{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,18]],"date-time":"2026-03-18T01:22:13Z","timestamp":1773796933576,"version":"3.50.1"},"reference-count":23,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2014,1,28]],"date-time":"2014-01-28T00:00:00Z","timestamp":1390867200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2016,4]]},"DOI":"10.1007\/s10845-014-0872-0","type":"journal-article","created":{"date-parts":[[2014,1,27]],"date-time":"2014-01-27T06:18:52Z","timestamp":1390803532000},"page":"409-416","source":"Crossref","is-referenced-by-count":39,"title":["A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem"],"prefix":"10.1007","volume":"27","author":[{"given":"Miguel A. Fern\u00e1ndez","family":"P\u00e9rez","sequence":"first","affiliation":[]},{"given":"Fernanda M. P.","family":"Raupp","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,1,28]]},"reference":[{"key":"872_CR1","doi-asserted-by":"crossref","first-page":"777","DOI":"10.1023\/B:JIMS.0000042663.16199.84","volume":"15","author":"A Baykaso\u011flu","year":"2004","unstructured":"Baykaso\u011flu, A., \u00d6zbakir, L., & S\u00f6nmez, A. I. (2004). Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling. Journal of Intelligent Manufacturing, 15, 777\u2013785.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"872_CR2","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/BF02023073","volume":"41","author":"P Brandimarte","year":"1993","unstructured":"Brandimarte, P. (1993). Routing and scheduling in a flexible job shop by taboo search. Annals of Operations Research, 41, 157\u2013183.","journal-title":"Annals of Operations Research"},{"key":"872_CR3","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1007\/BF02238804","volume":"45","author":"P Bruker","year":"1990","unstructured":"Bruker, P., & Schlie, R. (1990). Job-shop scheduling with multi-purpose machine. Computing, 45, 369\u2013375.","journal-title":"Computing"},{"key":"872_CR4","doi-asserted-by":"crossref","unstructured":"\u00c7ali\u015f, B., & Bulkan, S. (2013). A research survey: Review of AI solution strategies of job shop scheduling problem. Journal of Intelligent Manufacturing, doi: 10.1007\/s10845-013-0837-8","DOI":"10.1007\/s10845-013-0837-8"},{"key":"872_CR5","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1023\/A:1018930406487","volume":"70","author":"S Dauz\u00e8re-P\u00e9r\u00e8s","year":"1997","unstructured":"Dauz\u00e8re-P\u00e9r\u00e8s, S., & Paulli, J. (1997). An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search. Annals of Operations Research, 70, 281\u2013306.","journal-title":"Annals of Operations Research"},{"key":"872_CR6","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/s10845-007-0026-8","volume":"18","author":"P Fattahi","year":"2007","unstructured":"Fattahi, P., Mehrabad, M. S., & Jolai, F. (2007). Mathematical modeling and heuristic approaches to flexible job shop scheduling problems. Journal of Intelligent Manufacturing, 18, 331\u2013342.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"872_CR7","doi-asserted-by":"crossref","first-page":"602","DOI":"10.1137\/08071692X","volume":"20","author":"J Fliege","year":"2009","unstructured":"Fliege, J., Drummond, L. M. G., & Svaiter, B. (2009). Newton\u2019s method for multiobjective optimization. SIAM Journal on Optimization, 20(2), 602\u2013626.","journal-title":"SIAM Journal on Optimization"},{"key":"872_CR8","doi-asserted-by":"crossref","first-page":"2892","DOI":"10.1016\/j.cor.2007.01.001","volume":"35","author":"J Gao","year":"2008","unstructured":"Gao, J., Sun, L., & Gen, M. (2008). A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems. Computers and Operations Research, 35, 2892\u20132907.","journal-title":"Computers and Operations Research"},{"key":"872_CR9","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1007\/BF01719451","volume":"15","author":"E Hurink","year":"1994","unstructured":"Hurink, E., Jurisch, B., & Thole, M. (1994). Tabu search for the job shop scheduling problem with multi-purpose machines. Operations Research Spektrum, 15, 205\u2013215.","journal-title":"Operations Research Spektrum"},{"key":"872_CR10","doi-asserted-by":"crossref","unstructured":"Hsu, T., Dupas, R., Jolly, D. & Goncalves, G. (2002). Evaluation of mutation heuristics for solving a multiobjective flexible job shop by an evolutionary algorithm. Systems, Man and Cybernetics IEEE International Conference on, vol. 5, p. 6, 6\u20139 Oct.","DOI":"10.1109\/ICSMC.2002.1176444"},{"key":"872_CR11","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1109\/TSMCC.2002.1009117","volume":"32","author":"I Kacem","year":"2002","unstructured":"Kacem, I., Hammadi, S., & Borne, P. (2002a). Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling. IEEE Transactions on Systems, Man, and Cybernetics, 32, 1\u201313.