{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,27]],"date-time":"2025-10-27T20:35:35Z","timestamp":1761597335307},"reference-count":38,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2012,3,14]],"date-time":"2012-03-14T00:00:00Z","timestamp":1331683200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2013,8]]},"DOI":"10.1007\/s10845-012-0634-9","type":"journal-article","created":{"date-parts":[[2012,3,13]],"date-time":"2012-03-13T07:51:55Z","timestamp":1331625115000},"page":"847-872","source":"Crossref","is-referenced-by-count":16,"title":["A capacity allocation and expansion model for TFT-LCD multi-site manufacturing"],"prefix":"10.1007","volume":"24","author":[{"given":"Tzu-Li","family":"Chen","sequence":"first","affiliation":[]},{"given":"Yin-Yann","family":"Chen","sequence":"additional","affiliation":[]},{"given":"Hao-Chun","family":"Lu","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2012,3,14]]},"reference":[{"issue":"15","key":"634_CR1","doi-asserted-by":"crossref","first-page":"3359","DOI":"10.1080\/002075499190095","volume":"37","author":"J. F. Bard","year":"1999","unstructured":"Bard J. F., Srinivasan K., Tirupati D. (1999) An optimization approach to capacity expansion in semiconductor manufacturing facilities. International Journal of Production Research 37(15): 3359\u20133382","journal-title":"International Journal of Production Research"},{"issue":"5","key":"634_CR2","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1287\/inte.29.5.31","volume":"29","author":"S. Bermon","year":"1999","unstructured":"Bermon S., Hood S. J. (1999) Capacity optimization planning system. Interface 29(5): 31\u201350","journal-title":"Interface"},{"key":"634_CR3","volume-title":"Introduction to stochastic programming","author":"J. R. Birge","year":"1997","unstructured":"Birge J. R., Louveaus F. (1997) Introduction to stochastic programming. Springer, New York"},{"key":"634_CR4","doi-asserted-by":"crossref","first-page":"1349","DOI":"10.1016\/S0305-0548(02)00075-8","volume":"30","author":"B. Catay","year":"2003","unstructured":"Catay B., Erenguc S. S., Vakharia A. J. (2003) Tool capacity planning in semiconductor manufacturing. Computers and Operations Research 30: 1349\u20131366","journal-title":"Computers and Operations Research"},{"key":"634_CR5","doi-asserted-by":"crossref","unstructured":"Chen, C.-F., & Zheng, J.-N. (2011). Mini\u2013max regret strategy for robust capacity expansion decisions in semiconductor manufacturing. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-011-0561-1 .","DOI":"10.1007\/s10845-011-0561-1"},{"issue":"1","key":"634_CR6","doi-asserted-by":"crossref","first-page":"209","DOI":"10.3934\/jimo.2010.6.209","volume":"6","author":"T. L. Chen","year":"2010","unstructured":"Chen T. L., Lin J. T., Fang S. C. (2010) A shadow-price based heuristic for capacity planning of TFT-LCD manufacturing. Journal of Industrial and Management Optimization 6(1): 209\u2013239","journal-title":"Journal of Industrial and Management Optimization"},{"issue":"2","key":"634_CR7","first-page":"131","volume":"34","author":"R. M. E. Christie","year":"2002","unstructured":"Christie R. M. E., Wu S. D. (2002) Semiconductor capacity planning: Stochastic modeling and computational studies. IIE Transactions 34(2): 131\u2013143","journal-title":"IIE Transactions"},{"issue":"3","key":"634_CR8","doi-asserted-by":"crossref","first-page":"899","DOI":"10.1016\/j.ejor.2008.09.029","volume":"198","author":"N. Geng","year":"2009","unstructured":"Geng N., Jiang Z., Feng C. (2009) Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand and capacity. European Journal of Operational Research 198(3): 899\u2013908","journal-title":"European Journal of Operational Research"},{"issue":"13","key":"634_CR9","doi-asserted-by":"crossref","first-page":"3639","DOI":"10.1080\/00207540701871051","volume":"47","author":"N. Geng","year":"2009","unstructured":"Geng N., Jiang Z. (2009) A review on strategic capacity planning for the semiconductor manufacturing industry. International Journal of Production Research 47(13): 3639\u20133655","journal-title":"International Journal of Production Research"},{"issue":"2","key":"634_CR10","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1109\/TSM.2003.811894","volume":"16","author":"S. J. Hood","year":"2003","unstructured":"Hood S. J., Bermon S., Barahona F. (2003) Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing 16(2): 273\u2013280","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"634_CR11","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1016\/S0360-8352(02)00064-5","volume":"43","author":"B. Jeong","year":"2002","unstructured":"Jeong B., Sim S., Jeong H., Kim S. (2002) An available-to-promise system for TFT LCD manufacturing in supply chain. Computers & Industrial Engineering 43: 191\u2013212","journal-title":"Computers & Industrial Engineering"},{"key":"634_CR12","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/S0360-8352(01)00041-9","volume":"41","author":"B. Jeong","year":"2001","unstructured":"Jeong B., Kim S., Lee Y. (2001) An assembly scheduler for TFT LCD manufacturing. Computers & Industrial Engineering 41: 37\u201358","journal-title":"Computers & Industrial