{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,25]],"date-time":"2026-11-25T21:32:17Z","timestamp":1795642337463,"version":"4.11.3"},"reference-count":45,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2013,4,12]],"date-time":"2013-04-12T00:00:00Z","timestamp":1365724800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,2]]},"DOI":"10.1007\/s10845-013-0767-5","type":"journal-article","created":{"date-parts":[[2013,4,11]],"date-time":"2013-04-11T02:35:35Z","timestamp":1365647735000},"page":"123-138","source":"Crossref","is-referenced-by-count":31,"title":["Learning process on priority rules to solve the RCMPSP"],"prefix":"10.1007","volume":"26","author":[{"given":"E. P\u00e9rez","family":"V\u00e1zquez","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"M. Posada","family":"Calvo","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"P. Mart\u00edn","family":"Ord\u00f3\u00f1ez","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2013,4,12]]},"reference":[{"key":"767_CR1","doi-asserted-by":"crossref","unstructured":"Archimede, B., Letouzey, A., Memon, M. A., & Xu, J. (2013). Towards a distributed multi-agent framework for shared resources scheduling. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-013-0748-8 (Published on line).","DOI":"10.1007\/s10845-013-0748-8"},{"key":"767_CR2","doi-asserted-by":"crossref","unstructured":"Ash, R. (1999). Activity scheduling in the dynamic, multi-project setting: Choosing heuristics through deterministic simulation. In Proceedings of the 1999 winter simulation conference (pp. 937\u2013941). Pheoenix, USA.","DOI":"10.1145\/324898.324933"},{"key":"767_CR3","volume-title":"Introduction to sequencing and scheduling","author":"K Baker","year":"1974","unstructured":"Baker, K. (1974). Introduction to sequencing and scheduling. New York: Wiley."},{"key":"767_CR4","doi-asserted-by":"crossref","first-page":"212","DOI":"10.1016\/j.ijpe.2010.03.009","volume":"126","author":"T Browning","year":"2010","unstructured":"Browning, T., & Yassine, A. (2010a). Resource-constrained multi-project scheduling: Priority rule performance revisited. International Journal of Production Economics, 126, 212\u2013228. doi: 10.1016\/j.ijpe.2010.03.009 .","journal-title":"International Journal of Production Economics"},{"key":"767_CR5","doi-asserted-by":"crossref","unstructured":"Browning, T., & Yassine, A. (2010b). A test bank generator for resource-constrained multi-project scheduling problems. Journal of Scheduling. doi: 10.1007\/s10951-009-0131-y .","DOI":"10.1007\/s10951-009-0131-y"},{"issue":"4","key":"767_CR6","doi-asserted-by":"crossref","first-page":"527","DOI":"10.1023\/B:JIMS.0000034116.50789.df","volume":"15","author":"Y Canbolat","year":"2004","unstructured":"Canbolat, Y., & Gundogar, E. (2004). Fuzzy priority rule for job shop scheduling. Journal of Intelligent Manufacturing, 15(4), 527\u2013533. doi: 10.1023\/B:JIMS.0000034116.50789.df .","journal-title":"Journal of Intelligent Manufacturing"},{"key":"767_CR7","unstructured":"Chen, P., & Shahandashti, S. (2007). Simulated annealing algorithm for optimizing multi-project linear scheduling with multiple resource constratints. In 24th International symposium on automation & robotics in constructions."},{"key":"767_CR8","doi-asserted-by":"crossref","unstructured":"Chen, P., & Shahandashti, S. (2009). Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. Automation in Construction. doi: 10.1016\/j.autcon.2008.10.007 .","DOI":"10.1016\/j.autcon.2008.10.007"},{"key":"767_CR9","unstructured":"Chen, J., Jaong, W., Sun, C., Lee, H., Wu, J., & Ku, C. (2010). Applying genetic algorithm to resource constrained multi-project scheduling problems. Key Engineering Materials, 633, 419\u2013420. www.scientific.net\/KEM.419-420.633 ."},{"issue":"1","key":"767_CR10","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1080\/01446190110089718","volume":"20","author":"HN Chiu","year":"2002","unstructured":"Chiu, H. N., & Tsai, D. M. (2002). An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management & Economics, 20(1), 55\u201366. doi: 10.1080\/01446190110089718 .","journal-title":"Construction Management & Economics"},{"key":"767_CR11","unstructured":"Confessore, G., Giordani, S., & Rismondo, S. (2002). An auction based approach in decentralized project scheduling. In Proceedings of PMS 2002\u2014International workshop on project management and scheduling (pp. 110\u2013113). Valencia."