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics"},{"key":"872_CR12","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1016\/S0378-4754(02)00019-8","volume":"60","author":"I Kacem","year":"2002","unstructured":"Kacem, I., Hammadi, S., & Borne, P. (2002b). Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic. Mathematics and Computers in Simulation, 60, 245\u2013276.","journal-title":"Mathematics and Computers in Simulation"},{"key":"872_CR13","doi-asserted-by":"crossref","first-page":"992","DOI":"10.1016\/j.ress.2005.11.018","volume":"91","author":"A Konak","year":"2006","unstructured":"Konak, A., Coit, D., & Smith, A. (2006). Multi-objective optimization using genetic algorithms: A tutorial. Reliability Engineering & System Safety, 91, 992\u20131007.","journal-title":"Reliability Engineering & System Safety"},{"key":"872_CR14","doi-asserted-by":"crossref","unstructured":"Liu, D., Yan, P., & Yu, J. (2009). Development of a multiobjective GA for advanced planning and scheduling problem. The International Journal of Advanced Manufacturing Technology, 42, 974\u2013992.","DOI":"10.1007\/s00170-008-1653-8"},{"key":"872_CR15","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1002\/(SICI)1099-1425(200001\/02)3:1<3::AID-JOS32>3.0.CO;2-Y","volume":"3","author":"M Mastrolilli","year":"2000","unstructured":"Mastrolilli, M., & Gambardella, L. M. (2000). Effective neighborhood functions for the flexible job shop problem. Journal of Scheduling, 3, 3\u201320.","journal-title":"Journal of Scheduling"},{"key":"872_CR16","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1016\/j.ijpe.2010.08.004","volume":"129","author":"M Moslehi","year":"2011","unstructured":"Moslehi, M., & Mahnam, M. (2011). A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search. International Journal of Production Economics, 129, 14\u201322.","journal-title":"International Journal of Production Economics"},{"key":"872_CR17","doi-asserted-by":"crossref","unstructured":"Nie, L., Gao, L., Li, P., & Li, X. (2013). A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates. Journal of Intelligent Manufacturing, 24, 763\u2013774.","DOI":"10.1007\/s10845-012-0626-9"},{"key":"872_CR18","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1023\/B:JIMS.0000010078.30713.e9","volume":"15","author":"CR Scrich","year":"2004","unstructured":"Scrich, C. R., Armentano, V. A., & Laguna, M. (2004). Tardiness minimization in flexible job shop: A tabu search approach. Journal of Intelligent Manufacturing, 15, 103\u2013115.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"872_CR19","doi-asserted-by":"crossref","unstructured":"Xia, W., & Wu, Z. (2005). An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problem. Computers and Industrial Engineering, 48, 409\u2013425.","DOI":"10.1016\/j.cie.2005.01.018"},{"key":"872_CR20","first-page":"223","volume":"11","author":"H Zhang","year":"2005","unstructured":"Zhang, H., & Gen, M. (2005). Multistage-based genetic algorithm for flexible job-shop scheduling problem. Journal of Complexity International, 11, 223\u2013232.","journal-title":"Journal of Complexity International"},{"key":"872_CR21","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1007\/s10845-005-0012-y","volume":"17","author":"H Zhang","year":"2006","unstructured":"Zhang, H., Gen, M., & Seo, Y. (2006). An effective coding approach for multiobjective integrated resource selection and operation sequences problem. Journal of Intelligent Manufacturing, 17, 385\u2013397.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"872_CR22","doi-asserted-by":"crossref","first-page":"1309","DOI":"10.1016\/j.cie.2008.07.021","volume":"56","author":"G Zhang","year":"2009","unstructured":"Zhang, G., Shao, X., Li, P., & Gao, L. (2009). An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem. Computers and Industrial Engineering, 56, 1309\u20131318.","journal-title":"Computers and Industrial Engineering"},{"key":"872_CR23","doi-asserted-by":"crossref","first-page":"1543","DOI":"10.1109\/CESA.2006.4281882","volume":"2","author":"N Zribi","year":"2006","unstructured":"Zribi, N., El Kamel, A., & Borne, P. (2006). Total tardiness in a flexible job-shop. Multiconference on Computational Engineering in Systems Applications, 2, 1543\u20131549.","journal-title":"Multiconference on Computational Engineering in Systems Applications"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0872-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-0872-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0872-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:12:01Z","timestamp":1559254321000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-0872-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,1,28]]},"references-count":23,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,4]]}},"alternative-id":["872"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-0872-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,1,28]]}}}