{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,21]],"date-time":"2026-09-21T14:24:12Z","timestamp":1790000652343,"version":"4.0.1"},"reference-count":59,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2013,11,30]],"date-time":"2013-11-30T00:00:00Z","timestamp":1385769600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,12]]},"DOI":"10.1007\/s10845-013-0850-y","type":"journal-article","created":{"date-parts":[[2013,11,29]],"date-time":"2013-11-29T07:41:01Z","timestamp":1385710861000},"page":"1201-1215","source":"Crossref","is-referenced-by-count":10,"title":["Swarm lexicographic goal programming for fuzzy open shop scheduling"],"prefix":"10.1007","volume":"26","author":[{"given":"Juan Jos\u00e9","family":"Palacios","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"In\u00e9s","family":"Gonz\u00e1lez-Rodr\u00edguez","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Camino R.","family":"Vela","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jorge","family":"Puente","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2013,11,30]]},"reference":[{"key":"850_CR1","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1007\/s10696-006-8819-1","volume":"17","author":"D Alcaide","year":"2006","unstructured":"Alcaide, D., Rodriguez-Gonzalez, A., & Sicilia, J. (2006). A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures. International Journal of Flexible Manufacturing Systems, 17, 201\u2013226.","journal-title":"International Journal of Flexible Manufacturing Systems"},{"key":"850_CR2","doi-asserted-by":"crossref","first-page":"1279","DOI":"10.1016\/j.mcm.2008.01.002","volume":"48","author":"M Andresen","year":"2008","unstructured":"Andresen, M., Br\u00e4sel, H., M\u00f6rig, M., Tusch, J., Werner, F., & Willenius, P. (2008). Simulated annealing and genetic algorithms for minimizing mean flow time in an open shop. Mathematical and Computer Modelling, 48, 1279\u20131293.","journal-title":"Mathematical and Computer Modelling"},{"issue":"4","key":"850_CR3","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1287\/mnsc.17.4.B141","volume":"17","author":"RE Bellman","year":"1970","unstructured":"Bellman, R. E., & Zadeh, L. A. (1970). Decision-making in a fuzzy environment. Management Science, 17(4), 141\u2013164.","journal-title":"Management Science"},{"issue":"4","key":"850_CR4","doi-asserted-by":"crossref","first-page":"775","DOI":"10.1007\/s10845-012-0627-8","volume":"24","author":"F Belmecheri","year":"2013","unstructured":"Belmecheri, F., Prins, C., & Yalaoui, F. L. A. (2013). Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows. Journal of Intelligent Manufacturing, 24(4), 775\u2013789.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"850_CR5","doi-asserted-by":"crossref","first-page":"1565","DOI":"10.1016\/j.cor.2003.11.018","volume":"32","author":"C Blum","year":"2005","unstructured":"Blum, C. (2005). Beam-ACO\u2014hybridizing ant colony optimization with beam search: An application to open shop scheduling. Computers & Operations Research, 32(6), 1565\u20131591.","journal-title":"Computers & Operations Research"},{"key":"850_CR6","doi-asserted-by":"crossref","unstructured":"Bouveret, S., & Lema\u00eetre, M. (2009). Computing leximin-optimal solutions in constraint networks. Artificial Intelligence, 173, 343\u2013364.","DOI":"10.1016\/j.artint.2008.10.010"},{"key":"850_CR7","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/S0166-218X(96)00116-3","volume":"76","author":"P Brucker","year":"1997","unstructured":"Brucker, P., Hunrink, J., Jurisch, B., & W\u00f6stmann, B. (1997). A branch & bound algorithm for the open-shop problem. Discrete Applied Mathematics, 76, 43\u201359.","journal-title":"Discrete Applied Mathematics"},{"key":"850_CR8","doi-asserted-by":"crossref","first-page":"655","DOI":"10.1142\/S0218488503002466","volume":"11","author":"G Celano","year":"2003","unstructured":"Celano, G., Costa, A., & Fichera, S. (2003). An evolutionary algorithm for pure fuzzy flowshop scheduling problems. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 11, 655\u2013669.","journal-title":"International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems"},{"issue":"6","key":"850_CR9","doi-asserted-by":"crossref","first-page":"930","DOI":"10.1109\/3477.969496","volume":"31","author":"SM Chen","year":"2001","unstructured":"Chen, S. M., & Chang, T. H. (2001). Finding multiple possible critical paths using fuzzy PERT. IEEE Transactions on Systems, Man, and Cybernetics-Part B, 31(6), 930\u2013937.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics-Part B"},{"key":"850_CR10","doi-asserted-by":"crossref","first-page":"759","DOI":"10.1016\/j.tourman.2010.06.011","volume":"32","author":"JT Coshall","year":"2011","unstructured":"Coshall, J. T., & Charlesworth, R. (2011). A management orientated approach to combination forecasting of tourism demand. Tourism Management, 32, 759\u2013769.","journal-title":"Tourism Management"},{"key":"850_CR11","doi-asserted-by":"crossref","first-page":"3222","DOI":"10.1016\/j.foreco.2008.01.038","volume":"255","author":"L Diaz-Balteiro","year":"2008","unstructured":"Diaz-Balteiro, L., & Romero, C. (2008). Making forestry decisions with multiple criteria: A review and an assessment. Forest Ecology and Management, 255, 3222\u20133241.","journal-title":"Forest Ecology and Management"},{"key":"850_CR12","doi-asserted-by":"crossref","unstructured":"Dubois, D. (2011). The role of fuzzy sets in decision sciences: Old techniques and new directions. Fuzzy Sets and Systems, 184, 3\u201328.","DOI":"10.1016\/j.fss.2011.06.003"},{"key":"850_CR13","volume-title":"Possibility theory: An approach to computerized processing of uncertainty","author":"D Dubois","year":"1986","unstructured":"Dubois, D., & Prade, H. (1986). Possibility theory: An approach to computerized processing of uncertainty. New York, NY, USA: Plenum Press."},{"key":"850_CR14","doi-asserted-by":"crossref","unstructured":"Dubois, D., Fargier, H., & Prade, H. (1995). Fuzzy constraints in job-shop scheduling. Journal of Intelligent Manufacturing, 6, 215\u2013234.","DOI":"10.1007\/BF00128646"},{"key":"850_CR15","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/S0377-2217(02)00558-1","volume":"147","author":"D Dubois","year":"2003","unstructured":"Dubois, D., Fargier, H., & Fortemps, P. (2003). Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge. European Journal of Operational Research, 147, 231\u2013252.","journal-title":"European Journal of Operational Research"},{"key":"850_CR16","volume-title":"Multicriteria optimization","author":"M Ehrgott","year":"2005","unstructured":"Ehrgott, M. (2005). Multicriteria optimization (2nd ed.). Berlin: Springer.","edition":"2"},{"key":"850_CR17","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1007\/s002910000046","volume":"22","author":"M Ehrgott","year":"2000","unstructured":"Ehrgott, M., & Gandibleux, X. (2000). A survey and annotated bibliography of multiobjective combinatorial optimization. OR Spektrum, 22, 425\u2013460.","journal-title":"OR Spektrum"},{"key":"850_CR18","doi-asserted-by":"crossref","first-page":"1689","DOI":"10.1016\/j.apm.2009.10.005","volume":"34","author":"RZ Farahani","year":"2010","unstructured":"Farahani, R. Z., SteadieSeifi, M., & Asgari, N. (2010). Multiple criteria facility location problems: A survey. Applied Mathematical Modelling, 34, 1689\u20131709.","journal-title":"Applied Mathematical Modelling"},{"key":"850_CR19","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1109\/91.649907","volume":"7","author":"P