{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T15:04:22Z","timestamp":1725548662878},"reference-count":34,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2011,2,22]],"date-time":"2011-02-22T00:00:00Z","timestamp":1298332800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2012,12]]},"DOI":"10.1007\/s10845-011-0518-4","type":"journal-article","created":{"date-parts":[[2011,2,21]],"date-time":"2011-02-21T05:24:15Z","timestamp":1298265855000},"page":"2069-2084","source":"Crossref","is-referenced-by-count":8,"title":["Probabilistic assessment of loss in revenue generation in demand-driven production"],"prefix":"10.1007","volume":"23","author":[{"given":"Omar K.","family":"Hussain","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tharam","family":"Dillon","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Farookh Khadeer","family":"Hussain","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Elizabeth","family":"Chang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2011,2,22]]},"reference":[{"key":"518_CR1","unstructured":"Agervald, O. (1980). Demand driven manufacturing offers and delivers improvements. Manufacturing and Logistics IT Magazine. Available at: http:\/\/www.logisticsit.com\/absolutenm\/templates\/article-critical.aspx?articleid=480&zoneid=31 ."},{"key":"518_CR2","first-page":"1","volume":"16","author":"A. Alfieri","year":"2010","unstructured":"Alfieri A., Tolio T., Urgo M. (2010) A project scheduling approach to production and material requirement planning in Manufacturing-to-Order environments. Journal of Intelligent Manufacturing 16: 1\u201311","journal-title":"Journal of Intelligent Manufacturing"},{"key":"518_CR3","first-page":"56","volume":"154","author":"B. Berndt","year":"2006","unstructured":"Berndt B. (2006) Accurate planning in a demand-driven world. Quality Control: Manufacturing & Distribution 154: 56\u201358","journal-title":"Quality Control: Manufacturing & Distribution"},{"key":"518_CR4","doi-asserted-by":"crossref","first-page":"686","DOI":"10.1109\/TAC.2004.826721","volume":"49","author":"M. Chen","year":"2004","unstructured":"Chen M., Dubrawski R., Meyn S. P. (2004) Management of demand-driven production systems. IEEE Transactions on Automatic Control 49: 686\u2013698","journal-title":"IEEE Transactions on Automatic Control"},{"key":"518_CR5","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1109\/TPAS.1985.318881","volume":"104","author":"H. Duran","year":"1985","unstructured":"Duran H. (1985) A recursive approach to the cumulant method of calculating reliability and production Cost. IEEE Transactions on Power Apparatus and Systems 104: 82\u201390","journal-title":"IEEE Transactions on Power Apparatus and Systems"},{"key":"518_CR6","unstructured":"Factory Logic Company. (2003). The power of demand driven manufacturing in a down economy (pp. 1\u201311). Factory Logic, Austin."},{"key":"518_CR7","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1007\/BF02096605","volume":"17","author":"B. R. Feiring","year":"2005","unstructured":"Feiring B. R., Sastri T. (2005) A demand-driven method for scheduling optimal smooth production levels. Annals of Operations Research 17: 199\u2013215","journal-title":"Annals of Operations Research"},{"key":"518_CR8","doi-asserted-by":"crossref","first-page":"379","DOI":"10.1007\/s10845-008-0112-6","volume":"20","author":"O. Ghrayeb","year":"2009","unstructured":"Ghrayeb O., Phojanamongkolkij N., Tan B. (2009) A hybrid push\/pull system in assemble-to-order manufacturing environment. Journal of Intelligent Manufacturing 20: 379\u2013387","journal-title":"Journal of Intelligent Manufacturing"},{"key":"518_CR9","volume-title":"Theory of probability, (Vol. 1)","author":"B. V. Gnedenko","year":"1966","unstructured":"Gnedenko B. V. (1966) Theory of probability, (Vol. 1). Chelsea Publishing Company, New York"},{"key":"518_CR10","unstructured":"Hussain, O. K., Chang, E., Hussain, F. K., Dillon T. S. (2007). Towards quantifying the possible risk in e-commerce interactions for RDSS. In: IEEE (Ed.), Proceedings of the IEEE international conference on e-Business engineering (ICEBE\u201907) (pp. 89\u201396). Hong Kong, IEEE."},{"key":"518_CR11","unstructured":"Hussain, O., & Dillon, T. (2010). Cost-benefit analysis to hedge with third-party producers in demand-driven production. Complex intelligent systems and their applications (pp. 69\u201381). Berlin: Springer."