Engineering"},{"issue":"6","key":"634_CR13","doi-asserted-by":"crossref","first-page":"839","DOI":"10.1287\/opre.51.6.839.24917","volume":"51","author":"S. Karabuk","year":"2003","unstructured":"Karabuk S., Wu S. D. (2003) Coordinating strategic capacity planning in the semiconductor industry. Operations Research 51(6): 839\u2013849","journal-title":"Operations Research"},{"key":"634_CR14","doi-asserted-by":"crossref","first-page":"707","DOI":"10.1016\/j.compchemeng.2004.02.012","volume":"28","author":"A. A. Levis","year":"2004","unstructured":"Levis A. A., Papageorgiou L. (2004) A hierarchical solution approach for multi-site capacity planning under uncertainty in the pharmaceutical industry. Computers and Chemical Engineering 28: 707\u2013725","journal-title":"Computers and Chemical Engineering"},{"key":"634_CR15","first-page":"62","volume":"3950","author":"M. Lhlwan","year":"2005","unstructured":"Lhlwan M., Hall K. (2005) War of the screens. Business Week 3950: 62","journal-title":"Business Week"},{"key":"634_CR16","doi-asserted-by":"crossref","first-page":"1031","DOI":"10.1007\/s00170-006-0537-z","volume":"33","author":"J. T. Lin","year":"2007","unstructured":"Lin J. T., Chen Y. Y. (2007) A multi-site supply network planning problem considering variable time buckets\u2014A TFT-LCD industry case. International Journal of Advanced Manufacturing Technology 33: 1031\u20131044","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"634_CR17","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/j.rcim.2006.10.006","volume":"24","author":"J. T. Lin","year":"2008","unstructured":"Lin J. T., Wang F. K., Peng C. C. (2008) Lot release times and dispatching rule for a TFT-LCD cell process. Robotics and Computer-Integrated Manufacturing 24(2): 228\u2013238","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"634_CR18","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1021\/ie990870t","volume":"40","author":"L. G. Papageorgiou","year":"2001","unstructured":"Papageorgiou L. G., Rotstein G. E., Shah N. (2001) Strategic supply chain optimization for the pharmaceutical industries. Industrial & Engineering Chemistry Research 40: 275\u2013286","journal-title":"Industrial & Engineering Chemistry Research"},{"issue":"2","key":"634_CR19","doi-asserted-by":"crossref","first-page":"322","DOI":"10.1016\/j.ijpe.2009.11.006","volume":"134","author":"A. P. Rastogi","year":"2011","unstructured":"Rastogi A. P., Fowler J. W., Carlyle W. M., Araz O. M., B\u00fcke B. (2011) Supply network capacity planning for semiconductor manufacturing with uncertain demand and correlation in demand considerations. International Journal of Production Economics 134(2): 322\u2013332","journal-title":"International Journal of Production Economics"},{"key":"634_CR20","doi-asserted-by":"crossref","DOI":"10.1137\/1.9780898718751","volume-title":"Lectures on stochastic programming: Modeling and theory","author":"A. Shapiro","year":"2009","unstructured":"Shapiro A., Dentcheva D., Ruszczy\u0144ski A. (2009) Lectures on stochastic programming: Modeling and theory. SIAM, Philadelphia"},{"key":"634_CR21","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1243\/09544054JEM679","volume":"221","author":"S. Sharma","year":"2007","unstructured":"Sharma S. (2007) Interchange of the holding\/shortage costs in multiproduct manufacture. Journal of Engineering Manufacture 221: 135\u2013140","journal-title":"Journal of Engineering Manufacture"},{"key":"634_CR22","doi-asserted-by":"crossref","first-page":"128","DOI":"10.1016\/j.ejor.2007.01.013","volume":"186","author":"S. Sharma","year":"2008","unstructured":"Sharma S. (2008a) Theory of exchange. European Journal of Operational Research 186: 128\u2013136","journal-title":"European Journal of Operational Research"},{"key":"634_CR23","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1016\/j.ejor.2007.06.016","volume":"190","author":"S. Sharma","year":"2008","unstructured":"Sharma S. (2008b) On the flexibility of demand and production rate. European Journal of Operational Research 190: 557\u2013 561","journal-title":"European Journal of Operational Research"},{"key":"634_CR24","doi-asserted-by":"crossref","first-page":"1252","DOI":"10.1007\/s00170-007-0926-y","volume":"36","author":"S. Sharma","year":"2008","unstructured":"Sharma S. (2008c) A modification for the carrying cost estimation with respect to the flexibility in production rate. International Journal of Advanced Manufacturing Technology 36: 1252\u20131260","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"634_CR25","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1007\/s00170-008-1370-3","volume":"40","author":"S. Sharma","year":"2009","unstructured":"Sharma S. (2009a) Single\/multiple parameter swapping in the context of Sanjay Sharma\u2019s Theory of Exchange. International Journal of Advanced Manufacturing Technology 40: 629\u2013635","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"634_CR26","doi-asserted-by":"crossref","first-page":"382","DOI":"10.1007\/s00170-009-1959-1","volume":"45","author":"S. Sharma","year":"2009","unstructured":"Sharma S. (2009b) A method to exchange the demand of products for cost improvement. International Journal of Advanced Manufacturing Technology 45: 