{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T23:10:07Z","timestamp":1770505807524,"version":"3.49.0"},"reference-count":36,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2013,8,13]],"date-time":"2013-08-13T00:00:00Z","timestamp":1376352000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,10]]},"DOI":"10.1007\/s10845-013-0821-3","type":"journal-article","created":{"date-parts":[[2013,8,12]],"date-time":"2013-08-12T07:09:59Z","timestamp":1376291399000},"page":"861-871","source":"Crossref","is-referenced-by-count":21,"title":["A hybrid estimation of distribution algorithm for the semiconductor final testing scheduling problem"],"prefix":"10.1007","volume":"26","author":[{"given":"Shengyao","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ling","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Min","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ye","family":"Xu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,8,13]]},"reference":[{"key":"821_CR1","unstructured":"Baluja, S. (1994). Population-based incremental learning: A method for integrating genetic search based function optimization and competitive learning. Technical Report CMU-CS-94-163. Pittsburgh, PA: Carnegie Mellon University."},{"key":"821_CR2","unstructured":"Baluja, S., & Davies, S. (1997). Using optimal dependency-trees for combinatorial optimization: Learning the structure of the search space. In Proceedings of the 14th international conference on machine learning (pp. 30\u201338)."},{"issue":"11","key":"821_CR3","doi-asserted-by":"crossref","first-page":"2099","DOI":"10.1016\/j.patcog.2005.05.007","volume":"38","author":"RM Cesar","year":"2005","unstructured":"Cesar, R. M., Bengoetxea, E., Bloch, I., & Larranaga, P. (2005). Inexact graph matching for model-based recognition: Evaluation and comparison of optimization algorithms. Pattern Recognition, 38(11), 2099\u20132113.","journal-title":"Pattern Recognition"},{"issue":"1","key":"821_CR4","doi-asserted-by":"crossref","first-page":"24","DOI":"10.1016\/j.ijpe.2012.05.010","volume":"141","author":"SH Chen","year":"2013","unstructured":"Chen, S. H., & Chen, M. C. (2013). Addressing the advantages of using ensemble probabilistic models in estimation of distribution algorithms for scheduling problems. International Journal of Production Economics, 141(1), 24\u201333.","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"821_CR5","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1007\/s00291-006-0062-3","volume":"29","author":"CF Chien","year":"2007","unstructured":"Chien, C. F., & Chen, C. H. (2007a). A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups. OR Spectrum, 29(3), 391\u2013419.","journal-title":"OR Spectrum"},{"issue":"8","key":"821_CR6","doi-asserted-by":"crossref","first-page":"1763","DOI":"10.1080\/00207540500380981","volume":"45","author":"CF Chien","year":"2007","unstructured":"Chien, C. F., & Chen, C. H. (2007b). Using genetic algorithms (GA) and a colored timed Petri net (CTPN) for modeling the optimization-based schedule generator of a generic production scheduling system. International Journal of Production Research, 45(8), 1763\u20131789.","journal-title":"International Journal of Production Research"},{"key":"821_CR7","unstructured":"De Bonet, J. S., Isbell, C. L., Jr. & Viola, P. (1997). MIMIC: Finding optima by estimating probability densities. In M. C. Mozer, M. I. Jordan, & T. Petsche (Eds.), Advances in neural information processing systems (pp. 424\u2013430). Cambridge: MIT Press."},{"issue":"4","key":"821_CR8","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1109\/66.806130","volume":"12","author":"T Freed","year":"1999","unstructured":"Freed, T., & Leachman, R. (1999). Scheduling semiconductor device test operations on multihead testers. IEEE Transactions on Semiconductor Manufacturing, 12(4), 523\u2013530.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"821_CR9","doi-asserted-by":"crossref","unstructured":"Hao, X. C., Wu, J. Z., Chien, C. F., & Gen, M. (2013). The cooperative estimation of distribution algorithm: A novel approach for semiconductor final test scheduling problems. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-013-0746-x .","DOI":"10.1007\/s10845-013-0746-x"},{"key":"821_CR10","unstructured":"Harik, G. (1999). Linkage learning via probabilistic modeling in the ECGA. Illigal Report NO. 99010, Illinois Genetic Algorithms Lboratory, Illinois: University of Illinois at Urbana-Champaign."