{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,17]],"date-time":"2026-01-17T04:24:34Z","timestamp":1768623874476,"version":"3.49.0"},"reference-count":39,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2013,4,2]],"date-time":"2013-04-02T00:00:00Z","timestamp":1364860800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,2]]},"DOI":"10.1007\/s10845-013-0763-9","type":"journal-article","created":{"date-parts":[[2013,4,1]],"date-time":"2013-04-01T06:09:16Z","timestamp":1364796556000},"page":"73-85","source":"Crossref","is-referenced-by-count":11,"title":["Dynamic scheduling of photolithography process based on Kohonen neural network"],"prefix":"10.1007","volume":"26","author":[{"given":"Bing-hai","family":"Zhou","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xin","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Richard Y. K.","family":"Fung","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,4,2]]},"reference":[{"key":"763_CR1","doi-asserted-by":"crossref","first-page":"1943","DOI":"10.1080\/00207548808948007","volume":"26","author":"T Adachi","year":"1988","unstructured":"Adachi, T., Moodie, C. L., & Talavage, J. J. (1988). A pattern-recognition-based method for controlling a multi-loop production system. International Journal of Production Research, 26, 1943\u20131957.","journal-title":"International Journal of Production Research"},{"key":"763_CR2","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1109\/66.909654","volume":"14","author":"E Akcali","year":"2001","unstructured":"Akcali, E., Nemoto, K., & Uzsoy, R. (2001). Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 14, 48\u201356.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"763_CR3","doi-asserted-by":"crossref","first-page":"3801","DOI":"10.1080\/00207540600711879","volume":"46","author":"N Bahaji","year":"2008","unstructured":"Bahaji, N., & Kuhl, M. E. (2008). A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication. International Journal of Production Research, 46, 3801\u20133824.","journal-title":"International Journal of Production Research"},{"key":"763_CR4","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1080\/09591120010021793","volume":"14","author":"FTS Chan","year":"2001","unstructured":"Chan, F. T. S. (2001). The effects of routing flexibility on a flexible manufacturing system. International Journal of Computer Integrated Manufacturing, 14, 431\u2013445.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"763_CR5","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1016\/S0924-0136(03)00093-1","volume":"138","author":"FTS Chan","year":"2003","unstructured":"Chan, F. T. S., Chan, H. K., Lau, H. C. W., & Ip, R. W. L. (2003). Analysis of dynamic dispatching rules for a flexible manufacturing system. Journal of Materials Processing Technology, 138, 325\u2013331.","journal-title":"Journal of Materials Processing Technology"},{"key":"763_CR6","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1016\/j.rcim.2005.08.001","volume":"22","author":"FTS Chan","year":"2006","unstructured":"Chan, F. T. S., & Swarnkar, R. (2006). Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS. Robotics and Computer Integrated Manufacturing, 22, 353\u2013362.","journal-title":"Robotics and Computer Integrated Manufacturing"},{"key":"763_CR7","doi-asserted-by":"crossref","first-page":"493","DOI":"10.1016\/j.rcim.2005.11.005","volume":"22","author":"FTS Chan","year":"2006","unstructured":"Chan, F. T. S., Chung, S. H., Chan, P. L. Y., Finke, G., & Tiwari, M. K. (2006). Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach. Robotics and Computer Integrated Manufacturing, 22, 493\u2013540.","journal-title":"Robotics and Computer Integrated Manufacturing"},{"key":"763_CR8","unstructured":"Chen, C.C. (1997). A learning based methodology for scheduling problems in semiconductor fab plants. PhD thesis, Purdue University."},{"key":"763_CR9","doi-asserted-by":"crossref","first-page":"589","DOI":"10.1007\/s00170-007-1228-0","volume":"39","author":"T Chen","year":"2008","unstructured":"Chen, T. (2008). A fuzzy-neural approach for estimating the monthly output of a semiconductor manufacturing factory. International Journal of Advanced Manufacturing Technology, 39, 589\u2013598.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"763_CR10","doi-asserted-by":"crossref","first-page":"2151","DOI":"10.1007\/s10845-011-0561-1","volume":"23","author":"CF Chien","year":"2012","unstructured":"Chien, C. F., & Zheng, J. N. (2012). Mini-max regret strategy for robust capacity expansion decisions in semiconductor manufacturing. Journal of Intelligent Manufacturing, 23, 2151\u20132159.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"763_CR11","doi-asserted-by":"crossref","first-page":"412","DOI":"10.1109\/66.536112","volume":"9","author":"DP Connors","year":"1996","unstructured":"Connors, D. P., Feigin, G. E., & Yao, D. D. (1996). A queueing network model for semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 9, 412\u2013427.