{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,17]],"date-time":"2025-10-17T13:41:08Z","timestamp":1760708468115},"reference-count":21,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2011,4,12]],"date-time":"2011-04-12T00:00:00Z","timestamp":1302566400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2012,10]]},"DOI":"10.1007\/s10845-011-0531-7","type":"journal-article","created":{"date-parts":[[2012,9,13]],"date-time":"2012-09-13T07:22:05Z","timestamp":1347520925000},"page":"2047-2056","source":"Crossref","is-referenced-by-count":21,"title":["The heuristic preemptive dispatching method of material transportation system in 300\u00a0mm semiconductor fabrication"],"prefix":"10.1007","volume":"23","author":[{"given":"Chia-Nan","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Li-Chin","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2011,4,12]]},"reference":[{"key":"531_CR1","unstructured":"Bahri, N., Reiss, J., & Doherty, B. (2001). Comparison of unified vs. segregated automated material handling. In Proceedings of IEEE international symposium on semiconductor manufacturing (pp. 3\u20136)."},{"issue":"1","key":"531_CR2","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1007\/s10845-008-0203-4","volume":"21","author":"R. Bart\u00e1k","year":"2010","unstructured":"Bart\u00e1k R., Salido M. A., Rossi F. (2010) Constraint satisfaction techniques in planning and scheduling. Journal of Intelligent Manufacturing 21(1): 5\u201315","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"531_CR3","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/j.ijpe.2008.12.026","volume":"122","author":"S. S. Chakravorty","year":"2009","unstructured":"Chakravorty S. S. (2009) Improving distribution operations: Implementation of material handling systems. International Journal of Production Economics 122(1): 89\u2013106","journal-title":"International Journal of Production Economics"},{"issue":"6","key":"531_CR4","doi-asserted-by":"crossref","first-page":"1688","DOI":"10.1016\/j.cor.2005.07.004","volume":"34","author":"A. I. Corr\u00e9a","year":"2007","unstructured":"Corr\u00e9a A. I., Andr\u00e9 L., Rousseau L. M. (2007) Scheduling and routing of automated guided vehicles: A hybrid approach. Computers and Operations Research 34(6): 1688\u20131707","journal-title":"Computers and Operations Research"},{"key":"531_CR5","unstructured":"Duncan, J. E. (2002). Factory-wide integration of the 300\u00a0mm automated material handling system with wafer processing. In Proceedings of IEEE international symposium on semiconductor manufacturing conference (pp. 513\u2013516)."},{"key":"531_CR6","unstructured":"Flexsim. (2009). http:\/\/www.flexsim.com\/ ."},{"key":"531_CR7","unstructured":"Gartland, K. (1999). Automated material handling system (AMHS) framework user requirements document: Version 1.0, International SEMATECH."},{"issue":"12\u201313","key":"531_CR8","doi-asserted-by":"crossref","first-page":"1671","DOI":"10.1016\/j.ijmachtools.2005.08.017","volume":"46","author":"A. K. Gupta","year":"2006","unstructured":"Gupta A. K., Sivakumar A. I. (2006) Optimization of due-date objectives in scheduling semiconductor batch manufacturing. International Journal of Machine Tools and Manufacture 46(12\u201313): 1671\u20131679","journal-title":"International Journal of Machine Tools and Manufacture"},{"issue":"4","key":"531_CR9","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1016\/j.rcim.2006.05.004","volume":"23","author":"S. Kong","year":"2007","unstructured":"Kong S. (2007) Two-step simulation method for automatic material handling system of semiconductor fab. Robotics and Computer-Integrated Manufacturing 23(4): 409\u2013420","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"issue":"2","key":"531_CR10","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1007\/s001700200137","volume":"20","author":"C. Kuo","year":"2002","unstructured":"Kuo C. (2002) Modeling and performance evaluation of an overhead hoist Transport system in a 300\u00a0mm fabrication plant. International Journal of Advanced Manufacturing Technology 20(2): 153\u2013161","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"531_CR11","doi-asserted-by":"crossref","first-page":"866","DOI":"10.1016\/j.cor.2007.11.006","volume":"36","author":"Y. Lee","year":"2009","unstructured":"Lee Y., Jiang Z., Liu H. (2009) Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system. Computers and Operations Research 36(3): 866\u2013884","journal-title":"Computers and Operations Research"},{"key":"531_CR12","unstructured":"Liao, D., & Fu, H. (2002). Dynamic OHT allocation and dispatching in large-scale 300\u00a0mm AMHS management. In Proceedings of international conference on robotics and automation (pp. 3630\u20133636)."