{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,30]],"date-time":"2026-06-30T06:37:09Z","timestamp":1782801429300,"version":"3.54.5"},"reference-count":39,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2013,5,3]],"date-time":"2013-05-03T00:00:00Z","timestamp":1367539200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2014,10]]},"DOI":"10.1007\/s10845-013-0777-3","type":"journal-article","created":{"date-parts":[[2013,5,2]],"date-time":"2013-05-02T12:39:08Z","timestamp":1367498348000},"page":"899-911","source":"Crossref","is-referenced-by-count":8,"title":["Determining the operator-machine assignment for machine interference problem and an empirical study in semiconductor test facility"],"prefix":"10.1007","volume":"25","author":[{"given":"Chen-Fu","family":"Chien","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jia-Nian","family":"Zheng","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yi-Jay","family":"Lin","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2013,5,3]]},"reference":[{"issue":"10","key":"777_CR1","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0305-0548(99)00067-2","volume":"27","author":"RK Ahuja","year":"2000","unstructured":"Ahuja, R. K., Orlin, J. B., & Tiwari, A. (2000). A greedy genetic algorithm for the quadratic assignment problem. Computers and Operations Research, 27(10), 1\u201324.","journal-title":"Computers and Operations Research"},{"issue":"1","key":"777_CR2","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1111\/j.2517-6161.1950.tb00051.x","volume":"12","author":"MA Ashcroft","year":"1950","unstructured":"Ashcroft, M. A. (1950). The productivity of several machines under the care of one operator. Journal of the Royal Statistical Society (B), 12(1), 145\u2013151.","journal-title":"Journal of the Royal Statistical Society (B)"},{"issue":"4","key":"777_CR3","doi-asserted-by":"crossref","first-page":"753","DOI":"10.1016\/0360-8352(96)00027-7","volume":"30","author":"AA Bahnasawi","year":"1996","unstructured":"Bahnasawi, A. A., Mahmoud, M. S., & Eid, S. Z. (1996). Sensitivity analysis of machine interference in manufacturing systems. Computers and Industrial Engineering, 30(4), 753\u2013764.","journal-title":"Computers and Industrial Engineering"},{"issue":"12","key":"777_CR4","doi-asserted-by":"crossref","first-page":"2451","DOI":"10.1080\/00207540500045956","volume":"43","author":"FTS Chan","year":"2005","unstructured":"Chan, F. T. S., Wong, T. C., & Chan, L. Y. (2005). A genetic algorithm-based approach to machine assignment problem. International Journal of Production Research, 43(12), 2451\u20132472.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"777_CR5","doi-asserted-by":"crossref","first-page":"447","DOI":"10.1007\/s10845-009-0302-x","volume":"22","author":"W Chen","year":"2011","unstructured":"Chen, W., & Chien, C.-F. (2011). Measuring relative performance of wafer fabrication operations: A case study. Journal of Intelligent Manufacturing, 22(3), 447\u2013457.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"8","key":"777_CR6","doi-asserted-by":"crossref","first-page":"1763","DOI":"10.1080\/00207540500380981","volume":"45","author":"C-F Chien","year":"2007","unstructured":"Chien, C.-F., & Chen, C.-H. (2007a). Using GA and CTPN for modeling the optimization-based schedule generator of a generic production scheduling system. International Journal of Production Research, 45(8), 1763\u20131789.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"777_CR7","doi-asserted-by":"crossref","first-page":"528","DOI":"10.1109\/TSM.2007.907630","volume":"20","author":"C-F Chien","year":"2007","unstructured":"Chien, C.-F., & Chen, L.-F. (2007b). Using rough set theory to recruit and retain high-potential talents for semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 20(4), 528\u2013541.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"1","key":"777_CR8","doi-asserted-by":"crossref","first-page":"280","DOI":"10.1016\/j.eswa.2006.09.003","volume":"34","author":"C-F Chien","year":"2008","unstructured":"Chien, C.-F., & Chen, L.