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"763_CR12","doi-asserted-by":"crossref","first-page":"647","DOI":"10.1057\/palgrave.jors.2600406","volume":"48","author":"M Dessouky","year":"1997","unstructured":"Dessouky, M., & Leachman, R. C. (1997). Dynamic models of production with multiple operations and general processing times. Journal of the Operational Research Society, 48, 647\u2013654.","journal-title":"Journal of the Operational Research Society"},{"issue":"968","key":"763_CR13","first-page":"986","volume":"45","author":"H Eivazy","year":"2009","unstructured":"Eivazy, H., Rabbani, M., & Ebadian, M. (2009). A developed production control and scheduling model in the semiconductor manufacturing systems with hybrid make-to-stock\/make-to-order products. International Journal of Advanced Manufacturing Technology, 45(968), 986.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"763_CR14","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1016\/0167-6377(88)90033-8","volume":"7","author":"C Glassey","year":"1988","unstructured":"Glassey, C., & Resende, M. G. (1988). A scheduling rule for job release in semiconductor fabrication. Operations Research Letters, 7, 213\u2013217.","journal-title":"Operations Research Letters"},{"key":"763_CR15","unstructured":"Goldratt, E. M., & Cox, J. (2004). The goal: A process of ongoing improvement. In (3rd Revised ed.). North River Press, New York."},{"key":"763_CR16","doi-asserted-by":"crossref","unstructured":"Ham, M., Lee, Y.H., Fowler, J. (2009). Integer programming-based real-time scheduler in semiconductor manufacturing. In Proceedings of the 2009 winter simulation conference (WSC), pp. 1657\u20131666.","DOI":"10.1109\/WSC.2009.5429175"},{"key":"763_CR17","doi-asserted-by":"crossref","first-page":"714","DOI":"10.1080\/095372898233722","volume":"9","author":"YF Hung","year":"1998","unstructured":"Hung, Y. F., & Chen, I. R. (1998). A simulation study of dispatch rules for reducing flow times in semiconductor wafer fabrication. Production Planning and Control, 9, 714\u2013722.","journal-title":"Production Planning and Control"},{"key":"763_CR18","first-page":"1","volume":"1","author":"SK Karna","year":"2012","unstructured":"Karna, S. K., & Sahai, R. (2012). An overview on Taguchi method. International Journal of Engineering and Mathematical Sciences, 1, 1\u20137.","journal-title":"International Journal of Engineering and Mathematical Sciences"},{"key":"763_CR19","doi-asserted-by":"crossref","first-page":"333","DOI":"10.1007\/s00170-007-1208-4","volume":"39","author":"S Kim","year":"2008","unstructured":"Kim, S., Lee, Y. H., Yang, T., & Park, N. (2008). Robust production control policies considering WIP balance and setup time in a semiconductor fabrication line. International Journal of Advanced Manufacturing Technology, 39, 333\u2013343.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"763_CR20","doi-asserted-by":"crossref","first-page":"1464","DOI":"10.1109\/5.58325","volume":"78","author":"T Kohonen","year":"1990","unstructured":"Kohonen, T. (1990). The self-organizing map. Proceedings of the IEEE, 78, 1464\u20131480.","journal-title":"Proceedings of the IEEE"},{"key":"763_CR21","doi-asserted-by":"crossref","first-page":"5019","DOI":"10.1080\/00207540600596874","volume":"44","author":"N Kumar","year":"2006","unstructured":"Kumar, N., Kennedy, K., Gildersleeve, K., Abelson, R., Mastrangelo, C., & Montgomery, D. (2006). A review of yield modelling techniques for semiconductor manufacturing. International Journal of Production Research, 44, 5019\u20135036.","journal-title":"International Journal of Production Research"},{"key":"763_CR22","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/BF01158930","volume":"13","author":"P Kummar","year":"1993","unstructured":"Kummar, P. (1993). Re-entrant lines queuing systems: Theory and applications. Queuing System Theory and Application, 13, 87\u2013110.","journal-title":"Queuing System Theory and Application"},{"key":"763_CR23","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1016\/S0377-2217(99)00446-4","volume":"131","author":"YH Lin","year":"2001","unstructured":"Lin, Y. H., & Lee, C. E. (2001). A total standard WIP estimation method for wafer fabrication. European Journal of Operational Research, 131, 78\u201394.","journal-title":"European Journal of Operational Research"},{"key":"763_CR24","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1109\/66.44620","volume":"2","author":"SXC Lou","year":"1989","unstructured":"Lou, S. X. C., & Kager, P. W. (1989). A robust production control policy for WLSI wafer fabrication. IEEE Transactions on Semiconductor Manufacturing, 2, 159\u2013164.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"763_CR25","doi-asserted-by":"crossref","first-page":"990","DOI":"10.1007\/s00170-005-2585-1","volume":"29","author":"M Mathirajan","year":"2006","unstructured":"Mathirajan, M., & Sivakumar, A. I. (2006). A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. International Journal of Advanced Manufacturing Technology, 29, 990\u20131001.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"763_CR26","unstructured":"Min, H. S. (2002). Development of a real-time multiobjective scheduler for semiconductor fabrication systems. PhD thesis, Purdue University."