{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,30]],"date-time":"2026-09-30T07:24:58Z","timestamp":1790753098638,"version":"4.1.0"},"reference-count":43,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2013,8,22]],"date-time":"2013-08-22T00:00:00Z","timestamp":1377129600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,8]]},"DOI":"10.1007\/s10845-013-0827-x","type":"journal-article","created":{"date-parts":[[2013,8,21]],"date-time":"2013-08-21T06:35:29Z","timestamp":1377066929000},"page":"691-701","source":"Crossref","is-referenced-by-count":4,"title":["Using heuristic algorithms to solve the scheduling problems with job-dependent and machine-dependent learning effects"],"prefix":"10.1007","volume":"26","author":[{"given":"Peng-Jen","family":"Lai","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Hsien-Chung","family":"Wu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2013,8,22]]},"reference":[{"key":"827_CR1","doi-asserted-by":"crossref","first-page":"693","DOI":"10.1007\/s10845-009-0246-1","volume":"21","author":"J-P Arnaout","year":"2010","unstructured":"Arnaout, J.-P., Rabadi, G., & Musa, R. (2010). A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. Journal of Intelligent Manufacturing, 21, 693\u2013701.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"827_CR2","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1057\/palgrave.jors.2601689","volume":"55","author":"A Bachman","year":"2004","unstructured":"Bachman, A., & Janiak, A. (2004). Scheduling jobs with position-dependent processing times. Journal of Operational Research Society, 55, 257\u2013264.","journal-title":"Journal of Operational Research Society"},{"key":"827_CR3","doi-asserted-by":"crossref","first-page":"154","DOI":"10.1287\/ijoc.6.2.154","volume":"6","author":"JC Bean","year":"1994","unstructured":"Bean, J. C. (1994). Genetic algorithms and random keys for sequencing and optimization. ORSA Journal on Computing, 6, 154\u2013160.","journal-title":"ORSA Journal on Computing"},{"key":"827_CR4","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/S0377-2217(98)00246-X","volume":"115","author":"D Biskup","year":"1999","unstructured":"Biskup, D. (1999). Single-machine scheduling with learning considerations. European Journal of Operational Research, 115, 173\u2013178.","journal-title":"European Journal of Operational Research"},{"key":"827_CR5","doi-asserted-by":"crossref","first-page":"2476","DOI":"10.1016\/j.ins.2008.02.002","volume":"178","author":"TCE Cheng","year":"2008","unstructured":"Cheng, T. C. E., Wu, C. C., & Lee, W. C. (2008). Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects. Information Sciences, 178, 2476\u20132487.","journal-title":"Information Sciences"},{"key":"827_CR6","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1023\/A:1019216726076","volume":"98","author":"TCE Cheng","year":"2000","unstructured":"Cheng, T. C. E., & Wang, G. (2000). Single machine scheduling with learning effect considerations. Annals of Operations Research, 98, 273\u2013290.","journal-title":"Annals of Operations Research"},{"key":"827_CR7","doi-asserted-by":"crossref","DOI":"10.1007\/b99492","volume-title":"Ant colony optimization","author":"M Dorigo","year":"2004","unstructured":"Dorigo, M., & St\u00fctzle, T. (2004). Ant colony optimization. Cambridge: MIT Press."},{"key":"827_CR8","doi-asserted-by":"crossref","unstructured":"Eberhard, R. C., & Kennedy, J. (1995). A new optimizer using particle swarm theory. In Proceedings of the sixth international symposium on micro machine and human science, Nagoya, Japan (pp. 39\u201343).","DOI":"10.1109\/MHS.1995.494215"},{"key":"827_CR9","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1287\/opre.26.1.36","volume":"26","author":"T Gonzalez","year":"1978","unstructured":"Gonzalez, T., & Sahni, S. (1978). Flowshop and jobshop schedule: Complexity and approximation. Operations Research, 26, 36\u201352.","journal-title":"Operations Research"},{"key":"827_CR10","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1007\/s00170-008-1608-0","volume":"42","author":"H Hu","year":"2009","unstructured":"Hu, H., & Li, Z. (2009a). Modeling and scheduling for manufacturing grid workflows using timed Petri nets. The International Journal of Advanced Manufacturing Technology, 42, 553\u2013568.