{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,2,10]],"date-time":"2023-02-10T12:53:57Z","timestamp":1676033637059},"reference-count":33,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2011,12,21]],"date-time":"2011-12-21T00:00:00Z","timestamp":1324425600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2013,6]]},"DOI":"10.1007\/s10845-011-0605-6","type":"journal-article","created":{"date-parts":[[2011,12,20]],"date-time":"2011-12-20T19:15:02Z","timestamp":1324408502000},"page":"625-639","source":"Crossref","is-referenced-by-count":6,"title":["An analogy based estimation framework for design rework efforts"],"prefix":"10.1007","volume":"24","author":[{"given":"Panumas","family":"Arundacahawat","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Rajkumar","family":"Roy","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ahmed","family":"Al-Ashaab","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2011,12,21]]},"reference":[{"key":"605_CR1","unstructured":"Arundachawat, P., Roy, R., Al-Ashaab, A., & Shehab, E. (2009). Design rework prediction in concurrent design environment: Current trends and future research directions, CIRP design."},{"key":"605_CR2","unstructured":"Ballard, G. (2000). Positive VS negative iteration in design, In Proceedings of the international group for lean construction 8th annual conference (IGLC-8). Brighton, UK."},{"key":"605_CR3","unstructured":"Bashire, H. A. (2000). Models for estimating design effort. PhD Thesis, Canada: McGill University."},{"key":"605_CR4","first-page":"61","volume-title":"Cost management a strategic emphasis","author":"E. J. Blocher","year":"2005","unstructured":"Blocher E. J., Chen K. H., Cokins G., Lin T. W. (2005) Cost management a strategic emphasis. McGrawhill, New York, p 61"},{"key":"605_CR5","doi-asserted-by":"crossref","first-page":"829","DOI":"10.1080\/01446190600658529","volume":"24","author":"S. M. Bogus","year":"2006","unstructured":"Bogus S. M., Molenaar K. R., Deikmann J. E. (2006) Strategies for overlapping dependent design activities. Journal of Construction Management and Economics 24: 829\u2013837","journal-title":"Journal of Construction Management and Economics"},{"issue":"3","key":"605_CR6","doi-asserted-by":"crossref","first-page":"292","DOI":"10.1109\/17.946528","volume":"48","author":"T. Browning","year":"2001","unstructured":"Browning T. (2001) Applying the design structure matrix to system decomposition and integration problems: A review and new directions. IEEE Transaction on Engineering Management 48(3): 292\u2013306","journal-title":"IEEE Transaction on Engineering Management"},{"issue":"4","key":"605_CR7","doi-asserted-by":"crossref","first-page":"428","DOI":"10.1109\/TEM.2002.806709","volume":"49","author":"T. Browning","year":"2002","unstructured":"Browning T., Eppinger S. D. (2002) Modelling impacts of process architecture on cost and schedule risk in product development. IEEE Transaction on Engineering Management 49(4): 428\u2013441","journal-title":"IEEE Transaction on Engineering Management"},{"issue":"6","key":"605_CR8","doi-asserted-by":"crossref","first-page":"731","DOI":"10.1023\/B:JIMS.0000042660.77571.81","volume":"15","author":"G. B\u00fcy\u00fck\u00f6zkan","year":"2004","unstructured":"B\u00fcy\u00fck\u00f6zkan G., Dereli T., Baykasoglu A. (2004) A survey on the methods and tools of concurrent new product development and agile manufacturing. Journal of Intelligent Manufacturing 15(6): 731\u2013751","journal-title":"Journal of Intelligent Manufacturing"},{"key":"605_CR9","doi-asserted-by":"crossref","first-page":"392","DOI":"10.1016\/S0377-2217(00)00264-2","volume":"134","author":"A. Chakravarty","year":"2001","unstructured":"Chakravarty A. (2001) Overlapping design and build cycles in product development. European Journal of Operation Research 134: 392\u2013424","journal-title":"European Journal of Operation Research"},{"key":"605_CR10","unstructured":"Cho, S. H., & Eppinger, S. D. (2001). Product development process modelling using advanced simulation. In Proceedings of ASME 2001 design engineering technical conferences."