-F. (2008). Data mining to improve personnel selection and enhance human capital: A case study in high-technology industry. Expert Systems with Applications, 34(1), 280\u2013290.","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"777_CR9","doi-asserted-by":"crossref","first-page":"496","DOI":"10.1016\/j.ijpe.2010.07.022","volume":"128","author":"C-F Chien","year":"2010","unstructured":"Chien, C.-F., Chen, Y., & Peng, J. (2010). Manufacturing intelligence for semiconductor demand forecast based on technology diffusion and product life cycle. International Journal of Production Economics, 128(2), 496\u2013509.","journal-title":"International Journal of Production Economics"},{"key":"777_CR10","doi-asserted-by":"crossref","unstructured":"Chien, C.-F., & Hsu, C. (2006). A novel method for determining machine subgroups and backups with an empirical study for semiconductor manufacturing. Journal of Intelligent Manufacturing, 17(4), 429\u2013439.","DOI":"10.1007\/s10845-005-0016-7"},{"issue":"3","key":"777_CR11","doi-asserted-by":"crossref","first-page":"399","DOI":"10.1007\/s10845-009-0298-2","volume":"22","author":"C-F Chien","year":"2011","unstructured":"Chien, C.-F., & Hsu, C. (2011). UNISON analysis to model and reduce step-and-scan overlay errors for semiconductor manufacturing. Journal of Intelligent Manufacturing, 22(3), 399\u2013412.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"777_CR12","doi-asserted-by":"crossref","first-page":"2281","DOI":"10.1007\/s10845-011-0572-y","volume":"23","author":"C-F Chien","year":"2012","unstructured":"Chien, C.-F., Hsu, C., & Hsiao, C. (2012). Manufacturing intelligence to forecast and reduce semiconductor cycle time. Journal of Intelligent Manufacturing, 23(6), 2281\u20132294.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"777_CR13","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1016\/j.ijpe.2006.03.010","volume":"107","author":"C-F Chien","year":"2007","unstructured":"Chien, C.-F., Wang, H.-J., & Wang, M. (2007). A UNISON framework for analyzing alternative strategies of IC final testing for enhancing overall operational effectiveness. International Journal of Production Economics, 107(1), 20\u201330.","journal-title":"International Journal of Production Economics"},{"key":"777_CR14","doi-asserted-by":"crossref","unstructured":"Chien, C.-F., & Zheng, J.-N. (2012). Mini-max regret strategy for robust capacity expansion decisions in semiconductor manufacturing. Journal of Intelligent Manufacturing, 23(6), 2151\u20132159.","DOI":"10.1007\/s10845-011-0561-1"},{"issue":"2","key":"777_CR15","doi-asserted-by":"crossref","first-page":"210","DOI":"10.1109\/TSM.2010.2041399","volume":"23","author":"Y Deng","year":"2010","unstructured":"Deng, Y., Bard, J. F., Chacon, G. R., & Stuber, J. (2010). Scheduling back-end operations in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 23(2), 210\u2013220.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"777_CR16","volume-title":"Genetic algorithms and engineering design","author":"M Gen","year":"1997","unstructured":"Gen, M., & Cheng, R. (1997). Genetic algorithms and engineering design. New York: Wiley."},{"issue":"3","key":"777_CR17","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/S0166-5316(96)00046-6","volume":"29","author":"SM Gupta","year":"1996","unstructured":"Gupta, S. M. (1996). Machine interference problem with warm spares, server vacations and exhaustive service. Performance Evaluation, 29(3), 195\u2013211.","journal-title":"Performance Evaluation"},{"issue":"4","key":"777_CR18","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1016\/0166-5316(94)00035-2","volume":"24","author":"UC Gupta","year":"1996","unstructured":"Gupta, U. C., & Srinivasa Rao, T. S. S. (1996). Computing steady state probabilities in $$\\lambda \\text{(n)\/G\/1\/K }$$ \u03bb (n)\/G\/1\/K queue. Performance Evaluation, 24(4), 265\u2013275.","journal-title":"Performance Evaluation"},{"issue":"2","key":"777_CR19","doi-asserted-by":"crossref","first-page":"469","DOI":"10.1016\/j.ejor.2006.02.036","volume":"179","author":"L Haque","year":"2007","unstructured":"Haque, L., & Armstrong, M. J. (2007). A survey of the machine interference problem. European Journal of Operational Research, 179(2), 469\u2013482.