{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,5]],"date-time":"2026-09-05T05:44:50Z","timestamp":1788587090254,"version":"build-2803163510"},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2013,4,21]],"date-time":"2013-04-21T00:00:00Z","timestamp":1366502400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,2]]},"DOI":"10.1007\/s10845-013-0770-x","type":"journal-article","created":{"date-parts":[[2013,4,20]],"date-time":"2013-04-20T07:49:07Z","timestamp":1366444147000},"page":"159-168","source":"Crossref","is-referenced-by-count":58,"title":["A late acceptance hill-climbing algorithm for balancing two-sided assembly lines with multiple constraints"],"prefix":"10.1007","volume":"26","author":[{"given":"Biao","family":"Yuan","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Chaoyong","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xinyu","family":"Shao","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2013,4,21]]},"reference":[{"issue":"1","key":"770_CR1","first-page":"192","volume":"10","author":"A Abuhamdah","year":"2010","unstructured":"Abuhamdah, A. (2010). Experimental result of late acceptance randomized descent algorithm for solving course timetabling problems. International Journal of Computer Science and Network Security, 10(1), 192\u2013200.","journal-title":"International Journal of Computer Science and Network Security"},{"key":"770_CR2","doi-asserted-by":"crossref","unstructured":"Abuhamdah, A., & Ayob, M. (2010). Average late acceptance randomized descent algorithm for solving course timetabling problems. In Information Technology (ITSim), 2010 International Symposium (pp. 748\u2013753).","DOI":"10.1109\/ITSIM.2010.5561545"},{"issue":"10","key":"770_CR3","doi-asserted-by":"crossref","first-page":"2447","DOI":"10.1080\/00207549308956868","volume":"31","author":"J Bartholdi","year":"1993","unstructured":"Bartholdi, J. (1993). Balancing two-sided assembly lines: A case study. International Journal of Production Research, 31(10), 2447\u20132461.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"770_CR4","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1007\/s10845-005-6638-y","volume":"17","author":"A Baykasoglu","year":"2006","unstructured":"Baykasoglu, A. (2006). Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems. Journal of Intelligent Manufacturing, 17(2), 217\u2013232.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"770_CR5","doi-asserted-by":"crossref","first-page":"582","DOI":"10.1007\/s00170-006-0861-3","volume":"36","author":"A Baykasoglu","year":"2008","unstructured":"Baykasoglu, A., & Dereli, T. (2008). Two-sided assembly line balancing using an ant-colony-based heuristic. International Journal of Advanced Manufacturing Technology, 36, 582\u2013588.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"770_CR6","unstructured":"Burke, E. K., & Bykov, Y. (2008). A late acceptance strategy in hill-climbing for exam timetabling problems. In Conference on the practice and theory of automated timetabling, Montreal, Canada."},{"issue":"1","key":"770_CR7","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/j.cie.2011.08.015","volume":"62","author":"P Chutima","year":"2012","unstructured":"Chutima, P., & Chimklai, P. (2012). Multi-objective two-sided mixed-model assembly line balancing using particle swarm optimisation with negative knowledge. Computers & Industrial Engineering, 62(1), 39\u201355.","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"770_CR8","doi-asserted-by":"crossref","first-page":"435","DOI":"10.1016\/j.ejor.2007.01.022","volume":"186","author":"XF Hu","year":"2008","unstructured":"Hu, X. F., Wu, E. F., & Jin, Y. (2008). A station-oriented enumerative algorithm for two-sided assembly line balancing. European Journal of Operational Research, 186(1), 435\u2013440.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"770_CR9","doi-asserted-by":"crossref","first-page":"703","DOI":"10.1016\/j.ejor.2010.02.034","volume":"206","author":"XF Hu","year":"2010","unstructured":"Hu, X. F., Wu, E. F., Bao, J. S., & Jin, Y. (2010). A branch-and-bound algorithm to minimize the line length of a two-sided assembly line. European Journal of Operational Research, 206(3), 703\u2013707.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"770_CR10","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1080\/095372800232478","volume":"11","author":"YK Kim","year":"2000","unstructured":"Kim, Y. K., Kim, Y. H., & Kim, Y. J. (2000). Two-sided assembly line balancing: A genetic algorithm approach. Production Planning & Control, 11(1), 44\u201353.","journal-title":"Production Planning & Control"},{"issue":"3","key":"770_CR11","doi-asserted-by":"crossref","first-page":"853","DOI":"10.1016\/j.cor.2007.11.003","volume":"36","author":"YK Kim","year":"2009","unstructured":"Kim, Y. K., Song, W. S., & Kim, J. H. (2009). A mathematical model and a genetic algorithm for two-sided assembly line balancing. Computers & Operations Research, 36(3), 853\u2013865.","journal-title":"Computers & Operations Research"},{"issue":"3","key":"770_CR12","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1016\/S0360-8352(01)00029-8","volume":"40","author":"TO Lee","year":"2001","unstructured":"Lee, T. O., Kim, Y., & Kim, Y. K. (2001). Two-sided assembly line balancing to maximize work relatedness and slackness. Computers & Industrial Engineering, 40(3), 273\u2013292.","journal-title":"Computers & Industrial