{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,10]],"date-time":"2026-03-10T14:42:47Z","timestamp":1773153767538,"version":"3.50.1"},"reference-count":41,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2013,4,9]],"date-time":"2013-04-09T00:00:00Z","timestamp":1365465600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,2]]},"DOI":"10.1007\/s10845-013-0766-6","type":"journal-article","created":{"date-parts":[[2013,4,8]],"date-time":"2013-04-08T04:04:13Z","timestamp":1365393853000},"page":"111-122","source":"Crossref","is-referenced-by-count":60,"title":["Multi-objective modeling for preventive maintenance scheduling in a multiple production line"],"prefix":"10.1007","volume":"26","author":[{"given":"V.","family":"Ebrahimipour","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"A.","family":"Najjarbashi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Sheikhalishahi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,4,9]]},"reference":[{"key":"766_CR1","doi-asserted-by":"crossref","first-page":"276","DOI":"10.1108\/13552510710780294","volume":"13","author":"M Alardhi","year":"2007","unstructured":"Alardhi, M., Hannam, R. G., & Labib, A. W. (2007). Preventive maintenance scheduling for multi-cogeneration plants with production constraints. Journal of Quality in Maintenance Engineering, 13, 276\u2013292.","journal-title":"Journal of Quality in Maintenance Engineering"},{"key":"766_CR2","volume-title":"Repairable systems reliability: Modeling, inference misconceptions and their causes","author":"H Ascher","year":"1984","unstructured":"Ascher, H., & Feingold, H. (1984). Repairable systems reliability: Modeling, inference misconceptions and their causes. New York: Marcel Dekker inc."},{"key":"766_CR3","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1007\/s10589-006-6449-x","volume":"35","author":"M Bartholomew-Biggs","year":"2006","unstructured":"Bartholomew-Biggs, M., Christianson, B., & Zuo, M. (2006). Optimizing preventive maintenance models. Computational Optimization and Applications, 35, 261\u2013279.","journal-title":"Computational Optimization and Applications"},{"key":"766_CR4","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1016\/S0951-8320(03)00166-2","volume":"82","author":"R Bris","year":"2003","unstructured":"Bris, R., Chatelet, E., & Yalaoui, F. (2003). New method to minimize the preventive maintenance cost of series-parallel systems. Reliability Engineering and System Safety, 82, 247\u2013255.","journal-title":"Reliability Engineering and System Safety"},{"key":"766_CR5","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1109\/TR.1986.4335355","volume":"35","author":"R Canfield","year":"1986","unstructured":"Canfield, R. (1986). Cost optimization of periodic preventive maintenance. Reliability, IEEE Transactions on, 35, 78\u201381.","journal-title":"Reliability, IEEE Transactions on"},{"key":"766_CR6","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1016\/S0925-5273(01)00120-7","volume":"74","author":"G Cavory","year":"2001","unstructured":"Cavory, G., Dupas, R., & Goncalves, G. (2001). A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line. International Journal of Production Economics, 74, 135\u2013146.","journal-title":"International Journal of Production Economics"},{"key":"766_CR7","unstructured":"Che-Hua, L. (2007). Preventive maintenance scheduling via particle swarm optimization method. In International multi conference of engineers and computer scientists (pp. 121\u2013126). Hong Kong, China."},{"key":"766_CR8","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1016\/S0360-8352(97)00281-7","volume":"34","author":"I Dedopoulos","year":"1998","unstructured":"Dedopoulos, I., & Smeers, Y. (1998). An age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failures. Computers and Industrial Engineering, 34, 643\u2013654.","journal-title":"Computers and Industrial Engineering"},{"key":"766_CR9","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1080\/07408170500232545","volume":"38","author":"S El-Ferik","year":"2006","unstructured":"El-Ferik, S., & Ben-Daya, M. (2006). Age-based hybrid model for imperfect preventive maintenance. IIE Transactions, 38, 365\u2013375.","journal-title":"IIE Transactions"},{"key":"766_CR10","unstructured":"Goel, A. L., Nanda, P. S. & D\u2019sa, N. (1973). A statistical analysis of maintenance system simulation. In Proceedings of the 1973 annual reliability and maintainability, symposium. 