{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,17]],"date-time":"2025-10-17T13:42:24Z","timestamp":1760708544441},"reference-count":34,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2013,5,1]],"date-time":"2013-05-01T00:00:00Z","timestamp":1367366400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,4]]},"DOI":"10.1007\/s10845-013-0780-8","type":"journal-article","created":{"date-parts":[[2013,5,1]],"date-time":"2013-05-01T06:46:49Z","timestamp":1367390809000},"page":"269-280","source":"Crossref","is-referenced-by-count":37,"title":["Operating load based real-time rolling grey forecasting for machine health prognosis in dynamic maintenance schedule"],"prefix":"10.1007","volume":"26","author":[{"given":"Tangbin","family":"Xia","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiaoning","family":"Jin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lifeng","family":"Xi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yuejun","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jun","family":"Ni","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,5,1]]},"reference":[{"issue":"9","key":"780_CR1","doi-asserted-by":"crossref","first-page":"1670","DOI":"10.1016\/j.energy.2006.11.014","volume":"32","author":"D Akay","year":"2007","unstructured":"Akay, D., & Atak, M. (2007). Grey prediction with rolling mechanism for electricity demand forecasting of Turkey. Energy, 32(9), 1670\u20131675.","journal-title":"Energy"},{"issue":"1","key":"780_CR2","doi-asserted-by":"crossref","first-page":"212","DOI":"10.1016\/j.ijpe.2009.05.005","volume":"121","author":"I Alsyouf","year":"2009","unstructured":"Alsyouf, I. (2009). Maintenance practices in Swedish industries: Survey results. International Journal of Production Economics, 121(1), 212\u2013223.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"780_CR3","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1007\/s10845-009-0349-8","volume":"23","author":"A Bennane","year":"2012","unstructured":"Bennane, A., & Yacout, S. (2012). LAD-CBM; new data processing tool for diagnosis and prognosis in condition-based maintenance. Journal of Intelligent Manufacturing, 23(2), 265\u2013275.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"5","key":"780_CR4","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1016\/j.techfore.2003.09.002","volume":"72","author":"SC Chang","year":"2005","unstructured":"Chang, S. C., Lai, H. C., & Yu, H. C. (2005). A variable P value rolling Grey forecasting model for Taiwan semiconductor industry production. Technological Forecasting and Social Change, 72(5), 623\u2013640.","journal-title":"Technological Forecasting and Social Change"},{"key":"780_CR5","doi-asserted-by":"crossref","unstructured":"Chien, C. F., Hsu, C. Y., & Hsiao, C. W. (2012a). Manufacturing intelligence to forecast and reduce semiconductor cycle time. Journal of Intelligent Manufacturing, 23(6), 2281\u20132294.","DOI":"10.1007\/s10845-011-0572-y"},{"key":"780_CR6","doi-asserted-by":"crossref","unstructured":"Chien, C. F., Kim, K. H., Liu, B., & Gen, M. (2012b). Advanced decision and intelligence technologies for manufacturing and logistics. Journal of Intelligent Manufacturing, 23(6), 2133\u20132135.","DOI":"10.1007\/s10845-011-0559-8"},{"issue":"5","key":"780_CR7","doi-asserted-by":"crossref","first-page":"288","DOI":"10.1016\/S0167-6911(82)80025-X","volume":"1","author":"JL Deng","year":"1982","unstructured":"Deng, J. L. (1982). Control problems of grey system. Systems and Control Letters, 1(5), 288\u2013294.","journal-title":"Systems and Control Letters"},{"issue":"1","key":"780_CR8","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1007\/s10845-011-0533-5","volume":"24","author":"SG He","year":"2013","unstructured":"He, S. G., He, Z., & Wang, G. A. (2013). Online monitoring and fault identification of mean shifts in bivariate processes using decision tree learning techniques. Journal of Intelligent Manufacturing, 24(1), 25\u201334.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"11","key":"780_CR9","first-page":"13879","volume":"38","author":"LC Hsu","year":"2011","unstructured":"Hsu, L. C. (2011). Using improved grey forecasting models to forecast the output of opto-electronics industry. Expert Systems with Application, 38(11), 13879\u201313885.","journal-title":"Expert Systems with Application"},{"issue":"2","key":"780_CR10","doi-asserted-by":"crossref","first-page":"347","DOI":"10.1016\/j.ijpe.2009.03.005","volume":"119","author":"X Jin","year":"2009","unstructured":"Jin, X., Li, L., & Ni, J. (2009). Option model for joint production and preventive maintenance system. International Journal of Production Economics, 119(2), 347\u2013353.