{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,23]],"date-time":"2026-04-23T20:33:49Z","timestamp":1776976429438,"version":"3.51.4"},"reference-count":50,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2012,12,12]],"date-time":"2012-12-12T00:00:00Z","timestamp":1355270400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2014,8]]},"DOI":"10.1007\/s10845-012-0719-5","type":"journal-article","created":{"date-parts":[[2012,12,10]],"date-time":"2012-12-10T23:56:23Z","timestamp":1355183783000},"page":"797-811","source":"Crossref","is-referenced-by-count":14,"title":["CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping"],"prefix":"10.1007","volume":"25","author":[{"given":"Lucas","family":"Gr\u00e8ze","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Robert","family":"Pellerin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Patrice","family":"Leclaire","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Nathalie","family":"Perrier","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,12,12]]},"reference":[{"issue":"6","key":"719_CR1","doi-asserted-by":"crossref","first-page":"641","DOI":"10.1007\/s10845-006-0034-0","volume":"17","author":"ZA Banaszak","year":"2006","unstructured":"Banaszak, Z. A., & Zaremba, M. B. (2006). Project-driven planning and scheduling support for virtual manufacturing. Journal of Intelligent Manufacturing, 17(6), 641\u2013651.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"719_CR2","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1007\/BF02283745","volume":"16","author":"M Bartusch","year":"1988","unstructured":"Bartusch, M., M\u00f6hring, R. H., & Radermacher, F. J. (1988). Scheduling project networks with resource constraints and time windows. Annals of Operations Research, 16(1), 199\u2013240.","journal-title":"Annals of Operations Research"},{"key":"719_CR3","unstructured":"Berthaut, F., Gr\u00e8ze, L., Pellerin, R., Perrier, N., & Hajji, A. (2011). Optimal resource-constrained project scheduling with overlapping modes. In Proceedings of international conference on industrial engineering and systems management (pp. 299\u2013308). Metz, France: International Institute for Innovation, Industrial Engineering and Entrepreneurship."},{"key":"719_CR4","unstructured":"Berthaut, F., Pellerin, R., Perrier, N., & Hajji, A. (2012). Time-cost trade-offs in resource-constrained project scheduling problems with overlapping modes. International Journal of Project Organisation and Management (to appear)."},{"issue":"1","key":"719_CR5","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J Blazewicz","year":"1983","unstructured":"Blazewicz, J., & Lenstra, J. K. (1983). Scheduling subject to resource constraints: Classification and complexity. Discrete Applied Mathematics, 5(1), 11\u201324.","journal-title":"Discrete Applied Mathematics"},{"issue":"11","key":"719_CR6","doi-asserted-by":"crossref","first-page":"1179","DOI":"10.1061\/(ASCE)0733-9364(2005)131:11(1179)","volume":"131","author":"SM Bogus","year":"2005","unstructured":"Bogus, S. M., Molenaar, K. R., & Diekmann, J. E. (2005a). Concurrent engineering approach to reducing design delivery time. Journal of Construction Engineering and Management, 131(11), 1179\u20131185.","journal-title":"Journal of Construction Engineering and Management"},{"key":"719_CR7","doi-asserted-by":"crossref","unstructured":"Bogus, S. M., Diekmann, J. E., & Molenaar, K. R. (2005b). Evaluating the consequences of overlapping dependent activities. In Proceedings of the construction research congress 2005, San Diego, Paper 7539, pp. 1\u201310.","DOI":"10.1061\/40754(183)71"},{"key":"719_CR8","doi-asserted-by":"crossref","first-page":"829","DOI":"10.1080\/01446190600658529","volume":"24","author":"SM Bogus","year":"2006","unstructured":"Bogus, S. M., Molenaar, K. R., & Diekmann, J. E. (2006). Strategies for overlapping dependent design activities. Construction Management and Economics, 24, 829\u2013837.","journal-title":"Construction Management and Economics"},{"key":"719_CR9","doi-asserted-by":"crossref","unstructured":"Browning, T. R. (2001). Applying the design structure matrix to system decomposition and integration problems: A review and new directions. IEEE Transactions on Engineering Management, 48(3), 292\u2013306.","DOI":"10.1109\/17.946528"},{"issue":"4","key":"719_CR10","doi-asserted-by":"crossref","first-page":"428","DOI":"10.1109\/TEM.2002.806709","volume":"49","author":"TR Browning","year":"2002","unstructured":"Browning, T. R., & Eppinger, S. D. (2002). Modeling impacts of process architecture on cost and schedule risk in product development. IEEE Transactions on Engineering Management, 49(4), 428\u2013442.","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"1","key":"719_CR11","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker, P., Drexl, A., M\u00f6hring, R., Neumann, K., & Pesch, E. (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3\u201341.