},{"issue":"9\u201310","key":"531_CR13","doi-asserted-by":"crossref","first-page":"890","DOI":"10.1007\/s00170-005-2610-4","volume":"29","author":"D. Liao","year":"2006","unstructured":"Liao D., Wang C. (2006) Differentiated preemptive dispatching for automatic materials handling services in 300\u00a0mm semiconductor foundry. International Journal of Advanced Manufacturing Technology 29(9\u201310): 890\u2013896","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"531_CR14","doi-asserted-by":"crossref","first-page":"529","DOI":"10.1080\/0020754021000042418","volume":"41","author":"J. Lin","year":"2003","unstructured":"Lin J., Wang F., Wu C. (2003a) Connecting transport AMHS in a wafer fab. International Journal of Production Research 41(3): 529\u2013544","journal-title":"International Journal of Production Research"},{"issue":"3","key":"531_CR15","doi-asserted-by":"crossref","first-page":"555","DOI":"10.1109\/TSM.2003.815211","volume":"16","author":"J. Lin","year":"2003","unstructured":"Lin J., Wang F., Wu C. (2003b) Simulation analysis of the connecting transport AMHS in a wafer fab. IEEE Transactions on Semiconductor Manufacturing 16(3): 555\u2013564","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"1","key":"531_CR16","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1016\/j.rcim.2005.02.003","volume":"22","author":"J. Lin","year":"2006","unstructured":"Lin J., Wang F., Chang Y. (2006) A hybrid push\/pull-dispatching rule for a photobay in a 300\u00a0mm wafer fab. Robotics and Computer-Integrated Manufacturing 22(1): 47\u201355","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"issue":"8","key":"531_CR17","doi-asserted-by":"crossref","first-page":"2387","DOI":"10.1016\/j.cor.2008.09.006","volume":"36","author":"B. Mourad","year":"2009","unstructured":"Mourad B., Amina H. (2009) Preemptive scheduling in the presence of transportation times. Computers and Operations Research 36(8): 2387\u20132393","journal-title":"Computers and Operations Research"},{"issue":"1\u20132","key":"531_CR18","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1016\/j.ijpe.2007.02.020","volume":"110","author":"A. Persona","year":"2007","unstructured":"Persona A., Battini D., Manzini R., Pareschi A. (2007) Optimal safety stock levels of subassemblies and manufacturing components. International Journal of Production Economics 110(1\u20132): 147\u2013159","journal-title":"International Journal of Production Economics"},{"key":"531_CR19","unstructured":"Pillai, D., & Srinivasan, S. (1997). Material handling automation\u2014 trends, vision, and future plans. In Proceedings of IEEE\/SEMI international symposium on semiconductor manufacturing (pp. 251\u2013254)."},{"key":"531_CR20","unstructured":"Roland, W., Christian, F., & Fabian, B. (2008). Martin K. Improved Empty Vehicle Balancing in Automated Material Handling Systems. In Proceedings of international conference on computer modeling and simulation (pp. 732\u2013733)."},{"issue":"1","key":"531_CR21","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1007\/s10845-008-0176-3","volume":"21","author":"G. Verfaillie","year":"2010","unstructured":"Verfaillie G., Pralet C., Lema\u00eetre M. (2010) Constraint-based modeling of discrete event dynamic systems. Journal of Intelligent Manufacturing 21(1): 31\u201347","journal-title":"Journal of Intelligent Manufacturing"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-011-0531-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-011-0531-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-011-0531-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:51Z","timestamp":1559268711000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-011-0531-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,4,12]]},"references-count":21,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2012,10]]}},"alternative-id":["531"],"URL":"https:\/\/doi.org\/10.1007\/s10845-011-0531-7","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,4,12]]}}}