{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,15]],"date-time":"2026-05-15T13:37:14Z","timestamp":1778852234171,"version":"3.51.4"},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2010,7,13]],"date-time":"2010-07-13T00:00:00Z","timestamp":1278979200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2012,8]]},"DOI":"10.1007\/s10845-010-0425-0","type":"journal-article","created":{"date-parts":[[2010,7,12]],"date-time":"2010-07-12T10:15:45Z","timestamp":1278929745000},"page":"1207-1224","source":"Crossref","is-referenced-by-count":28,"title":["Earliness\u2013tardiness minimization on a single machine to schedule preventive maintenance tasks: metaheuristic and exact methods"],"prefix":"10.1007","volume":"23","author":[{"given":"Maher","family":"Rebai","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Imed","family":"Kacem","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kondo H.","family":"Adjallah","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2010,7,13]]},"reference":[{"issue":"2","key":"425_CR1","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1057\/jors.1988.26","volume":"39","author":"T. Abdul-Razaq","year":"1988","unstructured":"Abdul-Razaq T., Potts C. N. (1988) Dynamic state space relaxation for single machine scheduling. Journal of Operations Research Society 39(2): 141\u2013152","journal-title":"Journal of Operations Research Society"},{"key":"425_CR2","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1016\/j.ejor.2006.06.032","volume":"181","author":"E. H. Aghezzaf","year":"2007","unstructured":"Aghezzaf E. H., Jamali M. A., Ait-Kadi D. (2007) An integrated production and preventive maintenance planning model. European Journal of Operational Research 181: 679\u2013685","journal-title":"European Journal of Operational Research"},{"key":"425_CR3","doi-asserted-by":"crossref","first-page":"3382","DOI":"10.1016\/j.ins.2008.05.007","volume":"178","author":"E. H. Aghezzaf","year":"2008","unstructured":"Aghezzaf, E. H., & Najid, N. M. (2008). Integrated production planning and preventive maintenance in deteriorating production systems. Information Sciences, 178, 3382\u20133392.","journal-title":"Information Sciences"},{"key":"425_CR4","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1016\/0925-5273(91)90044-T","volume":"23","author":"M. Azizoglu","year":"1991","unstructured":"Azizoglu M., Kondakci S., Kirca O. (1991) Bicriteria scheduling problem involving total tardiness and total earliness penalties. International Journal of Production Economics 23: 17\u201324","journal-title":"International Journal of Production Economics"},{"key":"425_CR5","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1287\/opre.38.1.22","volume":"38","author":"K. R. Baker","year":"1990","unstructured":"Baker K. R., Scudder G. D. (1990) Sequencing with earliness and tardiness penalties: a review. Operations Research 38: 22\u201336","journal-title":"Operations Research"},{"key":"425_CR6","doi-asserted-by":"crossref","first-page":"845","DOI":"10.1002\/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#","volume":"46","author":"H. G. Graves","year":"1999","unstructured":"Graves H. G., Lee C.-Y. (1999) Scheduling maintenance and semiresumable jobs on a single machine. Naval Research Logistics 46: 845\u2013863","journal-title":"Naval Research Logistics"},{"key":"425_CR7","doi-asserted-by":"crossref","first-page":"196","DOI":"10.1137\/0110015","volume":"10","author":"M. Held","year":"1962","unstructured":"Held M., Karp R. M. (1962) A dynamic programming approach to sequencing problems. Journal of the Society for Industrial and Applied Mathematics 10: 196\u2013210","journal-title":"Journal of the Society for Industrial and Applied Mathematics"},{"key":"425_CR8","first-page":"18","volume":"4","author":"I. Kacem","year":"2007","unstructured":"Kacem I. (2007) Lower bounds for tardiness minimization on a single machine with family setup times. International Journal of Operations Research 4: 18\u201331","journal-title":"International Journal of Operations Research"},{"key":"425_CR9","doi-asserted-by":"crossref","first-page":"528","DOI":"10.1016\/S0377-2217(01)00083-2","volume":"136","author":"W. Kubiak","year":"2002","unstructured":"Kubiak W., Blazewicz J., Formanowicz P., Breit J., Schmidt G. (2002) Two-machine flow shops with limited machine availability. European Journal of Operational Research 136: 528\u2013540","journal-title":"European Journal of Operational Research"},{"key":"425_CR10","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/S0167-6377(96)00041-7","volume":"20","author":"C.-Y. Lee","year":"1996","unstructured":"Lee C.-Y. (1996) Minimising the makespan in the two machine scheduling scheduling problem with an availability constraint. Operational Research Letters 20: 129\u2013139","journal-title":"Operational Research Letters"},{"key":"425_CR11","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1002\/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3","volume":"47","author":"C.