},{"key":"763_CR27","doi-asserted-by":"crossref","first-page":"1749","DOI":"10.1080\/002075498192940","volume":"36","author":"HS Min","year":"1998","unstructured":"Min, H. S., Yih, Y., & Kim, C. O. (1998). A competitive neural network approach to multi-objective FMS scheduling. International Journal of Production Research, 36, 1749\u20131765.","journal-title":"International Journal of Production Research"},{"key":"763_CR28","doi-asserted-by":"crossref","first-page":"2345","DOI":"10.1080\/0020754031000077275","volume":"41","author":"HS Min","year":"2003","unstructured":"Min, H. S., & Yih, Y. (2003a). Development of a real-time multi-objective scheduler for a semiconductor fabrication system. International Journal of Production Research, 41, 2345\u20132364.","journal-title":"International Journal of Production Research"},{"key":"763_CR29","doi-asserted-by":"crossref","first-page":"3921","DOI":"10.1080\/0020754031000118099","volume":"41","author":"HS Min","year":"2003","unstructured":"Min, H. S., & Yih, Y. (2003b). Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system. International Journal of Production Research, 41, 3921\u20133941.","journal-title":"International Journal of Production Research"},{"key":"763_CR30","doi-asserted-by":"crossref","first-page":"555","DOI":"10.1016\/j.compchemeng.2010.01.010","volume":"34","author":"OB Senties","year":"2010","unstructured":"Senties, O. B., Azzaro-Pantel, C., Pibouleau, L., & Domenech, S. (2010). Multiobjective scheduling for semiconductor manufacturing plants. Computers and Chemical Engineering, 34, 555\u2013566.","journal-title":"Computers and Chemical Engineering"},{"key":"763_CR31","doi-asserted-by":"crossref","unstructured":"Sha, D. Y., & Liu, C. Y. (2003). A simulated annealing algorithm for integration of shop floor control strategies in semiconductor wafer fabrication. International Journal of Advanced Manufacturing Technology, 22, 75\u201388.","DOI":"10.1007\/s00170-002-1444-6"},{"key":"763_CR32","doi-asserted-by":"crossref","first-page":"879","DOI":"10.1080\/00207549008942761","volume":"28","author":"ML Spearman","year":"1990","unstructured":"Spearman, M. L., Woodruff, D. L., & Hopp, W. J. (1990). CONWIP: A pull alternative to kanban. International Journal of Production Research, 28, 879\u2013894.","journal-title":"International Journal of Production Research"},{"key":"763_CR33","unstructured":"Thompson, M. (1996). Simulation-based scheduling: Meeting the semiconductor wafer fabrication challenge. IIE Solutions, 28, 30\u201334."},{"key":"763_CR34","doi-asserted-by":"crossref","first-page":"1373","DOI":"10.1080\/00207540600570432","volume":"46","author":"S Wadhwa","year":"2008","unstructured":"Wadhwa, S., Saxena, A., & Chan, F. T. S. (2008). Framework for flexibility in dynamic supply chain management. International Journal of Production Research, 46, 1373\u20131404.","journal-title":"International Journal of Production Research"},{"key":"763_CR35","doi-asserted-by":"crossref","first-page":"2271","DOI":"10.1007\/s10845-011-0571-z","volume":"23","author":"IL Wang","year":"2012","unstructured":"Wang, I. L., Yang, T., & Chang, Y. B. (2012). Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints. Journal of Intelligent Manufacturing, 23, 2271\u20132280.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"763_CR36","doi-asserted-by":"crossref","first-page":"2047","DOI":"10.1007\/s10845-011-0531-7","volume":"23","author":"CN Wang","year":"2012","unstructured":"Wang, C. N., & Chen, L. C. (2012). The heuristic preemptive dispatching method of material transportation system in 300 mm semiconductor fabrication. Journal of Intelligent Manufacturing, 23, 2047\u20132056.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"763_CR37","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1109\/66.4384","volume":"1","author":"LM Wein","year":"1988","unstructured":"Wein, L. M. (1988). Scheduling semiconductor wafer fabrication. IEEE Transactions on Semiconductor Manufacturing, 1, 115\u2013130.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"763_CR38","doi-asserted-by":"crossref","first-page":"2255","DOI":"10.1007\/s10845-011-0570-0","volume":"23","author":"JZ Wu","year":"2012","unstructured":"Wu, J. Z., Hao, X. C., Chien, C. F., & Gen, M. (2012). A novel bi-vector encoding genetic algorithm for the simultaneous multiple resources scheduling problem. Journal of Intelligent Manufacturing, 23, 2255\u20132270.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"763_CR39","doi-asserted-by":"crossref","first-page":"3333","DOI":"10.1080\/00207540701805638","volume":"47","author":"H Zhang","year":"2009","unstructured":"Zhang, H., Jiang, Z., & Guo, C. (2009). An optimised dynamic bottleneck dispatching policy for semiconductor wafer fabrication. International Journal of Production Research, 47, 3333\u20133343.","journal-title":"International Journal of Production Research"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0763-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0763-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0763-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:57Z","timestamp":1559268717000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0763-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,4,2]]},"references-count":39,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,2]]}},"alternative-id":["763"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0763-9","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,4,2]]}}}