125\u2013135."},{"key":"766_CR11","doi-asserted-by":"crossref","unstructured":"Hagmark, P. E., & Virtanen, S. (2007). Simulation and calculation of reliability performance and maintenance costs. Reliability and maintainability, symposium, 34\u201340.","DOI":"10.1109\/RAMS.2007.328102"},{"key":"766_CR12","first-page":"59","volume":"1","author":"F Harrou","year":"2009","unstructured":"Harrou, F., Tassadit, A., Bouyeddou, B., & Zeblah, A. (2009). Efficient optimization algorithm for preventive-maintenance in transmission systems. Journal of Modelling and Simulation of Systems, 1, 59\u201367.","journal-title":"Journal of Modelling and Simulation of Systems"},{"key":"766_CR13","doi-asserted-by":"crossref","unstructured":"Harrou, F., & Zeblah, A. (2009). Harmony search algorithm optimization for preventive maintenance-planing for transmission systems. In International conference on advances in computational tools for engineering applications (pp. 584\u2013590). Zouk Mosbeh, Lebanon.","DOI":"10.1109\/ACTEA.2009.5227951"},{"key":"766_CR14","doi-asserted-by":"crossref","first-page":"983","DOI":"10.1080\/07408170500232040","volume":"37","author":"HZ Huang","year":"2005","unstructured":"Huang, H. Z., Tian, Z., & Zou, M. J. (2005). Intelligent interactive multiobjective optimization method and its application to reliability optimization. IIE Transactions, 37, 983\u2013993.","journal-title":"IIE Transactions"},{"key":"766_CR15","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1109\/24.126665","volume":"41","author":"V Jayabalan","year":"1992","unstructured":"Jayabalan, V., & Chaudhuri, D. (1992). Cost optimization of maintenance scheduling for a system with assured reliability. Reliability, IEEE Transactions on, 41, 21\u201325.","journal-title":"Reliability, IEEE Transactions on"},{"key":"766_CR16","first-page":"2051","volume":"40","author":"Y Jin","year":"2006","unstructured":"Jin, Y., JiangG, Z., & Houu, W. (2006). Optimal policy research on reliability-centered preventive maintenance for multi-components equipment. Journal Shanghai Jiaotong University-Chinese Edition, 40, 2051.","journal-title":"Journal Shanghai Jiaotong University-Chinese Edition"},{"key":"766_CR17","doi-asserted-by":"crossref","first-page":"481","DOI":"10.1016\/0377-2217(93)E0316-P","volume":"84","author":"B Kralj","year":"1995","unstructured":"Kralj, B., & Petrovic, R. (1995). A multi-objective optimization approach to thermal generation units maintenance scheduling. European Journal of Operational Research, 84, 481\u2013493.","journal-title":"European Journal of Operational Research"},{"key":"766_CR18","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/j.ress.2005.01.004","volume":"91","author":"CMF Lapa","year":"2006","unstructured":"Lapa, C. M. F., Pereira, C. M. N. A., & De Barros, M. P. (2006). A model for preventive maintenance planning by genetic algorithms based in cost and reliability. Reliability Engineering and System Safety, 91, 233\u2013240.","journal-title":"Reliability Engineering and System Safety"},{"key":"766_CR19","first-page":"246","volume":"1","author":"RC Leou","year":"2003","unstructured":"Leou, R. C. (2003). A new method for unit maintenance scheduling based on genetic algorithm. Power Engineering Society General Meeting, 1, 246\u2013251.","journal-title":"Power Engineering Society General Meeting"},{"key":"766_CR20","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1002\/(SICI)1099-1638(200003\/04)16:2<157::AID-QRE311>3.0.CO;2-J","volume":"16","author":"G Levitin","year":"2000","unstructured":"Levitin, G., & Lisnianski, A. (2000). Short communication optimal replacement scheduling in multi-state series-parallel systems. Quality and Reliability Engineering International, 16, 157\u2013162.","journal-title":"Quality and Reliability Engineering International"},{"issue":"6","key":"766_CR21","doi-asserted-by":"crossref","first-page":"875","DOI":"10.1007\/s10845-009-0264-z","volume":"21","author":"W Liao","year":"2010","unstructured":"Liao, W., Pan, E., & Xi, L. (2010). Preventive maintenance scheduling for repairable system with deterioration. Journal of Intelligent Manufacturing, 21(6), 875\u2013884.