},{"key":"821_CR11","doi-asserted-by":"crossref","unstructured":"Harik, G. R., Lobo, F. G., & Goldberg, D. E. (1998). The compact genetic algorithm. In Proceedings of the IEEE conference on evolutionary computation (pp. 523\u2013528).","DOI":"10.1109\/ICEC.1998.700083"},{"issue":"9","key":"821_CR12","doi-asserted-by":"crossref","first-page":"2638","DOI":"10.1016\/j.cor.2008.11.004","volume":"36","author":"B Jarboui","year":"2009","unstructured":"Jarboui, B., Eddaly, M., & Siarry, P. (2009). An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems. Computer & Operations Research, 36(9), 2638\u20132646.","journal-title":"Computer & Operations Research"},{"key":"821_CR13","doi-asserted-by":"crossref","unstructured":"Jeng, W. D., & Tsai, M. S. (2010). Scheduling semiconductor final testing a DBR based simulation model. In The 40th international conference on computers and industrial engineering (pp. 1\u20136).","DOI":"10.1109\/ICCIE.2010.5668304"},{"key":"821_CR14","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-1539-5","volume-title":"Estimation of distribution algorithms: A new tool for evolutionary computation","author":"P Larranaga","year":"2002","unstructured":"Larranaga, P., & Lozano, J. A. (2002). Estimation of distribution algorithms: A new tool for evolutionary computation. Netherlands: Springer."},{"issue":"1","key":"821_CR15","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1080\/0020754032000123588","volume":"42","author":"JT Lin","year":"2004","unstructured":"Lin, J. T., Wang, F. K., & Lee, W. T. (2004). Capacity-constrained scheduling for a logic IC final test facility. International Journal of Production Research, 42(1), 79\u201399.","journal-title":"International Journal of Production Research"},{"key":"821_CR16","volume-title":"Design and analysis of experiments","author":"DC Montgomery","year":"2005","unstructured":"Montgomery, D. C. (2005). Design and analysis of experiments. Arizona: Wiley."},{"key":"821_CR17","first-page":"19","volume":"7","author":"H M\u00fchlenbein","year":"1999","unstructured":"M\u00fchlenbein, H., & Mahnig, T. (1999). Convergence theory and applications of the factorized distribution algorithm. Jounal of Computing and Information Technology, 7, 19\u201332.","journal-title":"Jounal of Computing and Information Technology"},{"key":"821_CR18","doi-asserted-by":"crossref","first-page":"178","DOI":"10.1007\/3-540-61723-X_982","volume":"1141","author":"H M\u00fchlenbein","year":"1996","unstructured":"M\u00fchlenbein, H., & Paass, G. (1996). From recombination of genes to the estimation of distributions I: Binary parameters. Lecture Notes in Computer Science, 1141, 178\u2013187.","journal-title":"Lecture Notes in Computer Science"},{"issue":"4","key":"821_CR19","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1007\/BF00170018","volume":"8","author":"IM Ovacik","year":"1996","unstructured":"Ovacik, I. M., & Uzsoy, R. (1996). Decomposition methods for scheduling semiconductor testing facilities. International Journal of Flexible Manufacturing Systems, 8(4), 357\u2013388.","journal-title":"International Journal of Flexible Manufacturing Systems"},{"issue":"3","key":"821_CR20","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/S0925-5273(03)00186-5","volume":"88","author":"WL Pearn","year":"2004","unstructured":"Pearn, W. L., Chung, S. H., Chen, A. Y., & Yang, M. H. (2004). A case study on the multistage IC final testing scheduling problem with reentry. International Journal of Production Economics, 88(3), 257\u2013267.","journal-title":"International Journal of Production Economics"},{"key":"821_CR21","unstructured":"Pelikan, M., Goldberg, D. E., & Cant\u00fa-Paz, E. (1999). BOA: The bayesian optimization algorithm. In Proceedings of the genetic and evolutionary computation (pp. 525\u2013532), San Francisco."},{"key":"821_CR22","doi-asserted-by":"crossref","first-page":"521","DOI":"10.1007\/978-1-4471-0819-1_39","volume-title":"Advances in soft computing: Engineering design and manufacturing","author":"M Pelikan","year":"1999","unstructured":"Pelikan, M., & M\u00fchlenbein, H. (1999). The bivariate marginal distribution algorithm. In J. M. Ben\u00edtez (Ed.), Advances in soft computing: Engineering design and manufacturing (pp. 521\u2013535). London: Springer."},{"issue":"suppl 2","key":"821_CR23","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1093\/bioinformatics\/btg1076","volume":"19","author":"Y Saeys","year":"2003","unstructured":"Saeys, Y., Degroeve, S., Aeyels, D., Van de Peer, Y., & Rouze, P. (2003). Fast feature selection using a simple estimation of distribution algorithm: A case study on splice site prediction. Bioinformatics, 19(suppl 2), 179\u2013188.","journal-title":"Bioinformatics"},{"key":"821_CR24","unstructured":"Sagarna, R., & Lozano, J. (2003). On the performance of estimation of distribution algorithms applied to software testing. Technical Report EHU-KZAA-IK-1\/03. The University of the Basque Country, Spain."