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"719_CR12","doi-asserted-by":"crossref","first-page":"435","DOI":"10.1016\/S0360-8352(02)00230-9","volume":"44","author":"SJ Chen","year":"2003","unstructured":"Chen, S. J., & Li, L. (2003). Decomposition of interdependent task group for concurrent engineering. Computers and Industrial Engineering, 44(3), 435\u2013459.","journal-title":"Computers and Industrial Engineering"},{"issue":"3","key":"719_CR13","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1109\/TEM.2005.850722","volume":"52","author":"SH Cho","year":"2005","unstructured":"Cho, S. H., & Eppinger, S. D. (2005). A simulation-based process model for managing complex design projects. IEEE Transactions on Engineering Management, 52(3), 316\u2013328.","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"1","key":"719_CR14","doi-asserted-by":"crossref","first-page":"152","DOI":"10.1016\/S0377-2217(97)00305-6","volume":"111","author":"B Reyck De","year":"1998","unstructured":"De Reyck, B., & Herroelen, W. (1998). Branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational research, 111(1), 152\u2013174.","journal-title":"European Journal of Operational research"},{"issue":"1","key":"719_CR15","first-page":"1","volume":"6","author":"SD Eppinger","year":"1994","unstructured":"Eppinger, S. D., Whitney, D. E., Smith, R. P., & Gebala, D. A. (1994). A model-based method for organizing tasks in product development. Research in Engineering Design-Theory Applications and Concurrent Engineering, 6(1), 1\u201313.","journal-title":"Research in Engineering Design-Theory Applications and Concurrent Engineering"},{"key":"719_CR16","unstructured":"Fayez, M., Axelsson, P., Oloufa, A. A., & Hosni, Y. (2003). DSM versus CPM: Issues for planning design and construction activities. In Proceedings of the construction research congress, winds of change: Integration and innovation in construction (pp. 181\u2013188). Honolulu, HI: American Society of Civil Engineers."},{"issue":"4","key":"719_CR17","doi-asserted-by":"crossref","first-page":"590","DOI":"10.1109\/TEM.2008.927786","volume":"55","author":"JEV Gerk","year":"2008","unstructured":"Gerk, J. E. V., & Qassim, R. Y. (2008). Project acceleration via activity crashing, overlapping, and substitution. IEEE Transactions on Engineering Management, 55(4), 590\u2013601.","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"3","key":"719_CR18","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/0263-7863(94)90032-9","volume":"12","author":"S Globerson","year":"1994","unstructured":"Globerson, S. (1994). Impact of various work-breakdown structures on project conceptualization. International Journal of Project Management, 12(3), 165\u2013171.","journal-title":"International Journal of Project Management"},{"key":"719_CR19","volume-title":"Management de projet","author":"CF Gray","year":"2007","unstructured":"Gray, C. F., Langevin, Y., & Larson, E. W. (2007). Management de projet. Montr\u00e9al: Cheneli\u00e8re McGraw-Hill."},{"key":"719_CR20","unstructured":"Gr\u00e8ze, L., Pellerin, R., Leclaire, P., & Perrier, N. (2011). Evaluating the effectiveness of task overlapping as a risk response strategy in engineering projects. International Journal of Project Organisation and Management (to appear)."},{"key":"719_CR21","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-58627-9","volume-title":"Project scheduling under limited resources","author":"S Hartmann","year":"1999","unstructured":"Hartmann, S. (1999). Project scheduling under limited resources. Berlin: Springer."},{"issue":"1","key":"719_CR22","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207(1), 1\u201314.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"719_CR23","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1007\/s10845-008-0228-8","volume":"20","author":"S Hasg\u00fcl","year":"2009","unstructured":"Hasg\u00fcl, S., Saricicek, I., Ozkan, M., & Parlaktuna, O. (2009). Project-oriented task scheduling for mobile robot team. Journal of Intelligent Manufacturing, 20(2), 151\u2013158.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"719_CR24","volume-title":"Computer-based construction project management","author":"T Hegazy","year":"2002","unstructured":"Hegazy, T. (2002). Computer-based construction project management. Upper Saddle River, NJ: Prentice Hall."