{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,8]],"date-time":"2026-09-08T19:40:51Z","timestamp":1788896451103,"version":"build-2803163510"},"reference-count":29,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2013,8,9]],"date-time":"2013-08-09T00:00:00Z","timestamp":1376006400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,6]]},"DOI":"10.1007\/s10845-013-0819-x","type":"journal-article","created":{"date-parts":[[2013,8,8]],"date-time":"2013-08-08T08:03:17Z","timestamp":1375948997000},"page":"601-608","source":"Crossref","is-referenced-by-count":26,"title":["Hybrid hazard rate model for imperfect preventive maintenance of systems subject to random deterioration"],"prefix":"10.1007","volume":"26","author":[{"given":"Abdelhakim","family":"Khatab","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2013,8,9]]},"reference":[{"key":"819_CR1","doi-asserted-by":"crossref","unstructured":"Barlow, R., Proschan, F. (1996). Mathematical thoery of reliability. Reprint (31 Dec) edn, Society for industrial and applied mathematics, US.","DOI":"10.1137\/1.9781611971194"},{"issue":"1","key":"819_CR2","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1287\/opre.8.1.90","volume":"8","author":"R Barlow","year":"1960","unstructured":"Barlow, R., & Hunter, L. (1960). Optimum preventive maintenance policies. Operations Research, 8(1), 90\u2013100.","journal-title":"Operations Research"},{"key":"819_CR3","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1023\/A:1018570518804","volume":"8","author":"C Berenguer","year":"1997","unstructured":"Berenguer, C., Chu, C., & Grall, A. (1997). Inspection and maintenance planning: an application of semi-markov decision processes. Journal of Intelligent Manufacturing, 8, 467\u2013476.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"819_CR4","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(91)90141-H","volume":"51","author":"DI Cho","year":"1991","unstructured":"Cho, D. I., & Parlar, M. (1991). A survey of maintenance models for multi-unit systems. European Journal of Operational Research, 51, 1\u201323.","journal-title":"European Journal of Operational Research"},{"key":"819_CR5","doi-asserted-by":"crossref","unstructured":"Chouikhi, H., Khatab, A., & Rezg, N. (2012). A condition based maintenance policy for a production system under excessive environmental degradation. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-012-0715-9 .","DOI":"10.1007\/s10845-012-0715-9"},{"issue":"3","key":"819_CR6","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/0951-8320(95)00076-3","volume":"51","author":"R Dekker","year":"1996","unstructured":"Dekker, R. (1996). Application of maintenance optimization models: a review and analysis. Reliability Engineering and System Safety, 51(3), 229\u2013240.","journal-title":"Reliability Engineering and System Safety"},{"key":"819_CR7","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1080\/07408170500232545","volume":"38","author":"S El-Ferik","year":"2006","unstructured":"El-Ferik, S., & Ben-Daya, M. (2006). Age-based hybrid model for imperfect preventive maintenance. IIE Transactions, 38, 365\u2013375.","journal-title":"IIE Transactions"},{"issue":"4","key":"819_CR8","doi-asserted-by":"crossref","first-page":"989","DOI":"10.1080\/00207540600596882","volume":"45","author":"A Ghasemi","year":"2007","unstructured":"Ghasemi, A., Yacout, S., & Ouali, M. (2007). Optimal condition based maintenance with imperfect information and the proportional hazards model. International Journal of Production Research, 45(4), 989\u20131012.","journal-title":"International Journal of Production Research"},{"key":"819_CR9","volume-title":"Maintenance, replacement and reliability, theory and applications","author":"A Jardine","year":"2006","unstructured":"Jardine, A., & Tsang, A. (2006). Maintenance, replacement and reliability, theory and applications. London: Taylor and Francis."},{"issue":"6","key":"819_CR10","doi-asserted-by":"crossref","first-page":"885","DOI":"10.1007\/s10845-009-0364-9","volume":"22","author":"A Khatab","year":"2011","unstructured":"Khatab, A., Rezg, N., & Ait-Kadi, D. (2011). Optimum block replacement policy over a random time horizon. Journal of Intelligent Manufacturing, 22(6), 885\u2013889.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"819_CR11","doi-asserted-by":"crossref","unstructured":"Liao, W., Pan, E., & Xi, L. (2010). Preventive maintenance scheduling for repairable system with deterioration. Journal of Intelligent Manufacturing, 21(6), 875\u2013884.","DOI":"10.1007\/s10845-009-0264-z"},{"key":"819_CR12","doi-asserted-by":"crossref","unstructured":"Lin, D., Zuo, M. J., & Yam, R. C. M. (2000). General sequential imperfect preventive maintenance models. International Journal of Reliability, Quality and Safety Engineering, 7(3), 253\u2013266.","DOI":"10.1142\/S0218539300000213"},{"issue":"2","key":"819_CR13","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1002\/1520-6750(200103)48:2<172::AID-NAV5>3.0.CO;2-5","volume":"48","author":"D Lin","year":"2001","unstructured":"Lin, D., Zuo, M. J., & Yam, R. C. M. (2001). Sequential imperfect preventive maintenance models with two categories of failures modes. Naval Research Logistics, 48(2), 172\u2013183.","journal-title":"Naval Research Logistics"},{"key":"819_CR14","doi-asserted-by":"crossref","first-page":"943","DOI":"10.1002\/qre.859","volume":"23","author":"D Lugtighei","year":"2007","unstructured":"Lugtighei, D., Jardine, A., & Jiang, X. (2007). Optimizing the performance of a repairable system under a maintenance and repair contract. Quality and Reliability Engineering International, 23, 943\u2013960.","journal-title":"Quality and Reliability Engineering International"},{"issue":"3","key":"819_CR15","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1080\/05695557908974463","volume":"11","author":"M Malik","year":"1979","unstructured":"Malik, M. (1979). Reliable preventive maintenance scheduling. AIIE Transactions, 11(3), 221\u2013228.","journal-title":"AIIE Transactions"},{"issue":"3","key":"819_CR16","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1109\/24.3758","volume":"R\u201337","author":"T Nakagawa","year":"1988","unstructured":"Nakagawa, T. (1988). Sequential imperfect preventive maintenance policies. IEEE Transactions on Reliability, R\u201337(3), 295\u2013298.","journal-title":"IEEE Transactions on Reliability"},{"key":"819_CR17","volume-title":"Advanced reliability models and maintenance policies","author":"T Nakagawa","year":"2008","unstructured":"Nakagawa, T. (2008). Advanced reliability models and maintenance policies. Berlin: Springer."