-Y. Lee","year":"2000","unstructured":"Lee C.-Y., Chen Z.-L. (2000) Scheduling jobs and maintenance activities on parallel machines. Naval Research Logistics 47: 145\u2013165","journal-title":"Naval Research Logistics"},{"key":"425_CR12","first-page":"546","volume":"26","author":"G. Li","year":"1997","unstructured":"Li G. (1997) Single machine earliness and tardiness scheduling. European Journal of Operational Research 26: 546\u2013558","journal-title":"European Journal of Operational Research"},{"key":"425_CR13","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1016\/S0305-0548(98)00081-1","volume":"26","author":"C.-F. Liaw","year":"1999","unstructured":"Liaw C.-F. (1999) A branch and bound algorithm for the single machine earliness and tardiness scheduling problem. Computers & Operations Research 26: 679\u2013693","journal-title":"Computers & Operations Research"},{"key":"425_CR14","doi-asserted-by":"crossref","first-page":"3126","DOI":"10.1016\/j.cor.2005.11.021","volume":"34","author":"R. M\u2019Halla","year":"2006","unstructured":"M\u2019Halla R. (2006) Minimising total earliness and tardiness on a single machine using a hybrid heuristic. Computers & Operation Research 34: 3126\u20133142","journal-title":"Computers & Operation Research"},{"key":"425_CR15","first-page":"331","volume":"35","author":"P. S. Ow","year":"1989","unstructured":"Ow P. S., Morton E. T. (1989) The single machine early\/tardy problem. Management Science 35: 331\u2013342","journal-title":"Management Science"},{"key":"425_CR16","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1287\/opre.33.2.363","volume":"33","author":"C. N. Potts","year":"1984","unstructured":"Potts C. N., Van Wassenhove L. N. (1984) A branch and bound algorithm for the total weighted tardiness problem. Operations Research 33: 363\u2013377","journal-title":"Operations Research"},{"key":"425_CR17","doi-asserted-by":"crossref","first-page":"649","DOI":"10.1016\/S0305-0548(99)00153-7","volume":"28","author":"A. M. Sakib","year":"2001","unstructured":"Sakib A. M., Anup K. S. (2001) Single machine weighted earliness\/tardiness penalty problem with a common due date. Computers & Operation Research 28: 649\u2013669","journal-title":"Computers & Operation Research"},{"key":"425_CR18","doi-asserted-by":"crossref","first-page":"1305","DOI":"10.1016\/j.ejor.2006.05.052","volume":"189","author":"F. Sourd","year":"2008","unstructured":"Sourd F., Keded-Sidhoum S., Rio Solis Y. (2008) Lower bounds for the earliness\u2013tardiness scheduling problem on parallel machines with distinct due dates. European Journal of Operational Research 189: 1305\u20131319","journal-title":"European Journal of Operational Research"},{"key":"425_CR19","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1002\/nav.3800030106","volume":"3","author":"W. E. Smith","year":"1956","unstructured":"Smith W. E. (1956) Various optimizers for single-stage production. Naval Research Logistics Quarterly 3: 59\u201366","journal-title":"Naval Research Logistics Quarterly"},{"key":"425_CR20","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1287\/ijoc.14.1.37.7706","volume":"14","author":"M. Van den Akker","year":"2002","unstructured":"Van den Akker M., Hoogeveen J. A., van deVelde S. (2002) Combining column generation and lagrangean relaxation to solve a single-machine common due date problem. INFORMS Journal on Computing 14: 37\u201351","journal-title":"INFORMS Journal on Computing"},{"key":"425_CR21","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1504\/EJIE.2010.029572","volume":"4","author":"J. M. S. Valente","year":"2010","unstructured":"Valente J. M. S., Shaller J. E. (2010) Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties. European Journal of Industrial Engineering 4: 99\u2013129","journal-title":"European Journal of Industrial Engineering"},{"key":"425_CR22","first-page":"431","volume":"4","author":"J. M. S. Valente","year":"2010","unstructured":"Valente J. M. S. (2010) Heuristics for the single machine scheduling problem with early and quadratic tardy penalties. European Journal Industrial Engineering 4: 431\u2013448","journal-title":"European Journal Industrial Engineering"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-010-0425-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-010-0425-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-010-0425-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:48Z","timestamp":1559254308000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-010-0425-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,7,13]]},"references-count":22,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2012,8]]}},"alternative-id":["425"],"URL":"https:\/\/doi.org\/10.1007\/s10845-010-0425-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,7,13]]}}}