{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,9]],"date-time":"2025-09-09T20:45:13Z","timestamp":1757450713386},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2011,2,2]],"date-time":"2011-02-02T00:00:00Z","timestamp":1296604800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2012,10]]},"DOI":"10.1007\/s10845-011-0505-9","type":"journal-article","created":{"date-parts":[[2011,2,1]],"date-time":"2011-02-01T08:01:35Z","timestamp":1296547295000},"page":"1885-1891","source":"Crossref","is-referenced-by-count":13,"title":["Cyclic scheduling of a robotic flexible cell with load lock and swap"],"prefix":"10.1007","volume":"23","author":[{"given":"Fariborz","family":"Jolai","sequence":"first","affiliation":[]},{"given":"Mehdi","family":"Foumani","sequence":"additional","affiliation":[]},{"given":"Reza","family":"Tavakoli-Moghadam","sequence":"additional","affiliation":[]},{"given":"Parviz","family":"Fattahi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2011,2,2]]},"reference":[{"issue":"3","key":"505_CR1","doi-asserted-by":"crossref","first-page":"334","DOI":"10.1016\/j.dam.2004.02.012","volume":"145","author":"M. S. Akturk","year":"2005","unstructured":"Akturk M. S., Gultekin H., Karasana O. E. (2005) Robotic cell scheduling with operational flexibility. Discrete Applied Mathematics 145(3): 334\u2013348","journal-title":"Discrete Applied Mathematics"},{"key":"505_CR2","volume-title":"Final results on the one-cycle conjecture in robotic cells. Internal note, Laboratories LEIBNIZ, Institute IMAG","author":"N. Brauner","year":"1997","unstructured":"Brauner N., & Finke G. (1997) Final results on the one-cycle conjecture in robotic cells. Internal note, Laboratories LEIBNIZ, Institute IMAG. Grenoble. France"},{"key":"505_CR3","volume-title":"Production management systems","author":"J. Browne","year":"1996","unstructured":"Browne J., Harhen J., Shivnan J. (1996) Production management systems. Addison-Wesley, New York"},{"key":"505_CR4","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1023\/B:JIMS.0000010077.27141.be","volume":"15","author":"F. T. S. Chan","year":"2004","unstructured":"Chan F. T. S., Chan H. K. (2004) A comprehensive survey and future trend of simulation study on FMS scheduling. Journal of Intelligent Manufacturing 15: 87\u2013102","journal-title":"Journal of Intelligent Manufacturing"},{"key":"505_CR5","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1007\/BF01577270","volume":"3","author":"H.-G. Chen","year":"1992","unstructured":"Chen H.-G., Guerrero H. H. (1992) A rule-based robot scheduling system for flexible manufacturing cells. Journal of Intelligent Manufacturing 3: 285\u2013296","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"505_CR6","doi-asserted-by":"crossref","first-page":"952","DOI":"10.1287\/opre.45.6.952","volume":"45","author":"Y. Crama","year":"1997","unstructured":"Crama Y., Van de Klundert J. (1997) Cyclic scheduling of identical parts in a robotic cell. Operations Research 45(6): 952\u2013965","journal-title":"Operations Research"},{"issue":"4","key":"505_CR7","doi-asserted-by":"crossref","first-page":"296","DOI":"10.1287\/msom.4.4.296.5731","volume":"4","author":"M. Dawande","year":"2002","unstructured":"Dawande M., Sriskandarajah C., Sethi S. P. (2002) On throughput maximization in constant travel-time robotic cells. Manufacturing and Service Operations Management 4(4): 296\u2013312","journal-title":"Manufacturing and Service Operations Management"},{"issue":"5","key":"505_CR8","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1007\/s10951-005-2861-9","volume":"8","author":"M. Dawande","year":"2005","unstructured":"Dawande M., Geismar H. N., Sethi S., Sriskandarajah C. (2005) Sequencing and scheduling in robotics cells: Recent developments. Journal of Scheduling 8(5): 387\u2013426","journal-title":"Journal of Scheduling"},{"key":"505_CR9","doi-asserted-by":"crossref","first-page":"598","DOI":"10.1016\/j.ejor.2004.09.019","volume":"171","author":"I. G. Drobouchevitch","year":"2006","unstructured":"Drobouchevitch I. G., Sethi S. P., Sriskandarajah C. (2006) Scheduling dual gripper robotic cell: One-unit cycles. European Journal of Operational Research 171: 