{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,12]],"date-time":"2025-11-12T13:47:33Z","timestamp":1762955253701},"reference-count":64,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2014,1,21]],"date-time":"2014-01-21T00:00:00Z","timestamp":1390262400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2016,4]]},"DOI":"10.1007\/s10845-014-0870-2","type":"journal-article","created":{"date-parts":[[2014,1,20]],"date-time":"2014-01-20T09:27:25Z","timestamp":1390210045000},"page":"375-388","source":"Crossref","is-referenced-by-count":6,"title":["Evolutionary resource assignment for workload-based production scheduling"],"prefix":"10.1007","volume":"27","author":[{"given":"Ilkyeong","family":"Moon","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sanghyup","family":"Lee","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Moonsoo","family":"Shin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kwangyeol","family":"Ryu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,1,21]]},"reference":[{"issue":"18","key":"870_CR1","doi-asserted-by":"crossref","first-page":"5129","DOI":"10.1080\/00207540802010823","volume":"47","author":"A Alfieri","year":"2009","unstructured":"Alfieri, A. (2009). Workload simulation and optimization in multi-criteria hybrid flowshop scheduling: A case study. International Journal of Production Research, 47(18), 5129\u20135145.","journal-title":"International Journal of Production Research"},{"key":"870_CR2","volume-title":"Human performance engineering: Designing high quality professional user interfaces for computer products, applications and systems","author":"R Bailey","year":"1996","unstructured":"Bailey, R. (1996). Human performance engineering: Designing high quality professional user interfaces for computer products, applications and systems. Englewood Cliffs, NJ: Prentice-Hall."},{"key":"870_CR3","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1007\/BF02023072","volume":"41","author":"J Barnes","year":"1993","unstructured":"Barnes, J., & Laguna, M. (1993). A tabu search experience in production scheduling. Annals of Operations Research, 41, 141\u2013156.","journal-title":"Annals of Operations Research"},{"key":"870_CR4","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J Blazewicz","year":"1983","unstructured":"Blazewicz, J., & Lenstra, J. (1983). Scheduling subject to resource constraints: Classification and complexity. Discrete Applied Mathematics, 5, 11\u201324.","journal-title":"Discrete Applied Mathematics"},{"key":"870_CR5","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1016\/0377-2217(95)00359-2","volume":"90","author":"F Boctor","year":"1996","unstructured":"Boctor, F. (1996). A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes. European Journal of Operational Research, 90, 349\u2013361.","journal-title":"European Journal of Operational Research"},{"key":"870_CR6","doi-asserted-by":"crossref","first-page":"268","DOI":"10.1016\/S0377-2217(02)00761-0","volume":"149","author":"K Bouleimen","year":"2003","unstructured":"Bouleimen, K., & Lecocq, H. (2003). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research, 149, 268\u2013281.","journal-title":"European Journal of Operational Research"},{"key":"870_CR7","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker, P., Drexl, A., M\u00f6hring, R., Neumann, K., & Pesch, E. (1999). Resource constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112, 3\u201341.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"870_CR8","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1016\/S0305-0483(02)00024-5","volume":"30","author":"K Calhoun","year":"2002","unstructured":"Calhoun, K., Deckro, R., Moore, J., Chrissis, J., & Van Hove, J. (2002). Planning and re-planning in project and production scheduling. Omega, 30(3), 155\u2013170.","journal-title":"Omega"},{"issue":"11","key":"870_CR9","doi-asserted-by":"crossref","first-page":"2071","DOI":"10.1080\/00207540500386012","volume":"44","author":"FTS Chan","year":"2006","unstructured":"Chan, F. T. S., Wong, T. C., & Chan, L. Y. (2006). Flexible job-shop scheduling problem under resource constraints. International Journal of Production Research, 44(11), 2071\u20132089.","journal-title":"International Journal of Production Research"},{"key":"870_CR10","doi-asserted-by":"crossref","first-page":"581","DOI":"10.1007\/s00170-008-1617-z","volume":"42","author":"IA Chaudhry","year":"2009","unstructured":"Chaudhry, I. A., & Drake, P. R. (2009). Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms. International Journal of Advanced Manufacturing Technologies, 42, 581\u2013594.","journal-title":"International Journal of Advanced Manufacturing Technologies"},{"issue":"1","key":"870_CR11","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1016\/S0007-8506(07)62135-0","volume":"50","author":"K Cho","year":"2001","unstructured":"Cho, K., Chung, K., Park, C., Park, J., & Kim, H. (2001). A spatial scheduling system for block painting process in shipbuilding. CIRP Annals-Manufacturing Technology, 50(1), 339\u2013342.","journal-title":"CIRP Annals-Manufacturing Technology"},{"issue":"1","key":"870_CR12","doi-asserted-by":"crossref","first-page":"419","DOI":"10.1016\/S0007-8506(07)62865-0","volume":"47","author":"K Cho","year":"1998","unstructured":"Cho, K., Oh, J., Ryu, K., & Choi, H. (1998). An integrated process planning and scheduling system for block assembly in shipbuilding. CIRP Annals-Manufacturing Technology, 47(1), 419\u2013422.","journal-title":"CIRP Annals-Manufacturing Technology"},{"key":"870_CR13","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/j.ejor.2011.03.019","volume":"213","author":"J Coelho","year":"2011","unstructured":"Coelho, J., & Vanhoucke, M. (2011). Multi-mode project scheduling using RCPSP and SAT solvers. European Journal of Operational Research, 213, 73\u201382.","journal-title":"European Journal of Operational Research"},{"key":"870_CR14","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1016\/S0377-2217(97)00279-8","volume":"106","author":"E Costamagna","year":"1998","unstructured":"Costamagna, E., Fanni, A., & Giacinto, G. (1998). A tabu search algorithm for the optimization of telecommunication networks. European Journal of Operational Research, 106, 357\u2013372.","journal-title":"European Journal of Operational Research"},{"key":"870_CR15","doi-asserted-by":"crossref","unstructured":"Damak, J., Jarboui, B., Siarry, P., & Loukil, T. (2009). Differential evolution for solving multi-mode resource-constrained project scheduling problems. Computers & Operations Research, 36(9), 2653\u20132659.","DOI":"10.1016\/j.cor.2008.11.010"},{"key":"870_CR16","doi-asserted-by":"crossref","first-page":"638","DOI":"10.1016\/j.ejor.2004.08.020","volume":"169","author":"D Debels","year":"2006","unstructured":"Debels, D., Reyck, B. D., Leus, R., & Vanhoucke, M. (2006). A hybrid scatter search\/electromagnetism meta-heuristic for project scheduling. European Journal of Operational Research, 169, 638\u2013653.","journal-title":"European Journal of Operational Research"},{"key":"870_CR17","volume-title":"Project scheduling: A research handbook","author":"E Demeulemeester","year":"2002","unstructured":"Demeulemeester, E., & Herroelen, W. (2002). Project scheduling: A research handbook. Dordrecht: Kluwer Academic Publishers."},{"issue":"1","key":"870_CR18","doi-asserted-by":"crossref","first-page":"7","DOI":"10.1287\/opre.40.1.7","volume":"40","author":"R Dudek","year":"1992","unstructured":"Dudek, R., Panwalkar, S., & Smith, M. (1992). The lessons of flowshop scheduling research. Operations Research, 40(1), 7\u201313.","journal-title":"Operations Research"},{"issue":"3","key":"870_CR19","doi-asserted-by":"crossref","first-page":"186","DOI":"10.1016\/S0278-6125(00)80011-4","volume":"19","author":"H ElMaraghy","year":"2000","unstructured":"ElMaraghy, H., & Patel, V. (2000). Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms. Journal of Manufacturing Systems, 19(3), 186\u2013198.","journal-title":"Journal of Manufacturing Systems"},{"issue":"3","key":"870_CR20","first-page":"59","volume":"28","author":"F Ford","year":"1987","unstructured":"Ford, F., Bradbard, D., Ledbetter, W., & Cox, J. (1987). Use of operations research in production management. Production and Inventory Management, 28(3), 59\u201362.","journal-title":"Production and Inventory Management"},{"key":"870_CR21","doi-asserted-by":"crossref","first-page":"505","DOI":"10.1016\/S0377-2217(98)00327-0","volume":"118","author":"FE Fred","year":"1999","unstructured":"Fred, F. E., & Nashat, M. (1999). A distributed genetic algorithm for deterministic and stochastic labor scheduling problems. European Journal of Operational Research, 118, 505\u2013523.