{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,1]],"date-time":"2026-10-01T07:55:01Z","timestamp":1790841301683,"version":"4.1.0"},"reference-count":37,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2013,10,31]],"date-time":"2013-10-31T00:00:00Z","timestamp":1383177600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,12]]},"DOI":"10.1007\/s10845-013-0842-y","type":"journal-article","created":{"date-parts":[[2013,10,30]],"date-time":"2013-10-30T05:40:44Z","timestamp":1383111644000},"page":"1099-1112","source":"Crossref","is-referenced-by-count":24,"title":["Unrelated parallel-machine scheduling to minimize total weighted completion time"],"prefix":"10.1007","volume":"26","author":[{"given":"Jeng-Fung","family":"Chen","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2013,10,31]]},"reference":[{"key":"842_CR1","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi, A., Ng, C., Cheng, T., & Kovalyov, M. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187, 985\u20131032.","journal-title":"European Journal of Operational Research"},{"key":"842_CR2","doi-asserted-by":"crossref","first-page":"693","DOI":"10.1007\/s10845-009-0246-1","volume":"21","author":"J-P Arnaout","year":"2010","unstructured":"Arnaout, J.-P., Rabadi, G., & Musa, R. (2010). A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. Journal of Intelligent Manufacturing, 21, 693\u2013701.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"842_CR3","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/S0377-2217(97)00427-X","volume":"113","author":"M Azizoglu","year":"1999","unstructured":"Azizoglu, M., & Kirca, O. (1999). On the minimization of total weighted flow time with identical and uniform parallel machines. European Journal of Operational Research, 113, 91\u2013100.","journal-title":"European Journal of Operational Research"},{"key":"842_CR4","doi-asserted-by":"crossref","first-page":"1199","DOI":"10.1080\/0020754021000042959","volume":"41","author":"M Azizoglu","year":"2003","unstructured":"Azizoglu, M., & Webster, S. (2003). Scheduling parallel machines to minimize weighted flowtime with family set-up times. International Journal of Production Research, 41, 1199\u20131215.","journal-title":"International Journal of Production Research"},{"key":"842_CR5","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1080\/07408179308964284","volume":"25","author":"JW Barnes","year":"1993","unstructured":"Barnes, J. W., & Laguna, M. (1993). Solving the multiple-machine weighted flow time problem using tabu search. IIE Transactions, 25, 121\u2013128.","journal-title":"IIE Transactions"},{"key":"842_CR6","doi-asserted-by":"crossref","first-page":"637","DOI":"10.1007\/s10732-010-9149-8","volume":"17","author":"T Brueggemann","year":"2011","unstructured":"Brueggemann, T., & Hurink, J. (2011). Matching based very large-scale neighborhoods for parallel machine scheduling. Journal of Heuristics, 17, 637\u2013658.","journal-title":"Journal of Heuristics"},{"key":"842_CR7","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1016\/j.orl.2005.08.003","volume":"34","author":"T Brueggemann","year":"2006","unstructured":"Brueggemann, T., Hurink, J., & Kern, W. (2006). Quality of move-optimal schedules for minimizing total weighted completion time. Operations Research Letters, 34, 583\u2013590.","journal-title":"Operations Research Letters"},{"key":"842_CR8","doi-asserted-by":"crossref","first-page":"382","DOI":"10.1145\/361011.361064","volume":"17","author":"J Bruno","year":"1974","unstructured":"Bruno, J., Coffman, E. G, Jr, & Sethi, R. (1974). Scheduling independent tasks to reduce mean finishing time. Communications of the ACM, 17, 382\u2013387.","journal-title":"Communications of the ACM"},{"key":"842_CR9","doi-asserted-by":"crossref","first-page":"1204","DOI":"10.1007\/s00170-008-1917-3","volume":"44","author":"J-F Chen","year":"2009","unstructured":"Chen, J.-F. (2009). Scheduling on unrelated parallel machines with sequence- and machine-dependent setup times and due-date constraints. International Journal of Advanced Manufacturing Technology, 44, 1204\u20131212.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"842_CR10","doi-asserted-by":"crossref","first-page":"823","DOI":"10.1002\/nav.10091","volume":"50","author":"Z-L Chen","year":"2003","unstructured":"Chen, Z.