},{"key":"767_CR12","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1007\/s10479-006-0158-9","volume":"150","author":"G Confessore","year":"2007","unstructured":"Confessore, G., Giordani, S., & Rismondo, S. (2007). A market-based multi-agent system model for decentralized multi-project scheduling. Annals of Operations Research, 150, 115\u2013135. doi: 10.1007\/s10479-006-0158-9 .","journal-title":"Annals of Operations Research"},{"key":"767_CR13","unstructured":"Davis, L. (1989). Adapting operators probabilities in genetic algorithms. In J. D. Schaffer (Ed.). Proceedings of the 3th international conference on genetic algorithms (pp. 375\u2013378). San Mateo: Kaufmann"},{"key":"767_CR14","doi-asserted-by":"crossref","first-page":"110","DOI":"10.1016\/0377-2217(91)90150-T","volume":"51","author":"RF Deckro","year":"1991","unstructured":"Deckro, R. F., Winkofsky, E. P., Hebert, J. E., & Gagnon, R. (1991). A decomposition approach to multi-project scheduling. European Journal of Operational Research, 51, 110\u2013118. doi: 10.1016\/0377-2217(91)90150-T .","journal-title":"European Journal of Operational Research"},{"key":"767_CR15","volume-title":"Project scheduling: A research handbook","author":"E Demeulemeester","year":"2002","unstructured":"Demeulemeester, E., & Herroelen, W. (2002). Project scheduling: A research handbook. Boston: Kluwer Academic Publishers."},{"issue":"2\u20133","key":"767_CR16","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1016\/S0377-2217(97)00280-4","volume":"106","author":"B Dodin","year":"1998","unstructured":"Dodin, B., Elimam, A. A., & Rolland, E. (1998). Tabu search in audit scheduling. European Journal of Operational Research, 106(2\u20133), 373\u2013392. doi: 10.1016\/S0377-2217(97)00280-4 .","journal-title":"European Journal of Operational Research"},{"key":"767_CR17","volume-title":"Genetic algorithms in search optimization and machine learning","author":"DE Goldberg","year":"1989","unstructured":"Goldberg, D. E. (1989). Genetic algorithms in search optimization and machine learning. Reading: Addison-Wesley."},{"key":"767_CR18","doi-asserted-by":"crossref","first-page":"1171","DOI":"10.1016\/j.ejor.2006.06.074","volume":"189","author":"JF Gon\u00e7alves","year":"2008","unstructured":"Gon\u00e7alves, J. F., Mendes, J. J. M., & Resende, M. G. C. (2008). A genetic algorithm for the resource constrained multi-project scheduling problem. European Journal of Operational Research, 189, 1171\u20131190. doi: 10.1016\/j.ejor.2006.06.074 .","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"767_CR19","doi-asserted-by":"crossref","first-page":"394","DOI":"10.1016\/S0377-2217(99)00485-3","volume":"127","author":"S Hartmann","year":"2000","unstructured":"Hartmann, S., & Kolisch, R. (2000). Experimental state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research, 127(2), 394\u2013407. doi: 10.1016\/S0377-2217(99)00485-3 .","journal-title":"European Journal of Operational Research"},{"key":"767_CR20","unstructured":"Herroelen, W. S. (2005). Project scheduling\u2014Theory and practice. Production and Operations Management, 14(4), 413\u2013432. doi: 10.5555\/ijop.2005.14.4.413 ."},{"issue":"6","key":"767_CR21","doi-asserted-by":"crossref","first-page":"565","DOI":"10.1111\/j.1475-3995.2007.00614.x","volume":"14","author":"J Homberger","year":"2007","unstructured":"Homberger, J. (2007). A multi-agent system for the decentralized resource-constrained multi-project scheduling problem. International Transactions in Operational Research, 14(6), 565\u2013589. doi: 10.1111\/j.1475-3995.2007.00614.x .","journal-title":"International Transactions in Operational Research"},{"key":"767_CR22","unstructured":"Jinghua, L., & Wenjian, L. (2005). An agent-based system for multi-project planning and scheduling. In: Proceedings of the IEEE international conference on mechatronics & automation."},{"issue":"3","key":"767_CR23","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/0272-6963(95)00032-1","volume":"14","author":"R Kolisch","year":"1996","unstructured":"Kolisch, R. (1996). Efficient priority rules for the resource constrained project scheduling problem. Journal of Operations Management, 14(3), 179\u2013192. doi: 10.1016\/0272-6963(95)00032-1 .","journal-title":"Journal of Operations Management"},{"key":"767_CR24","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1007\/978-1-4615-5533-9_7","volume-title":"Handbook on recent advances in project scheduling","author":"R Kolisch","year":"1999","unstructured":"Kolisch, R., & Hartmann, S. (1999). Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. In J. Weglarz (Ed.), Handbook on recent advances in project scheduling (pp. 147\u2013178). Boston: Kluwer Academic Publishers."},{"issue":"1","key":"767_CR25","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1016\/j.ejor.2005.01.065","volume":"174","author":"R Kolisch","year":"2006","unstructured":"Kolisch, R., & Hartmann, S. (2006). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research, 174(1), 23\u201337. doi: 10.1016\/j.ejor.2005.01.065 .","journal-title":"European Journal of Operational Research"},{"key":"767_CR26","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/S0377-2217(96)00170-1","volume":"96","author":"R Kolisch","year":"1996","unstructured":"Kolisch, R., & Sprecher, A. (1996). PSPLIB\u2014A project scheduling library. European Journal of Operational Research, 96, 205\u2013216. doi: 10.1016\/S0377-2217(96)00170-1 .","journal-title":"European Journal of Operational Research"},{"key":"767_CR27","doi-asserted-by":"crossref","unstructured":"Kolisch, R., Schwindt, C. & Sprecher, A. (1999) Benchmark instances for project scheduling problems. J. Weglarz (Ed.), Handbook on recent advances in project scheduling (pp. 197\u2013212). Kluwer","DOI":"10.1007\/978-1-4615-5533-9_9"},{"key":"767_CR28","unstructured":"Kotwani, K., Yassine, A., & Zhao, Y. (2006). Scheduling resource constrained multi project DSM using modified simple GA and OmeGA. Working paper. Department of IESE, UIUC."},{"key":"767_CR29","doi-asserted-by":"crossref","first-page":"360","DOI":"10.1007\/s00170-005-0199-2","volume":"31","author":"S Kumanan","year":"2006","unstructured":"Kumanan, S., Jegan, G., & Raja, K. (2006). Multi-project scheduling using a heuristic and a genetic algorithm. International Journal of Advanced Manufacturing Technology, 31, 360\u2013366. doi: 10.1007\/s00170-005-0199- .","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"767_CR30","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1287\/mnsc.28.2.161","volume":"28","author":"I Kurtulus","year":"1982","unstructured":"Kurtulus, I., & Davis, E. W. (1982). Multi-project scheduling: Categorization of heuristic rules performance. Management Science, 28(2), 161\u2013172. doi: 10.1287\/mnsc.28.2.161 .","journal-title":"Management Science"},{"issue":"1","key":"767_CR31","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1287\/opre.26.1.22","volume":"26","author":"JK Lenstra","year":"1978","unstructured":"Lenstra, J. K., & Kan, A. H. (1978). Complexity of scheduling under precedence constraints. Operations Research, 26(1), 22\u201335. doi: 10.1287\/opre.26.1.22 .","journal-title":"Operations Research"},{"key":"767_CR32","doi-asserted-by":"crossref","unstructured":"Linyi, D., & Yan, L. (2007). A particle swarm optimization for resource-constrained multi-project scheduling problem. . In International conference on computational intelligence and security (CIS 2007) (pp. 1010\u20131014).","DOI":"10.1109\/CIS.2007.157"},{"key":"767_CR33","doi-asserted-by":"crossref","first-page":"408","DOI":"10.1016\/S0377-2217(99)00490-7","volume":"127","author":"A Lova","year":"2000","unstructured":"Lova, A., Maroto, C., & Tormos, P. (2000). A multicriteria heuristic method to improve resource allocation in multi-project scheduling. European Journal of Operational Research, 127, 408\u2013424. doi: 10.1016\/S0377-2217(99)00490-7 .","journal-title":"European Journal of Operational Research"},{"key":"767_CR34","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1023\/A:1010966401888","volume":"102","author":"A Lova","year":"2001","unstructured":"Lova, A., & Tormos, P. (2001). Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Annals of Operations Research, 102, 263\u2013286. doi: 10.1023\/A:1010966401888 .","journal-title":"Annals of Operations Research"},{"key":"767_CR35","doi-asserted-by":"crossref","unstructured":"Man, Z., Wei, T., Xiang, L., & Lishan, K. (2008). Research on multi-project scheduling problem based on hybrid genetic algorithm. In Computer science and software engineering, 2008 international conference on (Vol. 1, pp. 390\u2013394).","DOI":"10.1109\/CSSE.2008.925"},{"key":"767_CR36","volume-title":"Evolutionary search and the job shop. Investigations on genetic algorithms for production scheduling","author":"DC Mattfeld","year":"1995","unstructured":"Mattfeld, D. C. (1995). Evolutionary search and the job shop. Investigations on genetic algorithms for production scheduling. Berlin: Springer."