},{"key":"605_CR11","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1016\/0923-4748(89)90013-1","volume":"6","author":"K. B. Clark","year":"1989","unstructured":"Clark K. B., Fujimoto T. (1989) Lead time in automobile product development explaining the Japanese advantage. Journal of Engineering and Technology Management 6: 25\u201360","journal-title":"Journal of Engineering and Technology Management"},{"issue":"1","key":"605_CR12","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1111\/j.1540-5915.1999.tb01599.x","volume":"30","author":"G. M. Hoedemaker","year":"1999","unstructured":"Hoedemaker G. M., Blackburn J. D., Wassenhove L. N. V. (1999) Limits to concurrency. Journal of Decision Sciences 30(1): 1\u201317","journal-title":"Journal of Decision Sciences"},{"issue":"12","key":"605_CR13","doi-asserted-by":"crossref","first-page":"1605","DOI":"10.1287\/mnsc.47.12.1605.10240","volume":"47","author":"N. R. Joglekar","year":"2001","unstructured":"Joglekar N. R., Yassine A. A., Eppinger S. D., Whitney D. E. (2001) Performance of coupled product development activities with a deadline. Management Science, 47(12): 1605\u20131620","journal-title":"Management Science,"},{"issue":"3","key":"605_CR14","doi-asserted-by":"crossref","first-page":"336","DOI":"10.1109\/TEM.2005.850740","volume":"52","author":"H. B. Jun","year":"2005","unstructured":"Jun H. B., Ahn H. S., Suh H. W. (2005) On identifying and estimating the cycle time of product development process. IEEE Transaction on Engineering Management 52(3): 336\u2013349","journal-title":"IEEE Transaction on Engineering Management"},{"issue":"4","key":"605_CR15","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1023\/A:1016092808320","volume":"13","author":"J.-Y. Jung","year":"2002","unstructured":"Jung J.-Y. (2002) Manufacturing cost estimation for machined parts based on manufacturing features. Journal of Intelligent Manufacturing 13(4): 227\u2013238","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"4","key":"605_CR16","doi-asserted-by":"crossref","first-page":"437","DOI":"10.1287\/mnsc.43.4.437","volume":"43","author":"V. Krishnan","year":"1997","unstructured":"Krishnan V., Eppinger S. D., Whitney D. E. (1997) A model-based framework to overlap product development activities. Journal of Management Science 43(4): 437\u2013451","journal-title":"Journal of Management Science"},{"issue":"8","key":"605_CR17","doi-asserted-by":"crossref","first-page":"1032","DOI":"10.1287\/mnsc.44.8.1032","volume":"44","author":"C. H. Loch","year":"1998","unstructured":"Loch C. H., Terwiesch C. (1998) Communication and uncertainty in concurrent engineering. Management Science, 44(8): 1032\u20131048","journal-title":"Management Science,"},{"issue":"3","key":"605_CR18","doi-asserted-by":"crossref","first-page":"375","DOI":"10.1287\/mnsc.1060.0641","volume":"53","author":"V. L. Mitchell","year":"2007","unstructured":"Mitchell V. L., Nault B. R. (2007) Cooperation planning, uncertainty, and managerial control in concurrent design. Journal of Management Science 53(3): 375\u2013389","journal-title":"Journal of Management Science"},{"key":"605_CR19","volume-title":"Quantitative analysis for management","author":"B. Render","year":"2000","unstructured":"Render B., Stair R. M. (2000) Quantitative analysis for management. Prentice Hall International Inc, Englewood Cliffs NJ"},{"issue":"6","key":"605_CR20","doi-asserted-by":"crossref","first-page":"860","DOI":"10.1287\/opre.48.6.858.12396","volume":"48","author":"T. A. Roemer","year":"2000","unstructured":"Roemer T. A., Ahmadi R., Wang R. (2000) Time-cost tradeoffs in overlapped product development. Journal of Operation Research 48(6): 860\u2013865","journal-title":"Journal of Operation Research"},{"issue":"4","key":"605_CR21","doi-asserted-by":"crossref","first-page":"606","DOI":"10.1287\/opre.1040.0125","volume":"52","author":"T. A. Roemer","year":"2004","unstructured":"Roemer T. A., Ahmadi R. (2004) Concurrent crashing and overlapping in product development. Journal of Operations Research 52(4): 606\u2013622","journal-title":"Journal of Operations Research"},{"key":"605_CR22","volume-title":"Fundamentals of decision making and priority theory with the analytic Hierachy process","author":"T. L. Saaty","year":"2006","unstructured":"Saaty T. L. (2006) Fundamentals of decision making and priority theory with the analytic Hierachy process. RWS Publication, Pittsburgh, PA"},{"issue":"3","key":"605_CR23","doi-asserted-by":"crossref","first-page":"276","DOI":"10.1287\/mnsc.43.3.276","volume":"43","author":"R. P. Smith","year":"1997","unstructured":"Smith R. P., Eppinger S. D. (1997) Identifying controlling features of engineering design iteration. Journal of Management