{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,21]],"date-time":"2026-03-21T11:28:02Z","timestamp":1774092482614,"version":"3.50.1"},"reference-count":23,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2013,12,24]],"date-time":"2013-12-24T00:00:00Z","timestamp":1387843200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,12]]},"DOI":"10.1007\/s10845-013-0858-3","type":"journal-article","created":{"date-parts":[[2013,12,23]],"date-time":"2013-12-23T20:16:26Z","timestamp":1387829786000},"page":"1267-1279","source":"Crossref","is-referenced-by-count":18,"title":["A study on the man-hour prediction system for shipbuilding"],"prefix":"10.1007","volume":"26","author":[{"given":"Minhoe","family":"Hur","sequence":"first","affiliation":[]},{"given":"Seung-kyung","family":"Lee","sequence":"additional","affiliation":[]},{"given":"Bongseok","family":"Kim","sequence":"additional","affiliation":[]},{"given":"Sungzoon","family":"Cho","sequence":"additional","affiliation":[]},{"given":"Dongha","family":"Lee","sequence":"additional","affiliation":[]},{"given":"Daehyung","family":"Lee","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,12,24]]},"reference":[{"issue":"8","key":"858_CR1","doi-asserted-by":"crossref","first-page":"10114","DOI":"10.1016\/j.eswa.2011.02.073","volume":"38","author":"MK Ayoubloo","year":"2011","unstructured":"Ayoubloo, M. K., Azamathulla, H. M., Jabbari, E., & Zanganeh, M. (2011). Predictive model-based for the critical submergence of horizontal intakes in open channel flows with different clearance bottoms using CART, ANN and linear regression approaches. Expert Systems with Applications, 38(8), 10114\u201310123.","journal-title":"Expert Systems with Applications"},{"key":"858_CR2","volume-title":"Classification and regression trees","author":"L Breiman","year":"1993","unstructured":"Breiman, L. (1993). Classification and regression trees. RL: CRC Press."},{"key":"858_CR3","unstructured":"Carreyette, J. (1978). Preliminary ship cost estimation. Naval Architect (4)."},{"key":"858_CR4","doi-asserted-by":"crossref","unstructured":"Chen, Y. S., Cheng, C. H., & Lai, C. J. (2010). A hybrid procedure for extracting rules of production performance in the automobile parts industry. Journal of Intelligent Manufacturing, 21(4), 423\u2013437.","DOI":"10.1007\/s10845-008-0190-5"},{"key":"858_CR5","doi-asserted-by":"crossref","unstructured":"Chien, C. F., Zheng, J. N., Lin, Y. J. (2013). Determining the operator-machine assignment for machine interference problem and an empirical study in semiconductor test facility. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-013-0777-3 .","DOI":"10.1007\/s10845-013-0777-3"},{"issue":"2","key":"858_CR6","doi-asserted-by":"crossref","first-page":"92","DOI":"10.5957\/jsp.2001.17.2.92","volume":"17","author":"CC Chou","year":"2001","unstructured":"Chou, C. C., & Chang, P. L. (2001). Modeling and analysis of labor cost estimation for shipbuilding: The case of China Shipbuilding Corporation. Journal of ship production, 17(2), 92\u201396.","journal-title":"Journal of ship production"},{"key":"858_CR7","unstructured":"Gullander P, Davidsson A, Dencker K, Fasth As, F\u00e4ssberg T, Harlin U, Stahre J (2011) Towards a production complexity model that supports operation, re-balancing and man-hour planning. In: Proceedings of the 4th Swedish Production Symposium (SPS), Lund, Sweden."},{"key":"858_CR8","unstructured":"Huynh-Thu, V. A., Wehenkel, L., & Geurts, P. (2008). Exploiting tree-based variable importances to selectively identify relevant variables. Journal of Machine Learning Research-Proceedings Track, 4, 60\u201373."},{"issue":"18\u201319","key":"858_CR9","doi-asserted-by":"crossref","first-page":"4175","DOI":"10.1080\/00207540600632216","volume":"44","author":"A Kusiak","year":"2006","unstructured":"Kusiak, A. (2006). Data mining: Manufacturing and service applications. International Journal of Production Research, 44(18\u201319), 4175\u20134191.","journal-title":"International Journal of Production Research"},{"key":"858_CR10","unstructured":"Lee, J. K., Lee, K. J., Hong, J. S., Kim, W., Kim, E. Y., Choi, S. Y., et al. (1995). Das: Intelligent scheduling systems for shipbuilding. AI Magazine, 16(4), 78."