Fortemps","year":"1997","unstructured":"Fortemps, P. (1997). Jobshop scheduling with imprecise durations: A fuzzy approach. IEEE Transactions of Fuzzy Systems, 7, 557\u2013569.","journal-title":"IEEE Transactions of Fuzzy Systems"},{"key":"850_CR20","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1287\/opre.8.4.487","volume":"8","author":"B Giffler","year":"1960","unstructured":"Giffler, B., & Thompson, G. L. (1960). Algorithms for solving production scheduling problems. Operations Research, 8, 487\u2013503.","journal-title":"Operations Research"},{"key":"850_CR21","doi-asserted-by":"crossref","unstructured":"Gon\u00e7alves, J., Magalhaes Mendes, J. J., & Resende, M. G. C. (2005). A hybrid genetic algorithm for the job shop scheduling problem. European Journal of Operational Research, 167, 77\u201395.","DOI":"10.1016\/j.ejor.2004.03.012"},{"issue":"3","key":"850_CR22","doi-asserted-by":"crossref","first-page":"655","DOI":"10.1109\/TSMCA.2008.918603","volume":"38","author":"I Gonz\u00e1lez Rodr\u00edguez","year":"2008","unstructured":"Gonz\u00e1lez Rodr\u00edguez, I., Puente, J., Vela, C. R., & Varela, R. (2008). Semantics of schedules for the fuzzy job shop problem. IEEE Transactions on Systems, Man and Cybernetics, Part A, 38(3), 655\u2013666.","journal-title":"IEEE Transactions on Systems, Man and Cybernetics, Part A"},{"key":"850_CR23","doi-asserted-by":"crossref","unstructured":"Gonz\u00e1lez-Rodr\u00edguez, I., Palacios, J.J., Vela, C.R., & Puente, J. (2010). Heuristic local search for fuzzy open shop scheduling. In: Proceedings IEEE international conference on fuzzy systems, FUZZ-IEEE2010 (pp. 1858\u20131865). IEEE.","DOI":"10.1109\/FUZZY.2010.5584235"},{"key":"850_CR24","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1007\/s10845-008-0161-x","volume":"21","author":"I Gonz\u00e1lez Rodr\u00edguez","year":"2010","unstructured":"Gonz\u00e1lez Rodr\u00edguez, I., Vela, C. R., & Puente, J. (2010). A genetic solution based on lexicographical goal programming for a multiobjective job shop with uncertainty. Journal of Intelligent Manufacturing, 21, 65\u201373.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"850_CR25","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"4","author":"R Graham","year":"1979","unstructured":"Graham, R., Lawler, E., & Lenstra, J. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 4, 287\u2013326.","journal-title":"Annals of Discrete Mathematics"},{"key":"850_CR26","doi-asserted-by":"crossref","first-page":"306","DOI":"10.1016\/S0377-2217(97)00332-9","volume":"107","author":"C Gu\u00e9ret","year":"1998","unstructured":"Gu\u00e9ret, C., & Prins, C. (1998). Classical and new heuristics for the open-shop problem: A computational evaluation. European Journal of Operational Research, 107, 306\u2013314.","journal-title":"European Journal of Operational Research"},{"key":"850_CR27","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1023\/A:1008847308326","volume":"9","author":"AL Guiffrida","year":"1998","unstructured":"Guiffrida, A. L., & Nagi, R. (1998). Fuzzy set theory applications in production management research: A literature survey. Journal of Intelligent Manufacturing, 9, 39\u201356.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"850_CR28","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/j.ejor.2004.04.002","volume":"165","author":"W Herroelen","year":"2005","unstructured":"Herroelen, W., & Leus, R. (2005). Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research, 165, 289\u2013306.","journal-title":"European Journal of Operational Research"},{"key":"850_CR29","unstructured":"Hu, X., Eberhart, R.C., & Shi, Y. (2003). Swarm intelligence for permutation optimization: A case study of n-queens problem. In: Swarm intelligence symposium, 2003. SIS\u201903. Proceedings of the 2003 IEEE (pp. 243\u2013246). IEEE."