},{"issue":"4","key":"719_CR25","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1016\/S0305-0548(97)00055-5","volume":"25","author":"W Herroelen","year":"1998","unstructured":"Herroelen, W., De Reyck, B., & Demeulemeester, E. (1998). Resource constrained project scheduling\u2014A survey of recent developments. Computers and Operations Research, 25(4), 279\u2013302.","journal-title":"Computers and Operations Research"},{"issue":"4","key":"719_CR26","doi-asserted-by":"crossref","first-page":"413","DOI":"10.1111\/j.1937-5956.2005.tb00230.x","volume":"14","author":"W Herroelen","year":"2005","unstructured":"Herroelen, W. (2005). Project scheduling\u2014Theory and practice. Production and Operations Management, 14(4), 413\u2013432.","journal-title":"Production and Operations Management"},{"issue":"5","key":"719_CR27","doi-asserted-by":"crossref","first-page":"616","DOI":"10.1061\/(ASCE)0733-9364(2004)130:5(616)","volume":"130","author":"Y Jung","year":"2004","unstructured":"Jung, Y., & Woo, S. (2004). Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management-ASCE, 130(5), 616\u2013625.","journal-title":"Journal of Construction Engineering and Management-ASCE"},{"issue":"4","key":"719_CR28","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1287\/inte.29.4.19","volume":"29","author":"R Kolisch","year":"1999","unstructured":"Kolisch, R. (1999). Resource allocation capabilities of commercial project management software packages. Interfaces, 29(4), 19\u201331.","journal-title":"Interfaces"},{"issue":"1","key":"719_CR29","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1016\/j.ejor.2005.01.065","volume":"174","author":"R Kolisch","year":"2006","unstructured":"Kolisch, R., & Hartmann, S. (2006). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research, 174(1), 23\u201337.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"719_CR30","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/S0377-2217(96)00170-1","volume":"96","author":"R Kolisch","year":"1997","unstructured":"Kolisch, R., & Sprecher, A. (1997). PSPLIB\u2014A project scheduling problem library. European Journal of Operational Research, 96(1), 205\u2013216.","journal-title":"European Journal of Operational Research"},{"issue":"10","key":"719_CR31","doi-asserted-by":"crossref","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R Kolisch","year":"1995","unstructured":"Kolisch, R., Sprecher, A., & Drexl, A. (1995). Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41(10), 1693\u20131703.","journal-title":"Management Science"},{"issue":"3","key":"719_CR32","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/S0305-0483(00)00046-3","volume":"29","author":"R Kolisch","year":"2001","unstructured":"Kolisch, R., & Padman, R. (2001). An integrated survey of deterministic project scheduling. Omega, 29(3), 249\u2013272.","journal-title":"Omega"},{"issue":"2","key":"719_CR33","doi-asserted-by":"crossref","first-page":"210","DOI":"10.1109\/17.509986","volume":"43","author":"V Krishnan","year":"1996","unstructured":"Krishnan, V. (1996). Managing the simultaneous execution of coupled phases in concurrent product development. IEEE Transactions on Engineering Management, 43(2), 210\u2013217.","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"4","key":"719_CR34","doi-asserted-by":"crossref","first-page":"437","DOI":"10.1287\/mnsc.43.4.437","volume":"43","author":"V Krishnan","year":"1997","unstructured":"Krishnan, V., Eppinger, S. D., & Whitney, D. E. (1997). A model-based framework to overlap product development activities. Management Science, 43(4), 437\u2013451.","journal-title":"Management Science"},{"key":"719_CR35","doi-asserted-by":"crossref","unstructured":"Lee, Y.-H., Kumara, S. R. T., & Chatterjee, K. (2003). Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism. Journal of Intelligent Manufacturing, 14(5), 471\u2013484.","DOI":"10.1023\/A:1025753309346"},{"issue":"6","key":"719_CR36","doi-asserted-by":"crossref","first-page":"529","DOI":"10.1016\/j.ijproman.2006.04.004","volume":"24","author":"MJ Liberatore","year":"2006","unstructured":"Liberatore, M. J., & Pollack-Johnson, B. (2006). Extending project time-cost analysis by removing precedence relationships and task streaming. International Journal of Project Management, 24(6), 529\u2013535.","journal-title":"International Journal of Project Management"},{"key":"719_CR37","doi-asserted-by":"crossref","unstructured":"Lin, J., Chai, K. H., Brombacher, A. C., & Wong, Y. S. (2009). Optimal overlapping and functional interaction in product development. European Journal of Operational Research, 196(3), 1158\u20131169.","DOI":"10.1016\/j.ejor.2008.05.030"},{"issue":"3","key":"719_CR38","doi-asserted-by":"crossref","first-page":"737","DOI":"10.1016\/j.ejor.2009.03.040","volume":"201","author":"J Lin","year":"2010","unstructured":"Lin, J., Qian, Y., Cui, W., & Miao, Z. (2010). Overlapping and communication policies in product development. European Journal of Operational Research, 201(3), 737\u2013750.","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"719_CR39","doi-asserted-by":"crossref","first-page":"1032","DOI":"10.1287\/mnsc.44.8.1032","volume":"44","author":"CH