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"827_CR11","first-page":"1863","volume":"25","author":"H Hu","year":"2009","unstructured":"Hu, H., & Li, Z. (2009b). Liveness enforcing supervision in video streaming systems using siphons. Journal of Information Science and Engineering, 25, 1863\u20131884.","journal-title":"Journal of Information Science and Engineering"},{"key":"827_CR12","doi-asserted-by":"crossref","first-page":"1168","DOI":"10.1016\/j.cie.2009.05.006","volume":"57","author":"H Hu","year":"2009","unstructured":"Hu, H., & Li, Z. (2009c). Local and global deadlock prevention policies for resource allocation systems using partially generated reachability graphs. Computers and Industrial Engineering, 57, 1168\u20131181.","journal-title":"Computers and Industrial Engineering"},{"key":"827_CR13","doi-asserted-by":"crossref","first-page":"555","DOI":"10.1007\/s10845-009-0238-1","volume":"21","author":"H Hu","year":"2010","unstructured":"Hu, H., & Li, Z. (2010). Synthesis of liveness enforcing supervisor for automated manufacturing systems. Journal of Intelligent Manufacturing, 21, 555\u2013567.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"827_CR14","doi-asserted-by":"crossref","first-page":"505","DOI":"10.1016\/j.cie.2010.12.003","volume":"60","author":"H Hu","year":"2011","unstructured":"Hu, H., Li, Z., & Al-Ahmari, A. (2011). Reversed fuzzy Petri nets and their application for fault diagnosis. Computers and Industrial Engineering, 60, 505\u2013510.","journal-title":"Computers and Industrial Engineering"},{"key":"827_CR15","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, C. D., & Vecchi, M. P. (1983). Optimization by simulated annealing. Science, 220, 671\u2013680.","journal-title":"Science"},{"key":"827_CR16","doi-asserted-by":"crossref","first-page":"402","DOI":"10.1016\/j.ejor.2006.01.030","volume":"178","author":"C Koulamas","year":"2007","unstructured":"Koulamas, C., & Kyparisis, G. J. (2007). Single-machine and two-machine flowshop scheduling with general learning functions. European Journal of Operational Research, 178, 402\u2013407.","journal-title":"European Journal of Operational Research"},{"key":"827_CR17","doi-asserted-by":"crossref","first-page":"2099","DOI":"10.1016\/j.cor.2004.11.024","volume":"33","author":"W-H Kuo","year":"2006","unstructured":"Kuo, W.-H., & Yang, D.-L. (2006a). Single-machine group scheduling with a time-dependent learning effect. Computers and Operations Research, 33, 2099\u20132112.","journal-title":"Computers and Operations Research"},{"key":"827_CR18","doi-asserted-by":"crossref","first-page":"1184","DOI":"10.1016\/j.ejor.2005.03.020","volume":"174","author":"W-H Kuo","year":"2006","unstructured":"Kuo, W.-H., & Yang, D.-L. (2006b). Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect. European Journal of Operational Research, 174, 1184\u20131190.","journal-title":"European Journal of Operational Research"},{"key":"827_CR19","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1016\/j.ipl.2005.09.007","volume":"97","author":"W-H Kuo","year":"2006","unstructured":"Kuo, W.-H., & Yang, D.-L. (2006c). Minimizing the makespan in a single machine scheduling problem with a time-based learning effect. Information Processing Letter, 97, 64\u201367.","journal-title":"Information Processing Letter"},{"key":"827_CR20","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1016\/j.omega.2010.10.002","volume":"39","author":"P-J Lai","year":"2011","unstructured":"Lai, P.-J., & Lee, W.-C. (2011). Single-machine scheduling with general sum-of-processing time-based and position-based learning effects. Omega, 39, 467\u2013471.","journal-title":"Omega"},{"key":"827_CR21","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1142\/S0218488508005340","volume":"16","author":"P-J Lai","year":"2008","unstructured":"Lai, P.-J., & Wu, H.-C. (2008). Using genetic algorithms to solve fuzzy flow shop scheduling problems based on possibility and necessity measures. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 16, 409\u2013433.","journal-title":"International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems"},{"key":"827_CR22","doi-asserted-by":"crossref","first-page":"559","DOI":"10.1142\/S0218488509006145","volume":"17","author":"P-J Lai","year":"2009","unstructured":"Lai, P.-J., & Wu, H.