099","DOI":"10.1016\/j.cor.2004.11.024","volume":"33","author":"W. Kuo","year":"2006","unstructured":"Kuo W., Yang D. (2006) Single-machine group scheduling with a time-dependent learning effect. Computers & Operations Research 33: 2099\u20132112","journal-title":"Computers & Operations Research"},{"key":"374_CR27","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/S0377-2217(03)00401-6","volume":"159","author":"M. E. Kurz","year":"2004","unstructured":"Kurz M. E., Askin R. G. (2004) Scheduling flexible flow lines with sequence-dependent setup times. European Journal of Operational Research 159: 66\u201382","journal-title":"European Journal of Operational Research"},{"key":"374_CR28","doi-asserted-by":"crossref","first-page":"561","DOI":"10.1080\/00207548708919861","volume":"25","author":"A. Kusiak","year":"1987","unstructured":"Kusiak A. (1987) The generalized group technology concept. International Journal of Production Research 25: 561\u2013569","journal-title":"International Journal of Production Research"},{"issue":"(9","key":"374_CR29","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1108\/01443579510099715","volume":"15","author":"B. Y. Leu","year":"1995","unstructured":"Leu B. Y., Nazemetz J. W. (1995) Comparative analysis of group scheduling heuristics in a flow shop cellular system. International Journal of Operations & Production Management 15((9): 143\u2013157","journal-title":"International Journal of Operations & Production Management"},{"key":"374_CR30","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/S0925-5273(96)00105-3","volume":"51","author":"M. M. Liaee","year":"1997","unstructured":"Liaee M. M., Emmons H. (1997) Scheduling families of jobs with setup times. International Journal of Production Economics 51: 165\u2013176","journal-title":"International Journal of Production Economics"},{"key":"374_CR31","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1023\/A:1009841719644","volume":"3","author":"Z. Liu","year":"1999","unstructured":"Liu Z., Yu W. (1999) Minimizing the number of late jobs under the group technology assumption. Journal of Combinatorial Optimization 3: 5\u201315","journal-title":"Journal of Combinatorial Optimization"},{"key":"374_CR32","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1016\/0925-5273(94)00083-M","volume":"38","author":"R. Logendran","year":"1995","unstructured":"Logendran R., Mai L., Talkington D. (1995) Combined heuristics for bi-level group scheduling problems. International Journal of Production Economics 38: 133\u2013145","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"374_CR33","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1016\/j.ijpe.2004.03.011","volume":"96","author":"R. Logendran","year":"2005","unstructured":"Logendran R., Carson S., Hanson E. (2005) Group scheduling in flexible flow shops. International Journal of Production Economics 96(2): 143\u2013155","journal-title":"International Journal of Production Economics"},{"key":"374_CR34","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/j.ijpe.2005.02.006","volume":"102","author":"R. Logendran","year":"2006","unstructured":"Logendran R., deSzoeke P., Barnard F. (2006a) Sequence-dependent group scheduling problems in flexible flow shops. International Journal of Production Economics 102: 66\u201386","journal-title":"International Journal of Production Economics"},{"key":"374_CR35","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1016\/j.cor.2004.07.004","volume":"33","author":"R. Logendran","year":"2006","unstructured":"Logendran R., Salmasi N., Sriskandarajah C. (2006b) Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups. Computers & Operations Research 33: 158\u2013180","journal-title":"Computers & Operations Research"},{"key":"374_CR36","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1016\/S0166-218X(03)00302-0","volume":"134","author":"R. Mansini","year":"2004","unstructured":"Mansini R., Grazia Speranza M., Tuza Z. (2004) Scheduling groups of tasks with precedence constraints on three dedicated processors. Discrete Applied Mathematics 134: 141\u2013168","journal-title":"Discrete Applied Mathematics"},{"key":"374_CR37","volume-title":"Scientific principles of group technology","author":"S. P. Mitrofanov","year":"1966","unstructured":"Mitrofanov S. P. (1966) Scientific principles of group technology. National Lending Library, London (English Translation Boston Spa)"},{"key":"374_CR38","doi-asserted-by":"crossref","first-page":"957","DOI":"10.1016\/0360-8352(96)00045-9","volume":"30","author":"T. Murata","year":"1996","unstructured":"Murata T., Ishibuchi H., Tanaka H. (1996) Multi-objective genetic algorithm and its application to flowshop