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"870_CR22","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1016\/j.omega.2005.07.004","volume":"35","author":"J Garbowski","year":"2007","unstructured":"Garbowski, J., & Pempera, J. (2007). The permutation flow shop problem with blocking: A tabu search approach. Omega, 35(3), 302\u2013311.","journal-title":"Omega"},{"key":"870_CR23","doi-asserted-by":"crossref","first-page":"539","DOI":"10.1016\/S0377-2217(97)00289-0","volume":"106","author":"M Gendreau","year":"1998","unstructured":"Gendreau, M., Laporte, G., & Semet, F. (1998). A tabu search heuristic for the undirected selective travelling salesman problem. European Journal of Operational Research, 106, 539\u2013545.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"870_CR24","doi-asserted-by":"crossref","first-page":"533","DOI":"10.1016\/0305-0548(86)90048-1","volume":"13","author":"F Glover","year":"1986","unstructured":"Glover, F. (1986). Future paths for integer programming and links to artificial intelligence. Computers and Operations Research, 13(5), 533\u2013549.","journal-title":"Computers and Operations Research"},{"issue":"4","key":"870_CR25","doi-asserted-by":"crossref","first-page":"646","DOI":"10.1287\/opre.29.4.646","volume":"29","author":"S Graves","year":"1981","unstructured":"Graves, S. (1981). A review of production scheduling. Operations Research, 29(4), 646\u2013675.","journal-title":"Operations Research"},{"key":"870_CR26","unstructured":"Gwiazda, T. D. (2006). Genetic Algorithms Reference. Tomasz Gwiazda E-book."},{"key":"870_CR27","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1023\/A:1010902015091","volume":"102","author":"S Hartmann","year":"2001","unstructured":"Hartmann, S. (2001). Project scheduling with multiple modes: A genetic algorithm. Annals of Operations Research, 102, 111\u2013135.","journal-title":"Annals of Operations Research"},{"issue":"2","key":"870_CR28","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1007\/s10845-008-0228-8","volume":"20","author":"S Hasg\u00fcl","year":"2009","unstructured":"Hasg\u00fcl, S., Saricicek, I., Ozkan, M., & Parlaktuna, O. (2009). Project-oriented task scheduling for mobile robot team. Journal of Intelligent Manufacturing, 20(2), 151\u2013158.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"870_CR29","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1007\/s00607-001-1441-x","volume":"68","author":"H Hoogeveen","year":"2002","unstructured":"Hoogeveen, H., & Woeginger, G. J. (2002). Some comments on sequencing with controllable processing times. Computing, 68, 181\u2013192.","journal-title":"Computing"},{"key":"870_CR30","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1016\/j.amc.2007.04.096","volume":"195","author":"B Jarboui","year":"2008","unstructured":"Jarboui, B., Damak, N., Siarry, P., & Rebai, A. (2008). A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation, 195, 299\u2013308.","journal-title":"Applied Mathematics and Computation"},{"issue":"5","key":"870_CR31","first-page":"453","volume":"17","author":"K Kim","year":"2006","unstructured":"Kim, K., & Jung, S. (2006). Load scheduling for multiple quay cranes in port container terminals. Journal of Intelligent Manufacturing, 17(5), 453\u2013463.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"9","key":"870_CR32","doi-asserted-by":"crossref","first-page":"1195","DOI":"10.1057\/palgrave.jors.2602265","volume":"58","author":"K Kim","year":"2007","unstructured":"Kim, K., & Lee, M. (2007). Scheduling trucks in local depots for door-to-door delivery services. Journal of the Operational Research Society, 58(9), 1195\u20131202.","journal-title":"Journal of the Operational Research Society"},{"issue":"3\u20134","key":"870_CR33","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1016\/S0360-8352(97)00223-4","volume":"33","author":"S Kim","year":"1997","unstructured":"Kim, S., & Lee, K. (1997). An optimization-based decision support system for ship scheduling. Computers & Industrial Engineering, 33(3\u20134), 689\u2013692.","journal-title":"Computers & Industrial Engineering"},{"key":"870_CR34","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1016\/j.ejor.2005.01.065","volume":"174","author":"R Kolisch","year":"2006","unstructured":"Kolisch, R., & Hartmann, S. (2006). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research, 174, 23\u201337.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"870_CR35","doi-asserted-by":"crossref","first-page":"380","DOI":"10.1016\/S0377-2217(96)00205-6","volume":"97","author":"J Lee","year":"1997","unstructured":"Lee, J., Lee, K., Park, H., Hong, J., & Lee, J. (1997). Developing scheduling systems for Daewoo shipbuilding: DAS project. European Journal of Operational Research, 97(2), 380\u2013395.","journal-title":"European Journal of Operational Research"},{"issue":"3\u20134","key":"870_CR36","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1016\/0957-4174(96)00010-3","volume":"10","author":"K Lee","year":"1996","unstructured":"Lee, K., Lee, J., & Choi, S. (1996). A spatial scheduling system and its application to shipbuilding: DAS-CURVE. Expert Systems with Applications, 10(3\u20134), 311\u2013324.","journal-title":"Expert Systems with Applications"},{"issue":"5","key":"870_CR37","doi-asserted-by":"crossref","first-page":"471","DOI":"10.1023\/A:1025753309346","volume":"14","author":"Y-H Lee","year":"2003","unstructured":"Lee, Y.-H., Kumara, S. R. T., & Chatterjee, K. (2003). Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism. Journal of Intelligent Manufacturing, 14(5), 471\u2013484.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"870_CR38","doi-asserted-by":"crossref","first-page":"1021","DOI":"10.1016\/j.cie.2008.09.024","volume":"56","author":"C Liang","year":"2009","unstructured":"Liang, C., Huang, Y., & Yang, Y. (2009). A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning. Computers & Industrial Engineering, 56(3), 1021\u20131028.","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"870_CR39","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/j.ergon.2008.05.001","volume":"39","author":"EJ Lodree","year":"2009","unstructured":"Lodree, E. J., Geiger, C. D., & Jiang, X. (2009). Taxonomy for integrating scheduling theory and human factors: Review and research opportunities. International Journal of Industrial Ergonomics, 39(1), 39\u201351.","journal-title":"International Journal of Industrial Ergonomics"},{"issue":"2","key":"870_CR40","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1080\/00207549408956933","volume":"32","author":"R Logendran","year":"1994","unstructured":"Logendran, R., Ramakrjshna, P., & Sriskandarajah, C. (1994). Tabu search-based heuristics for cellular manufacturing systems in the presence of alternative process plans. International Journal of Production Research, 32(2), 273\u2013297.","journal-title":"International Journal of Production Research"},{"key":"870_CR41","first-page":"69","volume":"30","author":"A Lova","year":"2006","unstructured":"Lova, A., Tormos, P., & Barber, F. (2006). Multi-mode resource constrained project scheduling: Scheduling schemes, priority rules and mode selection rules. Inteligencia Artificial, 30, 69\u201386.","journal-title":"Inteligencia Artificial"},{"key":"870_CR42","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1016\/j.ijpe.2008.11.002","volume":"117","author":"A Lova","year":"2009","unstructured":"Lova, A., Tormos, P., Cervantes, M., & Barber, F. (2009). An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes. International Journal of Production Economics, 117, 302\u2013316.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"870_CR43","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1080\/00207549308956713","volume":"31","author":"B MacCarthy","year":"1993","unstructured":"MacCarthy, B., & Liu, J. (1993). Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling. International Journal of Production Research, 31(1), 59\u201379.","journal-title":"International Journal of Production Research"},{"key":"870_CR44","volume-title":"Human performance: Cognition, stress and individual difference","author":"G Matthews","year":"2000","unstructured":"Matthews, G., Davies, D., Westerman, S., & Stammers, R. (2000). Human performance: Cognition, stress and individual difference. Philadelphia: Psychology Press."