-L., & Powell, W. B. (2003). Exact algorithms for scheduling multiple families of jobs on parallel machines. Naval Research Logistics, 50, 823\u2013840.","journal-title":"Naval Research Logistics"},{"key":"842_CR11","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1002\/(SICI)1099-1425(199903\/04)2:2<73::AID-JOS18>3.0.CO;2-Q","volume":"2","author":"FA Chudak","year":"1999","unstructured":"Chudak, F. A. (1999). A min-sum 3\/2-approximation algorithm for scheduling unrelated parallel machines. Journal of Scheduling, 2, 73\u201377.","journal-title":"Journal of Scheduling"},{"key":"842_CR12","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1006\/jcph.1993.1010","volume":"104","author":"GT Dueck","year":"1993","unstructured":"Dueck, G. T. (1993). New optimization heuristics: The great deluge algorithm and the record-to-record travel. Journal Computing Physics, 104, 86\u201392.","journal-title":"Journal Computing Physics"},{"key":"842_CR13","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1016\/j.ejor.2004.03.022","volume":"167","author":"S Dunstall","year":"2005","unstructured":"Dunstall, S., & Wirth, A. (2005a). A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines. European Journal of Operational Research, 167, 283\u2013296.","journal-title":"European Journal of Operational Research"},{"key":"842_CR14","doi-asserted-by":"crossref","first-page":"2479","DOI":"10.1016\/j.cor.2004.03.013","volume":"32","author":"S Dunstall","year":"2005","unstructured":"Dunstall, S., & Wirth, A. (2005b). Heuristic methods for the identical parallel machine flowtime problem with set-up times. Computers & Operations Research, 32, 2479\u20132491.","journal-title":"Computers & Operations Research"},{"key":"842_CR15","doi-asserted-by":"crossref","first-page":"1849","DOI":"10.1007\/s10845-011-0522-8","volume":"23","author":"K Fleszar","year":"2012","unstructured":"Fleszar, K., Charalambous, C., & Hindi, K. S. (2012). A variable neighborhood descent heuristic for the problem of makespan minimisation on unrelated parallel machines with setup times. Journal of Intelligent Manufacturing, 23, 1849\u20131958.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"842_CR16","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1007\/s10845-009-0270-1","volume":"22","author":"JC Ho","year":"2011","unstructured":"Ho, J. C., Lopez, F. J., Ruiz-Torres, A. J., & Tseng, T.-L. (2011). Minizing total weighted flowtime subject to minimum makespan on two identical parallel machines. Journal of Intelligent Manufacturing, 22, 179\u2013190.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"842_CR17","doi-asserted-by":"crossref","first-page":"317","DOI":"10.1145\/321941.321951","volume":"23","author":"E Horowitz","year":"1976","unstructured":"Horowitz, E., & Sahni, S. (1976). Exact and approximate algorithms for scheduling nonidentical processors. Journal of the Association for Computing Machinery, 23, 317\u2013327.","journal-title":"Journal of the Association for Computing Machinery"},{"key":"842_CR18","doi-asserted-by":"crossref","unstructured":"Kasahara, H., Kai, M., Narita, S., & Wada, H. (1988). Application of DF\/IHS to minimum total weighted flow time multiprocessor scheduling problems. Systems and Computers in Japan, 19, 25\u201334.","DOI":"10.1002\/scj.4690190603"},{"key":"842_CR19","doi-asserted-by":"crossref","first-page":"1119","DOI":"10.1137\/0215081","volume":"15","author":"T Kawaguchi","year":"1986","unstructured":"Kawaguchi, T., & Kyan, S. (1986). Worst case bound of an LRF for the mean weighted flow time problem. SIAM Journal of Computing, 15, 1119\u20131129.","journal-title":"SIAM Journal of Computing"},{"key":"842_CR20","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1145\/1552285.1552289","volume":"56","author":"V Kumar","year":"2009","unstructured":"Kumar, V., Marathe, M., Parthasarathy, S., & Srinivasan, A. (2009). A unified approach to scheduling on unrelated parallel machines. Journal of the ACM, 56, 1\u201331.","journal-title":"Journal of the ACM"},{"key":"842_CR21","doi-asserted-by":"crossref","first-page":"2145","DOI":"10.1016\/j.apm.2008.05.019","volume":"33","author":"K Li","year":"2009","unstructured":"Li, K., & Yang, S-l. (2009). Non-identical parallel-machine scheduling research with minimizing total weighted completion times: Models, relaxations and algorithms. Applied Mathematical Modelling, 33, 2145\u20132158.","journal-title":"Applied Mathematical Modelling"},{"key":"842_CR22","doi-asserted-by":"crossref","first-page":"110","DOI":"10.1016\/j.camwa.2011.10.077","volume":"63","author":"X-J Liao","year":"2012","unstructured":"Liao, X.-J., Chao, C.-W., & Chen, L.-C. (2012). An improved heuristic for parallel machine weighted flowtime scheduling with family set-up times. Computers and Mathematics with Applications, 63, 110\u2013117.","journal-title":"Computers and Mathematics with Applications"},{"key":"842_CR23","doi-asserted-by":"crossref","first-page":"901","DOI":"10.1016\/j.cor.2010.08.018","volume":"38","author":"YK Lin","year":"2011","unstructured":"Lin, Y. K., Pfund, M. E., & Fowler, J. W. (2011). Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems. Computers and Operations Research, 38, 901\u2013916.","journal-title":"Computers and Operations Research"},{"key":"842_CR24","first-page":"47","volume":"6","author":"KC Pang","year":"1995","unstructured":"Pang, K. C. (1995). Algorithmic analysis of the unrelated parallel machines scheduling problem to minimize mean weighted flowtime. International journal of information and management sciences, 6, 47\u201372.","journal-title":"International journal of information and management sciences"},{"key":"842_CR25","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1007\/s10845-005-5514-0","volume":"17","author":"G Rabadi","year":"2006","unstructured":"Rabadi, G., Moraga, R., & Al-Salem, A. (2006). Heuristics for the unrelated parallel machine scheduling problem with setup times. Journal of Intelligent Manufacturing, 17, 85\u201397.