{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T12:35:50Z","timestamp":1759667750046},"reference-count":15,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2013,6,8]],"date-time":"2013-06-08T00:00:00Z","timestamp":1370649600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2014,10]]},"DOI":"10.1007\/s10845-013-0792-4","type":"journal-article","created":{"date-parts":[[2013,6,7]],"date-time":"2013-06-07T03:09:21Z","timestamp":1370574561000},"page":"1013-1024","source":"Crossref","is-referenced-by-count":15,"title":["A multi-objective genetic algorithm for yard crane scheduling problem with multiple work lines"],"prefix":"10.1007","volume":"25","author":[{"given":"Cheng-Ji","family":"Liang","sequence":"first","affiliation":[]},{"given":"Min","family":"Chen","sequence":"additional","affiliation":[]},{"given":"Mitsuo","family":"Gen","sequence":"additional","affiliation":[]},{"given":"Jungbok","family":"Jo","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,6,8]]},"reference":[{"key":"792_CR1","volume-title":"Network models and optimization: Multiobjective genetic algorithms approach","author":"M Gen","year":"2008","unstructured":"Gen, M., Cheng, R., & Lin, L. (2008). Network models and optimization: Multiobjective genetic algorithms approach. London: Springer."},{"key":"792_CR2","doi-asserted-by":"crossref","first-page":"136","DOI":"10.1016\/j.tre.2009.07.002","volume":"46","author":"JL He","year":"2010","unstructured":"He, J. L., Chang, D. F., & Mi, W. J. (2010). A hybrid parallel genetic algorithm for yard crane scheduling. Transportation Research Part E, 46, 136\u2013155.","journal-title":"Transportation Research Part E"},{"issue":"3\/4","key":"792_CR3","doi-asserted-by":"crossref","first-page":"673","DOI":"10.1016\/S0360-8352(97)00219-2","volume":"33","author":"KY Kim","year":"1997","unstructured":"Kim, K. Y., & Kim, K. H. (1997). A routing algorithm for a single transfer crane to load export containers onto a container ship. Computers & Industrial Engineering, 33(3\/4), 673\u2013676.","journal-title":"Computers & Industrial Engineering"},{"key":"792_CR4","doi-asserted-by":"crossref","unstructured":"Kim, K. H., & Kim, H. B. (1998). The optimal determination of the space requirement and the number of transfer cranes for import containers. Computers & Industrial Engineering, 35, 427\u2013430.","DOI":"10.1016\/S0360-8352(98)00125-9"},{"issue":"3","key":"792_CR5","doi-asserted-by":"crossref","first-page":"1021","DOI":"10.1016\/j.cie.2008.09.024","volume":"56","author":"CJ Liang","year":"2009","unstructured":"Liang, C. J., Huang, Y. F., & Yang, Y. (2009). A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning. Computers & Industrial Engineering, 56(3), 1021\u20131028.","journal-title":"Computers & Industrial Engineering"},{"issue":"4","key":"792_CR6","first-page":"375","volume":"18","author":"CJ Liang","year":"2011","unstructured":"Liang, C. J., Chen, M., & Ma, X. F. (2011a). Study on yard crane scheduling with multiple container flows in a container terminal. Journal of Quality, 18(4), 375\u2013392.","journal-title":"Journal of Quality"},{"key":"792_CR7","doi-asserted-by":"crossref","first-page":"471","DOI":"10.1007\/s10845-009-0304-8","volume":"22","author":"CJ Liang","year":"2011","unstructured":"Liang, C. J., Guo, J. Q., & Yang, Y. (2011b). Multiobjective hybrid genetic algorithm for quay crane dynamic assignment in berth allocation planning. Journal of Intelligent Manufacturing, 22, 471\u2013479.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"792_CR8","doi-asserted-by":"crossref","first-page":"2207","DOI":"10.1007\/s10845-011-0566-9","volume":"23","author":"CJ Liang","year":"2012","unstructured":"Liang, C. J., Hwang, H., & Gen, M. (2012). A berth allocation planning problem with direct transshipment consideration. Journal of Intelligent Manufacturing, 23, 2207\u20132214.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"792_CR9","doi-asserted-by":"crossref","first-page":"465","DOI":"10.1007\/s10845-005-0019-4","volume":"17","author":"L Lin","year":"2006","unstructured":"Lin, L., Shinn, S. W., Gen, M., & Hwang, H. (2006). Network model and effective evolutionary approach for AGV dispatching in manufacturing system. Journal of Intelligent Manufacturing, 17, 465\u2013477.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"792_CR10","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/s00500-008-0303-2","volume":"13","author":"L Lin","year":"2009","unstructured":"Lin, L., & Gen, M. (2009). Auto-tuning strategy for evolutionary algorithms: Balancing between exploration and exploitation. Soft Computing, 13, 157\u2013168.","journal-title":"Soft Computing"},{"key":"792_CR11","doi-asserted-by":"crossref","first-page":"2237","DOI":"10.1007\/s10845-011-0569-6","volume":"23","author":"L Lin","year":"2012","unstructured":"Lin, L., Hao, X. C., Gen, M., & Jo, J. B. (2012). Network modeling and evolutionary optimization for scheduling in manufacturing. Journal of Intelligent Manufacturing, 23, 2237\u20132253.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"792_CR12","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1080\/07408170304384","volume":"35","author":"IJ Linn","year":"2003","unstructured":"Linn, I. J., & Zhang, C.-Q. (2003). A heuristic for dynamic yard crane deployment in a container terminal. IIE Transactions, 35, 161\u2013174.","journal-title":"IIE Transactions"},{"key":"792_CR13","unstructured":"Xu, X. G. (2006). Yard crane operation control system in container terminal. Ph.D. dissertation at Shanghai Maritime University."},{"issue":"1","key":"792_CR14","first-page":"1720","volume":"27","author":"CX Yang","year":"2010","unstructured":"Yang, C. X., & Wang, N. (2010). Berth-quay crane allocation in container terminal based on multi-objective genetic algorithm. Application Research of Computers, 27(1), 1720\u20131725.","journal-title":"Application Research of Computers"},{"key":"792_CR15","doi-asserted-by":"crossref","first-page":"537","DOI":"10.1016\/S0191-2615(01)00017-0","volume":"36","author":"CQ Zhang","year":"2002","unstructured":"Zhang, C. Q., Wan, Y. W., & Liu, J. Y. (2002). Dynamic crane deployment in container storage yards. Transportation Research Part B, 36, 537\u2013555.","journal-title":"Transportation Research Part B"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0792-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0792-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0792-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:58Z","timestamp":1559254318000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0792-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,6,8]]},"references-count":15,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2014,10]]}},"alternative-id":["792"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0792-4","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,6,8]]}}}