Loch","year":"1998","unstructured":"Loch, C. H., & Terwiesch, C. (1998). Communication and uncertainty in concurrent engineering. Management Science, 44(8), 1032\u20131048.","journal-title":"Management Science"},{"issue":"3","key":"719_CR40","doi-asserted-by":"crossref","first-page":"223","DOI":"10.1016\/j.ijproman.2004.10.001","volume":"23","author":"JU Maheswari","year":"2005","unstructured":"Maheswari, J. U., & Varghese, K. (2005). Project scheduling using dependency structure matrix. International Journal of Project Management, 23(3), 223\u2013230.","journal-title":"International Journal of Project Management"},{"issue":"2","key":"719_CR41","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1007\/BF00123686","volume":"6","author":"K Neumann","year":"1995","unstructured":"Neumann, K., & Zhan, J. (1995). Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints. Journal of Intelligent Manufacturing, 6(2), 145\u2013154.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"719_CR42","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1007\/s10845-008-0163-8","volume":"21","author":"A Oddi","year":"2010","unstructured":"Oddi, A., Cesta, A., Policella, N., & Smith, S. F. (2010). Iterative flattening search for resource constrained scheduling. Journal of Intelligent Manufacturing, 21(1), 17\u201330.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"719_CR43","unstructured":"Pellerin, R. (1997). Mod\u00e8le d\u2019ordonnancement dynamique de projets de r\u00e9fection, Ph.D. Thesis. Montr\u00e9al: \u00c9cole Polytechnique de Montr\u00e9al."},{"issue":"1","key":"719_CR44","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1287\/mnsc.16.1.93","volume":"16","author":"AAB Pritsker","year":"1969","unstructured":"Pritsker, A. A. B., Watters, L. J., & Wolfe, P. M. (1969). Multi-project scheduling with limited resources: A zero-one programming approach. Management Science, 16(1), 93\u2013108.","journal-title":"Management Science"},{"issue":"6","key":"719_CR45","doi-asserted-by":"crossref","first-page":"858","DOI":"10.1287\/opre.48.6.858.12396","volume":"48","author":"TA Roemer","year":"2000","unstructured":"Roemer, T. A., Ahmadi, R., & Wang, R. H. (2000). Time-cost trade-offs in overlapped product development. Operations Research, 48(6), 858\u2013865.","journal-title":"Operations Research"},{"issue":"3","key":"719_CR46","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1023\/A:1008952024958","volume":"10","author":"L-Y Shue","year":"1999","unstructured":"Shue, L.-Y., & Zamani, R. (1999). Intelligent search method for project scheduling problems. Journal of Intelligent Manufacturing, 10(3), 279\u2013288.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"719_CR47","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1109\/TEM.1981.6448589","volume":"28","author":"DV Steward","year":"1981","unstructured":"Steward, D. V. (1981). The design structure system: A method for managing the design of complex systems. IEEE Transactions on Engineering Management, 28(3), 71\u201374.","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"4","key":"719_CR48","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1287\/mnsc.45.4.455","volume":"45","author":"C Terwiesch","year":"1999","unstructured":"Terwiesch, C., & Loch, C. H. (1999). Measuring the effectiveness of overlapping development activities. Management Science, 45(4), 455\u2013465.","journal-title":"Management Science"},{"issue":"2","key":"719_CR49","first-page":"42","volume":"1","author":"V Thiagarasu","year":"2009","unstructured":"Thiagarasu, V., & Devi, T. (2009). Multi-agent coordination in project scheduling: priority rules based resource allocation. International Journal of Recent Trends in Engineering, 1(2), 42\u201346.","journal-title":"International Journal of Recent Trends in Engineering"},{"issue":"2","key":"719_CR50","doi-asserted-by":"crossref","first-page":"460","DOI":"10.1016\/j.cie.2007.12.013","volume":"57","author":"JT Wang","year":"2009","unstructured":"Wang, J. T., & Lin, Y. I. (2009). An overlapping process model to assess schedule risk for new product development. Computers and Industrial Engineering, 57(2), 460\u2013474.","journal-title":"Computers and Industrial Engineering"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-012-0719-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-012-0719-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-012-0719-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:56Z","timestamp":1559254316000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-012-0719-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,12,12]]},"references-count":50,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2014,8]]}},"alternative-id":["719"],"URL":"https:\/\/doi.org\/10.1007\/s10845-012-0719-5","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,12,12]]}}}