-C. (2009). Using ant colony optimization to minimize the fuzzy makespan and total weighted fuzzy completion time in flow shop scheduling problems. The International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 17, 559\u2013584.","journal-title":"The International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems"},{"key":"827_CR23","first-page":"83","volume":"3","author":"WC Lee","year":"2004","unstructured":"Lee, W. C. (2004). A note on deteriorating jobs and learning in single-machine scheduling problems. International Journal of Business and Economics, 3, 83\u201389.","journal-title":"International Journal of Business and Economics"},{"key":"827_CR24","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/S0925-5273(03)00179-8","volume":"88","author":"W-C Lee","year":"2004","unstructured":"Lee, W.-C., & Wu, C.-C. (2004). Minimizing total completion time in a two-machine flowshop with a learning effect. International Journal of Production Economics, 88, 85\u201393.","journal-title":"International Journal of Production Economics"},{"key":"827_CR25","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1007\/s00236-003-0132-9","volume":"40","author":"W-C Lee","year":"2004","unstructured":"Lee, W.-C., Wu, C.-C., & Sung, H.-J. (2004). A bi-criterion single-machine scheduling problem with learning considerations. Acta Informatica, 40, 303\u2013315.","journal-title":"Acta Informatica"},{"key":"827_CR26","doi-asserted-by":"crossref","first-page":"3885","DOI":"10.1016\/j.ins.2009.07.011","volume":"179","author":"W-C Lee","year":"2009","unstructured":"Lee, W.-C., & Wu, C.-C. (2009). Some single-machine and m-machine flowshop scheduling problems with learning considerations. Information Sciences, 179, 3885\u20133892.","journal-title":"Information Sciences"},{"key":"827_CR27","doi-asserted-by":"crossref","first-page":"965","DOI":"10.1007\/s10845-009-0373-8","volume":"22","author":"HS Mirsanei","year":"2011","unstructured":"Mirsanei, H. S., Zandieh, M., Moayed, M. J., & Khabbazi, M. R. (2011). A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times. Journal of Intelligent Manufacturing, 22, 965\u2013978.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"827_CR28","doi-asserted-by":"crossref","first-page":"687","DOI":"10.1016\/S0377-2217(00)00175-2","volume":"132","author":"G Moshieov","year":"2001","unstructured":"Moshieov, G. (2001). Scheduling problems with a learning effect. European Journal of Operational Research, 132, 687\u2013693.","journal-title":"European Journal of Operational Research"},{"key":"827_CR29","doi-asserted-by":"crossref","first-page":"1165","DOI":"10.1057\/palgrave.jors.2601215","volume":"52","author":"G Moshieov","year":"2001","unstructured":"Moshieov, G. (2001). Parallel machine scheduling with a learning effect. Journal of Operational Research Society, 52, 1165\u20131169.","journal-title":"Journal of Operational Research Society"},{"key":"827_CR30","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1016\/S0377-2217(02)00358-2","volume":"147","author":"G Moshieov","year":"2003","unstructured":"Moshieov, G., & Sidney, J. B. (2003). Scheduling with general job-dependent learning curves. European Journal of Operational Research, 147, 665\u2013670.","journal-title":"European Journal of Operational Research"},{"key":"827_CR31","doi-asserted-by":"crossref","first-page":"110","DOI":"10.1057\/palgrave.jors.2601809","volume":"56","author":"G Moshieov","year":"2005","unstructured":"Moshieov, G., & Sidney, J. B. (2005). Note on scheduling with general learning curves to minimize the number of tardy jobs. Journal of Operational Research Society, 56, 110\u2013112.","journal-title":"Journal of Operational Research Society"},{"key":"827_CR32","doi-asserted-by":"crossref","first-page":"317","DOI":"10.1023\/B:JIMS.0000026570.03851.cc","volume":"15","author":"AC Nearchou","year":"2004","unstructured":"Nearchou, A. C. (2004). Flow-shop sequencing using hybrid simulated annealing. Journal of Intelligent Manufacturing, 15, 317\u2013328.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"827_CR33","doi-asserted-by":"crossref","first-page":"815","DOI":"10.1007\/s10845-009-0370-y","volume":"22","author":"EL Solano-Charris","year":"2011","unstructured":"Solano-Charris, E. L., Montoya-Torres, J. R., & Paternina-Arboleda, C. D. (2011). Ant colony optimization algorithm for a bi-criteria 2-stage hybrid flowshop scheduling problem. Journal of Intelligent Manufacturing, 22, 815\u2013822.