{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,4]],"date-time":"2026-06-04T19:51:23Z","timestamp":1780602683034,"version":"3.54.1"},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2014,1,5]],"date-time":"2014-01-05T00:00:00Z","timestamp":1388880000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2016,4]]},"DOI":"10.1007\/s10845-013-0859-2","type":"journal-article","created":{"date-parts":[[2014,1,4]],"date-time":"2014-01-04T01:47:11Z","timestamp":1388800031000},"page":"283-296","source":"Crossref","is-referenced-by-count":29,"title":["An ACO-based intercell scheduling approach for job shop cells with multiple single processing machines and one batch processing machine"],"prefix":"10.1007","volume":"27","author":[{"given":"Dongni","family":"Li","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xianwen","family":"Meng","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Miao","family":"Li","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yunna","family":"Tian","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2014,1,5]]},"reference":[{"issue":"3","key":"859_CR1","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2008). A survey of scheduling problems with setup times or costs. European Journal Of Operational Research, 187(3), 985\u20131032.","journal-title":"European Journal Of Operational Research"},{"key":"859_CR2","doi-asserted-by":"crossref","unstructured":"Blum, C. (2002). ACO applied to group shop scheduling: A case studied on an intensification and diversification. In M. Dorigo, G. D. Caro, & M. Sampels (Eds.), Ant algorithms (pp. 14\u201327). Berlin: Springer.","DOI":"10.1007\/3-540-45724-0_2"},{"issue":"2","key":"859_CR3","doi-asserted-by":"crossref","first-page":"882","DOI":"10.1016\/j.ijpe.2006.02.010","volume":"103","author":"P Damodaran","year":"2006","unstructured":"Damodaran, P., Manjeshwar, P. K., & Srihari, K. (2006). Minimizing makespan on a batch-processing machine with non-identical job sizes using genetic algorithms. International Journal of Production Economics, 103(2), 882\u2013891.","journal-title":"International Journal of Production Economics"},{"key":"859_CR4","doi-asserted-by":"crossref","DOI":"10.1007\/b99492","volume-title":"Ant colony optimization","author":"M Dorigo","year":"2004","unstructured":"Dorigo, M., & St\u00fctzle, T. (2004). Ant colony optimization. Cambridge: MIT Press."},{"issue":"1","key":"859_CR5","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1016\/j.cie.2011.03.007","volume":"61","author":"A Elmi","year":"2011","unstructured":"Elmi, A., Solimanpur, M., Topaloglu, S., & Elmi, A. (2011). A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts. Computers & Industrial Engineering, 61(1), 171\u2013178.","journal-title":"Computers & Industrial Engineering"},{"issue":"4","key":"859_CR6","doi-asserted-by":"crossref","first-page":"1010","DOI":"10.1016\/j.cor.2004.09.001","volume":"33","author":"LR Foulds","year":"2006","unstructured":"Foulds, L. R., French, A. P., & Wilson, J. M. (2006). The sustainable cell formation problem: Manufacturing cell creation with machine modification costs. Computers & Operations Research, 33(4), 1010\u20131032.","journal-title":"Computers & Operations Research"},{"issue":"1","key":"859_CR7","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1016\/0272-6963(91)90037-X","volume":"10","author":"O Garza","year":"1991","unstructured":"Garza, O., & Smunt, T. L. (1991). Countering the negative impact of intercell flow in cellular manufacturing. Journal of Operation Management, 10(1), 92\u2013118.","journal-title":"Journal of Operation Management"},{"issue":"1","key":"859_CR8","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1007\/s10479-005-3971-7","volume":"140","author":"M Gendreau","year":"2005","unstructured":"Gendreau, M., & Potvin, J. Y. (2005). Metaheuristics in combinatorial optimization. Annals of Operations Research, 140(1), 189\u2013213.","journal-title":"Annals of Operations Research"},{"key":"859_CR9","doi-asserted-by":"crossref","unstructured":"Golmohammadi, A., & Ghodsi, R. (2009). Applying an integer Electromagnetism-like algorithm to solve the cellular manufacturing scheduling problem with an integrated approach. In Cie: 2009 International conference on computers and industrial engineering (Vols. 1\u20133, pp. 34\u201339).","DOI":"10.1109\/ICCIE.2009.5223947"},{"issue":"2","key":"859_CR10","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1057\/palgrave.jors.2601971","volume":"57","author":"JND Gupta","year":"2006","unstructured":"Gupta, J. N. D., & Schaller, J. E. (2006). Minimizing flow time in a flow-line manufacturing cell with family setup times. Journal of the Operational Research Society, 57(2), 163\u2013176.","journal-title":"Journal of the Operational Research Society"},{"issue":"4","key":"859_CR11","doi-asserted-by":"crossref","first-page":"1030","DOI":"10.1016\/j.cor.2006.07.003","volume":"35","author":"KL Huang","year":"2008","unstructured":"Huang, K. L., & Liao, C. J. (2008). Ant colony optimization combined with taboo search for the job shop scheduling problem. Computers & Operations Research, 35(4), 1030\u20131046.","journal-title":"Computers & Operations Research"},{"issue":"3","key":"859_CR12","doi-asserted-by":"crossref","first-page":"272","DOI":"10.1111\/j.1937-5956.2004.tb00512.x","volume":"13","author":"DJ Johnson","year":"2004","unstructured":"Johnson, D. J., & Wemmerlov, U. (2004). Why does cell implementation stop? Factors influencing cell penetration in manufacturing plants. Production and Operations Management, 13(3), 272\u2013289.","journal-title":"Production and Operations Management"},{"issue":"5","key":"859_CR13","doi-asserted-by":"crossref","first-page":"1207","DOI":"10.1016\/j.cor.2012.11.024","volume":"40","author":"DN Li","year":"2013","unstructured":"Li, D. N., Wang, Y., Xiao, G. X., & Tang, J. F. (2013). Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routes. Computers & Operations Research, 40(5), 1207\u20131223.","journal-title":"Computers & Operations Research"},{"key":"859_CR14","doi-asserted-by":"crossref","unstructured":"Malve, S., & Uzsoy, R. (2007). A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families. Computers & Operations Research, 34(10), 3016\u20133028.","DOI":"10.1016\/j.cor.2005.11.011"},{"key":"859_CR15","doi-asserted-by":"crossref","unstructured":"Meeran, S., & Morshed, M. S. (2012). A hybrid genetic tabu search algorithm for solving job shop scheduling problems: A case studied. Journal of Intelligent Manufacturing, 23(4), 1063\u20131078.","DOI":"10.1007\/s10845-011-0520-x"},{"issue":"4","key":"859_CR16","doi-asserted-by":"crossref","first-page":"563","DOI":"10.1109\/TSMCC.2006.874022","volume":"36","author":"WM Shen","year":"2006","unstructured":"Shen, W. M., Wang, L. H., & Hao, Q. (2006). Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey. Eye Transactions on Systems Man And Cybernetics Part C-Applications and Reviews, 36(4), 563\u2013577.","journal-title":"Eye Transactions on Systems Man And Cybernetics Part C-Applications and Reviews"},{"issue":"3","key":"859_CR17","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/S0925-5273(03)00196-8","volume":"88","author":"M Solimanpur","year":"2004","unstructured":"Solimanpur, M., Vrat, P., & Shankar, R. (2004). A heuristic to minimize makespan of cell scheduling problem. International Journal Of Production Economics, 88(3), 231\u2013241.","journal-title":"International Journal Of Production Economics"},{"issue":"4","key":"859_CR18","doi-asserted-by":"crossref","first-page":"525","DOI":"10.1007\/s10845-008-0236-8","volume":"21","author":"JF Tang","year":"2010","unstructured":"Tang, J. F., Wang, X. Q., Kaku, I., & Yung, K. L. (2010). Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach. Journal of Intelligent Manufacturing, 21(4), 525\u2013537.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"859_CR19","doi-asserted-by":"crossref","first-page":"2661","DOI":"10.1016\/j.eswa.2009.08.012","volume":"37","author":"R Tavakkoli-Moghaddam","year":"2010","unstructured":"Tavakkoli-Moghaddam, R., Javadian, N., Khorrami, A., & Gholipour-Kanani, Y. (2010). Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system. Expert Systems with Applications, 37(3), 2661\u20132669.","journal-title":"Expert Systems with Applications"},{"issue":"4","key":"859_CR20","doi-asserted-by":"crossref","first-page":"1127","DOI":"10.1007\/s10845-010-0395-2","volume":"23","author":"R Tavakkoli-Moghaddam","year":"2012","unstructured":"Tavakkoli-Moghaddam, R., Ranjbar-Bourani, M., Amin, G. R., & Siadat, A. (2012). A cell formation problem considering machine utilization and alternative process routes by scatter search. Journal of Intelligent Manufacturing, 23(4), 1127\u20131139.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"859_CR21","doi-asserted-by":"crossref","first-page":"582","DOI":"10.1016\/j.cor.2011.05.011","volume":"39","author":"R Xu","year":"2012","unstructured":"Xu, R., Chen, H. P., & Li, X. P. (2012). Makespan minimization on single batch-processing machine via ant colony optimization. Computers & Operations Research, 39(3), 582\u2013593.","journal-title":"Computers & Operations Research"},{"issue":"3","key":"859_CR22","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1016\/j.cie.2007.08.003","volume":"54","author":"B Yagmahan","year":"2008","unstructured":"Yagmahan, B., & Yenisey, M. M. (2008). Ant colony optimization for multi-objective flow shop scheduling problem. Computers & Industrial Engineering, 54(3), 411\u2013420.","journal-title":"Computers & Industrial Engineering"},{"issue":"10","key":"859_CR23","doi-asserted-by":"crossref","first-page":"997","DOI":"10.1016\/0305-0548(96)00003-2","volume":"23","author":"WH Yang","year":"1996","unstructured":"Yang, W. H., & Liao, C. J. (1996). Group scheduling on two cells with intercell movement. Computers & Operations Research, 23(10), 997\u20131006.","journal-title":"Computers & Operations Research"},{"issue":"1\u20134","key":"859_CR24","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/0360-8352(94)90237-2","volume":"27","author":"YA Youssef","year":"1994","unstructured":"Youssef, Y. A., Beauchamp, Y., & Thomas, M. (1994). Comparison of a full factorial experiment to fractional and Taguchi designs in a lathe dry turning operation. Computers & Industrial Engineering, 27(1\u20134), 59\u201362.","journal-title":"Computers & Industrial Engineering"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0859-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-013-0859-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-013-0859-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:00Z","timestamp":1559268720000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-013-0859-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,1,5]]},"references-count":24,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,4]]}},"alternative-id":["859"],"URL":"https:\/\/doi.org\/10.1007\/s10845-013-0859-2","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,1,5]]}}}