},{"issue":"2","key":"858_CR11","doi-asserted-by":"crossref","first-page":"380","DOI":"10.1016\/S0377-2217(96)00205-6","volume":"97","author":"JK Lee","year":"1997","unstructured":"Lee, J. K., Lee, K. J., Park, H. K., Hong, J. S., & Lee, J. S. (1997). Developing scheduling systems for Daewoo shipbuilding: DAS project. European Journal of Operational Research, 97(2), 380\u2013395.","journal-title":"European Journal of Operational Research"},{"key":"858_CR12","first-page":"1979","volume":"12","author":"B Liu","year":"2005","unstructured":"Liu, B., & Zh, J. I. A. N. G. (2005). The intelligent man-hour estimate technique of assembly for shipbuilding. Journal of Shanghai Jiaotong University, 12, 1979\u20131983.","journal-title":"Journal of Shanghai Jiaotong University"},{"issue":"1","key":"858_CR13","first-page":"14","volume":"2","author":"B Liu","year":"2005","unstructured":"Liu, B., & Jiang, Z. H. (2005). The man-hour estimation models & its comparison of interim products assembly for shipbuilding. International Journal of Operations Research, 2(1), 14\u201319.","journal-title":"International Journal of Operations Research"},{"key":"858_CR14","first-page":"25","volume":"1","author":"S Liu","year":"2007","unstructured":"Liu, S., & Chen, J. (2007). Study on man-hour ration calculation with artificial neural networks. Machine Tool & Hydraulics, 1, 25.","journal-title":"Machine Tool & Hydraulics"},{"key":"858_CR15","volume-title":"Introduction to linear regression analysis","author":"DC Montgomery","year":"2012","unstructured":"Montgomery, D. C., Peck, E. A., & Vining, G. G. (2012). Introduction to linear regression analysis (Vol. 820). New York: Wiley."},{"key":"858_CR16","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1016\/j.autcon.2011.09.002","volume":"22","author":"M Oral","year":"2012","unstructured":"Oral, M., Oral, E. L., & Aydn, A. (2012). Supervised versus unsupervised learning for construction crew productivity prediction. Automation in Construction, 22, 271\u2013276.","journal-title":"Automation in Construction"},{"issue":"1","key":"858_CR17","doi-asserted-by":"crossref","first-page":"1256","DOI":"10.1016\/j.eswa.2011.07.134","volume":"39","author":"R Ramezanian","year":"2012","unstructured":"Ramezanian, R., Rahmani, D., & Barzinpour, F. (2012). An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search. Expert Systems with Applications, 39(1), 1256\u20131263.","journal-title":"Expert Systems with Applications"},{"issue":"4","key":"858_CR18","first-page":"527","volume":"44","author":"AM Rashwan","year":"2005","unstructured":"Rashwan, A. M. (2005). Estimation of Ship production man-hour. Alexandria Engineering Journal, 44(4), 527\u2013533.","journal-title":"Alexandria Engineering Journal"},{"issue":"6","key":"858_CR19","doi-asserted-by":"crossref","first-page":"2623","DOI":"10.1007\/s10845-011-0582-9","volume":"23","author":"M Sabar","year":"2012","unstructured":"Sabar, M., Montreuil, B., & Frayret, J. M. (2012). An agent-based algorithm for personnel shift-scheduling and rescheduling in flexible assembly lines. Journal of Intelligent Manufacturing, 23(6), 2623\u20132634.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"858_CR20","doi-asserted-by":"crossref","unstructured":"Sandri, M., & Zuccolotto, P. (2008). A bias correction algorithm for the Gini variable importance measure in classification trees. Journal of Computational and Graphical Statistics, 17(3), 1\u201318.","DOI":"10.1198\/106186008X344522"},{"key":"858_CR21","unstructured":"Shmueli, G., Patel, N. R., & Bruce, P. C. (2011). Data mining for business intelligence: Concepts, techniques, and applications in Microsoft Office Excel with XLMiner. NY: Wiley."},{"key":"858_CR22","doi-asserted-by":"crossref","unstructured":"Sierra, M. R., Menc\u00eda, C., & Varela, R. (2013). New schedule generation schemes for the job-shop problem with operators. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-013-0810-6 .","DOI":"10.1007\/s10845-013-0810-6"},{"key":"858_CR23","doi-asserted-by":"crossref","unstructured":"Zhong, R. Y., Huang , G. Q., Dai, Q. Y., & Zhang, T. (2012), Mining SOTs and dispatching rules from RFID-enabled real-time shopfloor production data. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-012-0721-y .","DOI":"10.1007\/s10845-012-0721-y"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0858-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0858-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0858-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,3,20]],"date-time":"2022-03-20T14:34:57Z","timestamp":1647786897000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0858-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,12,24]]},"references-count":23,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2015,12]]}},"alternative-id":["858"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0858-3","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,12,24]]}}}