},{"issue":"1","key":"819_CR18","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/j.ress.2007.04.004","volume":"94","author":"T Nakagawa","year":"2009","unstructured":"Nakagawa, T., & Mizutani, S. (2009). A summary of maintenance policies for a finite interval. Reliability Engineering and System Safety, 94(1), 89\u201396.","journal-title":"Reliability Engineering and System Safety"},{"key":"819_CR19","doi-asserted-by":"crossref","unstructured":"Nguyen, D. G., & Murthy, D. N. P. (1981). Optimal preventive maintenance policies for repairable systems. Operations Research, 29, 1181\u20131194.","DOI":"10.1287\/opre.29.6.1181"},{"key":"819_CR20","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/0377-2217(96)00099-9","volume":"94","author":"H Pham","year":"1996","unstructured":"Pham, H., & Wang, W. (1996). Imperfect maintenance. European Journal of Operational Research, 94, 425\u2013438.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"819_CR21","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1007\/s10845-009-0313-7","volume":"22","author":"J Schutz","year":"2011","unstructured":"Schutz, J., Rezg, N., & Leger, J.-B. (2011). Periodic and sequential preventive maintenance policies over a finite planning horizon with a dynamic failure law. Journal of Intelligent Manufacturing, 22(4), 523\u2013532.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"4","key":"819_CR22","doi-asserted-by":"crossref","first-page":"441","DOI":"10.1007\/s10845-005-0017-6","volume":"17","author":"DD Sheu","year":"2006","unstructured":"Sheu, D. D., & Kuo, J. Y. (2006). A model for preventive maintenance operations and forcasting. Journal of Intelligent Manufacturing, 17(4), 441\u2013451.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"819_CR23","first-page":"210","volume":"198","author":"Y Sun","year":"2009","unstructured":"Sun, Y., Ma, L., & Morris, J. (2009). A practical approach for reliability prediction of pipeline systems. Transactions of the ASME, 198, 210\u2013214.","journal-title":"Transactions of the ASME"},{"key":"819_CR24","doi-asserted-by":"crossref","first-page":"581","DOI":"10.1016\/j.ress.2010.12.023","volume":"96","author":"Z Tian","year":"2011","unstructured":"Tian, Z., & Liao, H. (2011). Condition based maintenance optimization for multi component systems using proportional hazards model. Reliability Engineering and System Safety, 96, 581\u2013589.","journal-title":"Reliability Engineering and System Safety"},{"issue":"4","key":"819_CR25","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1108\/13552510010346798","volume":"6","author":"Y Won","year":"2000","unstructured":"Won, Y., & Chung, H. (2000). Optimum replacement intervals with random time horizon. Journal of Quality in Maintenance Engineering, 6(4), 269\u2013274.","journal-title":"Journal of Quality in Maintenance Engineering"},{"key":"819_CR26","doi-asserted-by":"crossref","unstructured":"Xia, T., Xi, L., Zhou, X., & Du, S. (2012). Modeling and optimizing maintenance schedule for energy systems subject to degradation. Computers and Industrial Engineering. doi: 10.1016\/j.cie.2012.01.014 .","DOI":"10.1016\/j.cie.2012.01.014"},{"issue":"1","key":"819_CR27","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s10845-007-0047-3","volume":"19","author":"ZM Yang","year":"2008","unstructured":"Yang, Z. M., Djurdjanovic, D., & Ni, J. (2008). Maintenance scheduling in manufacturing systems based on predicted machine degradation. Journal of Intelligent Manufacturing, 19(1), 87\u201398.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"819_CR28","doi-asserted-by":"crossref","first-page":"796","DOI":"10.1115\/1.2175155","volume":"128","author":"Y Zhao","year":"2006","unstructured":"Zhao, Y., Volovoi, V., Waters, M., & Mavris, D. (2006). A sequential approach for gas turbine power plant preventive maintenance scheduling. Transactions of the ASME, 128, 796\u2013805.","journal-title":"Transactions of the ASME"},{"issue":"4","key":"819_CR29","doi-asserted-by":"crossref","first-page":"530","DOI":"10.1016\/j.ress.2006.01.006","volume":"92","author":"X Zhou","year":"2007","unstructured":"Zhou, X., Xi, L., & Lee, J. (2007). Reliability-centered predictive maintenance scheduling for continuously monitored system subject to degradation. Reliability Engineering and System Safety, 92(4), 530\u2013534.","journal-title":"Reliability Engineering and System Safety"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0819-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0819-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0819-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:11:59Z","timestamp":1559254319000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0819-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,8,9]]},"references-count":29,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2015,6]]}},"alternative-id":["819"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0819-x","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,8,9]]}}}