},{"key":"767_CR37","doi-asserted-by":"crossref","first-page":"1063","DOI":"10.1007\/s10845-011-0520-x","volume":"23","author":"S Meeran","year":"2012","unstructured":"Meeran, S., & Morshed, M. S. (2012). A hybrid genetic tabu search algorithm for solving job shop scheduling problems: A case study. Journal of Intelligent Manufacturing, 23, 1063\u20131078. doi: 10.1007\/s10845-011-0520-x .","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"767_CR38","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1016\/0263-7863(94)00019-9","volume":"13","author":"JH Payne","year":"1995","unstructured":"Payne, J. H. (1995). Management of multiple simultaneous projects: A state-of-the-art review. International Journal of Project Management, 13(3), 163\u2013168. doi: 10.1016\/0263-7863(94)00019-9 .","journal-title":"International Journal of Project Management"},{"issue":"3\/4","key":"767_CR39","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1023\/A:1024649709582","volume":"14","author":"E P\u00e9rez","year":"2003","unstructured":"P\u00e9rez, E., Herrera, F., & Hern\u00e1ndez, C. (2003). Finding multiple solutions in job shop scheduling by niching genetic algorithms. Journal of Intelligent manufacturing, 14(3\/4), 323\u2013341. doi: 10.1023\/A:1024649709582 .","journal-title":"Journal of Intelligent manufacturing"},{"key":"767_CR40","doi-asserted-by":"crossref","unstructured":"P\u00e9rez, E., Posada, M., & Herrera, F. (2012). Analysis of new niching genetic algorithms for finding multiple solutions in the job shop scheduling. Journal of Intelligent manufacturing, 23(3), 341\u2013356. doi: 10.1007\/s10845-010-0385-4 .","DOI":"10.1007\/s10845-010-0385-4"},{"key":"767_CR41","unstructured":"P\u00e9rez, E., Posada, M., & Lorenzana, A. (2010). Taking advantage of solving the resource constrained multi-project scheduling problems using multi-modal genetic algorithms. Soft Computing (in review process)."},{"issue":"1","key":"767_CR42","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1287\/mnsc.16.1.93","volume":"16","author":"B Pritsker","year":"1969","unstructured":"Pritsker, B., Watters, L. J., & Wolfe, P. M. (1969). Multi-project scheduling with limited resources: A zero-one programming approach. Management Science, 16(1), 93\u2013108. doi: 10.1287\/mnsc.16.1.93 .","journal-title":"Management Science"},{"key":"767_CR43","unstructured":"Schwindt, C. (1995). ProGen\/max: A new problem generator for different resource constrained project scheduling problems with minimal and maximal time lags. Report WIOR 449. Institut f\u00fcr Wirtschaftstheorie und Operations Research, Universit at Karlsruhe."},{"key":"767_CR44","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/0377-2217(93)E0294-8","volume":"80","author":"A Sprecher","year":"1995","unstructured":"Sprecher, A., Kolisch, R., & Drexl, A. (1995). Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research, 80, 94\u2013102. doi: 10.1016\/0377-2217(93)E0294-8 .","journal-title":"European Journal of Operational Research"},{"key":"767_CR45","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1109\/TEM.1981.6448589","volume":"28","author":"D Steward","year":"1981","unstructured":"Steward, D. (1981). The design structure system: A method for managing the design of complex systems. IEEE Transactions on Engineering Management, 28, 71\u201374.","journal-title":"IEEE Transactions on Engineering Management"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0767-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0767-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0767-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,7,25]],"date-time":"2020-07-25T07:05:02Z","timestamp":1595660702000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0767-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,4,12]]},"references-count":45,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,2]]}},"alternative-id":["767"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0767-5","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,4,12]]}}}