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"780_CR11","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1007\/s10845-009-0350-2","volume":"23","author":"P Joshi","year":"2012","unstructured":"Joshi, P., Imadabathuni, M., He, D., Al-Kateb, M., & Bechhoefer, E. (2012). Application of the condition based maintenance checking system for aircrafts. Journal of Intelligent Manufacturing, 23(2), 277\u2013288.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"780_CR12","doi-asserted-by":"crossref","first-page":"1184","DOI":"10.1016\/j.ejor.2007.02.046","volume":"186","author":"LM Kung","year":"2008","unstructured":"Kung, L. M., & Yu, S. W. (2008). Prediction of index futures returns and the analysis of financial spillovers\u2014A comparison between GARCH and the grey theorem. European Journal of Operational Research, 186(3), 1184\u20131200.","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"780_CR13","doi-asserted-by":"crossref","first-page":"476","DOI":"10.1016\/j.compind.2006.02.014","volume":"57","author":"J Lee","year":"2006","unstructured":"Lee, J., Ni, J., Djurdjanovic, D., Qiu, H., & Liao, H. (2006). Intelligent prognostics tools and e-maintenance. Computers in Industry, 57(6), 476\u2013489.","journal-title":"Computers in Industry"},{"key":"780_CR14","volume-title":"Industrial and business forecasting methods: A practical guide to exponential smoothing and curve fitting","author":"C Lewis","year":"1982","unstructured":"Lewis, C. (1982). Industrial and business forecasting methods: A practical guide to exponential smoothing and curve fitting. London: Butterworth Scientific."},{"issue":"6","key":"780_CR15","doi-asserted-by":"crossref","first-page":"875","DOI":"10.1007\/s10845-009-0264-z","volume":"21","author":"W Liao","year":"2010","unstructured":"Liao, W., Pan, E., & Xi, L. (2010). Preventive maintenance scheduling for repairable system with deterioration. Journal of Intelligent Manufacturing, 21(6), 875\u2013884.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1\u20134","key":"780_CR16","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1007\/s00170-011-3884-3","volume":"63","author":"W Liao","year":"2012","unstructured":"Liao, W., Wang, Y., & Pan, E. (2012). Single-machine-based predictive maintenance model considering intelligent machinery prognostics. International Journal of Advanced Manufacturing Technology, 63(1\u20134), 51\u201363.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"5","key":"780_CR17","doi-asserted-by":"crossref","first-page":"1671","DOI":"10.1007\/s10845-010-0468-2","volume":"23","author":"HL Lin","year":"2012","unstructured":"Lin, H. L. (2012). The use of the Taguchi method with grey relational analysis and a neural network to optimize a novel GMA welding process. Journal of Intelligent Manufacturing, 23(5), 1671\u20131680.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"4","key":"780_CR18","doi-asserted-by":"crossref","first-page":"1225","DOI":"10.1007\/s10845-010-0406-3","volume":"23","author":"TW Lin","year":"2012","unstructured":"Lin, T. W., & Wang, C. H. (2012). A hybrid genetic algorithm to minimize the periodic preventive maintenance cost in a series-parallel system. Journal of Intelligent Manufacturing, 23(4), 1225\u20131236.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"780_CR19","first-page":"811","volume":"16","author":"D Ma","year":"2011","unstructured":"Ma, D., Zhang, Q., Peng, Y., & Liu, S. (2011). A Particle Swarm Optimization Based Grey Forecast Model of Underground Pressure for Working Surface. Electronic Journal of Geotechnical Engineering, 16, 811\u2013830.","journal-title":"Electronic Journal of Geotechnical Engineering"},{"key":"780_CR20","volume-title":"An introduction to predictive maintenance","author":"RK Mobley","year":"2002","unstructured":"Mobley, R. K. (2002). An introduction to predictive maintenance. New York: Butterworth-Heinemann, Elsevier Science."},{"key":"780_CR21","doi-asserted-by":"crossref","unstructured":"Pham, H., & Wang, H. (1996). Imperfect maintenance. European Journal of Operational Research, 94(3), 425\u2013438.","DOI":"10.1016\/0377-2217(96)00099-9"},{"issue":"6","key":"780_CR22","doi-asserted-by":"crossref","first-page":"2085","DOI":"10.1007\/s10845-011-0549-x","volume":"23","author":"LI Rusu","year":"2012","unstructured":"Rusu, L. I., Rahayu, W., Torabi, T., Puersch, F., Coronado, W., Harris, A. T., et al. (2012). Moving towards a collaborative decision support system for aeronautical data. Journal of Intelligent Manufacturing, 23(6), 2085\u20132100.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"780_CR23","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s10845-011-0543-3","volume":"24","author":"J Schutz","year":"2013","unstructured":"Schutz, J., Rezg, N., & Leger, J. B. (2013). An integrated strategy for efficient business plan and maintenance plan for systems with a dynamic failure distribution. Journal of Intelligent Manufacturing, 24(1), 87\u201397.