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"777_CR20","doi-asserted-by":"crossref","first-page":"635","DOI":"10.1016\/S0026-2714(96)00072-8","volume":"37","author":"Y-C Hsieh","year":"1997","unstructured":"Hsieh, Y.-C. (1997). Optimal assignment of priorities for the machine interference problems. Microelectronics and Reliability, 37(4), 635\u2013640.","journal-title":"Microelectronics and Reliability"},{"issue":"14","key":"777_CR21","doi-asserted-by":"crossref","first-page":"3403","DOI":"10.1080\/002075400418315","volume":"38","author":"Y-F Hung","year":"2000","unstructured":"Hung, Y.-F., & Chen, I.-H. (2000). Dynamic operator assignment based on shifting machine loading. International Journal of Production Research, 38(14), 3403\u20133420.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"777_CR22","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1080\/00207540310001603747","volume":"42","author":"JP Ignizio","year":"2004","unstructured":"Ignizio, J. P. (2004). Optimal maintenance headcount allocation: An application of Chebyshev goal programming. International Journal of Production Research, 42(1), 201\u2013210.","journal-title":"International Journal of Production Research"},{"issue":"8","key":"777_CR23","doi-asserted-by":"crossref","first-page":"797","DOI":"10.1057\/jors.1993.138","volume":"44","author":"J Jackman","year":"1993","unstructured":"Jackman, J., & Johnson, E. (1993). The role of queueing network models in performance evaluation of manufacturing system. Journal of the Operation Research Society, 44(8), 797\u2013807.","journal-title":"Journal of the Operation Research Society"},{"key":"777_CR24","doi-asserted-by":"crossref","unstructured":"Lachenmaier, L. S., Cochran, J. K., (1996). Use of resource blocks in SLAM II for the evaluation of operator-machine assignments. In Proceedings of the 1996 winter simulation conference, pp. 1135\u20131140.","DOI":"10.1145\/256562.256923"},{"key":"777_CR25","volume-title":"Simulation modeling and analysis","author":"AM Law","year":"1991","unstructured":"Law, A. M., & Kelton, W. D. (1991). Simulation modeling and analysis (2nd ed.). New York: McGraw-Hill.","edition":"2"},{"key":"777_CR26","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1287\/opre.9.3.383","volume":"9","author":"JDC Little","year":"1961","unstructured":"Little, J. D. C. (1961). A proof for the queueing formula $$\\text{ L }=\\Lambda \\text{ w }$$ L = \u039b w . Operation Research, 9, 383\u2013387.","journal-title":"Operation Research"},{"issue":"3","key":"777_CR27","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1080\/00207540903555486","volume":"49","author":"X Luo","year":"2011","unstructured":"Luo, X., Li, W., Tu, Y., Xue, D., & Tang, J. (2011). Operator allocation planning for reconfigurable production line in one-of-a-kind production. International Journal of Production Research, 49(3), 689\u2013705.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"777_CR28","doi-asserted-by":"crossref","first-page":"300","DOI":"10.1016\/j.ijpe.2004.12.026","volume":"100","author":"D Nazzal","year":"2006","unstructured":"Nazzal, D., Mollaghasemi, M., & Anderson, D. (2006). A simulation-based evaluation of the cost of cycle time reduction in Agere Systems wafer fabrication facility: A case study. International Journal of Production Economics, 100(2), 300\u2013313.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"777_CR29","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/0360-8352(96)00102-7","volume":"31","author":"KH Oh","year":"1996","unstructured":"Oh, K. H. (1996). The computerized operator-machine system (OMS) for the least cost combination of operators and machines. Computers and Industrial Engineering, 31(1), 159\u2013162.","journal-title":"Computers and Industrial Engineering"},{"issue":"6","key":"777_CR30","doi-asserted-by":"crossref","first-page":"1605","DOI":"10.1080\/00207541003690090","volume":"49","author":"U \u00d6zcan","year":"2011","unstructured":"\u00d6zcan, U., Kelleg\u00f6z, T., & Toklu, B. (2011). A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem. International Journal of Production Research, 49(6), 1605\u20131626.