{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T03:13:50Z","timestamp":1777605230727,"version":"3.51.4"},"reference-count":34,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2013,3,17]],"date-time":"2013-03-17T00:00:00Z","timestamp":1363478400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2014,10]]},"DOI":"10.1007\/s10845-013-0746-x","type":"journal-article","created":{"date-parts":[[2013,3,16]],"date-time":"2013-03-16T07:58:02Z","timestamp":1363420682000},"page":"867-879","source":"Crossref","is-referenced-by-count":36,"title":["The cooperative estimation of distribution algorithm: a novel approach for semiconductor final test scheduling problems"],"prefix":"10.1007","volume":"25","author":[{"given":"Xin-Chang","family":"Hao","sequence":"first","affiliation":[]},{"given":"Jei-Zheng","family":"Wu","sequence":"additional","affiliation":[]},{"given":"Chen-Fu","family":"Chien","sequence":"additional","affiliation":[]},{"given":"Mitsuo","family":"Gen","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,3,17]]},"reference":[{"key":"746_CR1","unstructured":"Baluja, S. (1994). Population-based incremental learning: A method for integrating genetic search based function optimization and competitive, learning. CMU-CS-94-163."},{"key":"746_CR2","doi-asserted-by":"crossref","unstructured":"Baluja, S., & Caruana, R. (1995). Removing the genetics from the standard genetic algorithm. In Proceedings of the twelfth international conference on, machine learning (pp. 38\u201346).","DOI":"10.1016\/B978-1-55860-377-6.50014-1"},{"issue":"1","key":"746_CR3","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J Blazewicz","year":"1983","unstructured":"Blazewicz, J., Lenstra, J. K., & Kan, A. H. G. R. (1983). Scheduling subject to resource constraints: Classification and complexity. Discrete Applied Mathematics, 5(1), 11\u201324.","journal-title":"Discrete Applied Mathematics"},{"issue":"1","key":"746_CR4","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker, P., Drexl, A., M\u00f6hring, R., Neumann, K., & Pesch, E. (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3\u201341.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"746_CR5","first-page":"47","volume":"39","author":"C-F Chien","year":"2007","unstructured":"Chien, C.-F. (2007). Made in Taiwan: Shifting paradigms in high-tech industries. Industrial Engineer, 39(2), 47\u201349.","journal-title":"Industrial Engineer"},{"key":"746_CR6","doi-asserted-by":"crossref","unstructured":"Chien, C.-F., & Chen, C.-H. (2007a). Using genetic algorithms (GA) and a colored timed Petri net (CTPN) for modeling the optimization-based schedule generator of a generic production scheduling system. International Journal of Production Research, 45, 1763\u20131789.","DOI":"10.1080\/00207540500380981"},{"issue":"3","key":"746_CR7","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1007\/s00291-006-0062-3","volume":"29","author":"C-F Chien","year":"2007","unstructured":"Chien, C.-F., & Chen, C.-H. (2007b). A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups. OR Spectrum, 29(3), 391\u2013419.","journal-title":"OR Spectrum"},{"key":"746_CR8","doi-asserted-by":"crossref","unstructured":"Chien, C.-F. & Kuo, R.-T. (2012). Beyond make-or-buy: Cross-company short-term capacity backup in semiconductor industry ecosystem. Flexible Services Manufacturing Journal. doi: 10.1007\/s10696-011-9113-4 . (in press).","DOI":"10.1007\/s10696-011-9113-4"},{"key":"746_CR9","doi-asserted-by":"crossref","unstructured":"Chien, C.-F., & Zheng, J.-N. (2012). Mini-max regret strategy for robust capacity expansion decisions in semiconductor manufacturing. Journal of Intelligent Manufacturing, 23(6), 2151\u20132159.","DOI":"10.1007\/s10845-011-0561-1"},{"issue":"3","key":"746_CR10","doi-asserted-by":"crossref","first-page":"509","DOI":"10.1080\/00207540600792515","volume":"45","author":"C-F Chien","year":"2007","unstructured":"Chien, C.-F., Chen, H.-K., Wu, J.-Z., & Hu, C.-H. (2007a). Constructing the OGE for promoting tool group productivity in semiconductor manufacturing. International Journal of Production Research, 45(3), 509\u2013524.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"746_CR11","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1016\/j.ijpe.2006.03.010","volume":"107","author":"C-F Chien","year":"2007","unstructured":"Chien, C.-F., Wang, H., & Wang, M. (2007b). A UNISON framework for analyzing alternative strategies of IC final testing for enhancing overall operational effectiveness. International Journal of Production Economics, 107(1), 20\u201330.