},{"issue":"2","key":"821_CR25","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1142\/S0960313193000115","volume":"3","author":"R Uzsoy","year":"1993","unstructured":"Uzsoy, R., Church, L. K., Ovacik, I. M., & Hinchman, J. (1993). Performance evaluation of dispatching rules for semiconductor testing operations. Journal of Electronics Manufacturing, 3(2), 95\u2013105.","journal-title":"Journal of Electronics Manufacturing"},{"issue":"3","key":"821_CR26","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1002\/1520-6750(199204)39:3<369::AID-NAV3220390307>3.0.CO;2-F","volume":"39","author":"R Uzsoy","year":"1992","unstructured":"Uzsoy, R., Lee, C. Y., & Martin-Vega, L. A. (1992). Scheduling semiconductor test operations: Minimizing maximum lateness and number of tardy jobs on a single machine. Naval Research Logistics, 39(3), 369\u2013388.","journal-title":"Naval Research Logistics"},{"issue":"4","key":"821_CR27","doi-asserted-by":"crossref","first-page":"270","DOI":"10.1109\/66.97809","volume":"4","author":"R Uzsoy","year":"1991","unstructured":"Uzsoy, R., Martin-Vega, L. A., Lee, C. Y., & Leonard, P. A. (1991). Production scheduling algorithms for a semiconductor test facility. IEEE Transactions on Semiconductor Manufacturing, 4(4), 270\u2013280.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"2","key":"821_CR28","doi-asserted-by":"crossref","first-page":"449","DOI":"10.1016\/j.cor.2011.05.008","volume":"39","author":"L Wang","year":"2012","unstructured":"Wang, L., & Fang, C. (2012). An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem. Computer & Operations Research, 39(2), 449\u2013460.","journal-title":"Computer & Operations Research"},{"issue":"5","key":"821_CR29","doi-asserted-by":"crossref","first-page":"5593","DOI":"10.1016\/j.eswa.2011.11.058","volume":"39","author":"L Wang","year":"2012","unstructured":"Wang, L., Wang, S. Y., & Fang, C. (2012a). An effective hybrid EDA-based algorithm for solving multidimensional knapsack problem. Expert Systems with Applications, 39(5), 5593\u20135599.","journal-title":"Expert Systems with Applications"},{"key":"821_CR30","doi-asserted-by":"crossref","unstructured":"Wang, L., Wang, S. Y., & Liu, M. (2013a). A Pareto-based estimation of distribution algorithm for the multi-objective flexible job-shop scheduling problem. International Journal of Production Research, 51(12), 3574\u20133592.","DOI":"10.1080\/00207543.2012.752588"},{"key":"821_CR31","doi-asserted-by":"crossref","unstructured":"Wang, S. Y., Wang, L., Liu, M., & Xu, Y. (2013c). An enhanced estimation of distribution algorithm for solving hybrid flow-shop scheduling problem with identical parallel machines. The International Journal of Advanced Manufacturing Technology. doi: 10.1007\/s00170-013-4819-y .","DOI":"10.1007\/s00170-013-4819-y"},{"key":"821_CR32","doi-asserted-by":"crossref","unstructured":"Wang, S. Y., Wang, L., Xu, Y., & Liu, M. (2013b). An effective estimation of distribution algorithm for the flexible job-shop scheduling problem with fuzzy processing time. International Journal of Production Research, 51(12), 3778\u20133793.","DOI":"10.1080\/00207543.2013.765077"},{"issue":"4","key":"821_CR33","doi-asserted-by":"crossref","first-page":"917","DOI":"10.1016\/j.cie.2011.12.014","volume":"62","author":"L Wang","year":"2012","unstructured":"Wang, L., Wang, S. Y., Xu, Y., Zhou, G., & Liu, M. (2012b). A bi-population based estimation of distribution algorithm for the flexible job-shop scheduling problem. Computers & Industrial Engineering, 62(4), 917\u2013926.","journal-title":"Computers & Industrial Engineering"},{"issue":"1\u20132","key":"821_CR34","first-page":"485","volume":"35","author":"JZ Wu","year":"2008","unstructured":"Wu, J. Z., & Chien, C. F. (2008). Modeling semiconductor testing job scheduling and dynamic testing machine configuration. Expert Systems with Applications, 35(1\u20132), 485\u2013496.","journal-title":"Expert Systems with Applications"},{"issue":"6","key":"821_CR35","doi-asserted-by":"crossref","first-page":"2255","DOI":"10.1007\/s10845-011-0570-0","volume":"23","author":"JZ Wu","year":"2012","unstructured":"Wu, J. Z., Hao, X. C., Chien, C. F., & Gen, M. (2012). A novel bi-vector encoding genetic algorithm for the simultaneous multiple resources scheduling problem. Journal of Intelligent Manufacturing, 23(6), 2255\u20132270.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"821_CR36","doi-asserted-by":"crossref","first-page":"446","DOI":"10.1016\/j.ejor.2011.05.052","volume":"215","author":"ZC Zhang","year":"2011","unstructured":"Zhang, Z. C., Zheng, L., Hou, F., & Li, N. (2011). Semiconductor final test scheduling with Sarsa $$(\\lambda, \\text{ k })$$ ( \u03bb , k ) algorithm. European Journal of Operational Research, 215(2), 446\u2013458.","journal-title":"European Journal of Operational Research"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0821-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0821-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0821-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:59Z","timestamp":1559268719000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0821-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,8,13]]},"references-count":36,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2015,10]]}},"alternative-id":["821"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0821-3","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,8,13]]}}}