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"827_CR34","unstructured":"Speras, W. M. & DeJong, K. A. (1991). On the virtues of parameterized uniform crossover. In: Proceedings of the fourth international conference genetic algorithms (pp. 230\u2013236)."},{"key":"827_CR35","doi-asserted-by":"crossref","first-page":"1930","DOI":"10.1016\/j.ejor.2005.12.024","volume":"177","author":"MF Tasgetiren","year":"2007","unstructured":"Tasgetiren, M. F., Liang, Y.-C., Sevkli, M., & Gencyilmaz, G. (2007). A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem. European Journal of Operational Research, 177, 1930\u20131947.","journal-title":"European Journal of Operational Research"},{"key":"827_CR36","doi-asserted-by":"crossref","first-page":"843851","DOI":"10.1007\/s10845-009-0260-3","volume":"21","author":"MD Toksari","year":"2010","unstructured":"Toksari, M. D., & G\u00fcner, E. (2010). Parallel machine scheduling problem to minimize the earliness\/tardiness costs with learning effect and deteriorating jobs. Journal of Intelligent Manufacturing, 21, 843851.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"827_CR37","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1016\/j.omega.2005.07.008","volume":"35","author":"J-B Wang","year":"2007","unstructured":"Wang, J.-B. (2007). Single-machine scheduling problems with the effects of learning and deterioration. Omega, 35, 397\u2013402.","journal-title":"Omega"},{"key":"827_CR38","doi-asserted-by":"crossref","first-page":"1325","DOI":"10.1057\/palgrave.jors.2601856","volume":"56","author":"J-B Wang","year":"2005","unstructured":"Wang, J.-B., & Xia, Z.-Q. (2005). Flow shop scheduling with a learning effect. Journal of Operational Research Society, 56, 1325\u20131330.","journal-title":"Journal of Operational Research Society"},{"key":"827_CR39","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/j.ejor.2006.01.017","volume":"178","author":"X Wang","year":"2007","unstructured":"Wang, X., & Cheng, T. C. E. (2007). Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan. European Journal of Operational Research, 178, 57\u201370.","journal-title":"European Journal of Operational Research"},{"key":"827_CR40","first-page":"113","volume":"23","author":"C-C Wu","year":"2006","unstructured":"Wu, C.-C. (2006). The development of a solution to the single-machine total weighted completion time problem with a learning effect. International Journal of Management, 23, 113\u2013116.","journal-title":"International Journal of Management"},{"key":"827_CR41","first-page":"743","volume":"31","author":"C-C Wu","year":"2007","unstructured":"Wu, C.-C., Lee, W.-C., & Wang, W.-C. (2007). A two-machine flowshop maximum tardiness scheduling problem with a learning effect. International Journal of Advanced Manufacturing Technology, 31, 743\u2013750.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"827_CR42","doi-asserted-by":"crossref","first-page":"1985","DOI":"10.1007\/s10845-011-0525-5","volume":"23","author":"W-H Wu","year":"2012","unstructured":"Wu, W.-H., Cheng, S.-R., Wu, C.-C., & Yin, Y. (2012). Ant colony algorithms for a two-agent scheduling with sum-Of processing times-based learning and deteriorating considerations. Journal of Intelligent Manufacturing, 23, 1985\u20131993.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"827_CR43","doi-asserted-by":"crossref","first-page":"2416","DOI":"10.1016\/j.ins.2009.02.015","volume":"179","author":"Y-Q Yin","year":"2009","unstructured":"Yin, Y.-Q., Xu, D.-H., Sun, K.-B., & Li, H.-X. (2009). Some scheduling problems with general position-dependent and time-dependent learning effects. Information Sciences, 179, 2416\u20132425.","journal-title":"Information Sciences"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0827-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0827-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0827-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:11:59Z","timestamp":1559268719000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0827-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,8,22]]},"references-count":43,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2015,8]]}},"alternative-id":["827"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0827-x","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,8,22]]}}}