Engineering"},{"issue":"5","key":"770_CR13","doi-asserted-by":"crossref","first-page":"317","DOI":"10.3233\/IFS-2010-0464","volume":"21","author":"L Ozbakir","year":"2010","unstructured":"Ozbakir, L., & Tapkan, P. (2010). Balancing fuzzy multi-objective two-sided assembly lines via bees algorithm. Journal of Intelligent & Fuzzy Systems, 21(5), 317\u2013329.","journal-title":"Journal of Intelligent & Fuzzy Systems"},{"issue":"9","key":"770_CR14","doi-asserted-by":"crossref","first-page":"11947","DOI":"10.1016\/j.eswa.2011.03.089","volume":"38","author":"L Ozbakir","year":"2011","unstructured":"Ozbakir, L., & Tapkan, P. (2011). Bee colony intelligence in zone constrained two-sided assembly line balancing problem. Expert Systems with Applications, 38(9), 11947\u201311957.","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"770_CR15","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/j.ejor.2009.11.033","volume":"205","author":"U Ozcan","year":"2010","unstructured":"Ozcan, U. (2010). Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm. European Journal of Operational Research, 205(1), 81\u201397.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"770_CR16","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1007\/s10845-008-0108-2","volume":"20","author":"U Ozcan","year":"2009","unstructured":"Ozcan, U., & Toklu, B. (2009a). A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems. Journal of Intelligent Manufacturing, 20(1), 123\u2013136.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"770_CR17","doi-asserted-by":"crossref","first-page":"1955","DOI":"10.1016\/j.cor.2008.06.009","volume":"36","author":"U Ozcan","year":"2009","unstructured":"Ozcan, U., & Toklu, B. (2009b). Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models. Computers & Operations Research, 36(6), 1955\u20131965.","journal-title":"Computers & Operations Research"},{"key":"770_CR18","doi-asserted-by":"crossref","first-page":"822","DOI":"10.1007\/s00170-008-1753-5","volume":"43","author":"U Ozcan","year":"2009","unstructured":"Ozcan, U., & Toklu, B. (2009c). A tabu search algorithm for two-sided assembly line balancing. International Journal of Advanced Manufacturing Technology, 43, 822\u2013829.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"770_CR19","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1016\/j.cie.2008.11.012","volume":"57","author":"U Ozcan","year":"2009","unstructured":"Ozcan, U., & Toklu, B. (2009d). Balancing of mixed-model two-sided assembly lines. Computers & Industrial Engineering, 57(1), 217\u2013227.","journal-title":"Computers & Industrial Engineering"},{"key":"770_CR20","doi-asserted-by":"crossref","unstructured":"Sabuncuoglu, I., Erel, E., & Tanyer, M. (2000). Assembly line balancing using genetic algorithms. Journal of Intelligent Manufacturing, 11(3), 295\u2013310.","DOI":"10.1023\/A:1008923410076"},{"issue":"2","key":"770_CR21","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1016\/j.cie.2007.10.007","volume":"56","author":"AS Simaria","year":"2009","unstructured":"Simaria, A. S., & Vilarinho, P. M. (2009). 2-ANTBAL: An ant colony optimisation algorithm for balancing two-sided assembly lines. Computers & Industrial Engineering, 56(2), 489\u2013506.","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"770_CR22","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1007\/s10845-007-0045-5","volume":"19","author":"SO Tasan","year":"2008","unstructured":"Tasan, S. O., & Tunali, S. (2008). A review of the current applications of genetic algorithms in assembly line balancing. Journal of Intelligent Manufacturing, 19(1), 49\u201369.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"770_CR23","doi-asserted-by":"crossref","first-page":"1039","DOI":"10.1007\/s11590-011-0344-9","volume":"6","author":"P Tapkan","year":"2012","unstructured":"Tapkan, P., Ozbakir, L., & Baykasoglu, A. (2012). Bees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem. Optimization Letters, 6(6), 1039\u20131049.","journal-title":"Optimization Letters"},{"key":"770_CR24","doi-asserted-by":"crossref","first-page":"457","DOI":"10.1007\/978-3-7908-2362-2_23","volume":"5","author":"J Verstichel","year":"2009","unstructured":"Verstichel, J., & Berghe, G. V. (2009). A late acceptance algorithm for the lock scheduling problem. Logistic Management, 5, 457\u2013478.","journal-title":"Logistic Management"},{"key":"770_CR25","doi-asserted-by":"crossref","first-page":"1009","DOI":"10.1007\/s00170-007-1286-3","volume":"39","author":"EF Wu","year":"2008","unstructured":"Wu, E. F., Jin, Y., Bao, J. S., & Hu, X. F. (2008). A branch-and-bound algorithm for two-sided assembly line balancing. International Journal of Advanced Manufacturing Technology, 39, 1009\u20131015.","journal-title":"International Journal of Advanced Manufacturing Technology"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0770-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0770-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0770-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,7,25]],"date-time":"2020-07-25T17:46:26Z","timestamp":1595699186000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0770-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,4,21]]},"references-count":25,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,2]]}},"alternative-id":["770"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0770-x","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,4,21]]}}}