},{"issue":"2","key":"870_CR45","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1111\/j.1937-5956.2002.tb00494.x","volume":"11","author":"K McKay","year":"2002","unstructured":"McKay, K., Pinedo, M., & Webster, S. (2002). Practice-focused research issues for scheduling systems. Production and Operations Management, 11(2), 249\u2013258.","journal-title":"Production and Operations Management"},{"issue":"18","key":"870_CR46","doi-asserted-by":"crossref","first-page":"84","DOI":"10.1287\/inte.18.4.84","volume":"4","author":"K McKay","year":"1988","unstructured":"McKay, K., Safayeni, F., & Buzacott, J. (1988). Job-shop scheduling theory: What is relevant? Interfaces, 4(18), 84\u201390.","journal-title":"Interfaces"},{"key":"870_CR47","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1007\/978-1-4615-1507-4_25","volume-title":"Essays and surveys in metaheuristics","author":"K Nonobe","year":"2002","unstructured":"Nonobe, K., & Ibaraki, T. (2002). Formulation and tabu search algorithm for the resource constrained project scheduling problem. In C. Ribeiro & P. Hansen (Eds.), Essays and surveys in metaheuristics (pp. 557\u2013588). Dodrecht: Kluwer Academic Publishers."},{"key":"870_CR48","doi-asserted-by":"crossref","first-page":"237","DOI":"10.1016\/0166-218X(94)00071-5","volume":"63","author":"E Nowicki","year":"1995","unstructured":"Nowicki, E., & Zdrzalka, S. (1995). A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times. Discrete Applied Mathematics, 63, 237\u2013256.","journal-title":"Discrete Applied Mathematics"},{"issue":"1","key":"870_CR49","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1007\/s10845-008-0163-8","volume":"21","author":"A Oddi","year":"2010","unstructured":"Oddi, A., Cesta, A., Policella, N., & Smith, S. F. (2010). Iterative flattening search for resource constrained scheduling. Journal of Intelligent Manufacturing, 21(1), 17\u201330.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"870_CR50","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1111\/j.1475-3995.1995.tb00003.x","volume":"2","author":"J Olhager","year":"1995","unstructured":"Olhager, J., & Rapp, B. (1995). Operations research techniques in manufacturing planning and control systems. International Transactions in Operational Research, 2(1), 29\u201343.","journal-title":"International Transactions in Operational Research"},{"issue":"3","key":"870_CR51","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1007\/BF02941258","volume":"6","author":"J Pantouvakis","year":"2006","unstructured":"Pantouvakis, J., & Manoliadis, O. G. (2006). A practical approach to resource-constrained project scheduling. Operational Research, 6(3), 299\u2013309.","journal-title":"Operational Research"},{"issue":"3","key":"870_CR52","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1080\/00207540310001613656","volume":"42","author":"JA Persson","year":"2004","unstructured":"Persson, J. A., G\u00f6the-Lundgren, M., Lundgren, J. T., & Gendron, B. (2004). A tabu search heuristic for scheduling the production processes at an oil refinery. International Journal of Production Research, 42(3), 445\u2013471.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"870_CR53","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1109\/17.618173","volume":"44","author":"A Reisman","year":"1997","unstructured":"Reisman, A., Kumar, A., & Motwani, J. (1997). Flowshop scheduling\/sequencing research: A statistical review of the literature 1952\u20131994. IEEE Transactions on Engineering Management, 44(3), 316\u2013329.","journal-title":"IEEE Transactions on Engineering Management"},{"key":"870_CR54","doi-asserted-by":"crossref","first-page":"570","DOI":"10.1016\/S0377-2217(97)00292-0","volume":"106","author":"R Sexton","year":"1998","unstructured":"Sexton, R., Alidaee, B., Dorsey, R., & Johnson, J. (1998). Global optimization for artificial neural networks: A tabu search application. European Journal of Operational Research, 106, 570\u2013584.","journal-title":"European Journal of Operational Research"},{"key":"870_CR55","doi-asserted-by":"crossref","first-page":"1643","DOI":"10.1016\/j.dam.2007.02.003","volume":"155","author":"D Shabtay","year":"2007","unstructured":"Shabtay, D., & Steiner, G. (2007). A survey of scheduling with controllable processing times. Discrete Applied Mathematics, 155, 1643\u20131666.","journal-title":"Discrete Applied Mathematics"},{"issue":"3","key":"870_CR56","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1023\/A:1008952024958","volume":"10","author":"L-Y Shue","year":"1999","unstructured":"Shue, L.