382\u2013388","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"634_CR27","doi-asserted-by":"crossref","first-page":"545","DOI":"10.1016\/S0377-2217(98)00389-0","volume":"120","author":"J. M. Swaminathan","year":"2000","unstructured":"Swaminathan J. M. (2000) Tool capacity planning for semiconductor fabrication facilities under demand uncertainty. European Journal of Operational Research 120: 545\u2013558","journal-title":"European Journal of Operational Research"},{"key":"634_CR28","first-page":"145","volume":"34","author":"J. M. Swaminathan","year":"2002","unstructured":"Swaminathan J. M. (2002) Tool procurement planning for semiconductor fabrication facilities: A scenario-based approach. IIE Transactions 34: 145\u2013155","journal-title":"IIE Transactions"},{"issue":"2","key":"634_CR29","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1007\/BF01471220","volume":"2","author":"C. S. Tang","year":"1991","unstructured":"Tang C. S. (1991) Capacity and flexibility planning of an economical manufacturing system. Journal of Intelligent manufacturing 2(2): 75\u201382","journal-title":"Journal of Intelligent manufacturing"},{"key":"634_CR30","doi-asserted-by":"crossref","DOI":"10.1137\/1.9780898718799","volume-title":"Applications of stochastic programming","author":"S. W. Wallace","year":"2005","unstructured":"Wallace S. W., Ziemba W. T. (2005) Applications of stochastic programming. SIAM, Philadelphia"},{"issue":"5","key":"634_CR31","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1080\/09537280110121082","volume":"13","author":"K. J. Wang","year":"2002","unstructured":"Wang K. J., Lin S. H. (2002) Capacity expansion and allocation for a semiconductor testing facility under constrained budget. Production Planning & Control 13(5): 429\u2013437","journal-title":"Production Planning & Control"},{"issue":"14","key":"634_CR32","doi-asserted-by":"crossref","first-page":"3217","DOI":"10.1080\/0020754031000109152","volume":"41","author":"K. J. Wang","year":"2003","unstructured":"Wang K. J., Hou T. C. (2003) Modelling and resolving the joint problem of capacity expansion and allocation with multiple resources and a limited budget in the semiconductor testing industry. International Journal of Production Research 41(14): 3217\u20133235","journal-title":"International Journal of Production Research"},{"issue":"2","key":"634_CR33","doi-asserted-by":"crossref","first-page":"390","DOI":"10.1016\/j.ejor.2006.04.006","volume":"179","author":"K. J. Wang","year":"2007","unstructured":"Wang K. J., Wang S. M., Yang S. J. (2007a) A resource portfolio model for equipment investment and allocation of semiconductor testing industry. European Journal of Operational Research 179(2): 390\u2013403","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"634_CR34","doi-asserted-by":"crossref","first-page":"584","DOI":"10.1080\/09537280701546757","volume":"18","author":"F. K. Wang","year":"2007","unstructured":"Wang F. K., Du T., Wen F. C. (2007b) Product mix in the TFT-LCD industry. Production Planning and Control 18(7): 584\u2013591","journal-title":"Production Planning and Control"},{"key":"634_CR35","doi-asserted-by":"crossref","unstructured":"Wu, C.-H., & Chuang, Y.-T. (2011). An efficient algorithm for stochastic capacity portfolio planning problems. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-011-0562-0 .","DOI":"10.1007\/s10845-011-0562-0"},{"issue":"5\/6","key":"634_CR36","first-page":"565","volume":"26","author":"M. C. Wu","year":"2005","unstructured":"Wu M. C., Hsiung Y., Hsu H. M. (2005) A tool planning approach considering cycle time constraints and demand uncertainty. International Journal of Advanced Manufacturing Technology 26(5\/6): 565\u2013571","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"4","key":"634_CR37","doi-asserted-by":"crossref","first-page":"543","DOI":"10.1109\/TASE.2007.905977","volume":"4","author":"M. T. Zhang","year":"2007","unstructured":"Zhang M. T., Niu S., Deng S., Zhang Z., Li Q., Zheng L. (2007) Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing. IEEE Transactions on Automation Science and Engineering 4(4): 543\u2013552","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"13","key":"634_CR38","doi-asserted-by":"crossref","first-page":"2625","DOI":"10.1080\/00207540500490954","volume":"44","author":"Z. Zhang","year":"2006","unstructured":"Zhang Z., Zhang M. T., Niu S., Zheng L. (2006) Capacity planning with reconfigurable kits in semiconductor test manufacturing. International Journal of Production Research 44(13): 2625\u20132644","journal-title":"International Journal of Production Research"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-012-0634-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-012-0634-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-012-0634-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:54Z","timestamp":1559268714000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-012-0634-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,3,14]]},"references-count":38,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2013,8]]}},"alternative-id":["634"],"URL":"https:\/\/doi.org\/10.1007\/s10845-012-0634-9","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,3,14]]}}}