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"766_CR22","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1142\/S0217595907001139","volume":"24","author":"JH Lim","year":"2007","unstructured":"Lim, J. H., & Park, D. H. (2007). Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances. Asia Pacific Journal of Operational Research, 24, 111.","journal-title":"Asia Pacific Journal of Operational Research"},{"key":"766_CR23","unstructured":"Lin, T. W., & Wang, C. H. (2010). A new approach to minimize non-periodic preventive maintenance cost using importance measures of components. Journal of Scientific and Industrial Research, 69, 667\u2013671."},{"key":"766_CR24","doi-asserted-by":"crossref","unstructured":"Lin, T. W., & Wang, C. H. (2012). A hybrid genetic algorithm to minimize the periodic preventive maintenance cost in a series parallel system. Journal of Intelligent Manufacturing, 23(4), 1225\u20131236.","DOI":"10.1007\/s10845-010-0406-3"},{"key":"766_CR25","doi-asserted-by":"crossref","unstructured":"Luxhoj, J. T., & Shyur, H. J. (1997). Comparison of proportional hazards models and neural networks for reliability estimation. Journal of Intelligent Manufacturing, 8(3), 227\u2013234.","DOI":"10.1023\/A:1018525308809"},{"key":"766_CR26","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1080\/05695557908974463","volume":"11","author":"MAK Malik","year":"1979","unstructured":"Malik, M. A. K. (1979). Reliable preventive maintenance scheduling. AIIE Transactions, 11, 221\u2013228.","journal-title":"AIIE Transactions"},{"key":"766_CR27","first-page":"10","volume":"54","author":"S McClymonds","year":"1987","unstructured":"McClymonds, S., & Winge, D. (1987). Optimization of nuclear plant preventive maintenance. Transactions of the American Nuclear Society (United States), 54, 10\u201312.","journal-title":"Transactions of the American Nuclear Society (United States),"},{"key":"766_CR28","unstructured":"Moghaddam, K. S. (2008). Preventive maintenance and replacement scheduling: models and algorithms. Ph.D Dissertation, University of Louisville."},{"key":"766_CR29","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1109\/24.3758","volume":"37","author":"T Nakagawa","year":"1988","unstructured":"Nakagawa, T. (1988). Sequential imperfect preventive maintenance policies. Reliability, IEEE Transactions on, 37, 295\u2013298.","journal-title":"Reliability, IEEE Transactions on"},{"issue":"2","key":"766_CR30","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1007\/s10845-009-0342-2","volume":"23","author":"H Oh","year":"2012","unstructured":"Oh, H., Shibutani, T., & Pecht, M. (2012). Precursor monitoring approach for reliability assessment of cooling fans. Journal of Intelligent Manufacturing, 23(2), 173\u2013178.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"766_CR31","unstructured":"Pereira, C., Lapa, C., Mol, A., & Da Luz, A. (2009). A PSO approach for preventive maintenance scheduling optimization. International Nuclear Atlantic Conference."},{"key":"766_CR32","doi-asserted-by":"crossref","first-page":"1969","DOI":"10.1016\/j.ejor.2005.12.015","volume":"177","author":"G Quan","year":"2007","unstructured":"Quan, G., Greenwood, G. W., Liu, D., & Hu, S. (2007). Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms. European Journal of Operational Research, 177, 1969\u20131984.","journal-title":"European Journal of Operational Research"},{"key":"766_CR33","doi-asserted-by":"crossref","first-page":"346","DOI":"10.1016\/j.ress.2004.09.005","volume":"89","author":"M Samrout","year":"2005","unstructured":"Samrout, M., Yalaoui, F., Chatelet, E., & Chebbo, N. (2005). New methods to minimize the preventive maintenance cost of series-parallel systems using ant colony optimization. Reliability Engineering and System Safety, 89, 346\u2013354.","journal-title":"Reliability Engineering and System Safety"},{"issue":"4","key":"766_CR34","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1007\/s10845-009-0313-7","volume":"22","author":"J Schutz","year":"2011","unstructured":"Schutz, J., Rezg, N., & Leger, J. B. (2011). Periodic and sequential preventive maintenance policies over a finite planning horizon with a dynamic failure law. Journal of Intelligent Manufacturing, 22(4), 523\u2013532.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"766_CR35","doi-asserted-by":"crossref","first-page":"332","DOI":"10.1109\/TR.2007.896747","volume":"56","author":"AH Shirmohammadi","year":"2007","unstructured":"Shirmohammadi, A. H., Zhang, Z. G., & Love, E. (2007). A computational model for determining the optimal preventive maintenance policy with random breakdowns and imperfect repairs. Reliability, IEEE Transactions on, 56, 332\u2013339.","journal-title":"Reliability, IEEE Transactions on"},{"key":"766_CR36","unstructured":"Suresh, K. & Kumarappan, N. (2006) .Combined genetic algorithm and simulated annealing for preventive unit maintenance scheduling in power system. Power Engineering Society General Meeting, ISBN: 1-4244-0493-2."},{"key":"766_CR37","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1109\/TR.2008.916874","volume":"57","author":"HA Taboada","year":"2008","unstructured":"Taboada, H. A., Espiritu, J. F., & Coit, D. W. (2008). MOMS-GA: A multi-objective multi-state genetic algorithm for system reliability optimization design problems. Reliability, IEEE Transactions on, 57, 182\u2013191.","journal-title":"Reliability, IEEE Transactions on"},{"key":"766_CR38","doi-asserted-by":"crossref","first-page":"769","DOI":"10.1080\/09537280600834452","volume":"17","author":"A Tam","year":"2006","unstructured":"Tam, A., Chan, W., & Price, J. (2006). Optimal maintenance intervals for a multi-component system. Production Planning and Control, 17, 769\u2013779.","journal-title":"Production Planning and Control"},{"key":"766_CR39","doi-asserted-by":"crossref","unstructured":"Tian, Z., & Liao, H. (2011). Condition based maintenance optimization for multi-component systems using proportional hazards model. Reliability Engineering and System Safety, 96, 581\u2013589.","DOI":"10.1016\/j.ress.2010.12.023"},{"key":"766_CR40","doi-asserted-by":"crossref","first-page":"1568","DOI":"10.1016\/j.ress.2009.02.021","volume":"94","author":"Z Tian","year":"2009","unstructured":"Tian, Z., Levitin, G., & Zuo, M. J. (2009). A joint reliability-redundancy optimization approach for multi-state series-parallel systems. Reliability Engineering and System Safety, 94, 1568\u20131576.","journal-title":"Reliability Engineering and System Safety"},{"key":"766_CR41","doi-asserted-by":"crossref","unstructured":"Wang, C. H., & Tsai, S. W. (2012). Optimizing bi-objective imperfect preventive maintenance model for series-parallel system using established hybrid genetic algorithm. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-012-0708-8 .","DOI":"10.1007\/s10845-012-0708-8"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0766-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0766-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0766-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,11]],"date-time":"2019-07-11T22:10:06Z","timestamp":1562883006000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0766-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,4,9]]},"references-count":41,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,2]]}},"alternative-id":["766"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0766-6","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,4,9]]}}}