-Y., & Zamani, R. (1999). Intelligent search method for project scheduling problems. Journal of Intelligent Manufacturing, 10(3), 279\u2013288.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"870_CR57","doi-asserted-by":"crossref","unstructured":"Tavakkoli-Moghaddam, R., Markui, A., Salahi, S., Bazzazi, M., & Taheri, F. (2009). An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports. Computers & Industrial Engineering, 56(1), 241\u2013248.","DOI":"10.1016\/j.cie.2008.05.011"},{"issue":"2","key":"870_CR58","doi-asserted-by":"crossref","first-page":"312","DOI":"10.1007\/s10015-012-0065-x","volume":"17","author":"A Thammano","year":"2012","unstructured":"Thammano, A., & Phu-ang, A. (2012). A hybrid evolutionary algorithm for the resource-constrained project scheduling problem. Artificial Life and Robotics, 17(2), 312\u2013316.","journal-title":"Artificial Life and Robotics"},{"key":"870_CR59","doi-asserted-by":"crossref","unstructured":"Tseng, L. Y., & Chen, S. C. (2006). A hybrid metaheuristic for the resource constrained project scheduling problem. European Journal of Operational Research, 175, 707\u2013721.","DOI":"10.1016\/j.ejor.2005.06.014"},{"issue":"3","key":"870_CR60","doi-asserted-by":"crossref","first-page":"258","DOI":"10.1080\/05695558008974515","volume":"12","author":"RG Vickson","year":"1980","unstructured":"Vickson, R. G. (1980). Two single machine sequencing problem involving controllable job processing times. AIIE Transactions, 12(3), 258\u2013262.","journal-title":"AIIE Transactions"},{"key":"870_CR61","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1016\/j.ejor.2011.03.004","volume":"215","author":"J Xu","year":"2011","unstructured":"Xu, J., Xu, X., & Xie, S. Q. (2011). Recent developments in dual resource constrained (DRC) system research. European Journal of Operation Research, 215, 309\u2013318.","journal-title":"European Journal of Operation Research"},{"key":"870_CR62","doi-asserted-by":"crossref","first-page":"1859","DOI":"10.1016\/j.ejor.2005.10.048","volume":"176","author":"T Yang","year":"2007","unstructured":"Yang, T., Kuo, Y., & Cho, C. (2007). A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem. European Journal of Operational Research, 176, 1859\u20131873.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"870_CR63","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1111\/j.1467-8667.2005.00420.x","volume":"21","author":"H Zhang","year":"2006","unstructured":"Zhang, H., Tam, C. M., & Li, H. (2006). Multi-mode project scheduling based on particle swarm optimization. Computer-Aided Civil and Infrastructure Engineering, 21(2), 93\u2013103.","journal-title":"Computer-Aided Civil and Infrastructure Engineering"},{"issue":"3","key":"870_CR64","first-page":"377","volume":"18","author":"G Zhu","year":"2006","unstructured":"Zhu, G., Bard, J., & Tu, G. (2006). A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem. Journal on Computing, 18(3), 377\u2013390.","journal-title":"Journal on Computing"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0870-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-0870-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0870-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:00Z","timestamp":1559268720000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-0870-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,1,21]]},"references-count":64,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,4]]}},"alternative-id":["870"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-0870-2","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,1,21]]}}}