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"780_CR24","doi-asserted-by":"crossref","unstructured":"Sheu, D. D., & Kuo, J. Y. (2006). A model for preventive maintenance operations and forecasting. Journal of Intelligent Manufacturing, 17(4), 441\u2013451.","DOI":"10.1007\/s10845-005-0017-6"},{"issue":"1","key":"780_CR25","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1016\/j.ijpe.2009.10.018","volume":"124","author":"K Sun","year":"2010","unstructured":"Sun, K., & Li, H. (2010). Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines. International Journal of Production Economics, 124(1), 151\u2013158.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"780_CR26","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1007\/s10845-009-0356-9","volume":"23","author":"ZG Tian","year":"2012","unstructured":"Tian, Z. G. (2012). An artificial neural network method for remaining useful life prediction of equipment subject to condition monitoring. Journal of Intelligent Manufacturing, 23(2), 227\u2013237.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"780_CR27","doi-asserted-by":"crossref","first-page":"256","DOI":"10.1016\/j.amc.2007.04.080","volume":"195","author":"CH Wang","year":"2008","unstructured":"Wang, C. H., & Hsu, L. C. (2008). Using genetic algorithms grey theory to forecast high technology industrial output. Applied Mathematics and Computation, 195(1), 256\u2013263.","journal-title":"Applied Mathematics and Computation"},{"issue":"3","key":"780_CR28","doi-asserted-by":"crossref","first-page":"607","DOI":"10.1016\/j.cie.2012.01.014","volume":"63","author":"T Xia","year":"2012","unstructured":"Xia, T., Xi, L., Zhou, X., & Du, S. (2012). Modeling and optimizing maintenance schedule for energy systems subject to degradation. Computers and Industrial Engineering, 63(3), 607\u2013614.","journal-title":"Computers and Industrial Engineering"},{"key":"780_CR29","doi-asserted-by":"crossref","unstructured":"Xia, T., Xi, L., Zhou, X., & Lee, J. (2012). Dynamic maintenance decision-making for series-parallel manufacturing system based on MAM-MTW methodology. European Journal of Operational Research, 221(1), 231\u2013240.","DOI":"10.1016\/j.ejor.2012.03.027"},{"issue":"1","key":"780_CR30","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s10845-007-0047-3","volume":"19","author":"Z Yang","year":"2008","unstructured":"Yang, Z., Djurdjanovic, Z., & Ni, J. (2008). Maintenance scheduling in manufacturing systems based on predicted machine degradation. Journal of Intelligent Manufacturing, 19(1), 87\u201398.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2\u20133","key":"780_CR31","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1504\/IJCAT.2008.021933","volume":"33","author":"J Yu","year":"2008","unstructured":"Yu, J., & Xi, L. (2008). Intelligent monitoring and diagnosis of manufacturing process using an integrated approach of neural network ensemble and genetic algorithm. International Journal of Computer Applications in Technology, 33(2\u20133), 109\u2013119.","journal-title":"International Journal of Computer Applications in Technology"},{"issue":"1","key":"780_CR32","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1007\/s10845-011-0538-0","volume":"24","author":"F Zhang","year":"2013","unstructured":"Zhang, F., & Jiang, P. (2013). Complexity analysis of distributed measuring and sensing network in multistage machining processes. Journal of Intelligent Manufacturing, 24(1), 55\u201369.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"780_CR33","doi-asserted-by":"crossref","unstructured":"Zhou, P., Ang, B. W., & Poh, K. L. (2006). Decision analysis in energy and environmental modeling: An update. Energy, 31(14), 2268\u20132286.","DOI":"10.1016\/j.energy.2005.10.023"},{"key":"780_CR34","doi-asserted-by":"crossref","unstructured":"Zhou, X., Xi, L., & Lee, J. (2007). Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation. Reliability Engineering and System Safety, 92(4), 530\u2013534.","DOI":"10.1016\/j.ress.2006.01.006"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0780-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0780-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0780-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:58Z","timestamp":1559268718000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0780-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,5,1]]},"references-count":34,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2015,4]]}},"alternative-id":["780"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0780-8","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,5,1]]}}}