},{"key":"850_CR30","doi-asserted-by":"crossref","unstructured":"Jia, Q., & Seo, Y. (2013). An improved particle swarm optimization for the resource-constrained project scheduling problem. International Journal of Advanced Manufacturing Technology , 67(9\u201312), 2627\u20132638.","DOI":"10.1007\/s00170-012-4679-x"},{"key":"850_CR31","doi-asserted-by":"crossref","first-page":"1942","DOI":"10.1109\/ICNN.1995.488968","volume-title":"IEEE international conference on neural networks","author":"J Kennedy","year":"1995","unstructured":"Kennedy, J., & Eberhart, R. (1995). Particle swarm optimization. IEEE international conference on neural networks (pp. 1942\u20131948). New Jersey: IEEE Press."},{"key":"850_CR32","doi-asserted-by":"crossref","first-page":"1119","DOI":"10.1007\/s10845-010-0455-7","volume":"23","author":"BI Kim","year":"2012","unstructured":"Kim, B. I., & Son, S. J. (2012). A probability matrix based particle swarm optimization for the capacitated vehicle routing problem. Journal of Intelligent Manufacturing, 23, 1119\u20131126.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"850_CR33","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/s00170-007-0945-8","volume":"37","author":"D Lei","year":"2008","unstructured":"Lei, D. (2008). Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems. International Journal of Advanced Manufacturing Technology, 37, 157\u2013165.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"850_CR34","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1016\/S0305-0548(98)00056-2","volume":"26","author":"CF Liaw","year":"1999","unstructured":"Liaw, C. F. (1999). A tabu search algorithm for the open shop scheduling problem. Computers and Operations Research, 26, 109\u2013126.","journal-title":"Computers and Operations Research"},{"key":"850_CR35","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1016\/S0377-2217(99)00168-X","volume":"124","author":"CF Liaw","year":"2000","unstructured":"Liaw, C. F. (2000). A hybrid genetic algorithm for the open shop scheduling problem. European Journal of Operational Research, 124, 28\u201342.","journal-title":"European Journal of Operational Research"},{"key":"850_CR36","doi-asserted-by":"crossref","unstructured":"Liberatore, F., Ortu\u00f1o, M.T., Tirado, G., Vitoriano, B., & Scaparra, M. P. (2014). A hierarchical compromise model for the joint optimization of recovery operations and distribution of emergency goods in humanitarian logistics. Computers & Operations Research, 42, 3\u201313.","DOI":"10.1016\/j.cor.2012.03.019"},{"key":"850_CR37","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1109\/TFUZZ.2002.800692","volume":"10","author":"B Liu","year":"2002","unstructured":"Liu, B., & Liu, Y. K. (2002). Expected value of fuzzy variable and fuzzy expected value models. IEEE Transactions on Fuzzy Systems, 10, 445\u2013450.","journal-title":"IEEE Transactions on Fuzzy Systems"},{"issue":"7","key":"850_CR38","doi-asserted-by":"crossref","first-page":"1159","DOI":"10.1007\/s00500-013-0992-z","volume":"17","author":"Y Marinakis","year":"2013","unstructured":"Marinakis, Y., & Marinaki, M. (2013). Particle swarm optimization with expanding neighborhood topology for the permutation flowshop scheduling problem. Soft Computing, 17(7), 1159\u20131173.","journal-title":"Soft Computing"},{"key":"850_CR39","doi-asserted-by":"crossref","unstructured":"Naderi, B., Fatemi Ghomi, S. M. T., Aminnayeri, M., & Zandieh, M. (2011). A study on open shop scheduling to minimise total tardiness. International Journal of Production Research, 49(15), 4657\u20134678.","DOI":"10.1080\/00207543.2010.497174"},{"key":"850_CR40","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1016\/j.amc.2008.05.086","volume":"205","author":"Q Niu","year":"2008","unstructured":"Niu, Q., Jiao, B., & Gu, X. (2008). Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time. Applied Mathematics and Computation, 205, 148\u2013158.","journal-title":"Applied Mathematics and Computation"},{"key":"850_CR41","doi-asserted-by":"crossref","first-page":"1399","DOI":"10.1016\/j.asoc.2011.11.019","volume":"12","author":"S Noori-Darvish","year":"2012","unstructured":"Noori-Darvish, S., Mahdavi, I., & Mahdavi-Amiri, N. (2012). A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due-dates. Applied Soft Computing, 12, 1399\u20131416.","journal-title":"Applied Soft Computing"},{"key":"850_CR42","doi-asserted-by":"crossref","unstructured":"Palacios, J.J., Gonz\u00e1lez-Rodr\u00edguez, I., Vela, C.R., & Puente, J. (2011). Particle swarm optimisation for open shop problems with fuzzy durations. In: Proceedings of IWINAC 2011, Part I, Springer, Lecture Notes in Computer Science (Vol. 6686, pp. 362\u2013371).","DOI":"10.1007\/978-3-642-21344-1_38"},{"key":"850_CR43","doi-asserted-by":"crossref","unstructured":"Panahi, H., Rabbani, M., & Tavakkoli-Moghaddam, R. (2008). Solving an open shop scheduling problem by a novel hybrid multi-objective ant colony optimization. In: Eighth international conference on hybrid intelligent systems (pp. 320\u2013325). IEEE.","DOI":"10.1109\/HIS.2008.71"},{"key":"850_CR44","doi-asserted-by":"crossref","unstructured":"Pasandideh, S. H. R., Niaki, S. T. A., & Hajipour, V. (2013). A multi-objective facility location model with batch arrivals: two parameter-tuned meta-heuristic algorithms. Journal of Intelligent Manufacturing, 24(2), 331\u2013348.","DOI":"10.1007\/s10845-011-0592-7"},{"issue":"12","key":"850_CR45","doi-asserted-by":"crossref","first-page":"3327","DOI":"10.1080\/00207540601042472","volume":"46","author":"S Petrovic","year":"2008","unstructured":"Petrovic, S., Fayad, S., & Petrovic, D. (2008). Sensitivity analysis of a fuzzy multiobjective scheduling problem. International Journal of Production Research, 46(12), 3327\u20133344.","journal-title":"International Journal of Production Research"},{"key":"850_CR46","volume-title":"Scheduling, theory, algorithms, and systems","author":"ML Pinedo","year":"2008","unstructured":"Pinedo, M. L. (2008). Scheduling, theory, algorithms, and systems (3rd ed.). Berlin: Springer.","edition":"3"},{"key":"850_CR47","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1007\/s001860000090","volume":"52","author":"C Prins","year":"2000","unstructured":"Prins, C. (2000). Competitive genetic algorithms for the open-shop scheduling problem. Mathematical Methods of Operations Research, 52, 389\u2013411.","journal-title":"Mathematical Methods of Operations Research"},{"key":"850_CR48","unstructured":"Puente, J., Vela, C. R., & Gonz\u00e1lez-Rodr\u00edguez, I. (2010). Fast local search for fuzzy job shop scheduling. In: Proceedings of ECAI 2010 (pp. 739\u2013744). IOS Press."},{"key":"850_CR49","unstructured":"Puente, J., Vela, C. R., Gonz\u00e1lez-Rodr\u00edguez, I., Rodr\u00edguez, L. J., & Palacios, J. J. (2013). GRASPing examination board assignments for university-entrance exams. In: IEA-AIE 2013, Proceedings of, Springer, Lecture notes in computer science (Vol 7906, pp. 171\u2013180)."},{"key":"850_CR50","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1016\/S0305-0483(00)00026-8","volume":"29","author":"C Romero","year":"2001","unstructured":"Romero, C. (2001). Extended lexicographic goal programming: a unifying approach. Omega, 29, 63\u201371.","journal-title":"Omega"},{"key":"850_CR51","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1016\/S0377-2217(99)00094-6","volume":"120","author":"M Sakawa","year":"2000","unstructured":"Sakawa, M., & Kubota, R. (2000). Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European Journal of Operational Research, 120, 393\u2013407.","journal-title":"European Journal of Operational Research"},{"key":"850_CR52","unstructured":"Sha, D., Lin, H. H., & Hsu, C. (2010). A modified particle swarm optimization for multi-objective open shop scheduling. In: Proceeding of the international multiconference of engineers and computer scientists, Vol 3."},{"key":"850_CR53","doi-asserted-by":"crossref","first-page":"3243","DOI":"10.1016\/j.cor.2007.02.019","volume":"35","author":"DY Sha","year":"2008","unstructured":"Sha, D. Y., & Cheng-Yu, H. (2008). A new particle swarm optimization for the open shop scheduling problem. Computers & Operations Research, 35, 3243\u20133261.","journal-title":"Computers & Operations Research"},{"key":"850_CR54","doi-asserted-by":"crossref","first-page":"569","DOI":"10.1016\/S0377-2217(97)00317-2","volume":"111","author":"M Tamiz","year":"1998","unstructured":"Tamiz, M., Jones, D., & Romero, C. (1998). Goal programming for decision making: An overview of the current state-of-the-art. European Journal of Operations Research, 111, 569\u2013581.","journal-title":"European Journal of Operations Research"},{"key":"850_CR55","doi-asserted-by":"crossref","first-page":"1229","DOI":"10.1007\/s00500-012-0809-5","volume":"16","author":"IX Tassopoulos","year":"2012","unstructured":"Tassopoulos, I. X., & Beligiannis, G. N. (2012). Using particle swarm optimization to solve effectively the school timetabling problem. Soft Computing, 16, 1229\u20131252.","journal-title":"Soft Computing"},{"key":"850_CR56","volume-title":"Multicriteria scheduling. Theory, models and algorithms","author":"V T\u2019kindt","year":"2006","unstructured":"T\u2019kindt, V., & Billaut, J. C. (2006). Multicriteria scheduling. Theory, models and algorithms (2nd ed.). Berlin: Springer.","edition":"2"},{"key":"850_CR57","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1007\/s10845-011-0552-2","volume":"24","author":"G Vijay Chakaravarthy","year":"2013","unstructured":"Vijay Chakaravarthy, G., Marimuthu, S., & Naveen Sait, A. (2013). Performance evaluation of proposed differential evolution and particle swarm optimization algorithms for scheduling m-machine flow shops with lot streaming. Journal of Intelligent Manufacturing, 24, 175\u2013191.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"850_CR58","doi-asserted-by":"crossref","unstructured":"Wang, L., Zhou, G., Xu, Y., & Min, L. (2013). A hybrid artificial bee colony algorithm for the fuzzy flexible job-shop scheduling problem. International Journal of Production Research, 51(2), 3593\u20133608.","DOI":"10.1080\/00207543.2012.754549"},{"issue":"3","key":"850_CR59","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1504\/IJICA.2011.041915","volume":"3","author":"Y Zheng","year":"2011","unstructured":"Zheng, Y., Li, Y., & Lei, D. (2011). Swarm-based neighbourhood search for fuzzy job shop scheduling. International Journal of Innovative Computing and Applications, 3(3), 144\u2013151.","journal-title":"International Journal of Innovative Computing and Applications"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0850-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0850-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0850-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,4]],"date-time":"2019-08-04T07:05:31Z","timestamp":1564902331000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0850-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,11,30]]},"references-count":59,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2015,12]]}},"alternative-id":["850"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0850-y","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,11,30]]}}}