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"746_CR12","doi-asserted-by":"crossref","first-page":"496","DOI":"10.1016\/j.ijpe.2010.07.022","volume":"128","author":"C-F Chien","year":"2010","unstructured":"Chien, C.-F., Chen, Y.-J., & Peng, J.-T. (2010a). Manufacturing intelligence for semiconductor demand forecast based on technology diffusion and product life cycle. International Journal of Production Economics, 128(2), 496\u201350.","journal-title":"International Journal of Production Economics"},{"issue":"1\u20132","key":"746_CR13","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1007\/s10696-010-9073-0","volume":"22","author":"C-F Chien","year":"2010","unstructured":"Chien, C.-F., Wu, J.-Z., & Weng, Y.-D. (2010b). Modeling order assignment for semiconductor assembly hierarchical outsourcing and its decision support system. Flexible Services and Manufacturing Journal, 22(1\u20132), 109\u2013139.","journal-title":"Flexible Services and Manufacturing Journal"},{"key":"746_CR14","doi-asserted-by":"crossref","unstructured":"Chien, C.-F., Dauz\u00e9re-P\u00e9r\u00e9s, S., Ehm, H., Fowler, J. W., Jiang, Z., Krishnaswamy, Lee T.-E., et al. (2011a). Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes. European Journal of Industrial Engineering, 5(3), 254\u2013271.","DOI":"10.1504\/EJIE.2011.041616"},{"key":"746_CR15","doi-asserted-by":"crossref","unstructured":"Chien, C.-F., Wu, J.-Z., & Wu, C.-C. (2011b). A two-stage stochastic programming approach for new tape-out allocation decisions for demand fulfillment planning in semiconductor manufacturing. Flexible Services and Manufacturing Journal. doi: 10.1007\/s10696-011-9109-0 .","DOI":"10.1007\/s10696-011-9109-0"},{"key":"746_CR16","volume-title":"Genetic algorithms and engineering optimization","author":"M Gen","year":"2000","unstructured":"Gen, M., & Cheng, R. (2000). Genetic algorithms and engineering optimization. New York: Wiley-Interscience."},{"key":"746_CR17","volume-title":"Network models and optimization: Multiobjective genetic algorithm approach","author":"M Gen","year":"2008","unstructured":"Gen, M., Cheng, R., & Lin, L. (2008). Network models and optimization: Multiobjective genetic algorithm approach. Berlin: Springer."},{"issue":"4","key":"746_CR18","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1287\/mnsc.39.4.395","volume":"39","author":"D Gerwin","year":"1993","unstructured":"Gerwin, D. (1993). Manufacturing flexibility: A strategic perspective. Management Science, 39(4), 395\u2013410.","journal-title":"Management Science"},{"issue":"14","key":"746_CR19","doi-asserted-by":"crossref","first-page":"3775","DOI":"10.1080\/00207540701827905","volume":"47","author":"YW Guo","year":"2009","unstructured":"Guo, Y. W., Li, W. D., Mileham, A. R., & Owen, G. W. (2009). Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach. International Journal of Production Research, 47(14), 3775\u20133796.","journal-title":"International Journal of Production Research"},{"key":"746_CR20","doi-asserted-by":"crossref","first-page":"631","DOI":"10.1007\/s10845-007-0037-5","volume":"18","author":"YK Kim","year":"2007","unstructured":"Kim, Y. K., Kim, J. Y., & Shin, K. S. (2007). An asymmetric multileveled symbiotic evolutionary algorithm for integrated FMS scheduling. Journal of Intelligent Manufacturing, 18, 631\u2013645.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"746_CR21","doi-asserted-by":"crossref","first-page":"80","DOI":"10.1080\/09511920600667366","volume":"20","author":"WD Li","year":"2007","unstructured":"Li, W. D., & McMahon, C. A. (2007). A simulated annealing-based optimization approach for integrated process planning and scheduling. International Journal of Computer Integrated Manufacturing, 20(1), 80\u201395.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"6","key":"746_CR22","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1007\/s10951-010-0222-9","volume":"14","author":"L M\u00f6nch","year":"2011","unstructured":"M\u00f6nch, L., Fowler, J. W., Dauz\u00e8re-P\u00e9r\u00e8s, S., Mason, S. J., & Rose, O. (2011). A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. Journal of Scheduling, 14(6), 583\u2013599.","journal-title":"Journal of Scheduling"},{"issue":"1","key":"746_CR23","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1162\/106365600568086","volume":"8","author":"MA Potter","year":"2000","unstructured":"Potter, M. A., & de Jong, K. A. (2000). Cooperative coevolution: An architecture for evolving coadapted subcomponents. Evolutionary Computation, 8(1), 1\u201329.","journal-title":"Evolutionary Computation"},{"key":"746_CR24","unstructured":"Shih, W., Chien, C.-F., Shih, C., & Chang, J. (2009). The TSMC way: Meeting customer needs at Taiwan Semiconductor Manufacturing Co. Harvard Business School Technology & Operations Management Unit Case (610-003)."