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"777_CR31","first-page":"77","volume":"41","author":"A Raviv","year":"1998","unstructured":"Raviv, A. (1998). Optimal staffing in semiconductor manufacturing: A queueing theory approach. Solid State Technology, 41(4), 77\u201382.","journal-title":"Solid State Technology"},{"key":"777_CR32","doi-asserted-by":"crossref","unstructured":"Reeves, C. (1995). A genetic algorithm for flowshop sequencing. Computers & Operations Research, 22(1), 5\u201313.","DOI":"10.1016\/0305-0548(93)E0014-K"},{"issue":"3","key":"777_CR33","doi-asserted-by":"crossref","first-page":"655","DOI":"10.1016\/S0360-8352(97)00322-7","volume":"34","author":"MD Rossetti","year":"1998","unstructured":"Rossetti, M. D., & Clark, G. (1998). Evaluating a queueing approximation for the machine interference problem with two types of stoppages via simulation optimization. Computers Industrial Engineering, 34(3), 655\u2013668.","journal-title":"Computers Industrial Engineering"},{"issue":"9","key":"777_CR34","first-page":"1354","volume":"29","author":"EF Stafford","year":"1988","unstructured":"Stafford, E. F. (1988). An optimal solution technique for the operator-machine assignment problem. Production and Inventory Management Journal, 29(9), 1354\u20131359.","journal-title":"Production and Inventory Management Journal"},{"key":"777_CR35","doi-asserted-by":"crossref","first-page":"449","DOI":"10.1016\/j.cam.2009.07.043","volume":"233","author":"K-H Wang","year":"2009","unstructured":"Wang, K.-H., Chen, W.-L., & Yang, D.-Y. (2009). Optimal management of the machine repair problem with working vacation: Newton\u2019s method. Journal of Computational and Applied Mathematics, 233, 449\u2013458.","journal-title":"Journal of Computational and Applied Mathematics"},{"key":"777_CR36","doi-asserted-by":"crossref","unstructured":"Wu, J.-Z. (2013). Inventory write-down prediction for semiconductor manufacturing considering inventory age, accounting principle, and product structure with real settings. Computers & Industrial Engineering, 65(1), 128\u2013136.","DOI":"10.1016\/j.cie.2011.11.020"},{"key":"777_CR37","doi-asserted-by":"crossref","unstructured":"Wu, J.-Z., & Chien, C.-F. (2008). Modeling strategic semiconductor assembly outsourcing decisions based on empirical settings. OR Spectrum, 30(3), 401\u2013430.","DOI":"10.1007\/s00291-007-0120-5"},{"key":"777_CR38","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1016\/j.matcom.2006.04.002","volume":"73","author":"T Yang","year":"2007","unstructured":"Yang, T., Chen, M.-C., & Hung, C.-C. (2007). Multiple attribute decision-making methods for the dynamic operator allocation problem. Mathematics and Computers in Simulation, 73, 285\u2013299.","journal-title":"Mathematics and Computers in Simulation"},{"issue":"1","key":"777_CR39","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1016\/j.ejor.2004.02.025","volume":"167","author":"T Yang","year":"2005","unstructured":"Yang, T., Lee, R.-S., Chen, M.-C., & Chen, P. (2005). Queueing network model for a single-operator machine interference problem with external operations. European Journal of Operational Research, 167(1), 163\u2013178.","journal-title":"European Journal of Operational Research"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0777-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0777-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0777-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,5,9]],"date-time":"2024-05-09T23:59:30Z","timestamp":1715299170000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0777-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,5,3]]},"references-count":39,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2014,10]]}},"alternative-id":["777"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0777-3","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,5,3]]}}}