scheduling. Computers & Industrial Engineering 30: 957\u2013968","journal-title":"Computers & Industrial Engineering"},{"key":"374_CR39","doi-asserted-by":"crossref","unstructured":"Naderi, B., Zandieh, M., & Fatemi Ghomi, S. M. (2008). A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling. Journal of intelligent manufacturing. doi: 10.1007\/s10845-008-0157-6 .","DOI":"10.1007\/s10845-008-0157-6"},{"issue":"1","key":"374_CR40","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1080\/00207540210163973","volume":"41","author":"V. Reddy","year":"2003","unstructured":"Reddy V., Narendran T. T. (2003) Heuristics for scheduling sequence dependent set-up jobs in flow line cells. International Journal of Production Research 41(1): 193\u2013206","journal-title":"International Journal of Production Research"},{"key":"374_CR41","unstructured":"Schaffer, J. D. (1985). Multiple objective optimization with vector evaluated genetic algorithms. In Proceedings of the first ICGA (pp. 93\u2013100)."},{"key":"374_CR42","doi-asserted-by":"crossref","first-page":"324","DOI":"10.1016\/S0377-2217(99)00387-2","volume":"125","author":"J. E. Schaller","year":"2000","unstructured":"Schaller J. E., Gupta J. N. D., Vakharia A. J. (2000) Scheduling a flowline manufacturing cell with sequence dependent family setup times. European Journal of Operational Research 125: 324\u2013339","journal-title":"European Journal of Operational Research"},{"key":"374_CR43","doi-asserted-by":"crossref","first-page":"226","DOI":"10.15807\/jorsj.26.226","volume":"26","author":"Y. Sekiguchi","year":"1983","unstructured":"Sekiguchi Y. (1983) Optimal schedule in a GT-type flow-shop under series-parallel precedence constraints. Journal of the Operations Research Society of Japan 26: 226\u2013251","journal-title":"Journal of the Operations Research Society of Japan"},{"issue":"9-10","key":"374_CR44","doi-asserted-by":"crossref","first-page":"969","DOI":"10.1007\/s00170-006-0906-7","volume":"36","author":"R. Tavakkoli-Moghaddam","year":"2008","unstructured":"Tavakkoli-Moghaddam R., Rahimi-Vahed A. R., Mirzaei A. H. (2008) Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm. International Journal of Advanced Manufacturing Technology 36(9-10): 969\u2013981","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"374_CR45","doi-asserted-by":"crossref","first-page":"1551","DOI":"10.1080\/00207549208948107","volume":"30","author":"R. G. Vickson","year":"1992","unstructured":"Vickson R. G., Alfredsson B. E. (1992) Two- and three-machine flow shop scheduling problems with equal sized transfer batches. International Journal of Production Research 30: 1551\u20131574","journal-title":"International Journal of Production Research"},{"key":"374_CR46","doi-asserted-by":"crossref","first-page":"505","DOI":"10.1016\/j.rcim.2004.07.002","volume":"20","author":"A. D. Wilson","year":"2004","unstructured":"Wilson A. D., King R. E., Hodgson T. J. (2004) Scheduling non-similar groups on a flow line: Multiple group setups. Robotics and Computer-Integrated Manufacturing 20: 505\u2013515","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"374_CR47","doi-asserted-by":"crossref","first-page":"975","DOI":"10.1016\/S0305-0548(99)00070-2","volume":"27","author":"D. Yang","year":"2000","unstructured":"Yang D., Chern M. S. (2000) Two-machine flowshop group scheduling problem. Computers and Operations Research 27: 975\u2013985","journal-title":"Computers and Operations Research"},{"key":"374_CR48","doi-asserted-by":"crossref","unstructured":"Zandieh, M., Dorri, B., & Khamseh, A. R. (2008). Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops. International Journal of Advanced Manufacturing Technology. doi: 10.1007\/s00170-008-1740-x .","DOI":"10.1007\/s00170-008-1740-x"},{"key":"374_CR49","unstructured":"Zitzler, E., Laumanns, M., & Thiele, L. (2001). SPEA2: Improving the strength Pareto evolutionary algorithm. Technical report 103, Computer Engineering and Networks Laboratory (TIK), Swiss Federal Institute of Technology (ETH), Zurich, Switzerland."}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-009-0374-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-009-0374-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-009-0374-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,23]],"date-time":"2024-03-23T07:45:04Z","timestamp":1711179904000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-009-0374-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,1,30]]},"references-count":49,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2011,12]]}},"alternative-id":["374"],"URL":"https:\/\/doi.org\/10.1007\/s10845-009-0374-7","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,1,30]]}}}