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"842_CR26","doi-asserted-by":"crossref","first-page":"116","DOI":"10.1145\/321921.321934","volume":"28","author":"S Sahni","year":"1976","unstructured":"Sahni, S. (1976). Algorithms for scheduling independent tasks. Journal of ACM, 28, 116\u2013127.","journal-title":"Journal of ACM"},{"key":"842_CR27","doi-asserted-by":"crossref","first-page":"1183","DOI":"10.1080\/00207548808947934","volume":"26","author":"S Sarin","year":"1988","unstructured":"Sarin, S., Ahn, S., & Bishop, A. (1988). An improved scheme for the branch and bound procedure of scheduling n jobs on m parallel machines to minimize total weighted flowtime. International Journal of Production Research, 26, 1183\u20131191.","journal-title":"International Journal of Production Research"},{"key":"842_CR28","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1007\/3-540-61310-2_23","volume":"1084","author":"AS Schulz","year":"1996","unstructured":"Schulz, A. S. (1996). Scheduling to minimize total weighted completion time: Performance guarantees of LP-based heuristics and lower bound. Lecture Notes in Computer Science, 1084, 301.","journal-title":"Lecture Notes in Computer Science"},{"key":"842_CR29","doi-asserted-by":"crossref","first-page":"450","DOI":"10.1137\/S0895480199357078","volume":"15","author":"AS Schulz","year":"2002","unstructured":"Schulz, A. S., & Skutella, M. (2002). Scheduling unrelated machines by randomized rounding. SIAM Journal of Discrete Mathematics, 15, 450\u2013469.","journal-title":"SIAM Journal of Discrete Mathematics"},{"key":"842_CR30","doi-asserted-by":"crossref","first-page":"758","DOI":"10.1016\/j.cie.2010.02.012","volume":"58","author":"Y Unlu","year":"2010","unstructured":"Unlu, Y., & Masson, S. J. (2010). Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems. Computers & Industrial Engineering, 58, 758\u2013800.","journal-title":"Computers & Industrial Engineering"},{"key":"842_CR31","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/0167-6377(93)90100-U","volume":"14","author":"S Webster","year":"1993","unstructured":"Webster, S. (1993). Bounds and asymptotic results for the uniform parallel processor weighted flow time problem. Operations Research Letters, 14, 85\u201390.","journal-title":"Operations Research Letters"},{"key":"842_CR32","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1016\/0377-2217(93)E0142-K","volume":"80","author":"S Webster","year":"1995","unstructured":"Webster, S. (1995). Weighted flow time bounds for scheduling identical processors. European Journal of Operational Research, 80, 103\u2013111.","journal-title":"European Journal of Operational Research"},{"key":"842_CR33","doi-asserted-by":"crossref","unstructured":"Weng, M., Lu, J., & Ren, H. (2001). Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective. International Journal of Production Economics, 70, 215\u2013226.","DOI":"10.1016\/S0925-5273(00)00066-9"},{"key":"842_CR34","unstructured":"Woeginger, G. J. (1999) When does a dynamic programming formulation guarantee the existence of an FPTAS. In Proceedings of the SODA (pp. 820\u2013829)."},{"key":"842_CR35","doi-asserted-by":"crossref","unstructured":"Ying, K.-C., Lee, Z.-J., & Lin, S.-W. (2012). Makespan minimization for scheduling unrelated parallel machines with setup times. Journal of Intelligent Manufacturing, 23, 1795\u20131803.","DOI":"10.1007\/s10845-010-0483-3"},{"key":"842_CR36","doi-asserted-by":"crossref","unstructured":"Ying, K.-C., & Wang, D.-M. (2003). Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines. Journal of Intelligent Manufacturing, 14, 311\u2013322.","DOI":"10.1023\/A:1024697625512"},{"key":"842_CR37","first-page":"3510","volume":"20","author":"H-R Zhou","year":"2008","unstructured":"Zhou, H.-R., Zheng, P.-E., & Wang, H.-L. (2008). Hierarchical genetic algorithm-based parallel machine scheduling for minimization of total weighted completion time. Journal of System Simulation, 20, 3510\u20133513.","journal-title":"Journal of System Simulation"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0842-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0842-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0842-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:00Z","timestamp":1559268720000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0842-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,10,31]]},"references-count":37,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2015,12]]}},"alternative-id":["842"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0842-y","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,10,31]]}}}