},{"key":"518_CR12","first-page":"15","volume":"25","author":"O. K. Hussain","year":"2010","unstructured":"Hussain O. K., Dillon T., Hussain F. K., Chang Elizabeth. (2010) Transactional risk-based decision making system in e-business computing. Computer Systems Science and Engineering 25: 15\u201325","journal-title":"Computer Systems Science and Engineering"},{"key":"518_CR13","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1016\/j.compchemeng.2006.05.035","volume":"31","author":"S. L. Janaka","year":"2007","unstructured":"Janaka S. L., Lina X., Floudas C. A. (2007) A new robust optimization approach for scheduling under uncertainty: II. Uncertainty with known probability distribution. Computers & Chemical Engineering 31: 171\u2013195","journal-title":"Computers & Chemical Engineering"},{"key":"518_CR14","first-page":"1","volume":"16","author":"R. Jardim-Goncalves","year":"2009","unstructured":"Jardim-Goncalves R., Sarraipa J., Agostinho C., Panetto H. (2009) Knowledge framework for intelligent manufacturing systems. Journal of Intelligent Manufacturing 16: 1\u201311","journal-title":"Journal of Intelligent Manufacturing"},{"key":"518_CR15","unstructured":"Johnson, D. C. (1997). Implementing a demand driven production system in an automotive assembly plant (p. 83). Sloan School of Management; Massachusetts Institute of Technology. Department of Mechanical Engineering, M.S. Massachusetts Institute of Technology."},{"key":"518_CR16","volume-title":"The advanced theory of statistics, (Vol. 1)","author":"M. G. Kendall","year":"1969","unstructured":"Kendall M. G., Stuart A. (1969) The advanced theory of statistics, (Vol. 1). Butler & Tanner Ltd, London"},{"key":"518_CR17","first-page":"1","volume":"57","author":"D.-C. Li","year":"2010","unstructured":"Li D.-C., Fang Y.-H., Liu C.-W., Juang C.-j. (2010) Using past manufacturing experience to assist building the yield forecast model for new manufacturing processes. Journal of Intelligent Manufacturing 57: 1\u201312","journal-title":"Journal of Intelligent Manufacturing"},{"key":"518_CR18","doi-asserted-by":"crossref","first-page":"1326","DOI":"10.1109\/59.41682","volume":"4","author":"M. Lin","year":"1986","unstructured":"Lin M., Breipohl A., Lee F. (1986) Comparison of probabilistic production cost simulation methods. IEEE Transactions on Power Systems 4: 1326\u20131334","journal-title":"IEEE Transactions on Power Systems"},{"key":"518_CR19","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1016\/j.ijpe.2006.09.015","volume":"107","author":"E. Mohebbi","year":"2007","unstructured":"Mohebbi E., Choobineh F., Pattanayak A. (2007) Capacity-driven vs. demand-driven material procurement systems. International Journal of Production Economics 107: 451\u2013466","journal-title":"International Journal of Production Economics"},{"key":"518_CR20","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1080\/10864415.2002.11044249","volume":"6","author":"W. Oh","year":"2002","unstructured":"Oh W. (2002) C2C versus B2C: A comparison of the winner\u2019s curse in two types of electronic auctions. International Journal of Electronic Commerce 6: 115\u2013138","journal-title":"International Journal of Electronic Commerce"},{"key":"518_CR21","doi-asserted-by":"crossref","first-page":"3023","DOI":"10.1080\/002075497194273","volume":"35","author":"M.M. Qiu","year":"1997","unstructured":"Qiu M.M., Burch E.E. (1997) Hierarchical production planning and scheduling in a multiproduct, multi-machine environment. International Journal of Production Research 35: 3023\u20133042","journal-title":"International Journal of Production Research"},{"key":"518_CR22","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1016\/0142-0615(86)90025-6","volume":"8","author":"L. A. Sanabria","year":"1986","unstructured":"Sanabria L. A., Dillon T. S. (1986) Stochastic power flow using cumulants and Von Mises functions. International Journal of Electrical Power & Energy Systems 8: 47\u201360","journal-title":"International Journal of Electrical Power & Energy Systems"},{"key":"518_CR23","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1109\/59.43185","volume":"3","author":"L. A. Sanabria","year":"1988","unstructured":"Sanabria L. A., Dillon T. S. (1988) An error correction algorithm for stochastic production costing. IEEE Transactions on Power Systems 3: 94\u2013100","journal-title":"IEEE Transactions on Power Systems"},{"key":"518_CR24","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1016\/S0142-0615(97)00050-1","volume":"20","author":"L. A. Sanabria","year":"1998","unstructured":"Sanabria