{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,4]],"date-time":"2026-06-04T19:51:05Z","timestamp":1780602665754,"version":"3.54.1"},"reference-count":30,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2014,2,21]],"date-time":"2014-02-21T00:00:00Z","timestamp":1392940800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,10]]},"DOI":"10.1007\/s10845-014-0874-y","type":"journal-article","created":{"date-parts":[[2014,2,20]],"date-time":"2014-02-20T03:14:26Z","timestamp":1392866066000},"page":"873-890","source":"Crossref","is-referenced-by-count":52,"title":["A heuristic-search genetic algorithm for multi-stage hybrid flow shop scheduling with single processing machines and batch processing machines"],"prefix":"10.1007","volume":"26","author":[{"given":"Dongni","family":"Li","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xianwen","family":"Meng","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Qiqiang","family":"Liang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Junqing","family":"Zhao","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2014,2,21]]},"reference":[{"issue":"3","key":"874_CR1","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2008). A survey of scheduling problems with setup times or costs. European Journal Of Operational Research, 187(3), 985\u20131032.","journal-title":"European Journal Of Operational Research"},{"issue":"10","key":"874_CR2","doi-asserted-by":"crossref","first-page":"2857","DOI":"10.1080\/002075497194480","volume":"35","author":"S Barman","year":"1997","unstructured":"Barman, S. (1997). Simple priority rule combinations: An approach to improve both flow time and tardiness. International Journal of Production Research, 35(10), 2857\u20132870.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"874_CR3","doi-asserted-by":"crossref","first-page":"723","DOI":"10.1016\/j.apm.2011.07.011","volume":"36","author":"J Behnamian","year":"2012","unstructured":"Behnamian, J., Ghomi, S. M. T. F., Jolai, F., & Amirtaheri, O. (2012). Realistic two-stage flowshop batch scheduling problems with transportation capacity and times. Applied Mathematical Modelling, 36(2), 723\u2013735.","journal-title":"Applied Mathematical Modelling"},{"issue":"5\u20138","key":"874_CR4","doi-asserted-by":"crossref","first-page":"989","DOI":"10.1007\/s00170-012-4037-z","volume":"64","author":"P Damodaran","year":"2013","unstructured":"Damodaran, P., Rao, A. G., & Mestry, S. (2013). Particle swarm optimization for scheduling batch processing machines in a permutation flowshop. International Journal of Advanced Manufacturing Technology, 64(5\u20138), 989\u20131000.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"874_CR5","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1016\/0305-0548(93)E0016-M","volume":"22","author":"U Dorndorf","year":"1995","unstructured":"Dorndorf, U., & Pesch, E. (1995). Evolution based learning in a job-shop scheduling environment. Computers & Operations Research, 22(1), 25\u201340.","journal-title":"Computers & Operations Research"},{"key":"874_CR6","doi-asserted-by":"crossref","first-page":"524","DOI":"10.1007\/11504894_71","volume":"3533","author":"C Fayad","year":"2005","unstructured":"Fayad, C., & Petrovic, S. (2005). A fuzzy genetic algorithm for real-world job shop scheduling. Innovations in Applied Artificial Intelligence, 3533, 524\u2013533.","journal-title":"Innovations in Applied Artificial Intelligence"},{"key":"874_CR7","doi-asserted-by":"crossref","unstructured":"Feng, H. D., Lu, S. P., & Li, X. Q. (2009). Genetic algorithm for hybrid flow-shop scheduling with parrel batch processors. In 2009 Wase international conference on information engineering, Icie 2009, Vol Ii, 9\u201313.","DOI":"10.1109\/ICIE.2009.87"},{"key":"874_CR8","doi-asserted-by":"crossref","unstructured":"Hu, H., & Li, Z. (2009). Modeling and scheduling for manufacturing grid workflows using timed Petri nets. The International Journal of Advanced Manufacturing Technology, 42(5\u20136), 553\u2013568.","DOI":"10.1007\/s00170-008-1608-0"},{"issue":"1","key":"874_CR9","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1007\/s10732-007-9061-z","volume":"15","author":"YD Kim","year":"2009","unstructured":"Kim, Y. D., Joo, B. J., & Shin, J. H. (2009). Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint. Journal of Heuristics, 15(1), 19\u201342.","journal-title":"Journal of Heuristics"},{"issue":"3","key":"874_CR10","first-page":"1","volume":"30","author":"RL Laforge","year":"1989","unstructured":"Laforge, R. L., & Barman, S. (1989). Performance of simple priority rule combinations in a flow dominant shop. Production & Inventory Management Journal, 30(3), 1\u20134.","journal-title":"Production & Inventory Management Journal"},{"issue":"4\u20135","key":"874_CR11","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1016\/j.compchemeng.2007.02.002","volume":"32","author":"Y Liu","year":"2008","unstructured":"Liu, Y., & Karimi, I. A. (2008). Scheduling multistage batch plants with parallel units and no interstage storage. Computers & Chemical Engineering, 32(4\u20135), 671\u2013693.","journal-title":"Computers & Chemical Engineering"},{"issue":"6","key":"874_CR12","doi-asserted-by":"crossref","first-page":"1575","DOI":"10.1080\/00207541003610262","volume":"49","author":"H Luo","year":"2011","unstructured":"Luo, H., Huang, G. Q., Zhang, Y. F., & Dai, Q. Y. (2011). Hybrid flowshop scheduling with batch-discrete processors and machine maintenance in time windows. International Journal of Production Research, 49(6), 1575\u20131603.","journal-title":"International Journal of Production Research"},{"key":"874_CR13","doi-asserted-by":"crossref","unstructured":"Mathirajan, M., Bhargav, V., & Ramachandran, V. (2010). Minimizing total weighted tardiness on a batch-processing machine with non-agreeable release times and due dates. International Journal of Advanced Manufacturing Technology, 48(9\u201312), 1133\u20131148.","DOI":"10.1007\/s00170-009-2342-y"},{"issue":"6","key":"874_CR14","doi-asserted-by":"crossref","first-page":"965","DOI":"10.1007\/s10845-009-0373-8","volume":"22","author":"HS Mirsanei","year":"2011","unstructured":"Mirsanei, H. S., Zandieh, M., Moayed, M. J., & Khabbazi, M. R. (2011). A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times. Journal of Intelligent Manufacturing, 22(6), 965\u2013978.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"874_CR15","volume-title":"Design and analysis of experiments","author":"DC Montgomery","year":"2000","unstructured":"Montgomery, D. C. (2000). Design and analysis of experiments (5th ed.). New York: Wiley.","edition":"5"},{"issue":"4","key":"874_CR16","doi-asserted-by":"crossref","first-page":"486","DOI":"10.1109\/70.611301","volume":"13","author":"SC Park","year":"1997","unstructured":"Park, S. C., Raman, N., & Shaw, M. J. (1997). Adaptive scheduling in dynamic flexible manufacturing systems: A dynamic rule selection approach. Ieee Transactions on Robotics and Automation, 13(4), 486\u2013502.","journal-title":"Ieee Transactions on Robotics and Automation"},{"issue":"8","key":"874_CR17","doi-asserted-by":"crossref","first-page":"764","DOI":"10.1080\/09537280110040424","volume":"12","author":"SG Ponnambalam","year":"2001","unstructured":"Ponnambalam, S. G., Ramkumar, V., & Jawahar, N. (2001). A multiobjective genetic algorithm for job shop scheduling. Production Planning & Control, 12(8), 764\u2013774.","journal-title":"Production Planning & Control"},{"issue":"2","key":"874_CR18","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"CN Potts","year":"2000","unstructured":"Potts, C. N., & Kovalyov, M. Y. (2000). Scheduling with batching: A review. European Journal of Operational Research, 120(2), 228\u2013249.","journal-title":"European Journal of Operational Research"},{"key":"874_CR19","doi-asserted-by":"crossref","unstructured":"Rossi, A., & Dini, G. (2007). Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method. Robotics and Computer-Integrated Manufacturing, 23(5), 503\u2013516.","DOI":"10.1016\/j.rcim.2006.06.004"},{"key":"874_CR20","doi-asserted-by":"crossref","unstructured":"Ruiz, R., & Maroto, C. (2006). A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility. European Journal of Operational Research, 169(3), 781\u2013800.","DOI":"10.1016\/j.ejor.2004.06.038"},{"issue":"4","key":"874_CR21","doi-asserted-by":"crossref","first-page":"1151","DOI":"10.1016\/j.cor.2006.07.014","volume":"35","author":"R Ruiz","year":"2008","unstructured":"Ruiz, R., Serifoglu, F. S., & Urlings, T. (2008). Modeling realistic hybrid flexible flowshop scheduling problems. Computers & Operations Research, 35(4), 1151\u20131175.","journal-title":"Computers & Operations Research"},{"issue":"1","key":"874_CR22","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.09.024","volume":"205","author":"R Ruiz","year":"2010","unstructured":"Ruiz, R., & Vazquez-Rodriguez, J. A. (2010). The hybrid flow shop scheduling problem. European Journal Of Operational Research, 205(1), 1\u201318.","journal-title":"European Journal Of Operational Research"},{"issue":"1","key":"874_CR23","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/0305-0483(95)00049-6","volume":"24","author":"H Sarper","year":"1996","unstructured":"Sarper, H., & Henry, M. C. (1996). Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop. Omega, 24(1), 73\u201381.","journal-title":"Omega"},{"issue":"1\u20134","key":"874_CR24","first-page":"259","volume":"47","author":"LH Su","year":"2010","unstructured":"Su, L. H., & Chen, J. C. (2010). Sequencing two-stage flowshop with nonidentical job sizes. International Journal of Advanced Manufacturing Technology, 47(1\u20134), 259\u2013268.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"874_CR25","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/S0377-2217(99)00031-4","volume":"121","author":"CS Sung","year":"2000","unstructured":"Sung, C. S., Kim, Y. H., & Yoon, S. H. (2000). A problem reduction and decomposition approach for scheduling for a flowshop of batch processing machines. European Journal of Operational Research, 121(1), 179\u2013192.","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"874_CR26","doi-asserted-by":"crossref","first-page":"771","DOI":"10.1007\/s10732-009-9120-8","volume":"16","author":"JA Vazquez-Rodriguez","year":"2010","unstructured":"Vazquez-Rodriguez, J. A., & Petrovic, S. (2010). A new dispatching rule based genetic algorithm for the multi-objective job shop problem. Journal of Heuristics, 16(6), 771\u2013793.","journal-title":"Journal of Heuristics"},{"issue":"6","key":"874_CR27","doi-asserted-by":"crossref","first-page":"2271","DOI":"10.1007\/s10845-011-0571-z","volume":"23","author":"IL Wang","year":"2012","unstructured":"Wang, I. L., Yang, T. H., & Chang, Y. B. (2012). Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints. Journal of Intelligent Manufacturing, 23(6), 2271\u20132280.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"874_CR28","doi-asserted-by":"crossref","first-page":"1859","DOI":"10.1016\/j.ejor.2005.10.048","volume":"176","author":"T Yang","year":"2007","unstructured":"Yang, T., Kuo, Y., & Cho, C. (2007). A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem. European Journal of Operational Research, 176(3), 1859\u20131873.","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"874_CR29","doi-asserted-by":"crossref","first-page":"1701","DOI":"10.1016\/j.cor.2011.10.006","volume":"39","author":"FS Yao","year":"2012","unstructured":"Yao, F. S., Zhao, M., & Zhang, H. (2012). Two-stage hybrid flow shop scheduling with dynamic job arrivals. Computers & Operations Research, 39(7), 1701\u20131712.","journal-title":"Computers & Operations Research"},{"issue":"6","key":"874_CR30","doi-asserted-by":"crossref","first-page":"731","DOI":"10.1007\/s10845-009-0250-5","volume":"21","author":"M Zandieh","year":"2010","unstructured":"Zandieh, M., Mozaffari, E., & Gholami, M. (2010). A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems. Journal of Intelligent Manufacturing, 21(6), 731\u2013743.","journal-title":"Journal of Intelligent Manufacturing"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0874-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-0874-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0874-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:01Z","timestamp":1559268721000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-0874-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,2,21]]},"references-count":30,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2015,10]]}},"alternative-id":["874"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-0874-y","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,2,21]]}}}