},{"key":"746_CR25","doi-asserted-by":"crossref","unstructured":"Tan, K. C., Yang, Y. J., & Goh, C. K. (2006). A distributed cooperative coevolutionary algorithm for multiobjective optimization. IEEE Transactions on Evolutionary Computation, 10(5), 527\u2013549.","DOI":"10.1109\/TEVC.2005.860762"},{"key":"746_CR26","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1080\/07408179208964233","volume":"24","author":"R Uzsoy","year":"1992","unstructured":"Uzsoy, R., Lee, C. Y., & Martin-Vega, L. (1992). A review of production planning and scheduling models in the semiconductor industry, part I: System characteristics, performance evaluation, and production planning. IIE Transactions, 24, 47\u201360.","journal-title":"IIE Transactions"},{"issue":"4","key":"746_CR27","doi-asserted-by":"crossref","first-page":"270","DOI":"10.1109\/66.97809","volume":"4","author":"R Uzsoy","year":"1991","unstructured":"Uzsoy, R., Martin-Vega, L., Lee, C., & Leonard, P. (1991). Production scheduling algorithms for a semiconductor test facility. IEEE Transactions on Semiconductor Manufacturing, 4(4), 270\u2013280.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"746_CR28","doi-asserted-by":"crossref","unstructured":"Wu, J.-Z. (2011). Inventory write-down prediction for semiconductor manufacturing considering inventory age, accounting principle, and product structure with real settings. Computers & Industrial Engineering. doi: 10.1016\/j.cie.2011.11.020 ). (in press).","DOI":"10.1016\/j.cie.2011.11.020"},{"issue":"3","key":"746_CR29","doi-asserted-by":"crossref","first-page":"401","DOI":"10.1007\/s00291-007-0120-5","volume":"30","author":"J-Z Wu","year":"2008","unstructured":"Wu, J.-Z., & Chien, C.-F. (2008a). Modeling strategic semiconductor assembly outsourcing decisions based on empirical settings. OR Spectrum, 30(3), 401\u2013430.","journal-title":"OR Spectrum"},{"issue":"1\u20132","key":"746_CR30","first-page":"485","volume":"35","author":"J-Z Wu","year":"2008","unstructured":"Wu, J.-Z., & Chien, C.-F. (2008b). Modeling semiconductor testing job scheduling and dynamic modeling semiconductor testing job scheduling and dynamic testing machine configuration. Expert Systems with Applications, 35(1\u20132), 485\u2013496.","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"746_CR31","first-page":"95","volume":"16","author":"J-Z Wu","year":"2009","unstructured":"Wu, J.-Z., & Hsu, C.-Y. (2009). Critical success factors for improving decision quality on collaborative design in the IC supply chain. Journal of Quality, 16(2), 95\u2013108.","journal-title":"Journal of Quality"},{"issue":"1","key":"746_CR32","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1080\/00207543.2011.571457","volume":"50","author":"J-Z Wu","year":"2012","unstructured":"Wu, J.-Z., Chien, C.-F., & Gen, M. (2012a). Coordinating strategic outsourcing decisions for semiconductor assembly using a bi-objective genetic algorithm. International Journal of Production Research, 50(1), 235\u2013260.","journal-title":"International Journal of Production Research"},{"issue":"6","key":"746_CR33","doi-asserted-by":"crossref","first-page":"2255","DOI":"10.1007\/s10845-011-0570-0","volume":"23","author":"J-Z Wu","year":"2012","unstructured":"Wu, J.-Z., Hao, X.-C., Chien, C.-F., & Gen, M. (2012b). A novel bi-vector encoding genetic algorithm for the simultaneous multiple resources scheduling problem. Journal of Intelligent Manufacturing, 23(6), 2255\u20132270.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"746_CR34","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1002\/tee.20494","volume":"5","author":"W Zhang","year":"2010","unstructured":"Zhang, W., & Gen, M. (2010). Process planning and scheduling in distributed manufacturing system using multiobjective genetic algorithm. IEEJ Transactions on Electrical and Electronic Engineering, 5(1), 62\u201372.","journal-title":"IEEJ Transactions on Electrical and Electronic Engineering"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0746-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0746-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0746-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,2,11]],"date-time":"2022-02-11T16:53:41Z","timestamp":1644598421000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0746-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,3,17]]},"references-count":34,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2014,10]]}},"alternative-id":["746"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0746-x","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,3,17]]}}}