Science 43(3): 276\u2013293","journal-title":"Journal of Management Science"},{"key":"605_CR24","volume-title":"Cost estimating","author":"R. D. Stewart","year":"1991","unstructured":"Stewart R. D. (1991) Cost estimating. Wiley, NY"},{"key":"605_CR25","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1115\/1.1862678","volume":"127","author":"R. B. Stone","year":"2005","unstructured":"Stone R. B., Tumer I. Y., Wie M. V. (2005) The function-failure design method. Journal of Mechanical Design 127: 397\u2013407","journal-title":"Journal of Mechanical Design"},{"issue":"4","key":"605_CR26","doi-asserted-by":"crossref","first-page":"402","DOI":"10.1287\/orsc.13.4.402.2948","volume":"13","author":"C. H. Terwiesch","year":"2002","unstructured":"Terwiesch C. H., Loch C. H., Meyer A. D. (2002) Exchanging preliminary information in concurrent engineering: Alternative coordination strategies. Journal of Organization Science 13(4): 402\u2013421","journal-title":"Journal of Organization Science"},{"issue":"1","key":"605_CR27","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1109\/TEM.2004.839965","volume":"52","author":"Z. Wang","year":"2005","unstructured":"Wang Z., Yan H. S. (2005) Optimising the concurrency for a group of design activities. IEEE Transactions on Engineering Management 52(1): 102\u2013118","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"7","key":"605_CR28","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1108\/09576060310491928","volume":"14","author":"R. Xiao","year":"2003","unstructured":"Xiao R., Si S. (2003) Research on the process model of product development with uncertainty based on activity overlapping. Journal of Integrated Manufacturing Systems, 14(7): 567\u2013574","journal-title":"Journal of Integrated Manufacturing Systems,"},{"key":"605_CR29","doi-asserted-by":"crossref","first-page":"139","DOI":"10.1016\/S0166-3615(01)00120-8","volume":"46","author":"J. H. Yan","year":"2001","unstructured":"Yan J. H., Wu C. (2001) Scheduling approach for concurrent product development processes. Journal of Computers in Industry 46: 139\u2013147","journal-title":"Journal of Computers in Industry"},{"issue":"2","key":"605_CR30","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1177\/1063293X02010002053","volume":"10","author":"H. S. Yan","year":"2002","unstructured":"Yan H. S., Wang Z., Jiang M. (2002) A quantitative approach to the process modelling and planing in concurrent engineering. Journal of Concurrent Engineering: Research and Application 10(2): 97\u2013111","journal-title":"Journal of Concurrent Engineering: Research and Application"},{"issue":"2","key":"605_CR31","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1109\/17.759142","volume":"46","author":"A. A. Yassine","year":"1999","unstructured":"Yassine A. A., Chelst K. R., Falkenburg D. R. (1999) A decision analytic framework for evaluating concurrent engineering. IEEE Transactions on Engineering Management 46(2): 144\u2013157","journal-title":"IEEE Transactions on Engineering Management"},{"key":"605_CR32","unstructured":"Yassine, A. A., Whitney, D. E., & Zambito, T. (2001). Assessment of rework probabilities for simulating product development processes using the design structure matrix. ASME 2001 international design engineering technical conferences, computers and information in engineering conferences, Pittsburgh, Pennsylvania."},{"issue":"1","key":"605_CR33","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1016\/j.ejor.2006.10.042","volume":"184","author":"A. A. Yassine","year":"2008","unstructured":"Yassine A. A., Sreenivas R. S., Zhu J. (2008) Managing the exchange of information in product development. European Journal of Operational Research 184(1): 311\u2013326","journal-title":"European Journal of Operational Research"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-011-0605-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-011-0605-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-011-0605-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:53Z","timestamp":1559268713000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-011-0605-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,12,21]]},"references-count":33,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2013,6]]}},"alternative-id":["605"],"URL":"https:\/\/doi.org\/10.1007\/s10845-011-0605-6","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,12,21]]}}}