L. A., Dillon T. S. (1998) Power system reliability assessment suitable for a deregulated system via the method of cumulants. International Journal of Electrical Power & Energy Systems 20: 203\u2013211","journal-title":"International Journal of Electrical Power & Energy Systems"},{"key":"518_CR25","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1023\/B:ANOR.0000011192.23903.7f","volume":"125","author":"B. Tan","year":"2004","unstructured":"Tan B., Gershwin S. B. (2004) Production and subcontracting strategies for manufacturers with limited capacity and volatile demand. Annals of Operations Research 125: 205\u2013232","journal-title":"Annals of Operations Research"},{"key":"518_CR26","unstructured":"Tony, S. (2004). History repeated as Apple slams CPU supplier. http:\/\/www.theregister.co.uk\/2004\/07\/15\/apple_cpu_grumbles\/ ."},{"key":"518_CR27","doi-asserted-by":"crossref","first-page":"769","DOI":"10.1016\/S0272-6963(02)00039-6","volume":"20","author":"H. Van Landeghem","year":"2002","unstructured":"Van Landeghem H., Vanmaele H. (2002) Robust planning: A new paradigm for demand chain planning. Journal of Operations Management 20: 769\u2013783","journal-title":"Journal of Operations Management"},{"key":"518_CR28","doi-asserted-by":"crossref","first-page":"978","DOI":"10.1109\/T-PAS.1977.32411","volume":"96","author":"J. Vardi","year":"1976","unstructured":"Vardi J., Zahavi J., Avi-Itzhak B. (1976) The combined load duration curve and its derivation. IEEE Transactions on Power Apparatus and Systems 96: 978\u2013983","journal-title":"IEEE Transactions on Power Apparatus and Systems"},{"key":"518_CR29","volume-title":"Probability and statistics for engineers and scientists","author":"R.E. Walpole","year":"2001","unstructured":"Walpole R.E., Myers R.H., Myers S.L. (2001) Probability and statistics for engineers and scientists. New Jersey, Prentice Hall"},{"key":"518_CR30","volume-title":"A course in probability","author":"N. A. Weiss","year":"2005","unstructured":"Weiss N. A., Holmes P. T., Hardy M. (2005) A course in probability. Addison-Wesley, Massachusetts"},{"key":"518_CR31","doi-asserted-by":"crossref","first-page":"471","DOI":"10.1007\/s00291-005-0203-0","volume":"27","author":"I. Y\u0131ld\u0131r\u0131m","year":"2005","unstructured":"Y\u0131ld\u0131r\u0131m I., Bar\u0131\u015f T., Karaesmen F. (2005) A multiperiod stochastic production planning and sourcing problem with service level constraints. OR Spectrum 27: 471\u2013489","journal-title":"OR Spectrum"},{"issue":"57","key":"518_CR32","doi-asserted-by":"crossref","first-page":"699","DOI":"10.1016\/S0925-5273(97)00080-7","volume":"56","author":"G. Z\u00e4pfel","year":"1998","unstructured":"Z\u00e4pfel G. (1998) Customer-order-driven production: An economical concept for responding to demand uncertainty. International Journal of Production Economics 56(57): 699\u2013709","journal-title":"International Journal of Production Economics"},{"key":"518_CR33","doi-asserted-by":"crossref","first-page":"676","DOI":"10.1109\/TPWRS.2003.818743","volume":"19","author":"P. Zhang","year":"2004","unstructured":"Zhang P., Lee S. T. (2004) Probabilistic load flow computation using the method of combined cumulants and Gram-Charlier expansion. IEEE Transactions on Power Systems 19: 676\u2013682","journal-title":"IEEE Transactions on Power Systems"},{"key":"518_CR34","doi-asserted-by":"crossref","first-page":"668","DOI":"10.1108\/01443570610666993","volume":"26","author":"X. Zhang","year":"2006","unstructured":"Zhang X., Chen R. (2006) Forecast-driven or customer-order-driven? An empirical analysis of the Chinese automotive industry. International Journal of Operations & Production Management 26: 668\u2013688","journal-title":"International Journal of Operations & Production Management"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-011-0518-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-011-0518-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-011-0518-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,8]],"date-time":"2019-06-08T17:48:08Z","timestamp":1560016088000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-011-0518-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,2,22]]},"references-count":34,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2012,12]]}},"alternative-id":["518"],"URL":"https:\/\/doi.org\/10.1007\/s10845-011-0518-4","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,2,22]]}}}