598\u2013631","journal-title":"European Journal of Operational Research"},{"key":"505_CR10","doi-asserted-by":"crossref","first-page":"2463","DOI":"10.1016\/j.cor.2005.09.015","volume":"34","author":"H. Gultekin","year":"2007","unstructured":"Gultekin H., Akturk M. S., Karasana O. E. (2007) Scheduling in a three-machine robotic flexible manufacturing cell. Computers & Operations Research 34: 2463\u20132477","journal-title":"Computers & Operations Research"},{"issue":"8","key":"505_CR11","doi-asserted-by":"crossref","first-page":"2105","DOI":"10.1080\/00207540601100262","volume":"46","author":"H. Gultekin","year":"2008","unstructured":"Gultekin H., Akturk M. S., Karasana O. E. (2008) Scheduling in robotic cells: Process flexibility and cell layout. International Journal of Production Research 46(8): 2105\u20132121","journal-title":"International Journal of Production Research"},{"issue":"3","key":"505_CR12","doi-asserted-by":"crossref","first-page":"421","DOI":"10.1287\/opre.45.3.421","volume":"45","author":"N. G. Hall","year":"1997","unstructured":"Hall N. G., Kamoun H., Sriskandarajah C. (1997) Scheduling in robotic cells: Classification, two and three machine cells. Operations Research 45(3): 421\u2013439","journal-title":"Operations Research"},{"key":"505_CR13","doi-asserted-by":"crossref","first-page":"719","DOI":"10.1007\/s10845-008-0160-y","volume":"20","author":"J. Liu","year":"2009","unstructured":"Liu J. (2009) 3D surface reconstruction based trajectory control for a magnetic scattering film plating robot. Journal of Intelligent Manufacturing 20: 719\u2013726","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"4","key":"505_CR14","doi-asserted-by":"crossref","first-page":"403","DOI":"10.1023\/A:1008930403506","volume":"11","author":"M. G. Mehrabi","year":"2000","unstructured":"Mehrabi M. G., Ulsoy G., Koren Y. (2000) Reconfigurable manufacturing systems: Key to future manufacturing. Journal of Intelligent Manufacturing 11(4): 403\u2013409","journal-title":"Journal of Intelligent Manufacturing"},{"key":"505_CR15","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/BF01324886","volume":"4","author":"S. P. Sethi","year":"1992","unstructured":"Sethi S. P., Sriskandarajah C., Sorger G., Blazewicz J., Kubiak W. (1992) Sequencing of parts and robot moves in a robotic cell. International Journal of Flexible Manufacturing Systems 4: 331\u2013358","journal-title":"International Journal of Flexible Manufacturing Systems"},{"key":"505_CR16","doi-asserted-by":"crossref","first-page":"441","DOI":"10.1007\/BF00122834","volume":"7","author":"C. S. Shukla","year":"1996","unstructured":"Shukla C. S., Chen F. F. (1996) The state of the art in intelligent real-time FMS control: A comprehensive survey. Journal of Intelligent Manufacturing 7: 441\u2013455","journal-title":"Journal of Intelligent Manufacturing"},{"key":"505_CR17","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1016\/j.ejor.2003.08.028","volume":"161","author":"A. Soukhal","year":"2005","unstructured":"Soukhal A., Martineau P. (2005) Resolution of a scheduling problem in a flowshop robotic cell. European Journal of Operational Research 161: 62\u201372","journal-title":"European Journal of Operational Research"},{"key":"505_CR18","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1007\/s10845-007-0042-8","volume":"19","author":"N.-C. Wei","year":"2008","unstructured":"Wei N.-C., Mejabi O. O. (2008) A clustering approach for minimizing intercell trips in cell formation. Journal of Intelligent Manufacturing 19: 13\u201320","journal-title":"Journal of Intelligent Manufacturing"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-011-0505-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-011-0505-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-011-0505-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:50Z","timestamp":1559268710000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-011-0505-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,2,2]]},"references-count":18,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2012,10]]}},"alternative-id":["505"],"URL":"https:\/\/doi.org\/10.1007\/s10845-011-0505-9","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,2,2]]}}}